CN106505731A - A kind of intelligent substation is with scheduling to test case intelligent generating system and a method - Google Patents

A kind of intelligent substation is with scheduling to test case intelligent generating system and a method Download PDF

Info

Publication number
CN106505731A
CN106505731A CN201610946108.9A CN201610946108A CN106505731A CN 106505731 A CN106505731 A CN 106505731A CN 201610946108 A CN201610946108 A CN 201610946108A CN 106505731 A CN106505731 A CN 106505731A
Authority
CN
China
Prior art keywords
data
substation
intelligent
test case
standard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610946108.9A
Other languages
Chinese (zh)
Other versions
CN106505731B (en
Inventor
李俊庆
陈中
钱晶
陈伟
周宏军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PONOVO POWER Co.,Ltd.
Original Assignee
Nanjing Neng Yun Power Tech Corp Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Neng Yun Power Tech Corp Inc filed Critical Nanjing Neng Yun Power Tech Corp Inc
Priority to CN201610946108.9A priority Critical patent/CN106505731B/en
Publication of CN106505731A publication Critical patent/CN106505731A/en
Application granted granted Critical
Publication of CN106505731B publication Critical patent/CN106505731B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00007Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using the power network as support for the transmission
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/18Systems supporting electrical power generation, transmission or distribution using switches, relays or circuit breakers, e.g. intelligent electronic devices [IED]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/121Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using the power network as support for the transmission

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Selective Calling Equipment (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of intelligent substation and scheduling are to a test case intelligent generating system, including SCD file parsing module, point list file parsing module, substation data management module, point table data management module and test case intelligence generation module.The invention also discloses a kind of intelligent substation and scheduling are to a test case intelligent generation method.Instant invention overcomes tradition is carried out, to putting brought problem, can effectively reducing labor workload, improving operating efficiency using manually method to point.

