CN106495600A - Hydraulic engineering soft fascine mattress river bottom protection shore protection, shield beach sand soil solidifying agent - Google Patents

Hydraulic engineering soft fascine mattress river bottom protection shore protection, shield beach sand soil solidifying agent Download PDF

Info

Publication number
CN106495600A
CN106495600A CN201510563530.1A CN201510563530A CN106495600A CN 106495600 A CN106495600 A CN 106495600A CN 201510563530 A CN201510563530 A CN 201510563530A CN 106495600 A CN106495600 A CN 106495600A
Authority
CN
China
Prior art keywords
cellulose ether
solidifying agent
soil solidifying
isostere
sand soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510563530.1A
Other languages
Chinese (zh)
Inventor
陈国贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU DINGTAI ENGINEERING MATERIALS Co Ltd
Original Assignee
JIANGSU DINGTAI ENGINEERING MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU DINGTAI ENGINEERING MATERIALS Co Ltd filed Critical JIANGSU DINGTAI ENGINEERING MATERIALS Co Ltd
Priority to CN201510563530.1A priority Critical patent/CN106495600A/en
Publication of CN106495600A publication Critical patent/CN106495600A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Abstract

The technical problem to be solved in the present invention is to provide hydraulic engineering soft fascine mattress river bottom protection shore protection, shield beach sand soil solidifying agent and its construction method that a kind of technical matters are simple and convenient to operate.Sand soil solidifying agent includes:Flyash 8-16wt%, additive 1-5wt%, Gypsum Fibrosum 1-5wt%, sodium sulfate 1-5wt%, Nacl 0.5-3wt%, polycarboxylate water-reducer (or powder) 0.5-3wt%, fast hard agent A:0.2-1wt%, methyl cellulose ether A:0.1-0.6wt%, cellulose ether B:0.1-0.6wt%, cellulose ether C:0.1-0.6wt%, cement surplus.Present invention preserves the technological merit of traditional sand rib row and as the functional requirement of loaded filter, can also be on the premise of engineering cost not be improved, mutual supplement with each other's advantages, the perfect adaptation of rigid filler and flexible geotextile is preferably realized, " soft landing, the hard protection " of isostere is really cleverly achieved.

