CN106499047A - Pit structure installation method - Google Patents

Pit structure installation method Download PDF

Info

Publication number
CN106499047A
CN106499047A CN201611107746.8A CN201611107746A CN106499047A CN 106499047 A CN106499047 A CN 106499047A CN 201611107746 A CN201611107746 A CN 201611107746A CN 106499047 A CN106499047 A CN 106499047A
Authority
CN
China
Prior art keywords
connecting portion
pit
installation method
supporting part
structure installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611107746.8A
Other languages
Chinese (zh)
Other versions
CN106499047B (en
Inventor
郭永平
胡国良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongxiang Tengfei Home Textile Co ltd
Original Assignee
Ningbo Ever Elevator Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Ever Elevator Technology Development Co Ltd filed Critical Ningbo Ever Elevator Technology Development Co Ltd
Priority to CN201611107746.8A priority Critical patent/CN106499047B/en
Publication of CN106499047A publication Critical patent/CN106499047A/en
Application granted granted Critical
Publication of CN106499047B publication Critical patent/CN106499047B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars

Abstract

The present invention provides a kind of pit structure installation method.The pit structure installation method comprises the steps:Pit cushion cap set up by cast concrete, there is provided foundation bolt and anchor nut, and the anchor nut is embedded on pit cushion cap, then mounting foot bolt in the anchor nut;Connecting portion is provided, two adjacent foundation bolts are connected by the connecting portion;Supporting part is provided, the supporting part is connected with the connecting portion;Casting concrete, makes concrete cover the connecting bolt again.The supporting part that the pit structure installation method of the present invention is adopted is made using Steel material, enhances the structural of pit structure;The supporting part is integrally formed with the connecting portion or is articulated with the connecting portion, and the structure is connected firmly, and construction cost is low, and bearing capacity is strong, is not in obscission;The foundation bolt is enclosed to form sealing structure with the connecting portion simultaneously, is less prone to running pulp, good seepage-proof property.

