CN209482259U - It is a kind of to cross water landscape earth dam structure - Google Patents

It is a kind of to cross water landscape earth dam structure Download PDF

Info

Publication number
CN209482259U
CN209482259U CN201822026860.9U CN201822026860U CN209482259U CN 209482259 U CN209482259 U CN 209482259U CN 201822026860 U CN201822026860 U CN 201822026860U CN 209482259 U CN209482259 U CN 209482259U
Authority
CN
China
Prior art keywords
dam structure
rockfill area
cross water
water landscape
rockfill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822026860.9U
Other languages
Chinese (zh)
Inventor
房彬
陈海坤
居浩
宁华晚
彭继乐
李刚
高传彬
俞灵光
李丹丹
何建峰
郑晓晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201822026860.9U priority Critical patent/CN209482259U/en
Application granted granted Critical
Publication of CN209482259U publication Critical patent/CN209482259U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides a kind of water landscape earth dam structure, including dam foundation coating and the supratectal rockfill area of dam foundation excessively;Rockfill area section is trapezoidal, the downstream of rockfill area sets gradually transition zone, bed course, armored concrete step mask in slope surface from bottom to up, rubble transition zone is lined between rockfill area and dam foundation coating, the downstream of rockfill area is provided with boulder energy dissipating mask to bottom position.The utility model avoids conventional landscape earth and rockfill dam structure and builds spillway on bank or flood discharge culvert to drain off floodwater, and has saved construction investment and construction period, preferably guarantees landscape effect, in the long run, has significant economic benefit and social benefit.

Description

It is a kind of to cross water landscape earth dam structure
Technical field
Water landscape earth dam structure is crossed the utility model relates to a kind of, belongs to water conservancy and hydropower and landscape engineering application technology neck Domain.
Background technique
In the design of landscape dam, through frequently with earth and rockfill dam structure Store water.It is big vast that earth and rockfill dam structure generally uses bank to overflow Road or flood discharge culvert drain off floodwater, some dam site landform are steeper, build the excavation of spillway on bank, investment and duration influence compared with Greatly, and the landscape effect of spillway on bank or flood discharge culvert is poor.
Utility model content
In order to solve the above technical problems, the utility model provides a kind of water landscape earth dam structure excessively, this crosses water landscape soil Dam structure avoids conventional landscape earth and rockfill dam structure and builds spillway on bank or flood discharge culvert to drain off floodwater, and has saved engineering throwing Money and construction period.
The utility model is achieved by the following technical programs.
A kind of water landscape earth dam structure excessively provided by the utility model, including dam foundation coating and dam foundation covering Rockfill area on layer;Rockfill area section be it is trapezoidal, the downstream of rockfill area set gradually from bottom to up in slope surface transition zone, pad Layer, armored concrete step mask, are lined with rubble transition zone between rockfill area and dam foundation coating, the downstream of rockfill area to Bottom position is provided with boulder energy dissipating mask.
The transition zone and bed course are located above rubble transition zone.
Artificial hillock block piling and layout of stones moulding is fixed on the armored concrete step mask.
Nut cap concrete is covered at the top of the rockfill area.
The nut cap concrete base extends to dam foundation coating bottom and is provided with concrete cut.
The concrete cut is vertically arranged.
The armored concrete step mask is linked together with nut cap concrete.
The top surface of the nut cap concrete is smooth and horizontal.
The utility model has the beneficial effects that: avoiding conventional landscape earth and rockfill dam structure builds spillway on bank or flood discharge Culvert drains off floodwater, and has saved construction investment and construction period, preferably guarantees landscape effect, in the long run, has aobvious The economic benefit and social benefit of work.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
In figure: the rockfill area 1-, 2- nut cap concrete, 3- concrete cut, 4- transition zone, 5- bed course, 6- reinforced concrete Earthen platform rank mask, 7- artificial hillock block piling and layout of stones moulding, 8- boulder energy dissipating mask, 9- rubble transition zone, 10- dam foundation coating.
Specific embodiment
Be described further below the technical solution of the utility model, but claimed range be not limited to it is described.
A kind of water landscape earth dam structure, including dam foundation coating 10 and dam foundation coating excessively as shown in Figure 1 Rockfill area 1 on 10;1 section of rockfill area be it is trapezoidal, the downstream of rockfill area 1 set gradually from bottom to up in slope surface transition zone 4, Bed course 5, armored concrete step mask 6, are lined with rubble transition zone 9, rockfill area between rockfill area 1 and dam foundation coating 10 1 downstream is provided with boulder energy dissipating mask 8 to bottom position.
The transition zone 4 and bed course 5 are located at 9 top of rubble transition zone.
Artificial hillock block piling and layout of stones moulding 7 is fixed on the armored concrete step mask 6.
Nut cap concrete 2 is covered at the top of the rockfill area 1.
2 bottom of nut cap concrete extends to 10 bottom of dam foundation coating and is provided with concrete cut 3.
The concrete cut 3 is vertically arranged.
The armored concrete step mask 6 is linked together with nut cap concrete 2.
The top surface of the nut cap concrete 2 is smooth and horizontal.
Rockfill area 1 is the main body of gravity type dam body carrying, and transition region 4 is arranged among bed course area 5 and rockfill area 1, is padding Armored concrete step mask 6 is arranged in floor area 5, and artificial hillock block piling and layout of stones 7 is arranged on armored concrete step mask.Rockfill area 1 9 transition of rubble transition zone is used between dam foundation coating 10.Flow-passing surface is used as using nut cap concrete 2 at the top of dam, Dam facing energy dissipating uses 7 energy dissipating of armored concrete step mask 6+ artificial hillock block piling and layout of stones, and downstream uses 8 energy dissipating of boulder mask, antiseepage Using concrete cut 10.