Description

A kind of intelligent substation is with scheduling to test case intelligent generating system and a method
Technical field
The present invention relates to relay protection of power system field of automatic testing, more particularly to a kind of intelligent substation and scheduling To test case intelligent generating system and a method.
Background technology
Can control centre carry out the important prerequisite that correct monitoring is substation safety, stable operation to transformer station.Will Ensure that control centre correctly can be monitored to end of standing, should actually ensure the correct of the information that control centre receives Property.Transformer station is that scheduling station is received information to proofread with substation equipment actual information to point.It is in order to right to point The actual information of each equipment of transformer station is compared with the information that control centre receives, so as to find out in control centre's point table The error message of storage, while also can carry out functional test to telemechanical apparatus, graph gateway machine, the alarm machine of direct transferring.
Traditional is complicated to point methods, loaded down with trivial details, remote with transformer substation end two ends at scheduling station end to a need of work To point.Its detailed process is:First, scheduling station staff obtains connection by Electricity Federation mode with transformer substation end staff System, transformer substation end staff artificially carries out action to primary equipment, used as input stimulus;Then, control centre's receives input Corresponding output information is encouraged, the action message of the primary equipment that transformer substation end is input into is carried out with the information that control centre receives Artificial check and correction, is finally completed to a job.Tradition is carried out to point using method manually to point, gives work of transformer substation personnel With control centre staff bring a series of be awkward, in addition traditional manual has also run counter to intelligent substation to point methods The development trend of intelligent, unattendedization.
Content of the invention
Goal of the invention:It is an object of the invention to provide a kind of intelligent power transformation that can solve the problem that defect present in prior art Stand with scheduling to test case intelligent generating system and a method.
Technical scheme:Intelligent substation of the present invention with scheduling to a test case intelligent generating system, including SCD Document analysis module, point list file parsing module, substation data management module, point table data management module and test case intelligence Energy generation module, wherein:
SCD file parsing module:For reading and parsing the SCD file at the whole station of transformer station, all numbers of each IED are obtained It is believed that breath;
Point list file parsing module:For reading and parsing telecontrol communication machine point list file, remote signalling, telemetry and telecommand data are obtained Information;
Substation data management module:For managing data message and the intelligence of the IED of SCD file parsing module extraction The intermediate data of analysis, forms standard substation information data;The intellectual analysis intermediate data, for each data message pair As defining semantic keywords information and carry out intelligent according to semantic keywords information that data message object oriented includes Match somebody with somebody successful data link table;
Point table data management module:For managing and adjusting the analysis result and intellectual analysis of point list file parsing module Intermediate data, formed standard telemechanical point table data;
Test case intelligence generation module:Data and point table data pipe for intellectual analysis substation data management module Both data are carried out intelligent Matching according to analysis result by the data of reason module, the corresponding relation that sets up between data, according to Corresponding relation is generated to a test case table.
Further, all data messages of each IED include the link information of the IED and other IED, the IED Device data model and the configuration information of the IED.
Further, the link information of the described IED and other IED include the type of the IED, IP address, SvIn, SvOut, GooseIn and GooseOut configuration informations.
Further, the device data model of the IED includes remote signalling, remote measurement, fault-signal and the alarm letter of the IED Number.
Further, the data message of the IED is relative with the remote signalling in telecontrol communication machine point list file, telemetry and telecommand information The data that answers, specifically include:
(1) the GooseIn configuration informations of the transforming plant protecting device corresponding with telecontrol communication machine remote signalling information and measure and control device, The GooseOut configuration informations of remote signalling data collection and intelligent terminal in device data model;
(2) distant in corresponding with telecontrol communication machine telemetry intelligence (TELINT) transforming plant protecting device and measure and control device device data model Survey data set;
(3) corresponding with telecontrol communication machine remote information transforming plant protecting device and the remote controlled point table of measure and control device.
Further, standard substation information data are formed in the following manner:Substation data management object is divided into Remote signalling, remote measurement, remote control and remote regulating this four data set nodes, the corresponding data extracted in SCD file is stored in respectively In four data set nodes, standard substation information data are formed.
Further, standard telemechanical point table data are formed in the following manner:Telemechanical point table data management object is divided into A data for list file parsing module parsing is stored in three numbers by remote signalling, telemetry and telecommand these three data set nodes respectively According to concentration, standard telemechanical point table data are formed.
Further, generate in the following manner to a test case table:Intellectual analysis standard substation information data and mark The semantic key words of quasi- telemechanical point table data, carry out intelligent Matching, Criterion substation information data according to semantic key words With the corresponding relation of standard telemechanical point table data, according to setting up the data genaration of corresponding relation specifically to a test case table, Automatic to a test according to carrying out to data to a test case table.
Further, standard substation information data and standard telemechanical point table data are carried out intelligent in the following manner Match somebody with somebody:First match point standard substation information data and the logical node of standard telemechanical point table data, then under matching logic node Data set, the data object that last matched data is concentrated;During matched data object, mated according to key word library file, counted The matching degree of the data in data and standard telemechanical point table data in calculation standard substation information data, selects matching degree Highest data are used as the match is successful data.