Description

Pit structure installation method
Technical field
The present invention relates to elevator hoistways field, and in particular to the pit structure installation method of elevator hoistways.
Background technology
Aging blocks building in, sometimes according to production, life needs, it is necessary to add elevator outside building, outside building elevator build in Outside aging blocks, need to build the hoistway independently of building beyond the region of objective existence, therefore hoistway frame is stable firmly particularly significant.Pit structure from Well pit stretches out, and the firm annexation of connection hoistway frame and pit cushion cap, pit structure and hoistway frame is to whole hoistway Stable safety, pit structure are one of important composition components of elevator hoistways construction.In the prior art, hoistway frame is held with pit Platform framework of steel reinforcement is directly welded, and after-pouring concrete covers pit structure and hoistway frame weld, completes hoistway frame and bottom with this The connection of hole structure.
This kind of pit structure mounting means is excessively coarse simple, there is connection shakiness, easily causes stand-off error, is difficult to entangle Inclined problem.
Content of the invention
Present invention solves the technical problem that being to improve a kind of structural behaviour well, construction cost is low, the strong bottom of bearing capacity Hole structure installation method.
Technical scheme is as follows:
A kind of pit structure installation method, comprises the steps,
Pit cushion cap set up by step S1, cast concrete, there is provided foundation bolt and anchor nut, will be embedding for the anchor nut On the pit cushion cap, then mounting foot bolt in the anchor nut;
First steel plate is fixed in the lower margin by step S2, the first steel plate for providing several the first installing holes of tool At the top of bolt;
Step S3, the height for adjusting foundation bolt, make the first steel plate height in same level;
Two adjacent foundation bolts are connected by step S4, offer connecting portion, the connecting portion;
Step S5, offer supporting part, the supporting part are connected with the connecting portion;
Step S6, the hoistway frame for providing bottom the second steel plate of tool, second steel plate have several the second installing holes, pass through Second steel plate of hoistway frame and the first steel plate are connected by connecting bolt, fixed hoistway frame;
Step S7, again casting concrete, make concrete cover the connecting bolt.
Preferably, the supporting part extends to be formed from the top of the connecting portion towards the pit cushion cap outer rim side.
Preferably, the supporting part is articulated with the top of the connecting portion.
Preferably, the supporting part is del.
Preferably, the foundation bolt encloses the collecting to form a sealing at the top of the pit cushion cap with the connecting portion Groove.
Preferably, the supporting part is 30 ° to 60 ° with the angle of the connecting portion.
Preferably, the quantity of first installing hole and second installing hole is four.
Preferably, the connecting portion is material of rectangular channel, and its end is welded and fixed with the foundation bolt.
Preferably, sealing joint strip is provided with the accepting groove, the sealing joint strip is located at the connecting portion and the lower margin The junction of bolt.
Compared with correlation technique, the pit structure installation method that the present invention is provided has the advantages that:
First, the supporting part that pit structure installation method of the invention is adopted is made using Steel material, enhances pit structure Structural;The supporting part is integrally formed with the connecting portion or is articulated with the connecting portion, and the structure is connected firmly, and applies Work low cost, bearing capacity are strong, are not in obscission;Foundation bolt encloses to form sealing knot with the connecting portion simultaneously Structure, is less prone to running pulp, good seepage-proof property.
2nd, the hoistway frame of the prior art and the bottom are replaced by the tight bolt of the first steel plate and the second steel plate The framework of steel reinforcement of hole cushion cap is directly welded, and has both improve the stability and intensity of connection, is reduced again and is subsequently poured mixed mud and apply The stand-off error that work is caused, is beneficial to the hoistway frame and is connected with the accurate firm of the pit cushion cap.
Description of the drawings
The step of Fig. 1 is pit structure installation method of the present invention flow chart;
Fig. 2 is a kind of top view of embodiment of pit structure shown in Fig. 1;
Fig. 3 is a kind of three-dimensional exploded view of embodiment of pit structure shown in Fig. 1.
Specific embodiment
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
Please refer to Fig. 1 to Fig. 3, flow chart the step of Fig. 1 is pit structure installation method of the present invention;Fig. 2 is Fig. 1 institutes Show a kind of top view of embodiment of pit structure;Fig. 3 is a kind of three-dimensional exploded view of embodiment of pit structure shown in Fig. 1.
The pit structure installation method, comprises the steps,
Pit cushion cap 3 set up by step S1, cast concrete, there is provided foundation bolt 111 and anchor nut 113, will be described Foot nut 113 is embedded on pit cushion cap 3, then mounting foot bolt 111 in the anchor nut 113;
Step S2, the first steel plate 116 for providing several the first installing holes 1161 of tool, will be affixed for first steel plate 116 At the top of the foundation bolt 111;
Step S3, the height for adjusting foundation bolt 111, make 116 height of the first steel plate in same level;
Two adjacent foundation bolts 111 are connected by step S4, offer connecting portion 115, the connecting portion 115;
Step S5, offer supporting part 117, the supporting part 117 are connected with the connecting portion 115;
Step S6, the hoistway frame 2 for providing bottom the second steel plate 21 of tool, second steel plate 21 have several second installing holes 211, second steel plate 21 and the first steel plate 116 of hoistway frame 2 are connected by connecting bolt, fixed hoistway frame 2;
Step S7, again casting concrete, make concrete cover the connecting bolt.
The pit structure 1 is used for connecting hoistway frame 2 and pit cushion cap 3, and which includes that the pit on pit cushion cap is solid Determine device 11.
The pit fixing device 11 include some anchor nuts 113 for being embedded at the pit cushion cap 3, be bolted in described Foundation bolt 111 in anchor nut 113, the connecting portion 115 of two adjacent foundation bolts 111 of connection and with the connecting portion 115 The supporting part 117 of connection.Specifically, the connecting portion 115 is material of rectangular channel, and its end is welded with the foundation bolt 111 Fixed.
In the present embodiment, the supporting part 117 is from the top of the connecting portion 115 towards 3 outer rim of pit cushion cap Side extends to be formed.
The supporting part 117 is del, and the structure is conducive to apical support using triangle in foundation ditch, and Increase Area of bearing, further improves the stability that the pit fixing device 11 tackles geological disaster.
The foundation bolt 111 encloses the collecting to form a sealing at the top of the pit cushion cap 3 with the connecting portion 115 Groove 100, the accepting groove 100 are used for concrete perfusion.
Preferably, sealing joint strip is provided with the accepting groove, the sealing joint strip is located at the connecting portion and the lower margin The junction of bolt.Increase the sealing that sealing joint strip further increases the accepting groove 100.
During concrete perfusion, the foundation bolt 111 encloses to form sealing structure with the connecting portion 115, no Easily there is running pulp, good seepage-proof property.
The supporting part 117 is 30 ° to 60 ° with the angle of the connecting portion 115, installs the pit fixing device 11, The supporting part 117 can be adjusted to different according to the concrete geologic structure for installing ground with the angle number of degrees of the connecting portion 115 Angle initialization.
The pit fixing device 11 includes foundation bolt 111, anchor nut 113 and the first steel plate 116, the lower margin spiral shell Bolt 111 is plugged in the anchor nut 113 and the anchor nut 113 is embedded at the pit cushion cap 3, the connecting rod 15 Connect first group 131 and the foundation bolt 111.
Further, the quantity of the foundation bolt 111, the anchor nut 113 and the connecting rod 15 is also four Root, four connecting rods 15 connect four first pile bodies 1311 and four foundation bolts 111 respectively.
First steel plate 116 is fixed at the top of the foundation bolt 111, and first steel plate 116 is formed with four One installing hole 1161.
The hoistway frame 2 includes that the second steel plate 21, second steel plate 21 are formed with four the second installing holes 211.
First steel plate 116 and second steel plate 21 are abutted and first installing hole 1161 and described second is installed 211 position of hole is corresponding, and the connecting bolt passes through through located at first installing hole 1161 and second installing hole 211 The foundation bolt 111 and the mutual regulation of anchor nut 113, by first steel plate 116 located at same level, reuse Connecting bolt is fixedly connected the hoistway frame 2 and the pit fixing device 11.
In another kind of alternate embodiment of the present invention, the supporting part is articulated with the top of the connecting portion, the structure Be conducive to the production and installation of equipment, by articulated structure, after installation pit fixing device, adjust the supporting part and institute The different number of degrees of connecting portion are stated, then will be welded and fixed both which.
Compared with correlation technique, the pit structure installation method that the present invention is provided has the advantages that:
First, the supporting part that pit structure installation method of the invention is adopted is made using Steel material, enhances pit structure Structural;The supporting part is integrally formed with the connecting portion or is articulated with the connecting portion, and the structure is connected firmly, and applies Work low cost, bearing capacity are strong, are not in obscission;The foundation bolt encloses to form sealing with the connecting portion simultaneously Structure, is less prone to running pulp, good seepage-proof property.
2nd, the hoistway frame of the prior art and the bottom are replaced by the tight bolt of the first steel plate and the second steel plate The framework of steel reinforcement of hole cushion cap is directly welded, and has both improve the stability and intensity of connection, is reduced again and is subsequently poured mixed mud and apply The stand-off error that work is caused, is beneficial to the hoistway frame and is connected with the accurate firm of the pit cushion cap.
Embodiments of the invention are the foregoing is only, the scope of the claims of the present invention is not thereby limited, every using this Equivalent structure or equivalent flow conversion that bright description and accompanying drawing content are made, or directly or indirectly it is used in other related skills Art field, is included within the scope of the present invention.

