CN104060845B - A kind of steel column temporary fixing structure and construction method thereof - Google Patents

A kind of steel column temporary fixing structure and construction method thereof Download PDF

Info

Publication number
CN104060845B
CN104060845B CN201410307092.8A CN201410307092A CN104060845B CN 104060845 B CN104060845 B CN 104060845B CN 201410307092 A CN201410307092 A CN 201410307092A CN 104060845 B CN104060845 B CN 104060845B
Authority
CN
China
Prior art keywords
plate
hoop
hoop plate
steel column
architecture basics
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410307092.8A
Other languages
Chinese (zh)
Other versions
CN104060845A (en
Inventor
李林海
魏广忠
曹海良
李景林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201410307092.8A priority Critical patent/CN104060845B/en
Publication of CN104060845A publication Critical patent/CN104060845A/en
Application granted granted Critical
Publication of CN104060845B publication Critical patent/CN104060845B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of steel column temporary fixing structure and construction method thereof, structure includes that shape adaptation binds round plate at least one first hoop plate and one second of described steel column outer cylinder, first hoop plate with second bind round plate be respectively provided on two sides with the first connecting plate, and make the first hoop plate and the second hoop plate hoop be located on steel column outer cylinder by fixing first connecting plate that connects, the bottom of the first hoop plate and the second hoop plate is respectively equipped with the second connecting plate, second connecting plate is fixedly connected on architecture basics, thus by the first hoop plate, the steel column that second hoop plate and hoop are located in the first hoop plate and the second hoop plate is fixed on architecture basics.Use the first hoop plate and the second hoop plate banding steel column, then fixed with architecture basics by the second connecting plate bottom the first hoop plate and the second hoop plate, thus steel column is securely seated between on architecture basics, replace earth anchor and cable rope, simple to operate, sound construction.