Intelligent substation of the present invention, is comprised the following steps to a test case intelligent generation method with scheduling:
S1:The SCD file at the whole station of transformer station is read and parsed, all data messages of each IED are obtained;
S2:Telecontrol communication machine point list file is read, remote signalling, telemetry and telecommand information is obtained;
S3:Substation data required for extracting in SCD file, forms standard substation information data, and by telemechanical Machine point list file is adjusted to standard telemechanical point table data;
S4:Criterion substation information data and the one-to-one relationship of standard telemechanical point table data, according to corresponding pass System is generated to a test case table.
Beneficial effect:The invention discloses a kind of intelligent substation and scheduling are to test case intelligent generating system and a side Method, overcoming tradition is carried out to putting brought problem using manually method to point, effectively can reduce labor workload, Improve operating efficiency.
Description of the drawings
System block diagrams of the Fig. 1 for the specific embodiment of the invention.
Specific embodiment
With reference to the accompanying drawings and detailed description, technical scheme is further introduced.
This specific embodiment discloses a kind of intelligent substation with scheduling to a test case intelligent generating system, such as schemes Shown in 1, including SCD file parsing module, point list file parsing module, substation data management module, point table data management mould Block and test case intelligence generation module, wherein:
SCD file parsing module:For reading and parsing the SCD file at the whole station of transformer station, all numbers of each IED are obtained It is believed that breath.
Point list file parsing module:For reading and parsing telecontrol communication machine point list file, remote signalling, telemetry and telecommand data are obtained Information.
Substation data management module:For managing data message and the intelligence of the IED of SCD file parsing module extraction The intermediate data of analysis, forms standard substation information data;Intellectual analysis intermediate data, for each data message object, Define semantic keywords information and intelligent Matching is carried out according to semantic keywords information that data message object oriented includes Successful data link table;Semantic keywords, are the keyword of the power equipment data model that data object includes;Data link table is Each data object has the set of the data object of public keyword, is ranked up according to the matching degree of keyword, mates journey The maximum data object of degree, used as the data for setting up corresponding relation.
Point table data management module:For managing and adjusting the analysis result and intellectual analysis of point list file parsing module Intermediate data, formed standard telemechanical point table data.
Test case intelligence generation module:Data and point table data pipe for intellectual analysis substation data management module Both data are carried out intelligent Matching according to analysis result by the data of reason module, the corresponding relation that sets up between data, according to Corresponding relation is generated to a test case table.
Wherein, all data messages of each IED include the link information of the IED and other IED, the number of devices of the IED According to model and the configuration information of the IED.The link information of the IED and other IED include the type of the IED, IP address, SvIn, SvOut, GooseIn and GooseOut configuration information.The device data model of the IED include the remote signalling of the IED, remote measurement, Fault-signal and alarm signal.
The data message of IED is the number corresponding with the remote signalling, telemetry and telecommand information that include in telecontrol communication machine point list file According to specifically including:
(1) the GooseIn configuration informations of the transforming plant protecting device corresponding with telecontrol communication machine remote signalling information and measure and control device, The GooseOut configuration informations of remote signalling data collection and intelligent terminal in device data model;
(2) distant in corresponding with telecontrol communication machine telemetry intelligence (TELINT) transforming plant protecting device and measure and control device device data model Survey data set;
(3) corresponding with telecontrol communication machine remote information transforming plant protecting device and the remote controlled point table of measure and control device.
Standard substation information data are formed in the following manner:Substation data management object is divided into remote signalling, distant Survey, remote control and remote regulating this four data set nodes, the corresponding data extracted in SCD file is stored in four data respectively In collection node, standard substation information data are formed.
Standard telemechanical point table data are formed in the following manner:Telemechanical point table data management object is divided into remote signalling, distant Survey and these three data set nodes of remote control, a data for list file parsing module parsing be stored in three data respectively and concentrated, Formation standard telemechanical point table data.
Generated to a test case table in the following manner:Intellectual analysis standard substation information data and standard telemechanical point The semantic key words of table data, carry out intelligent Matching according to semantic key words, and Criterion substation information data are remote with standard The corresponding relation of moving point table data, according to the data genaration of corresponding relation is set up specifically to a test case table, according to point Test case table is carried out to data automatically to a test.
Standard substation information data and standard telemechanical point table data are carried out intelligent Matching in the following manner:First mate Point standard substation information data and the logical node of standard telemechanical point table data, then the data set under matching logic node, most The data object that matched data is concentrated afterwards;During matched data object, mated according to key word library file, calculated standard power transformation The matching degree of the data in the data that stands in information data and standard telemechanical point table data, selects matching degree highest data As the match is successful data.
This specific embodiment also discloses a kind of intelligent substation with scheduling to a test case intelligent generation method, wraps Include following steps:
S1:The SCD file at the whole station of transformer station is read and parsed, all data messages of each IED are obtained;
S2:Telecontrol communication machine point list file is read, remote signalling, telemetry and telecommand information is obtained;
S3:Substation data required for extracting in SCD file, forms standard substation information data, and by telemechanical Machine point list file is adjusted to standard telemechanical point table data;
S4:Criterion substation information data and the one-to-one relationship of standard telemechanical point table data, according to corresponding pass System is generated to a test case table.