Description

Hydraulic engineering soft fascine mattress river bottom protection shore protection, shield beach sand soil solidifying agent
Technical field
The present invention relates to a kind of hydraulic engineering soft fascine mattress river bottom protection shore protection, shield beach sand soil solidifying agent and its construction method.
Background technology
The Changjiang river Deepwater Waterway Regulating Projects region top layer basis is loose silty sand ground, and lower sleeping soil layer is high-compressibility, the muck soil of low intensity.Top layer silty sand ground has thin granule, uniform particle sizes, loose feature, easily lifts because of flow action and raises and migrate.The construction of regulating structure necessarily causes the change in periphery flow field again, it will usually makes to develop and aggravate dike side beach and wash away along dike stream, and then jeopardizes stablizing for building.The bed protection structure design and construction of effective control building periphery channel scour is taken to become one of key technology of engineering success construction.
By the investigation to the current soft raft river bottom protection present situation in Yangtze Area, unrealistic using mattress dumped rocks protecting foundation, simultaneously because Engineering Zone upper soil horizon impact resilience is poor, to the globality of bed protection structure and adapt to beach face and wash away change require higher, and isostere ballast material should not be too thick in order to avoid cause the change of isostere ambient water.For the engineering of entrance of Changjiang River, it is required that isostere ballast material is uniformly distributed in isostere, thickness should not be too thick, good integrity, adapt to beach and wash away deformation, and from construction all in all, it is also desirable to the ballast material energy factorial praluction of isostere, accumulating convenience, easy construction, large stretch of sand resource near engineering location can be made full use of.
Content of the invention
The technical problem to be solved in the present invention is to provide hydraulic engineering soft fascine mattress river bottom protection shore protection, shield beach sand soil solidifying agent and its construction method that a kind of technical matters are simple and convenient to operate.
A kind of sand soil solidifying agent, its each component for including and its mass percent:
Cement 65-80wt%,
Flyash 8-16wt%,
Additive 1-5 wt%, specifically nano-calcium carbonate or aerosil etc.;
Gypsum Fibrosum 1-5 wt%,
Sodium sulfate 1-5 wt%,
Nacl 0.5-3 wt%,
Polycarboxylate water-reducer (or powder) 0.5-3 wt%,
Fast hard agent:0.2-1 wt%, specifically lithium salt compound, such as:LiCl or lithium carbonate etc.;
Methyl cellulose ether:0.1-0.6 wt%,
Cellulose ether:0.1-0.6 wt%,
Cellulose ether:0.1-0.6 wt%.
Apply above-mentioned sand soil solidifying agent to hydraulic engineering soft fascine mattress river bottom protection shore protection, protect the construction method on beach, including:By taking river silt and/or fluvial sand on the spot in riverbed bottom, fill silt firming agent, stirring be prepared into self-leveling can mortar, the mortar by pumping equipment Fast Filling rib bag and is constituted isostere then, then by filling after isostere lay and sink to the bottom;
As gravity flowing levelling mortar still has high fluidity, the complicated metamorphosis in bed body surface under water can be adaptive to, make closely to attach between isostere and bed body;Then, with the condensation hardening and strength development of gravity flowing levelling mortar, soft raft is finally consolidated into the higher hardenite of intensity, so as to isostere tight permanent is fixedly arranged at predeterminated position, constitutes mattress sinking, and guarantees the extended protection using effect of mattress sinking.
Relative to the technique effect that prior art, the application are obtained:
(1) A whole set of technical matters are simple, easy to operate, it is only necessary on the basis of traditional sand ribbed soft mattress construction machinery, increase a blender.
(2) Special curing agent wide adaptability, is adaptable to the sand of different clay contents(Maximum clay content is up to more than 60%), sand directly can draw materials in water, need not dry, it is only necessary to add a certain amount of special curing agent(The 1/4-1/5 of about damp sand soil property amount)The high gravity flowing levelling mortar of mobility and pumpability is modulated into by agitated.
(3) The gravity flowing levelling mortar good fluidity that is modulated, not only can quickly pump and easily fill rib bag, convenient construction;And, the complicated metamorphosis in bed body surface under water can be adaptive to, make closely to attach between isostere and bed body, preferably control current scour and the protection soil body.
(4) The gravity flowing levelling mortar stability that is modulated and homogeneity are high, will not be layered or isolation problem, after implantation can closely knit molding in water, after molding, up to more than 15MPa, and prolongation over time, intensity can further improve intensity.
(5) The gravity flowing levelling mortar cohesiveness that is modulated is good, and subparticle will not be excessive from fine and close geotextile or be oozed out, will not polluted-water.
(6) The raw material of composition special curing agent meets environmental requirement, nonpoisonous and tasteless non-volatile, pollution-free to water body, to no toxic biological.
(7) The engineering reliability is high, it is achieved that the mutual supplement with each other's advantages of rigid filler and flexible geotextile, and the tension of formed mattress sinking and comprcssive strength are high, resist and lift and stability against sliding height, globality and good endurance, it can be ensured that the extended protection effect of mattress sinking.
(8) Cost is suitable, and as the raw materials such as silt directly can be gathered materials on the spot and the consumption of firming agent is few, integral construction efficiency high, its integrated cost is less than being protected using precast concrete.
(9) The technical matters are simple, construct convenient, wide adaptability, reliability are high, form the anti-of mattress sinking lifts, globality higher with stability against sliding and durability is more preferable, the technological merit of traditional sand rib row is not only remained and as the functional requirement of loaded filter, can also be on the premise of engineering cost not be improved, mutual supplement with each other's advantages, the perfect adaptation of rigid filler and flexible geotextile is preferably realized, " soft landing, the hard protection " of isostere is really cleverly achieved.
Specific embodiment
Embodiment 1
The sand soil solidifying agent of the present embodiment(Including composition and its), such as table 1:
The main performance index of above-mentioned sand soil solidifying agent, such as table 2:
Embodiment 2
The sand soil solidifying agent of the present embodiment(Including composition and its), such as following table:
Component Mass percent
1 Cement Surplus
2 Flyash 8.11%
3 Nano-calcium carbonate 4.53%
4 Gypsum Fibrosum 1.13%
5 Sodium sulfate 1.23%
6 Nacl 2.26%
7 Polycarboxylate water-reducer (or powder) 2.86%
8 LiCl or lithium carbonate 0.95%
9 Methyl cellulose ether 0.11%
10 Cellulose ether 0.11%
11 Cellulose ether 0.55%
The main performance index of above-mentioned sand soil solidifying agent, such as table 2.
Embodiment 3
The sand soil solidifying agent of the present embodiment(Including composition and its), such as following table:
Component Mass percent
1 Cement Surplus
2 Flyash 15.81%
3 Nano-calcium carbonate 1.13%
4 Gypsum Fibrosum 4.53%
5 Sodium sulfate 1.13%
6 Nacl 0.96%
7 Polycarboxylate water-reducer (or powder) 0.86%
8 LiCl or lithium carbonate 0.55%
9 Methyl cellulose ether 0.51%
10 Cellulose ether 0.51%
11 Cellulose ether 0.15%
The main performance index of above-mentioned sand soil solidifying agent, such as table 2.
Embodiment 4
The sand soil solidifying agent of the present embodiment(Including composition and its), such as following table:
Component Mass percent
1 Cement Surplus
2 Flyash 8.81%
3 Aerosil 1.13%
4 Gypsum Fibrosum 4.53%
5 Sodium sulfate 4.63%
6 Nacl 1.96%
7 Polycarboxylate water-reducer (or powder) 1.86%
8 LiCl or lithium carbonate 0.2%
9 Methyl cellulose ether 0.58%
10 Cellulose ether 0.1%
11 Cellulose ether 0.6%
The main performance index of above-mentioned sand soil solidifying agent, such as table 2.
Embodiment 5
The sand soil solidifying agent of the present embodiment(Including composition and its), such as following table:
Component Mass percent
1 Cement Surplus
2 Flyash 12.81%
3 Aerosil 4%
4 Gypsum Fibrosum 2.53%
5 Sodium sulfate 2.63%
6 Nacl 1.46%
7 Polycarboxylate water-reducer (or powder) 1.26%
8 LiCl or lithium carbonate 0.50%
9 Methyl cellulose ether 0.28%
10 Cellulose ether 0.31%
11 Cellulose ether 0.26%
The main performance index of above-mentioned sand soil solidifying agent, such as table 2.

