CN106480996A - A kind of method are in the milk by docking structure of levels prefabricated component and the faying face to levels prefabricated component - Google Patents

A kind of method are in the milk by docking structure of levels prefabricated component and the faying face to levels prefabricated component Download PDF

Info

Publication number
CN106480996A
CN106480996A CN201610913784.6A CN201610913784A CN106480996A CN 106480996 A CN106480996 A CN 106480996A CN 201610913784 A CN201610913784 A CN 201610913784A CN 106480996 A CN106480996 A CN 106480996A
Authority
CN
China
Prior art keywords
prefabricated component
levels
faying face
exhaust passage
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610913784.6A
Other languages
Chinese (zh)
Inventor
费权
李宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Pengjian Precast Concrete Elements Co Ltd
SHENZHEN PENGCHENG BUILDING GROUP CO Ltd
Original Assignee
Shenzhen Pengjian Precast Concrete Elements Co Ltd
SHENZHEN PENGCHENG BUILDING GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Pengjian Precast Concrete Elements Co Ltd, SHENZHEN PENGCHENG BUILDING GROUP CO Ltd filed Critical Shenzhen Pengjian Precast Concrete Elements Co Ltd
Priority to CN201610913784.6A priority Critical patent/CN106480996A/en
Publication of CN106480996A publication Critical patent/CN106480996A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members

Abstract

A kind of method are in the milk by docking structure of levels prefabricated component and the faying face to levels prefabricated component, it is intended to overcome levels shear wall of the prior art, frame column faying face is in filling grouting, as empty chamber air cannot be discharged, ultimately result in levels faying face and cavity occur, the shortcoming of impact structure safety, a kind of docking structure of levels prefabricated component is provided, two prefabricated components including levels docking, grouting is filled between the faying face of levels prefabricated component, exhaust passage is provided with least one prefabricated component, exhaust passage one end is extended to outside the faying face of prefabricated component, the exhaust passage other end is extended to outside the other surfaces of prefabricated component.A kind of method is in the milk by faying face to levels prefabricated component is also provided.The present invention not only ensure that the safety of structure, it is ensured that the quality of construction, use when being suitable for being in the milk the faying face of levels prefabricated components.

Description

A kind of docking structure of levels prefabricated component and the faying face to levels prefabricated component The method being in the milk
The present invention relates to building industrialization field, more particularly to a kind of docking structure of levels prefabricated component and to upper and lower The method is in the milk by the faying face of layer prefabricated component.
Background technology
In the installation process of fabricated shear wall and frame column, levels shear wall, frame column faying face are filled in filling During slurry, as empty chamber air cannot be discharged, during being constantly in the milk, air pressure inside also can be increasing therewith, finally Cause cavity in levels faying face, occur, affect structure safety.
Content of the invention
Instant invention overcomes levels shear wall of the prior art, frame column faying face are in filling grouting, due to sky Chamber air cannot be discharged, and ultimately result in and occur cavity in levels faying face, affect the shortcoming of structure safety, there is provided a kind of The docking structure of levels prefabricated component, also provides a kind of method is in the milk by faying face to levels prefabricated component.
The present invention realizes the technical scheme of the first goal of the invention employing:A kind of docking structure of levels prefabricated component, bag Two prefabricated components of levels docking are included, and grouting are filled between the faying face of levels prefabricated component, at least one prefabricated component Exhaust passage is provided with, exhaust passage one end is extended to outside the faying face of prefabricated component, and the exhaust passage other end extends to prefabricated component Outside other surfaces.
Further, described exhaust passage is built-in blast pipe or air discharge duct.
Further, described prefabricated component is precast shear wall, and even cloth is provided with one group of blast pipe, one group of blast pipe one end Extend to outside the faying face of precast shear wall.
Further, described prefabricated component is prefabricated frame trestle, and blast pipe one end extends to the faying face of prefabricated frame trestle Outside center.
The present invention realizes the technical scheme of the second goal of the invention employing:A kind of faying face to levels prefabricated component is carried out The method of grouting, including two prefabricated components of levels docking, concrete grammar is comprised the following steps:
A. the prefabricated component of exhaust passage is set at least making one, and exhaust passage one end is extended to outside the faying face of prefabricated component, row The gas passage other end is extended to outside the other surfaces of prefabricated component;
B. levels prefabricated component is docked, the faying face of the relatively another prefabricated component in one end of the exhaust passage described in step A is arranged;
C. it is in the milk to the faying face of levels prefabricated component, till the outside grout of the other end of the exhaust passage described in step A.
Further, described exhaust passage is built-in blast pipe or air discharge duct.
Further, described prefabricated component is precast shear wall, and even cloth is provided with one group of blast pipe, one group of blast pipe one end Extend to outside the faying face of precast shear wall.
Further, described prefabricated component is prefabricated frame trestle, and blast pipe one end extends to the faying face of prefabricated frame trestle Outside center.
The invention has the beneficial effects as follows:By arranging exhaust passage, the gas in faying face is discharged in filling process, Cavity can effectively be eliminated, it is ensured that the safety of structure.
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
Description of the drawings
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the A direction view of Fig. 1.
Fig. 3 is the flow chart of the present invention.
In accompanying drawing, 1 is upper strata prefabricated component, 2 is grouting, 3 is lower floor's prefabricated component, 4 is blast pipe.
Specific embodiment
As shown in accompanying drawing 1,2, a kind of docking structure of levels prefabricated component of the present embodiment, including the two of levels docking Individual prefabricated component, i.e. upper strata prefabricated component 1 and lower floor's prefabricated component 3, are filled with grouting between the faying face of levels prefabricated component.At least one Individual prefabricated component is to be provided with exhaust passage in upper strata prefabricated component 1, and exhaust passage one end is extended to outside the faying face of prefabricated component, and exhaust is logical The road other end is extended to outside the other surfaces of prefabricated component.The preferred exhaust passage of the present embodiment is built-in blast pipe 4 or exhaust Groove.In actual irrigation process, pre-buried blast pipe 4 in upper strata prefabricated component 1.To upper strata prefabricated component 1 and lower floor's prefabricated component 3 During faying face penetration concrete 2, the gas in faying face is discharged along blast pipe 4, finally, is all filled in faying face and blast pipe 4 Full concrete 2.In this way, the formation of cavity not only can be effectively avoided, can also intuitively judges very much coagulation Whether soil 2 is filled, and not only ensure that the safety of structure, it is ensured that the quality of construction.For different prefabricated components, in view of its body Long-pending difference, the setting of blast pipe 4 can be variant.Described prefabricated component is precast shear wall, because precast shear wall is longer, if The gas that a blast pipe 4 can not be in completely drained faying face is put, the preferably even cloth of the present embodiment is provided with one group of blast pipe 4, One group of 4 one end of blast pipe is extended to outside the faying face of precast shear wall.Described prefabricated component is prefabricated frame trestle, because prefabricated frame Trestle base plate center is farthest with respect to surrounding, is that preferred 4 one end of blast pipe of the present embodiment extends where cavity is most easily formed To outside the faying face center of prefabricated frame trestle.
As shown in Figure 3, a kind of method is in the milk by faying face to levels prefabricated component of the present embodiment, including upper Two prefabricated components of lower floor's docking, concrete grammar are comprised the following steps:
A. the prefabricated component of exhaust passage is set at least making one, and exhaust passage one end is extended to outside the faying face of prefabricated component, row The gas passage other end is extended to outside the other surfaces of prefabricated component, is the flatness for ensureing preform surfaces, the end of exhaust passage Level is kept with the surface of prefabricated component;
B. levels prefabricated component is docked, the faying face of the relatively another prefabricated component in one end of the exhaust passage described in step A is arranged, It is easy to the gas produced in faying face to discharge along exhaust passage;
C. it is in the milk to the faying face of levels prefabricated component, the gas produced in faying face is arranged along exhaust passage in filling process Go out, after faying face is filled, concrete is entered in exhaust passage, filling process is another up to the exhaust passage described in step A Till holding outside grout, now explanation is filled, and the inside is nothing cavity.
For convenience of exhaust passage is made, the preferred exhaust passage of the present embodiment is built-in blast pipe or air discharge duct.
For different prefabricated components, in view of the difference of its volume, the setting of blast pipe can be variant.Described prefabricated component is Precast shear wall, because precast shear wall is longer, arranges the gas that blast pipe can not be in completely drained faying face, this enforcement The preferably even cloth of example is provided with one group of blast pipe, and one group of blast pipe one end is extended to outside the faying face of precast shear wall.Described Prefabricated component is prefabricated frame trestle, because precast frame column base plate center with respect to surrounding farthest, is where cavity is most easily formed, The preferred blast pipe one end of the present embodiment is extended to outside the faying face center of prefabricated frame trestle.