Description

A kind of steel column temporary fixing structure and construction method thereof
Technical field
The present invention relates to the realm of building construction, particularly relate to a kind of steel column temporary fixing structure and construction method thereof.
Background technology
In steel construction band sliding installing engineering, as monolayer large-span steel coal canopy, construction process is first to exist Lifting region carries out the installation of steel column and roof structure, after sliding element has lifted, uses sliding technology Complete the installation of structure.But in the structure hoisting stage, need between steel column and basis to take interim fixation.
Traditional method of temporarily fixing is: after steel column lifting is in place, and by setting earth anchor, to add cable rope interim by it Fixing, this big consuming of method amount of high-altitude operation the most more, earth anchor and cable rope turnover utilization rate are low, Therefore uneconomical practicality.Particularly traditional method is higher to site requirements, as existing railway line, high-voltage line, Periphery barrier is constructed in the interim fixing environment causing difficulty of structure, and traditional method even cannot be implemented.
Summary of the invention
The technical problem to be solved be to provide a kind of make simple, convenient to assemble and disassemble, economical and practical, The steel column temporary fixing structure low to site requirements and construction method thereof.
For realizing above-mentioned technique effect, the invention discloses a kind of steel column temporary fixing structure, for by described Steel column is fixed on architecture basics, and described temporary fixing structure includes that shape adaptation is in described steel column outer cylinder At least one first hoop plate and one second hoop plate, described first hoop plate is respectively provided on two sides with described second hoop plate First connecting plate, and make described first hoop plate and described second hoop plate by described first connecting plate of fixing connection Hoop is located on described steel column outer cylinder, and described first hoop plate is respectively equipped with second with the bottom of described second hoop plate Connecting plate, described second connecting plate is fixedly connected on described architecture basics, thus by described first hoop plate, The steel column that described second hoop plate and hoop are located in described first hoop plate and described second hoop plate is fixed on described knot On the basis of structure.
Due to the fact that and have employed above technical scheme so that it is have the advantages that and be: use the first hoop Plate and the second hoop plate banding steel column, then by the second connecting plate bottom the first hoop plate and the second hoop plate and structure Basis fixes, thus is securely seated between on architecture basics by steel column, replaces earth anchor and cable rope, operation Simply, sound construction.Whole post boots use assembled attachment structure, can have enough to meet the need use, post boots simple installation, Stability Analysis of Structures, substantially increases the efficiency of construction that steel column is fixed temporarily.
Described temporary fixing structure is further improved by, and described second connecting plate is secured by bolts in one On support baseboard, described support baseboard is fixed on described architecture basics by foundation bolt, and described It is provided with cushion block between architecture basics and described support baseboard.Support baseboard is used to connect temperature pier structure, The bottom stationarity of temperature pier structure can be improved, not only increase support baseboard and knot by setting up cushion block Bonding strength between structure basis, moreover it is possible to be used for regulating the height of support baseboard, and then adjust the height of steel column.
Described temporary fixing structure is further improved by, described second connecting plate with described first hoop plate and It is provided with multiple tracks the first securing plate between described second hoop plate, improves bonding strength.
Described temporary fixing structure is further improved by, and is bolted between described first connecting plate Connect, and be provided with multiple tracks the between described first connecting plate and described first hoop plate and described second hoop plate Two securing plates, improve bonding strength.
The invention also discloses a kind of steel column and fix construction method temporarily, described construction method comprises the following steps:
By in steel column lifting to architecture basics;
Outer cylinder at described steel column installs described first hoop plate and described second hoop plate, and fixing connection is described First hoop plate and described first connecting plate of described second hoop plate both sides, make described steel column hoop be located at described first In hoop plate and described second hoop plate;
Described second connecting plate bottom described first hoop plate and described second hoop plate is fixed on described structure base On plinth, described first hoop plate, described second hoop plate and hoop is made to be located at described first hoop plate and described second hoop Steel column in plate is fixed on described architecture basics.
Described steel column is fixed construction method temporarily and is further improved by, by following steps by described second Connecting plate is fixed on described architecture basics:
Pre-embedded anchoring bolts on described architecture basics in advance, and a support end, is installed on described foundation bolt Plate;
Described second connecting plate is secured by bolts on described support baseboard, and described support baseboard with Cushion block is set between architecture basics.
Accompanying drawing explanation
Fig. 1 is the structural representation of steel column temporary fixing structure of the present invention.
Fig. 2 is the perspective view of a preferred embodiment of steel column temporary fixing structure of the present invention.
Fig. 3 is the planar structure schematic diagram of a preferred embodiment of steel column temporary fixing structure of the present invention.
Fig. 4 is the A-A generalized section of Fig. 3.
Fig. 5 is the floor map of the second connecting plate.
Detailed description of the invention
Below in conjunction with the accompanying drawings and detailed description of the invention the present invention is further detailed explanation.
Referring initially to shown in Fig. 1, a kind of steel column temporary fixing structure 10 of the present invention, it is mainly used at rack steel The rack steel structure hoisting stage of structure band sliding installing engineering, to the steel column 11 below rack steel construction and knot Fix between structure basis 12 temporarily.Coordinating shown in Fig. 2~Fig. 4, steel column 11 uses common circular columns structure, Temporary fixing structure 10 is mainly bound round plate 131 He by shape adaptation in semicircular the one first of steel column 11 outer cylinder One second hoop plate 132 is constituted, the first hoop plate 131 with second bind round plate 132 be respectively provided on two sides with one first connecting plate 15, along short transverse uniform pore openings on the first connecting plate 15 of steel column, and it is attached by bolt 16, The first hoop plate 131 and the second hoop plate 132 is made to bind round tightly and be located on the outer cylinder of steel column 11 suspension column.First hoop plate 131 and second hoop plate 132 bottom be respectively equipped with the second connecting plate 14, shown in Fig. 5, the second connecting plate 14 On offer two semienclosed scalable bar holes 140, opening outwardly, is attached by bolt 18, Second connecting plate 14 is fixed on a support baseboard 122, uses the semienclosed scalable bar hole 140 can So that regulation the second connecting plate 14 and the link position of bolt 19, adjust the horizontal level of steel column 11, support Base plate 122 is fixed on architecture basics 12 by foundation bolt 121 further, thus by the first hoop plate 131, the The steel column 11 that two hoop plates 132 and hoop are located in the first hoop plate 131 and the second hoop plate 132 is fixed on architecture basics On 12, earth anchor and cable rope is replaced to carry out the interim fixing of steel column foot.Wherein foundation bolt 121 is in structure During 12 construction of basis the most pre-buried, and coordinate with foundation bolt 121 by nut support baseboard 122 fixed On foundation bolt 121, between the bottom of support baseboard 122 and architecture basics 12, it is provided with cushion block 123, adjusts The height of joint support baseboard 122, and the bonding strength strengthened between support baseboard 122 and architecture basics 12, use Support baseboard 122 connects temperature pier structure, can improve the bottom stationarity of temperature pier structure.
Further, between the second connecting plate 14 and the first hoop plate 131 and the second hoop plate 132, it is welded with multiple tracks First securing plate 171, strengthens the connection between the second connecting plate 14 and the first hoop plate 131 and the second hoop plate 132 Intensity, wherein the first securing plate 171 is respectively welded in the position, left, center, right of the second connecting plate 14, and respectively welds one Road.
Same, between the first connecting plate 15 and the first hoop plate 131 and the second hoop plate 132, it is welded with multiple tracks the Two securing plates 172, strengthen the connection between the first connecting plate 15 and the first hoop plate 131 and the second hoop plate 132 strong Degree, wherein the second securing plate 172 is respectively welded in the upper, middle and lower position of the first connecting plate 15, and each welding is together.
The steel column temporary fixing structure 10 of the present invention can bind round plate 132 by arranging the first hoop plate 131 and second Height and thickness and the first securing plate 171 and the quantity of the second securing plate 172 and thickness, so that temporarily Fixed structure 10 meets different stressing conditions, by arranging the first hoop plate 131 and the second hoop big I of plate 132 To meet the interim fixed installation of the steel column of different cross section size, simple to operate, Stability Analysis of Structures.
The Specific construction step that steel column of the present invention fixes construction method temporarily is as follows:
The xoncrete structure on constructing structure basis 12, and upwards reserve vertical lower margin in the top of xoncrete structure Bolt 121;
On foundation bolt 121, level fixes support baseboard 122, and bottom support baseboard 122 and architecture basics Cushion block 123 is set between 12, adjusts height and the flatness of support baseboard 122;
Steel column 11 lifting is located on support baseboard 122;
Being accurately positioned coordinate position, it is ensured that after errorless, the suspension column outer cylinder at steel column 11 installs the first hoop plate 131 Bind round plate 132 with second, and use the fixing first hoop plate 131 and second that connects of bolt 16 to bind round the first of plate 132 both sides Connecting plate 15, makes steel column 11 suspension column bind round tightly and is located in the first hoop plate 131 and the second hoop plate 132;
Bolt 18 is used to be fixed on support the second connecting plate 14 bottom the first hoop plate 131 and the second hoop plate 132 On base plate 122, make the first hoop plate 131, second bind round plate 132 and the first hoop plate 131 and the second hoop plate be located at by hoop Steel column 11 in 132 is fixed on support baseboard 122, and then is fixed on architecture basics 12.
The present invention draws materials easily, cheap, it is simple to operative, can improve work task efficiency.? Construction quality aspect can ensure that steel column is accurately positioned and constitutes stabilisation systems, and then eliminates engineering safety hidden danger.
Being described in detail the present invention above in association with accompanying drawing embodiment, those skilled in the art can According to the above description the present invention is made many variations example.Thus, some details in embodiment should not be constituted Limitation of the invention, the present invention by the scope that defines using appended claims as the protection model of the present invention Enclose.