Claims (10)

1. a kind of intelligent substation and scheduling are to a test case intelligent generating system, it is characterised in that:Parse including SCD file Module, point list file parsing module, substation data management module, point table data management module and test case intelligently generate mould Block, wherein:
SCD file parsing module:For reading and parsing the SCD file at the whole station of transformer station, all data letters of each IED are obtained Breath;
Point list file parsing module:For reading and parsing telecontrol communication machine point list file, remote signalling, telemetry and telecommand data letter is obtained Breath;
Substation data management module:For managing the data message and intellectual analysis of the IED of SCD file parsing module extraction Intermediate data, formed standard substation information data;The intellectual analysis intermediate data, for each data message object, Define semantic keywords information and intelligent Matching is carried out according to semantic keywords information that data message object oriented includes Successful data link table;
Point table data management module:In analysis result and intellectual analysis for management and adjustment point list file parsing module Between data, formed standard telemechanical point table data;
Test case intelligence generation module:Data and point table data management mould for intellectual analysis substation data management module Both data are carried out intelligent Matching according to analysis result by the data of block, the corresponding relation that sets up between data, according to corresponding Relation is generated to a test case table.
2. intelligent substation according to claim 1 and scheduling are to a test case intelligent generating system, it is characterised in that: All data messages of each IED include the link information of the IED and other IED, the device data model of the IED and The configuration information of the IED.
3. intelligent substation according to claim 2 and scheduling are to a test case intelligent generating system, it is characterised in that: The link information of the described IED and other IED include the type of the IED, IP address, SvIn, SvOut, GooseIn and GooseOut configuration informations.
4. intelligent substation according to claim 2 and scheduling are to a test case intelligent generating system, it is characterised in that: The device data model of the IED includes remote signalling, remote measurement, fault-signal and the alarm signal of the IED.
5. intelligent substation according to claim 1 and scheduling are to a test case intelligent generating system, it is characterised in that: The data message of the IED is the data corresponding with the remote signalling in telecontrol communication machine point list file, telemetry and telecommand information, concrete bag Include:
(1) the GooseIn configuration informations of the transforming plant protecting device corresponding with telecontrol communication machine remote signalling information and measure and control device, equipment The GooseOut configuration informations of remote signalling data collection and intelligent terminal in data model;
(2) the remote measurement number in corresponding with telecontrol communication machine telemetry intelligence (TELINT) transforming plant protecting device and measure and control device device data model According to collection;
(3) corresponding with telecontrol communication machine remote information transforming plant protecting device and the remote controlled point table of measure and control device.
6. intelligent substation according to claim 1 and scheduling are to a test case intelligent generating system, it is characterised in that: Standard substation information data are formed in the following manner:By substation data management object be divided into remote signalling, remote measurement, remote control and Remote regulating this four data set nodes, the corresponding data extracted in SCD file is stored in four data set nodes respectively, Formation standard substation information data.
7. intelligent substation according to claim 1 and scheduling are to a test case intelligent generating system, it is characterised in that: Standard telemechanical point table data are formed in the following manner:Telemechanical point table data management object is divided into remote signalling, telemetry and telecommand A data for list file parsing module parsing is stored in three data and is concentrated, forms standard by these three data set nodes respectively Telemechanical point table data.
8. intelligent substation according to claim 1 and scheduling are to a test case intelligent generating system, it is characterised in that: Generated to a test case table in the following manner:Intellectual analysis standard substation information data and standard telemechanical point table data Semantic key words, carry out intelligent Matching, Criterion substation information data and standard telemechanical point table number according to semantic key words According to corresponding relation, according to the data genaration of corresponding relation is set up specifically to a test case table, according to a test case Table is carried out to data automatically to a test.
9. intelligent substation according to claim 8 and scheduling are to a test case intelligent generating system, it is characterised in that: Standard substation information data and standard telemechanical point table data are carried out intelligent Matching in the following manner:First match point standard becomes Power station information data and the logical node of standard telemechanical point table data, then the data set under matching logic node, last coupling number According to the data object that concentrates;During matched data object, mated according to key word library file, calculated standard substation information number The matching degree of the data in data and standard telemechanical point table data according in, selects matching degree highest data as coupling Successful data.
10. a kind of intelligent substation and scheduling are to a test case intelligent generation method, it is characterised in that:Comprise the following steps:
S1:The SCD file at the whole station of transformer station is read and parsed, all data messages of each IED are obtained;
S2:Telecontrol communication machine point list file is read, remote signalling, telemetry and telecommand information is obtained;
S3:Substation data required for extracting in SCD file, forms standard substation information data, and by telecontrol communication machine point List file is adjusted to standard telemechanical point table data;
S4:Criterion substation information data and the one-to-one relationship of standard telemechanical point table data, give birth to according to corresponding relation Test case table is put in pairs.
CN201610946108.9A 2016-10-26 2016-10-26 A kind of intelligent substation and scheduling are to test case intelligent generating system and a method Active CN106505731B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610946108.9A CN106505731B (en) 2016-10-26 2016-10-26 A kind of intelligent substation and scheduling are to test case intelligent generating system and a method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610946108.9A CN106505731B (en) 2016-10-26 2016-10-26 A kind of intelligent substation and scheduling are to test case intelligent generating system and a method