Claims (9)

1. a kind of pit structure installation method, it is characterised in that:Comprise the steps,
Pit cushion cap set up by step S1, cast concrete, there is provided foundation bolt and anchor nut, and the anchor nut is embedded at On pit cushion cap, then mounting foot bolt in the anchor nut;
First steel plate is fixed in the foundation bolt by step S2, the first steel plate for providing several the first installing holes of tool Top;
Step S3, the height for adjusting foundation bolt, make the first steel plate height in same level;
Two adjacent foundation bolts are connected by step S4, offer connecting portion, the connecting portion;
Step S5, offer supporting part, the supporting part are connected with the connecting portion;
Step S6, the hoistway frame for providing bottom the second steel plate of tool, second steel plate has several the second installing holes, by connection Second steel plate of hoistway frame and the first steel plate are connected by bolt, fixed hoistway frame;
Step S7, again casting concrete, make concrete cover the connecting bolt.
2. pit structure installation method according to claim 1, it is characterised in that:The supporting part is from the connecting portion Top extends to be formed towards the pit cushion cap outer rim side.
3. pit structure installation method according to claim 1, it is characterised in that:The supporting part is articulated with the connection The top in portion.
4. pit structure installation method according to claim 1, it is characterised in that:The supporting part is del.
5. pit structure installation method according to claim 1, it is characterised in that:The foundation bolt and the connecting portion The accepting groove to form a sealing is enclosed at the top of the pit cushion cap.
6. pit structure installation method according to claim 5, it is characterised in that:Fluid sealant is provided with the accepting groove Bar, the sealing joint strip are located at the junction of the connecting portion and the foundation bolt.
7. pit structure installation method according to claim 2, it is characterised in that:The supporting part and the connecting portion Angle is 30 ° to 60 °.
8. pit structure installation method according to claim 1, it is characterised in that:First installing hole and described second The quantity of installing hole is four.
9. pit structure installation method according to claim 1, it is characterised in that:The connecting portion is material of rectangular channel, Its end is welded and fixed with the foundation bolt.
CN201611107746.8A 2016-12-06 2016-12-06 Pit structure installation method Active CN106499047B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611107746.8A CN106499047B (en) 2016-12-06 2016-12-06 Pit structure installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611107746.8A CN106499047B (en) 2016-12-06 2016-12-06 Pit structure installation method

Publications (2)

Publication Number Publication Date
CN106499047A true CN106499047A (en) 2017-03-15
CN106499047B CN106499047B (en) 2019-01-29