Claims (5)

1. a steel column temporary fixing structure, for described steel column is fixed on architecture basics, it is special Levy and be: described temporary fixing structure includes that shape adaptation is at least the one first of described steel column outer cylinder Hoop plate and one second hoop plate, described first hoop plate is respectively provided on two sides with first even with described second hoop plate Fishplate bar, and make described first hoop plate and described second hoop plate hoop by described first connecting plate of fixing connection Being located on described steel column outer cylinder, described first hoop plate is respectively equipped with the with the bottom of described second hoop plate Two connecting plates, described second connecting plate is fixedly connected on described architecture basics, thus by described first The steel column that hoop plate, described second hoop plate and hoop are located in described first hoop plate and described second hoop plate is solid On described architecture basics;
Described second connecting plate is secured by bolts on a support baseboard, and described support baseboard is by ground Foot bolt is fixed on described architecture basics, and between described architecture basics and described support baseboard It is provided with cushion block;
Offering semienclosed scalable bar hole on described second connecting plate, opening is outwardly, described Bolt is arranged in described scalable bar hole, is attached by described bolt, by described second even Fishplate bar is fixed on described support baseboard.
2. steel column temporary fixing structure as claimed in claim 1, it is characterised in that: described second even It is provided with multiple tracks the first securing plate between fishplate bar and described first hoop plate and described second hoop plate.
3. steel column temporary fixing structure as claimed in claim 2, it is characterised in that: described first even It is bolted to connection between fishplate bar, and in described first connecting plate and described first hoop plate and institute State and between the second hoop plate, be provided with multiple tracks the second securing plate.
4. one kind utilizes steel column temporary fixing structure as claimed in claim 1 to carry out steel column to fix temporarily Construction method, it is characterised in that described construction method comprises the following steps:
By in steel column lifting to architecture basics;
Outer cylinder at described steel column installs described first hoop plate and described second hoop plate, and fixing connection Described first hoop plate and described first connecting plate of described second hoop plate both sides, make described steel column hoop be located at In described first hoop plate and described second hoop plate;
Described second connecting plate bottom described first hoop plate and described second hoop plate is fixed on described knot On the basis of structure, described first hoop plate, described second hoop plate and hoop is made to be located at described first hoop plate and institute The steel column stated in the second hoop plate is fixed on described architecture basics.
5. construction method as claimed in claim 4, it is characterised in that by following steps by described the Two connecting plates are fixed on described architecture basics:
Pre-embedded anchoring bolts on described architecture basics in advance, and install one on described foundation bolt Support base plate;
Described second connecting plate is secured by bolts on described support baseboard, and at the bottom of described support Cushion block is set between plate and architecture basics.
CN201410307092.8A 2014-06-30 2014-06-30 A kind of steel column temporary fixing structure and construction method thereof Active CN104060845B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410307092.8A CN104060845B (en) 2014-06-30 2014-06-30 A kind of steel column temporary fixing structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410307092.8A CN104060845B (en) 2014-06-30 2014-06-30 A kind of steel column temporary fixing structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN104060845A CN104060845A (en) 2014-09-24
CN104060845B true CN104060845B (en) 2016-08-24