Claims (2)

1. a kind of sand soil solidifying agent, it is characterised in that each component for including and its mass percent:
Flyash 8-16wt%,
Additive 1-5 wt%,
Gypsum Fibrosum 1-5 wt%,
Sodium sulfate 1-5 wt%,
Nacl 0.5-3 wt%,
Polycarboxylate water-reducer or powder 0.5-3 wt%,
Fast hard agent:0.2-1 wt%,
Methyl cellulose ether:0.1-0.6 Wt%,
Cellulose ether:0.1-0.6 Wt%,
Cellulose ether:0.1-0.6 wt%;.
2. the construction method of the above-mentioned sand soil solidifying agent of a kind of application, it is characterised in that include:By taking river silt and/or fluvial sand on the spot in riverbed bottom, fill silt firming agent, stirring be prepared into self-leveling can mortar, the mortar by pumping equipment Fast Filling rib bag and is constituted isostere then, then by filling after isostere lay and sink to the bottom;
As gravity flowing levelling mortar still has high fluidity, the complicated metamorphosis in bed body surface under water can be adaptive to, make closely to attach between isostere and bed body;Then, with the condensation hardening and strength development of gravity flowing levelling mortar, soft raft is finally consolidated into the higher hardenite of intensity, so as to isostere tight permanent is fixedly arranged at predeterminated position, constitutes mattress sinking.
CN201510563530.1A 2015-09-08 2015-09-08 Hydraulic engineering soft fascine mattress river bottom protection shore protection, shield beach sand soil solidifying agent Pending CN106495600A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510563530.1A CN106495600A (en) 2015-09-08 2015-09-08 Hydraulic engineering soft fascine mattress river bottom protection shore protection, shield beach sand soil solidifying agent

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510563530.1A CN106495600A (en) 2015-09-08 2015-09-08 Hydraulic engineering soft fascine mattress river bottom protection shore protection, shield beach sand soil solidifying agent

Publications (1)

Publication Number Publication Date
CN106495600A true CN106495600A (en) 2017-03-15

Family

ID=58287698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510563530.1A Pending CN106495600A (en) 2015-09-08 2015-09-08 Hydraulic engineering soft fascine mattress river bottom protection shore protection, shield beach sand soil solidifying agent

Country Status (1)

Country Link
CN (1) CN106495600A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100854A (en) * 2007-08-06 2008-01-09 杨毅男 Environment-friendly type soil solidifying agent

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101100854A (en) * 2007-08-06 2008-01-09 杨毅男 Environment-friendly type soil solidifying agent

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宋少民,王林主编: "《土木工程材料》", 31 December 2013 *
王惠明: "《建筑涂料》", 31 December 2007 *

Similar Documents

Publication Publication Date Title
CN107700435B (en) The cementing rock-fill dams of rock-fill concrete core-wall and its construction method
CN105297570B (en) Special soil subgrade structure and construction method thereof
CN105625264B (en) A kind of hydraulic engineering dyke seepage control water sealing structure
CN107747262A (en) A kind of area of heavy rainfull is red sandstone roadbed to fill structure and construction method
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
JP5140843B2 (en) Cover method of the embankment back surface
CN103205951A (en) Sludge-type soil combined secondary dike-back pressure diking method
CN107761668A (en) A kind of strand Bin Ku makes ground type bank protection structure and its construction process
CN207244553U (en) A kind of flexible offshore type breakwater system for sandy beach protection
CN209482259U (en) It is a kind of to cross water landscape earth dam structure
CN104695455B (en) High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof
CN108532543B (en) Auxiliary anti-seepage layer-paving structure for foundation pit on upstream of dam
CN206844135U (en) A kind of cofferdam
CN110453653A (en) A kind of landscape water pond and its construction method
CN106495600A (en) Hydraulic engineering soft fascine mattress river bottom protection shore protection, shield beach sand soil solidifying agent
CN105839653A (en) Construction method for reconstructing cofferdam anti-seepage system in immersed tube tunnel
CN202466518U (en) Back pressure structure of soft soil foundation dam
CN204780776U (en) Submarine lawn
CN207567719U (en) The dykes and dams that a kind of gangue dead meal fills
CN203096696U (en) High and low composite backwater weir
CN203080480U (en) Upstream blanket structure of concrete face rockfill dam
CN203307768U (en) Ecological bank protection structure
CN106049371B (en) A kind of method for storing silt dam and its soil being prevented to be lost in
CN206385498U (en) The compound sea wall of holding one's breath of Shuangzi dike
CN111424739A (en) Composite protection structure for locally scouring pits under strong current condition and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170315

RJ01 Rejection of invention patent application after publication