Family

ID=58330462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611107746.8A Active CN106499047B (en) 2016-12-06 2016-12-06 Pit structure installation method

Country Status (1)

Country Link
CN (1) CN106499047B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009263102A (en) * 2008-04-25 2009-11-12 Toshiba Elevator Co Ltd Buffer stand mounting structure of elevator
CN202245617U (en) * 2011-01-04 2012-05-30 张向阳 Elevator well wall assembled by adopting combined type derricks
CN104340813A (en) * 2014-10-30 2015-02-11 中国建筑股份有限公司 Construction method of elevator mounting

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009263102A (en) * 2008-04-25 2009-11-12 Toshiba Elevator Co Ltd Buffer stand mounting structure of elevator
CN202245617U (en) * 2011-01-04 2012-05-30 张向阳 Elevator well wall assembled by adopting combined type derricks
CN104340813A (en) * 2014-10-30 2015-02-11 中国建筑股份有限公司 Construction method of elevator mounting

Also Published As

Publication number Publication date
CN106499047B (en) 2019-01-29

Similar Documents

Publication Publication Date Title
CN106012864B (en) A kind of method of the overall erection & lift of bridge arch rib
CN105484157B (en) Positioning device and construction method of capping beam of prefabricated bridge
CN108842624B (en) High pier cast-in-place cover beam composite cantilever formwork system and construction method
CN105714683A (en) Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames
CN108411790A (en) A kind of adjustable installing bracket of prefabricated assembled segmentation bent cap
CN205917601U (en) Integrally lift up device of bridge arch rib
CN105971005B (en) Open cut method large-span two-arch two-cable subway station structure
CN105347142A (en) Plate penetrating installing method for installing construction lifting machine on basement top plate
CN106049527B (en) Open cut method can restore three cable subway station structures of three arches
CN106150105A (en) A kind of stiffened column installation method
CN106499047A (en) Pit structure installation method
KR101130166B1 (en) Apparatus and method for replacing bearings of box girder bridge
CN208379444U (en) A kind of adjustable installing bracket of prefabricated assembled segmentation bent cap
US9365999B1 (en) Method of installing a housing for an inground vehicle lift
KR101282333B1 (en) Cross-type supporting structure and method for super-structure of bridge
CN109879179A (en) A kind of assembling type steel structure tower crane platform
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN202099879U (en) Box type steel pedestal supporting base with shear key
CN206396887U (en) Pit structure
CN106592623A (en) Pit structure mounting method
CN206396778U (en) Pit structure
CN104060845B (en) A kind of steel column temporary fixing structure and construction method thereof
CN206667213U (en) A kind of embedded parts structure of ship lift main equipment room steel lattice column
CN106638937B (en) Pit structure and its installation method
KR100519718B1 (en) Strong form structure that ease exchange of support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191025

Address after: 314513, Dongsheng Street, Quanzhou Town, Jiaxing, Zhejiang, Tongxiang

Patentee after: TONGXIANG TENGFEI QUILT WADDING CO.,LTD.

Address before: 315040 room 233-3, building, No. 66, academician Road, high tech Zone, Zhejiang, Ningbo, China

Patentee before: NINGBO YONGLIANG ELEVATOR TECHNOLOGY DEVELOPMENT CO.,LTD.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 314513, Dongsheng Street, Quanzhou Town, Jiaxing, Zhejiang, Tongxiang

Patentee after: Tongxiang Tengfei Home Textile Co.,Ltd.

Address before: 314513, Dongsheng Street, Quanzhou Town, Jiaxing, Zhejiang, Tongxiang

Patentee before: TONGXIANG TENGFEI QUILT WADDING Co.,Ltd.

CP01 Change in the name or title of a patent holder
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Pit structure installation method

Effective date of registration: 20211202

Granted publication date: 20190129

Pledgee: Zhejiang Tongxiang Rural Commercial Bank Co.,Ltd. Zhouquan Branch

Pledgor: Tongxiang Tengfei Home Textile Co.,Ltd.

Registration number: Y2021330002445

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230907

Granted publication date: 20190129

Pledgee: Zhejiang Tongxiang Rural Commercial Bank Co.,Ltd. Zhouquan Branch

Pledgor: Tongxiang Tengfei Home Textile Co.,Ltd.

Registration number: Y2021330002445

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Installation method of pit structure

Effective date of registration: 20230924

Granted publication date: 20190129

Pledgee: Zhejiang Tongxiang Rural Commercial Bank Co.,Ltd. Zhouquan Branch

Pledgor: Tongxiang Tengfei Home Textile Co.,Ltd.

Registration number: Y2023330002103

PE01 Entry into force of the registration of the contract for pledge of patent right