Claims (8)

1. a kind of cross water landscape earth dam structure, including the enrockment on dam foundation coating (10) and dam foundation coating (10) Area (1), it is characterised in that: rockfill area (1) section be it is trapezoidal, the downstream of rockfill area (1) is set gradually from bottom to up in slope surface Transition zone (4), bed course (5), armored concrete step mask (6), are lined between rockfill area (1) and dam foundation coating (10) The downstream of rubble transition zone (9), rockfill area (1) is provided with boulder energy dissipating mask (8) to bottom position.
2. as described in claim 1 cross water landscape earth dam structure, it is characterised in that: the transition zone (4) and bed course (5) are located at Above rubble transition zone (9).
3. as described in claim 1 cross water landscape earth dam structure, it is characterised in that: the armored concrete step mask (6) On be fixed with artificial hillock block piling and layout of stones moulding (7).
4. as described in claim 1 cross water landscape earth dam structure, it is characterised in that: be covered with lid at the top of the rockfill area (1) Cap concrete (2).
5. as claimed in claim 4 cross water landscape earth dam structure, it is characterised in that: nut cap concrete (2) bottom extends Dam foundation coating (10) bottom is provided with concrete cut (3).
6. as claimed in claim 5 cross water landscape earth dam structure, it is characterised in that: the concrete cut (3) vertically sets It sets.
7. as described in claim 1 cross water landscape earth dam structure, it is characterised in that: the armored concrete step mask (6) It is linked together with nut cap concrete (2).
8. as claimed in claim 4 cross water landscape earth dam structure, it is characterised in that: the top surface of the nut cap concrete (2) is flat It is whole and horizontal.
CN201822026860.9U 2018-12-04 2018-12-04 It is a kind of to cross water landscape earth dam structure Active CN209482259U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822026860.9U CN209482259U (en) 2018-12-04 2018-12-04 It is a kind of to cross water landscape earth dam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822026860.9U CN209482259U (en) 2018-12-04 2018-12-04 It is a kind of to cross water landscape earth dam structure

Publications (1)

Publication Number Publication Date
CN209482259U true CN209482259U (en) 2019-10-11

Family

ID=68117830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822026860.9U Active CN209482259U (en) 2018-12-04 2018-12-04 It is a kind of to cross water landscape earth dam structure

Country Status (1)

Country Link
CN (1) CN209482259U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761120A (en) * 2021-01-21 2021-05-07 山东世鑫建设工程有限公司 City river landscape blocking body
CN113638367A (en) * 2021-08-16 2021-11-12 黄河勘测规划设计研究院有限公司 Be suitable for mortise type prefabricated section bank protection and construction equipment of check dam low reaches dam slope

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761120A (en) * 2021-01-21 2021-05-07 山东世鑫建设工程有限公司 City river landscape blocking body
CN113638367A (en) * 2021-08-16 2021-11-12 黄河勘测规划设计研究院有限公司 Be suitable for mortise type prefabricated section bank protection and construction equipment of check dam low reaches dam slope
CN113638367B (en) * 2021-08-16 2022-08-30 黄河勘测规划设计研究院有限公司 Be suitable for mortise type prefabricated section bank protection and construction equipment of check dam low reaches dam slope

Similar Documents

Publication Publication Date Title
CN206189340U (en) Structure is reformed transform to ecologization shore protection that grouts a stone barricade
CN203373705U (en) Ecological slope protection
CN212533968U (en) Drop ecological landscape dam
CN216074968U (en) River course river system view combined type ecological revetment structure
CN209482259U (en) It is a kind of to cross water landscape earth dam structure
CN203160202U (en) Slope protection and reinforcing device in water conservancy projects
CN104695379A (en) Ecological river channel revetment structure
CN216195256U (en) Ecological evaporation overflow tank
CN202509450U (en) Ecological slope protection device
CN108824365A (en) The double-deck arc riverbed restoration of the ecosystem structure
CN103938585A (en) Arrangement structure of mixed dam composed of earth dams and gravity dam
CN207567719U (en) The dykes and dams that a kind of gangue dead meal fills
CN210151667U (en) A seepage prevention structure for city river course
CN203834439U (en) Temporarily built site along river or gully
CN209584969U (en) A kind of water conservancy construction protective slope structure
CN209429035U (en) Mountain stream river levee engineering
RU2010108291A (en) COMPLEX OF HYDROTECHNICAL STRUCTURES FOR PREVENTING FLOODING OF TERRITORIES BELOW THE DAM OF THE KRASNODAR HYDROGROUND ON THE KUBAN RIVER
CN203096696U (en) High and low composite backwater weir
CN208363029U (en) A kind of hard revetment restoration of the ecosystem structure
CN207047790U (en) A kind of protection slope
CN105064264A (en) Super-large-scale water conservancy project and construction technology thereof
CN205296060U (en) One set of new structural type's water conservancy building
CN106368169A (en) Ecological protection slope for river protection
CN204875703U (en) A cross adfluxion sediment weir for hydraulic and hydroelectric engineering