Family

ID=51548758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410307092.8A Active CN104060845B (en) 2014-06-30 2014-06-30 A kind of steel column temporary fixing structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN104060845B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106250627B (en) * 2016-07-30 2019-04-16 青岛理工大学 A kind of determination method of angle steel reinforced cracking steel box column angle steel length
CN106351400B (en) * 2016-10-11 2018-08-28 中国建筑股份有限公司海拓工程分公司 A kind of precast concrete octagonal column assembly device and its installation method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09189132A (en) * 1996-01-10 1997-07-22 Tokyu Constr Co Ltd Fixing method of column base for steel frame column
JP3859787B2 (en) * 1996-12-25 2006-12-20 大和ハウス工業株式会社 Column / column joining method and its rough assembly jig
CN102644379A (en) * 2012-04-28 2012-08-22 中建一局集团建设发展有限公司 Temporary supporting system of steel column base and construction method of temporary supporting system
CN102661002B (en) * 2012-05-07 2014-12-24 山东科技大学 Construction method of joint of double-circular steel tube concrete column and steel beam
CN204040496U (en) * 2014-06-30 2014-12-24 中国建筑第八工程局有限公司 A kind of steel column temporary fixing structure

Also Published As

Publication number Publication date
CN104060845A (en) 2014-09-24

Similar Documents

Publication Publication Date Title
CN201835387U (en) Foundation bolt exposed type steel column foot connection structure
CN103328820A (en) Method for assembling shell segments for forming tower sections of a hybrid wind turbine tower
KR20120096605A (en) Bracket support type downward construction system and method
CN209369395U (en) A kind of building strengthening reconstruction structure
KR101222550B1 (en) Modular unit with unified double beam and modular structure using the same
CN104060845B (en) A kind of steel column temporary fixing structure and construction method thereof
CN203531005U (en) Steel structure combined type tower crane base structure
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
KR20180118414A (en) Tunnel soundproofed wall having steel pipe connecting part
JP2014088708A (en) Mounting rack for photovoltaic generation module and photovoltaic generation device
CN102817617A (en) Novel inhaul cable type shield originating backrest substrate system
CN102619335A (en) Construction method of large-height small-sized cast-in-place concrete beam slab
CN205296206U (en) Tower cane foundation
KR20150120779A (en) Bracket for the horizontal frame of a one-way steel structure
CN204040496U (en) A kind of steel column temporary fixing structure
CN204282788U (en) Shaping type scaffold can be assembled
CN208934293U (en) Vertical shaft stair
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
KR20160053668A (en) the Post-inserting and the Base-connecting system for noise barrier
CN206428815U (en) The firm sunlight shed of fixed structure
CN201826512U (en) Steel supporting platform for sectional hoisting of long-span special triangular truss
CN204112827U (en) A kind of communications tower
CN110512639A (en) A kind of no floor steel structure tower crane foundation construction method and constructing structure
JP6752006B2 (en) Fixed structure of building unit and unit building
JP5705005B2 (en) Skip floor type building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant