CN206189340U - Structure is reformed transform to ecologization shore protection that grouts a stone barricade - Google Patents

Structure is reformed transform to ecologization shore protection that grouts a stone barricade Download PDF

Info

Publication number
CN206189340U
CN206189340U CN201621073310.7U CN201621073310U CN206189340U CN 206189340 U CN206189340 U CN 206189340U CN 201621073310 U CN201621073310 U CN 201621073310U CN 206189340 U CN206189340 U CN 206189340U
Authority
CN
China
Prior art keywords
barricade
revetment
platform
wall body
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621073310.7U
Other languages
Chinese (zh)
Inventor
朱定国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Water Engineering Design and Research Institute Co Ltd
Original Assignee
Shanghai Water Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Water Engineering Design and Research Institute Co Ltd filed Critical Shanghai Water Engineering Design and Research Institute Co Ltd
Priority to CN201621073310.7U priority Critical patent/CN206189340U/en
Application granted granted Critical
Publication of CN206189340U publication Critical patent/CN206189340U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本实用新型公开的一种浆砌块石挡墙的生态化护岸改造结构,包括:既有护岸下部结构,所述既有护岸下部结构包括前排桩、后排桩、设置在所述前排桩和后排桩的顶部且与所述前排桩和后排桩固接的挡墙底板以及设置在所述挡墙底板上且被破拆至设计高程的挡墙墙身;设置在所述挡墙墙身的顶面的前侧缘上的墙身压顶;设置在所述挡墙墙身的顶面上且位于所述墙身压顶的后侧的亲水平台;设置在河道岸坡的顶部上的防汛通道;设置在河道岸坡上且位于所述亲水平台与防汛通道之间的斜坡式绿化带;以及铺设在所述亲水平台前方的地面上的生物膜。本实用新型具有安全耐久、生态景观优美、环保节能、改造成本低、实施难度低、维护便利等优点。

The utility model discloses an ecological bank revetment reconstruction structure of a mortar block stone retaining wall, comprising: an existing bank revetment substructure, and the existing revetment substructure includes a front row of piles, a rear row of piles, and is arranged on the front row The top of the pile and the rear row of piles and the bottom plate of the retaining wall fixed to the front row of piles and the rear row of piles, and the retaining wall body which is arranged on the bottom plate of the retaining wall and is demolished to the design elevation; The top of the wall on the front side edge of the top surface of the retaining wall body; the hydrophilic platform arranged on the top surface of the wall body of the retaining wall and at the rear side of the top of the wall body; the water platform arranged on the bank slope of the river The flood control channel on the top; the slope type green belt arranged on the bank slope of the river and between the hydrophilic platform and the flood control channel; and the biofilm laid on the ground in front of the hydrophilic platform. The utility model has the advantages of safety and durability, beautiful ecological landscape, environmental protection and energy saving, low transformation cost, low implementation difficulty, convenient maintenance and the like.

Description

一种浆砌块石挡墙的生态化护岸改造结构An ecological bank revetment reconstruction structure of mortar block stone retaining wall

技术领域technical field

本实用新型涉及河湖堤岸生态景观改造技术领域,尤其涉及一种浆砌块石挡墙的生态化护岸改造结构。The utility model relates to the technical field of ecological landscape reconstruction of banks of rivers and lakes, in particular to an ecological revetment reconstruction structure of a mortar block stone retaining wall.

背景技术Background technique

随着城市化进程的推进,传统的挡墙结构已无法满足人们对生态景观的需求。近些年,城市内涝的频繁发生,促使建设“海绵城市”的理念得以推广,其中就包括了建设生态河道及其附属结构。With the advancement of urbanization, the traditional retaining wall structure can no longer meet people's needs for ecological landscape. In recent years, the frequent occurrence of urban waterlogging has promoted the concept of building a "sponge city", which includes the construction of ecological rivers and their subsidiary structures.

为了改善城市积弊和美化环境,越来越多的河道生态化改造工程列入建设计划中。目前常见的改造方式多为将现状护岸拆除,重建新型生态护岸,但存在对周边环境负面影响大、资源浪费、能耗高、造价高等一系列弊病,同时由于土地资源日益紧缺,产生的建筑垃圾也无处安置。In order to improve the urban disadvantages and beautify the environment, more and more river ecological reconstruction projects are included in the construction plan. At present, most of the common transformation methods are to demolish the existing revetment and rebuild new ecological revetment, but there are a series of disadvantages such as large negative impact on the surrounding environment, waste of resources, high energy consumption, and high cost. At the same time, due to the increasing shortage of land resources, the construction waste generated There is nowhere to place it.

浆砌块石挡墙是最古老的一种挡墙结构形式,因其料源丰富、形式简单、取材方便、施工简便,一直以来应用十分广泛。参见图1,图中给出的是传统的浆砌块石挡墙护岸结构,包括前排钢筋砼预制方桩10、后排钢筋砼预制方桩20、设置在前排钢筋砼预制方桩10和后排钢筋砼预制方桩20的顶端且与前排钢筋砼预制方桩10和后排钢筋砼预制方桩20固接的钢筋砼底板30、设置在钢筋砼底板30上的浆砌块石墙身40以及设置在浆砌块石墙身40的顶面上的压顶50。对于地势落差小、河道水不深、挡土高度小的平原地区,从经济实用层面来考虑,大多会选用浆砌块石挡墙护岸结构。Mortar block stone retaining wall is the oldest form of retaining wall structure. It has been widely used because of its rich material source, simple form, convenient material acquisition and convenient construction. Referring to Fig. 1, what provided in the figure is traditional mortar block stone retaining wall revetment structure, comprises front row reinforced concrete prefabricated square pile 10, back row reinforced concrete prefabricated square pile 20, is arranged on front row reinforced concrete prefabricated square pile 10 The reinforced concrete bottom plate 30 fixedly connected to the top of the rear reinforced concrete prefabricated square pile 20 and the front row reinforced concrete prefabricated square pile 10 and the rear reinforced concrete prefabricated square pile 20, and the mortar block stone arranged on the reinforced concrete bottom plate 30 The wall body 40 and the topping 50 arranged on the top surface of the mortar block stone wall body 40 . For plain areas with small terrain drop, low river water, and low retaining height, from the perspective of economy and practicality, most of them will choose the revetment structure of mortar block stone retaining wall.

基于城市发展需求,需要对现状护岸进行生态化改造。大多数设计者通常是采用完全拆卸现状挡墙结构,取而代之以墙体材料为预制砼块体、生态石笼等生态景观效果好的护岸结构形式,在河湖生态化治理方面取得了一定的成效。但由于较多现状护岸尚在使用年限内,结构安全可靠,安全拆除重建既不经济也不环保,实施难度也大,缺点比较明显,亟需在现状护岸结构的基础上研究出利用现状护岸、仅进行局部拆除的生态化改造方案。Based on the needs of urban development, it is necessary to carry out ecological transformation of the current revetment. Most designers usually completely dismantle the existing retaining wall structure and replace it with prefabricated concrete blocks, ecological gabions and other revetment structures with good ecological landscape effects, which have achieved certain results in the ecological management of rivers and lakes. . However, because most of the current revetment is still within the service life, the structure is safe and reliable, safe demolition and reconstruction are neither economical nor environmentally friendly, and the implementation is also difficult, with obvious shortcomings. An ecological transformation plan with only partial demolition.

为此,申请人进行了有益的探索和尝试,找到了解决上述问题的办法,下面将要介绍的技术方案便是在这种背景下产生的。For this reason, the applicant has conducted useful explorations and attempts, and has found a solution to the above-mentioned problems, and the technical solutions to be introduced below are produced under this background.

实用新型内容Utility model content

本实用新型所要解决的技术问题在于:针对传统的浆砌块石挡墙护岸结构在进行生态化改造时采用完全拆卸现状浆砌块石挡墙而导致既不经济也不环保,且实施难度大等问题,而提供一种既经济环保,也便于施工实施和安全耐久的浆砌块石挡墙的生态化护岸改造结构。The technical problem to be solved by the utility model is: for the traditional masonry block stone retaining wall revetment structure, it is neither economical nor environmentally friendly to completely dismantle the existing masonry block stone retaining wall when carrying out ecological transformation, and the implementation is difficult In order to solve these problems, an ecological bank revetment reconstruction structure of the mortar block stone retaining wall is provided which is not only economical and environmentally friendly, but also convenient for construction and implementation, safe and durable.

本实用新型所要解决的技术问题可以采用如下技术方案来实现:The technical problem to be solved by the utility model can be realized by adopting the following technical solutions:

一种浆砌块石挡墙的生态化护岸改造结构,包括:An ecological revetment reconstruction structure for a mortar block stone retaining wall, comprising:

既有护岸下部结构,所述既有护岸下部结构包括前排桩、后排桩、设置在所述前排桩和后排桩的顶部且与所述前排桩和后排桩固接的挡墙底板以及设置在所述挡墙底板上且被破拆至设计高程的挡墙墙身;The existing bank revetment substructure, the existing bank revetment substructure includes a front row of piles, a rear row of piles, a retaining block arranged on the top of the front row of piles and the rear row of piles and fixedly connected to the front row of piles and the rear row of piles The bottom plate of the wall and the body of the retaining wall arranged on the bottom plate of the retaining wall and demolished to the design elevation;

设置在所述挡墙墙身的顶面的前侧缘上的墙身压顶;wall topping arranged on the front side edge of the top surface of the retaining wall;

设置在所述挡墙墙身的顶面上且位于所述墙身压顶的后侧的亲水平台;a hydrophilic platform arranged on the top surface of the wall body of the retaining wall and located at the rear side of the top of the wall body;

设置在河道岸坡的顶部上的防汛通道;Flood control channel set on the top of the river bank slope;

设置在河道岸坡上且位于所述亲水平台与防汛通道之间的斜坡式绿化带;以及A slope-type green belt arranged on the bank slope of the river and between the hydrophilic platform and the flood control channel; and

铺设在所述亲水平台前方的地面上的生物膜。A biofilm laying on the ground in front of the hydrophilic platform.

在本实用新型的一个优选实施例中,所述挡墙墙身的顶面高于河道设计常水位。In a preferred embodiment of the present utility model, the top surface of the wall body of the retaining wall is higher than the design normal water level of the river channel.

在本实用新型的一个优选实施例中,所述亲水平台包括由下至上依次设置的第一碎石垫层、第一素砼垫层、第一水泥砂浆以及透水彩色人行道砖层。In a preferred embodiment of the present invention, the hydrophilic platform includes a first crushed stone cushion layer, a first plain concrete cushion layer, a first cement mortar layer and a water-permeable colored pavement brick layer arranged sequentially from bottom to top.

在本实用新型的一个优选实施例中,所述防汛通道包括由下至上依次设置的第二碎石垫层、第二素砼垫层、第二水泥砂浆以及彩色舒布洛克砖层。In a preferred embodiment of the present utility model, the flood control passage includes a second gravel cushion layer, a second plain concrete cushion layer, a second cement mortar layer and a colored Shubrok brick layer arranged in sequence from bottom to top.

在本实用新型的一个优选实施例中,在所述河道岸坡上且位于所述斜坡式绿化带的下方铺设有三维土工网。In a preferred embodiment of the present invention, a three-dimensional geonetwork is laid on the bank slope of the river channel and below the sloped green belt.

在本实用新型的一个优选实施例中,所述生物膜由所述挡墙底板的前侧缘延伸至河道的底部。In a preferred embodiment of the present utility model, the biofilm extends from the front side edge of the bottom plate of the retaining wall to the bottom of the channel.

在本实用新型的一个优选实施例中,在所述亲水平台的前侧缘上竖直设置有亲水平台栏杆。In a preferred embodiment of the present utility model, a hydrophilic platform railing is vertically arranged on the front edge of the hydrophilic platform.

在本实用新型的一个优选实施例中,在所述亲水平台前方的地面上种植水生植物。In a preferred embodiment of the present utility model, aquatic plants are planted on the ground in front of the hydrophilic platform.

在本实用新型的一个优选实施例中,在所述亲水平台前方的地面上通过支撑立柱设置有一与所述墙身压顶衔接的景观平台。In a preferred embodiment of the present utility model, a landscape platform connected to the top of the wall is provided on the ground in front of the hydrophilic platform through supporting columns.

在本实用新型的一个优选实施例中,在所述景观平台的前侧缘上竖直设置有景观平台栏杆。In a preferred embodiment of the present utility model, a landscape platform railing is vertically arranged on the front edge of the landscape platform.

由于采用了如上的技术方案,本实用新型的有益效果在于:Due to adopting the above technical scheme, the beneficial effects of the utility model are:

1、本实用新型对传统的浆砌块石挡墙护岸结构进行了生态化改造,根据河道的设计常水位拆除设计常水位以上的挡墙墙身部分,并采用墙身压顶使得墙顶标高达到防洪要求;1. The utility model carries out an ecological transformation on the traditional mortar block stone retaining wall revetment structure. According to the design constant water level of the river channel, the part of the retaining wall above the design constant water level is removed, and the wall top is used to make the wall top elevation reach flood protection requirements;

2、本实用新型的挡墙墙身采用亲水平台、斜坡式绿化带以及防汛通道,景观绿化效果佳,使得人们可以亲近自然;2. The wall body of the retaining wall of the utility model adopts a hydrophilic platform, a slope-type green belt and a flood control channel, and the landscape greening effect is good, so that people can get close to nature;

3、亲水平台前种植水生植物,可以美化环境和净化水质,生物膜的设计也可以净化和过滤水质,增强河流的自净能力;3. Planting aquatic plants in front of the hydrophilic platform can beautify the environment and purify water quality. The design of biofilm can also purify and filter water quality and enhance the self-purification ability of rivers;

4、景观平台使得人们可以更好地亲近自然和亲水戏水。4. The landscape platform enables people to get closer to nature and play in the water.

5、本实用新型具有安全耐久、生态景观优美、环保节能、改造成本低、实施难度低、维护便利等优点。5. The utility model has the advantages of safety and durability, beautiful ecological landscape, environmental protection and energy saving, low renovation cost, low implementation difficulty, and convenient maintenance.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1是传统的浆砌块石挡墙护岸结构的断面结构示意图。Fig. 1 is a cross-sectional schematic diagram of a traditional mortar block stone retaining wall revetment structure.

图2是本实用新型的实施例1的断面结构示意图。Fig. 2 is a schematic cross-sectional structure diagram of Embodiment 1 of the present utility model.

图3是本实用新型的实施例2的断面结构示意图。Fig. 3 is a schematic cross-sectional structure diagram of Embodiment 2 of the present utility model.

具体实施方式detailed description

为了使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本实用新型。In order to make the technical means, creative features, goals and effects achieved by the utility model easy to understand, the utility model will be further elaborated below in conjunction with specific illustrations.

实施例1Example 1

参见图2,图中给出的是一种浆砌块石挡墙的生态化护岸改造结构,包括既有护岸下部结构100、墙身压顶200、亲水平台300、防汛通道400、斜坡式绿化带500以及生物膜600。See Figure 2, which shows an ecological bank revetment reconstruction structure of a mortar block stone retaining wall, including the existing bank revetment substructure 100, wall top pressure 200, hydrophilic platform 300, flood control channel 400, and slope greening Belt 500 and biofilm 600.

既有护岸下部结构100包括前排桩110、后排桩120、挡墙底板130以及挡墙墙身140。挡墙底板130设置在前排桩110和后排桩120的顶部,并且与前排桩110和后排桩120固接,挡墙墙身140设置在挡墙底板130上且被破拆至设计高程,通常而言,挡墙墙身140的顶面高于河道设计常水位。The existing revetment substructure 100 includes a front row of piles 110 , a rear row of piles 120 , a retaining wall bottom plate 130 and a retaining wall body 140 . The retaining wall bottom plate 130 is arranged on the top of the front row of piles 110 and the rear row of piles 120, and is fixedly connected with the front row of piles 110 and the rear row of piles 120, and the retaining wall body 140 is arranged on the retaining wall bottom plate 130 and is demolished to the design Elevation, generally speaking, the top surface of the retaining wall body 140 is higher than the design constant water level of the river channel.

墙身压顶200采用钢筋砼制成,其设置在挡墙墙身140的顶面的前侧缘上,使得墙顶标高达到防洪要求。The wall top 200 is made of reinforced concrete, which is arranged on the front side edge of the top surface of the retaining wall body 140, so that the elevation of the top of the wall meets the flood control requirements.

亲水平台300设置在挡墙墙身140的顶面上且位于墙身压顶200的后侧。亲水平台300包括由下至上依次设置的碎石垫层310、素砼垫层320、水泥砂浆330以及透水彩色人行道砖层340。在亲水平台300的前侧缘上竖直设置有亲水平台栏杆350。在亲水平台300前方的地面上种植水生植物700,水生植物700为黄菖蒲、睡莲、干屈菜等水生植物,水生植物700可以美化环境和净化水质。The hydrophilic platform 300 is disposed on the top surface of the retaining wall body 140 and is located at the rear side of the wall body top 200 . The hydrophilic platform 300 includes a crushed stone cushion 310 , a plain concrete cushion 320 , cement mortar 330 and a water-permeable colored pavement brick layer 340 arranged in sequence from bottom to top. A hydrophilic platform railing 350 is vertically arranged on the front edge of the hydrophilic platform 300 . Aquatic plants 700 are planted on the ground in front of the hydrophilic platform 300. The aquatic plants 700 are aquatic plants such as calamus, water lilies, and dried vegetables. The aquatic plants 700 can beautify the environment and purify water quality.

防汛通道400设置在河道岸坡10的顶部上。防汛通道400包括由下至上依次设置的碎石垫层410、素砼垫层420、水泥砂浆430以及彩色舒布洛克砖层440。The flood control channel 400 is set on the top of the river bank slope 10 . The flood control channel 400 includes a crushed stone cushion 410 , a plain concrete cushion 420 , cement mortar 430 and a layer of colored Shubrox bricks 440 arranged in sequence from bottom to top.

斜坡式绿化带500设置在河道岸坡10上且位于亲水平台300与防汛通道400之间,并将亲水平台300与防汛通道400衔接起来。在所述河道岸坡上且位于斜坡式绿化带500的下方铺设有三维土工网510。The slope-type green belt 500 is set on the river bank slope 10 and is located between the hydrophilic platform 300 and the flood control channel 400 , and connects the hydrophilic platform 300 and the flood control channel 400 . A three-dimensional geonet 510 is laid on the river bank slope and below the slope green belt 500 .

生物膜600铺设在亲水平台300前方的地面上,生物膜600由挡墙底板130的前侧缘延伸至河道的底部,生物膜600的设置可以净化和过滤水质,增强河流的自净能力。The biofilm 600 is laid on the ground in front of the hydrophilic platform 300. The biofilm 600 extends from the front side edge of the retaining wall bottom plate 130 to the bottom of the river channel. The biofilm 600 can purify and filter water quality and enhance the self-purification ability of the river.

实施例2Example 2

本实施例的结构与实施例1的结构大致相同,其区别在于:参见图3,在亲水平台300前方的地面上通过支撑立柱810设置有一与墙身压顶200衔接的景观平台800,景观平台800的设置可以使得人们更加亲近自然和亲水戏水。景观平台800采用钢筋混凝土板制成,其上铺设水泥砂浆和透水彩色人行道砖层。支撑立柱810为多根,且间隔均匀分布,对景观平台800起到制成支撑的作用,支撑立柱810采用仿木桩制成。景观平台800的前侧缘上竖直设置有景观平台栏杆820。The structure of this embodiment is roughly the same as that of Embodiment 1, the difference being that: referring to Fig. 3 , a landscape platform 800 connected to the top of the wall 200 is provided on the ground in front of the hydrophilic platform 300 through a support column 810, the landscape platform The setting of 800 can make people get closer to nature and play in water. The landscape platform 800 is made of reinforced concrete slabs, on which cement mortar and permeable colored sidewalk brick layers are laid. There are a plurality of support columns 810, and the intervals are evenly distributed to support the landscape platform 800. The support columns 810 are made of imitation wood piles. Landscape platform railings 820 are vertically arranged on the front edge of the landscape platform 800 .

以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present utility model and the advantages of the present utility model have been shown and described above. Those skilled in the art should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection required by the utility model is defined by the appended claims and their equivalents.

Claims (10)

1. the ecology revetment modification structure of a kind of cemented rock barricade, it is characterised in that including:
Existing shore protection substructure, the existing shore protection substructure include preceding campshed, rear campshed, be arranged on the preceding campshed and The top of campshed and the barricade base plate affixed with the preceding campshed and rear campshed and it is arranged on the barricade base plate and quilt afterwards Dismantle to the barricade wall body of design altitude;
The wall body being arranged on the cephalolateral margin of the top surface of the barricade wall body bears down on one;
The water balcony of the rear side for being arranged on the top surface of the barricade wall body and bearing down on one positioned at the wall body;
It is arranged on the flood control passage on the top of river course bank slope;
It is arranged on the ramp type greenbelt on river course bank slope and between the water balcony and flood control passage;And
It is laid on the biomembrane on the ground in front of the water balcony.
2. the ecology revetment modification structure of cemented rock barricade as claimed in claim 1, it is characterised in that the barricade wall The top surface of body is higher than River Design ordinary water level.
3. the ecology revetment modification structure of cemented rock barricade as claimed in claim 1, it is characterised in that described hydrophilic flat Platform includes the first blotter, the first plain concrete bed course, the first cement mortar and the water-permeable colored people that set gradually from the bottom to top Trade brick layer.
4. the ecology revetment modification structure of cemented rock barricade as claimed in claim 1, it is characterised in that the flood control is led to Road includes the second blotter, the second plain concrete bed course, the second cement mortar and the colour Shu Buluo that set gradually from the bottom to top Gram brick layer.
5. the ecology revetment modification structure of cemented rock barricade as claimed in claim 1, it is characterised in that in the river course Three-dimensional earthwork is equipped with bank slope and below the ramp type greenbelt.
6. the ecology revetment modification structure of cemented rock barricade as claimed in claim 1, it is characterised in that the biomembrane The bottom in river course is extended to by the cephalolateral margin of the barricade base plate.
7. the ecology revetment modification structure of cemented rock barricade as claimed in claim 1, it is characterised in that described hydrophilic Water balcony railing is vertically arranged with the cephalolateral margin of platform.
8. the ecology revetment modification structure of cemented rock barricade as claimed in claim 7, it is characterised in that described hydrophilic Planting aquatic plants on ground in front of platform.
9. the ecology revetment modification structure of cemented rock barricade as claimed in claim 1, it is characterised in that described hydrophilic Support post one is provided with ground in front of platform to bear down on one with the wall body landscape platform that is connected.
10. the ecology revetment modification structure of cemented rock barricade as claimed in claim 9, it is characterised in that in the scape Landscape platform railing is vertically arranged with the cephalolateral margin for seeing platform.
CN201621073310.7U 2016-09-22 2016-09-22 Structure is reformed transform to ecologization shore protection that grouts a stone barricade Expired - Fee Related CN206189340U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621073310.7U CN206189340U (en) 2016-09-22 2016-09-22 Structure is reformed transform to ecologization shore protection that grouts a stone barricade

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621073310.7U CN206189340U (en) 2016-09-22 2016-09-22 Structure is reformed transform to ecologization shore protection that grouts a stone barricade

Publications (1)

Publication Number Publication Date
CN206189340U true CN206189340U (en) 2017-05-24

Family

ID=58729593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621073310.7U Expired - Fee Related CN206189340U (en) 2016-09-22 2016-09-22 Structure is reformed transform to ecologization shore protection that grouts a stone barricade

Country Status (1)

Country Link
CN (1) CN206189340U (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107653837A (en) * 2017-10-31 2018-02-02 温州市水利电力勘测设计院 The native compound dike of stone framework
CN108330910A (en) * 2018-01-10 2018-07-27 上海勘测设计研究院有限公司 revetment structure
CN108755591A (en) * 2018-08-06 2018-11-06 上海宝冶集团有限公司 ecological revetment and construction method
CN109235358A (en) * 2018-11-16 2019-01-18 中交上海航道勘察设计研究院有限公司 A kind of slope type ecological revetment structure
CN109267541A (en) * 2018-09-26 2019-01-25 安溪县斯马拓科技发展有限公司 A kind of hybrid revetment structure
CN110644426A (en) * 2019-09-26 2020-01-03 中铁二十三局集团轨道交通工程有限公司 Prefabricated assembled flood prevention view dykes and dams structure
CN110804990A (en) * 2019-11-21 2020-02-18 深圳春沐源控股有限公司 Boundless scenic spot river course structure
CN112176945A (en) * 2020-09-28 2021-01-05 中交水利水电建设有限公司 Construction method for moving back dike to sea
CN112176947A (en) * 2020-09-28 2021-01-05 中交水利水电建设有限公司 Bank protection construction method for concave bank line of sludge layer foundation
CN112281745A (en) * 2020-11-13 2021-01-29 中交浚浦建筑科技(上海)有限公司 A new type of prefabricated revetment device for quick installation
CN112392001A (en) * 2020-10-26 2021-02-23 上海市政工程设计研究总院(集团)有限公司 Assembled ecological revetment and construction method
CN112982281A (en) * 2021-04-15 2021-06-18 黄河勘测规划设计研究院有限公司 Ecological retaining wall structure suitable for landscape river channel
CN114960545A (en) * 2022-06-08 2022-08-30 长江勘测规划设计研究有限责任公司 Green road system constructed on soft foundation permeable dike and construction method thereof
CN115478513A (en) * 2022-09-28 2022-12-16 长江勘测规划设计研究有限责任公司 Structure and method for reinforcement and ecological transformation of soft foundation and slope of rivers and lakes in urban areas
CN117071495A (en) * 2023-08-14 2023-11-17 金陵科技学院 Ecological management structure of urban land and river zone water level amplitude region and construction method