Publications (2)

Publication Number Publication Date
CN106505731A true CN106505731A (en) 2017-03-15
CN106505731B CN106505731B (en) 2019-10-18

Family

ID=58322136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610946108.9A Active CN106505731B (en) 2016-10-26 2016-10-26 A kind of intelligent substation and scheduling are to test case intelligent generating system and a method

Country Status (1)

Country Link
CN (1) CN106505731B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107133275A (en) * 2017-04-11 2017-09-05 国网福建省电力有限公司 The method that a kind of regulation and control main website telemechanical point table is audited automatically
CN107257304A (en) * 2017-07-31 2017-10-17 国电南瑞科技股份有限公司 Telemechanical is exempted to a configuration testing system
CN107508733A (en) * 2017-10-23 2017-12-22 国网河南省电力公司检修公司 A kind of transformer station's graph gateway machine communication failure detecting system and method
CN107623312A (en) * 2017-10-27 2018-01-23 国网福建省电力有限公司 A kind of protective relaying device remote control safety measure performs method
CN108132664A (en) * 2017-12-21 2018-06-08 北京四方继保自动化股份有限公司 A kind of relay protection information suitable for intelligent substation is automatically to point methods
CN108448721A (en) * 2018-03-27 2018-08-24 国网山东省电力公司潍坊供电公司 The method of electric system main station monitoring signal and standard signal Auto-matching
CN108490282A (en) * 2018-01-31 2018-09-04 中国电力科学研究院有限公司 A kind of pre-setting method and system of intelligent substation alarm test data
CN111505416A (en) * 2020-04-26 2020-08-07 伟宸科技(武汉)有限公司 Comprehensive automatic test system for transformer substation
CN112165444A (en) * 2020-08-10 2021-01-01 国网安徽省电力有限公司 Automatic comparison and verification system and method for remote signaling and remote measuring quantity of telecontrol machine of intelligent substation
CN113114732A (en) * 2021-03-23 2021-07-13 国网江苏省电力有限公司连云港供电分公司 Automatic data point aligning system and method suitable for multiple links of transformer substation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013164731A (en) * 2012-02-10 2013-08-22 Toshiba Corp Electric power substation automation system and automatic recognition method for terminal
CN103268236A (en) * 2013-05-02 2013-08-28 中国南方电网有限责任公司 Source side maintaining method and system based on intelligent telecontrol device
CN104333134A (en) * 2014-10-30 2015-02-04 国家电网公司 Substation cluster measurement and control system ICD model automatic recognition device and recognition method
CN105511294A (en) * 2015-11-24 2016-04-20 积成电子股份有限公司 Simulated-IED-device-based simulated telecontrol virtual debugging method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013164731A (en) * 2012-02-10 2013-08-22 Toshiba Corp Electric power substation automation system and automatic recognition method for terminal
CN103268236A (en) * 2013-05-02 2013-08-28 中国南方电网有限责任公司 Source side maintaining method and system based on intelligent telecontrol device
CN104333134A (en) * 2014-10-30 2015-02-04 国家电网公司 Substation cluster measurement and control system ICD model automatic recognition device and recognition method
CN105511294A (en) * 2015-11-24 2016-04-20 积成电子股份有限公司 Simulated-IED-device-based simulated telecontrol virtual debugging method