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107653837A (en) * 2017-10-31 2018-02-02 温州市水利电力勘测设计院 The native compound dike of stone framework
CN108330910A (en) * 2018-01-10 2018-07-27 上海勘测设计研究院有限公司 revetment structure
CN108330910B (en) * 2018-01-10 2024-10-22 上海勘测设计研究院有限公司 Bank protection structure
CN108755591A (en) * 2018-08-06 2018-11-06 上海宝冶集团有限公司 ecological revetment and construction method
CN109267541A (en) * 2018-09-26 2019-01-25 安溪县斯马拓科技发展有限公司 A kind of hybrid revetment structure
CN109235358A (en) * 2018-11-16 2019-01-18 中交上海航道勘察设计研究院有限公司 A kind of slope type ecological revetment structure
CN110644426A (en) * 2019-09-26 2020-01-03 中铁二十三局集团轨道交通工程有限公司 Prefabricated assembled flood prevention view dykes and dams structure
CN110804990A (en) * 2019-11-21 2020-02-18 深圳春沐源控股有限公司 Boundless scenic spot river course structure
CN112176947A (en) * 2020-09-28 2021-01-05 中交水利水电建设有限公司 Bank protection construction method for concave bank line of sludge layer foundation
CN112176945A (en) * 2020-09-28 2021-01-05 中交水利水电建设有限公司 Construction method for moving back dike to sea
CN112392001A (en) * 2020-10-26 2021-02-23 上海市政工程设计研究总院(集团)有限公司 Assembled ecological revetment and construction method
CN112281745A (en) * 2020-11-13 2021-01-29 中交浚浦建筑科技(上海)有限公司 A new type of prefabricated revetment device for quick installation
CN112982281A (en) * 2021-04-15 2021-06-18 黄河勘测规划设计研究院有限公司 Ecological retaining wall structure suitable for landscape river channel
CN114960545A (en) * 2022-06-08 2022-08-30 长江勘测规划设计研究有限责任公司 Green road system constructed on soft foundation permeable dike and construction method thereof
CN114960545B (en) * 2022-06-08 2023-11-10 长江勘测规划设计研究有限责任公司 Green road system constructed on soft foundation permeable dike and construction method thereof
CN115478513A (en) * 2022-09-28 2022-12-16 长江勘测规划设计研究有限责任公司 Structure and method for reinforcement and ecological transformation of soft foundation and slope of rivers and lakes in urban areas
CN117071495A (en) * 2023-08-14 2023-11-17 金陵科技学院 Ecological management structure of urban land and river zone water level amplitude region and construction method

Similar Documents

Publication Publication Date Title
CN206189340U (en) Structure is reformed transform to ecologization shore protection that grouts a stone barricade
CN106149625B (en) A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method
CN102277852B (en) Teaching model for construction of earth and rockfill dam
CN203795372U (en) Box body and inserted plate combined type ecological bank protection structure
CN205329626U (en) Ecological purification of water can prevent soil erosion and water loss view ecological revetment
CN204875416U (en) Porous pavement structure
CN105735082A (en) Water-permeable planting formwork frame and multifunctional water-permeable pavement structure system and pavement method thereof
CN206189344U (en) Existing stereoplasm shore protection ecological landscape ization transformation structure
CN209873714U (en) River bank protection structure for urban mountain area
CN205711609U (en) Framed and the multi-functional porous pavement structural system of permeable plantation
CN205205608U (en) Permeable pavement
CN203866858U (en) Riverway revetment plant-growing retaining wall
CN206438465U (en) A kind of ecological self-purification type landscape revetment reconstruction structure
CN105484132B (en) A kind of construction method that novel water permeable pavement is mated formation
CN104372765A (en) Frame column type frame bank protection structure for city watercourse and construction method of bank protection structure
CN205276215U (en) Ecological block that kayser formula is piled up
CN205116096U (en) Crisscross formula ecological block that inlays
CN202323869U (en) Urban river bank protection structure
CN106192890A (en) A kind of dam crest cultural landscape band structure
CN207092011U (en) A kind of water conservancy ecosystem system
CN213296235U (en) Ecological bank protection structure for urban river channel treatment
CN110512562A (en) A kind of river corridor restoration construction method
CN204982937U (en) Multi -functional gravity type barricade
CN211690179U (en) Composite embankment structure for urban river
CN211227905U (en) Double-channel slow running diameter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170524

Termination date: 20210922