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107133275A (en) * 2017-04-11 2017-09-05 国网福建省电力有限公司 The method that a kind of regulation and control main website telemechanical point table is audited automatically
CN107257304A (en) * 2017-07-31 2017-10-17 国电南瑞科技股份有限公司 Telemechanical is exempted to a configuration testing system
CN107257304B (en) * 2017-07-31 2020-04-07 国电南瑞科技股份有限公司 Telecontrol point-aligning-free configuration test system
CN107508733A (en) * 2017-10-23 2017-12-22 国网河南省电力公司检修公司 A kind of transformer station's graph gateway machine communication failure detecting system and method
CN107623312A (en) * 2017-10-27 2018-01-23 国网福建省电力有限公司 A kind of protective relaying device remote control safety measure performs method
CN108132664A (en) * 2017-12-21 2018-06-08 北京四方继保自动化股份有限公司 A kind of relay protection information suitable for intelligent substation is automatically to point methods
CN108490282A (en) * 2018-01-31 2018-09-04 中国电力科学研究院有限公司 A kind of pre-setting method and system of intelligent substation alarm test data
CN108490282B (en) * 2018-01-31 2021-03-02 中国电力科学研究院有限公司 Method and system for presetting alarm test data of intelligent substation
CN108448721A (en) * 2018-03-27 2018-08-24 国网山东省电力公司潍坊供电公司 The method of electric system main station monitoring signal and standard signal Auto-matching
CN108448721B (en) * 2018-03-27 2022-12-02 国网山东省电力公司潍坊供电公司 Method for automatically matching monitoring signal of main station of power system with standard signal
CN111505416A (en) * 2020-04-26 2020-08-07 伟宸科技(武汉)有限公司 Comprehensive automatic test system for transformer substation
CN111505416B (en) * 2020-04-26 2023-02-28 伟宸科技(武汉)有限公司 Comprehensive automatic test system for transformer substation
CN112165444A (en) * 2020-08-10 2021-01-01 国网安徽省电力有限公司 Automatic comparison and verification system and method for remote signaling and remote measuring quantity of telecontrol machine of intelligent substation
CN113114732A (en) * 2021-03-23 2021-07-13 国网江苏省电力有限公司连云港供电分公司 Automatic data point aligning system and method suitable for multiple links of transformer substation
CN113114732B (en) * 2021-03-23 2022-03-15 国网江苏省电力有限公司连云港供电分公司 Automatic data point aligning system and method suitable for multiple links of transformer substation

Also Published As

Publication number Publication date
CN106505731B (en) 2019-10-18

Similar Documents

Publication Publication Date Title
CN106505731B (en) A kind of intelligent substation and scheduling are to test case intelligent generating system and a method
CN104951620B (en) Intelligent substation configuration file SCD file checking method based on business rule
CN103631921B (en) A kind of configuration information of transformer substation detection method and device
CN110401692B (en) Integrated automatic checking and accepting system and method for monitoring information of transformer substation
CN102567603A (en) Method for automatically generating BPA calculation file based on actual measurement topology and measured data
CN106941281B (en) A method of telemechanical apparatus and regulation main website telemetering automated closed-loop joint debugging based on supervisory control of substation backstage
CN103746368A (en) Method of optimizing static safe and stable operation limit of electric power system
CN107045706A (en) Intelligent substation secondary safety measure operation order automatic generation method
CN105045991B (en) The checking method of intelligent substation intelligent apparatus allocation plan and empty terminal
CN103632307A (en) Method for checking consistency between SCD and virtual loop table of intelligent substation
CN108448721A (en) The method of electric system main station monitoring signal and standard signal Auto-matching
CN117439264A (en) Automatic acceptance checking system for monitoring information of substation of dispatching master station
CN105680441B (en) Simulation based on stimulated replacement technology is to a device
CN110852904B (en) Signal checking system and method based on RCD and SCD checking
CN107563031B (en) Intelligent substation virtual terminal automatic association method based on standard function coding
CN106056218A (en) Equipment monthly maintenance scheduling optimization method considering overload and transient stability constraint
CN110674353B (en) XML-based in-place protection process layer automatic configuration method
CN106570775A (en) Power grid fault countermeasure plan combining compilation method and device
CN106647648A (en) Method for checking power plant and transformer substation operation order execution conditions in scheduling automation system
CN104182818B (en) A kind of method and system of substation information intelligence automatic data collection
CN104392398B (en) Power distribution automation CIM imports and exports function test system and its method
CN106408206A (en) Reliability evaluation method for power distribution network containing microgrid formed by photovoltaic power generation
CN105095571B (en) Intelligent substation intelligent apparatus allocation plan checking method based on business rule
CN112420042A (en) Control method and device of power system
CN107133275A (en) The method that a kind of regulation and control main website telemechanical point table is audited automatically

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220224

Address after: 100176 floor 2, block a, building 1, yard 139, Jinghai Third Road, Beijing Economic and Technological Development Zone, Daxing District, Beijing (Yizhuang group, high-end industrial area of Beijing Pilot Free Trade Zone)

Patentee after: PONOVO POWER Co.,Ltd.

Address before: No. 33, Dongqi Road, Dongshan street, Jiangning District, Nanjing City, Jiangsu Province, 211103

Patentee before: NANJING NENGYUN ELECTRIC POWER TECHNOLOGY CO.,LTD.