Claims (8)

1. a kind of docking structure of levels prefabricated component, including two prefabricated components of levels docking, the knot of levels prefabricated component Grouting is filled between conjunction face, it is characterised in that be provided with exhaust passage at least one prefabricated component, exhaust passage one end extends to Outside the faying face of prefabricated component, the exhaust passage other end is extended to outside the other surfaces of prefabricated component.
2. a kind of docking structure of levels prefabricated component according to claim 1, it is characterised in that described exhaust passage For built-in blast pipe or air discharge duct.
3. the docking structure of a kind of levels prefabricated component according to claim 2, it is characterised in that described prefabricated component is Precast shear wall, even cloth are provided with one group of blast pipe, and one group of blast pipe one end is extended to outside the faying face of precast shear wall.
4. the docking structure of a kind of levels prefabricated component according to claim 2, it is characterised in that described prefabricated component is Prefabricated frame trestle, blast pipe one end are extended to outside the faying face center of prefabricated frame trestle.
5. a kind of method is in the milk by faying face to levels prefabricated component, including two prefabricated components of levels docking, its It is characterised by, concrete grammar is comprised the following steps:
A. the prefabricated component of exhaust passage is set at least making one, and exhaust passage one end is extended to outside the faying face of prefabricated component, row The gas passage other end is extended to outside the other surfaces of prefabricated component;
B. levels prefabricated component is docked, the faying face of the relatively another prefabricated component in one end of the exhaust passage described in step A is arranged;
C. it is in the milk to the faying face of levels prefabricated component, till the outside grout of the other end of the exhaust passage described in step A.
6. a kind of method is in the milk by faying face to levels prefabricated component according to claim 5, it is characterised in that Described exhaust passage is built-in blast pipe or air discharge duct.
7. a kind of method is in the milk by faying face to levels prefabricated component according to claim 6, it is characterised in that Described prefabricated component is precast shear wall, and even cloth is provided with one group of blast pipe, and one group of blast pipe one end extends to precast shear wall Faying face outside.
8. a kind of method is in the milk by faying face to levels prefabricated component according to claim 6, it is characterised in that Described prefabricated component is prefabricated frame trestle, and blast pipe one end is extended to outside the faying face center of prefabricated frame trestle.
CN201610913784.6A 2016-10-20 2016-10-20 A kind of method are in the milk by docking structure of levels prefabricated component and the faying face to levels prefabricated component Pending CN106480996A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610913784.6A CN106480996A (en) 2016-10-20 2016-10-20 A kind of method are in the milk by docking structure of levels prefabricated component and the faying face to levels prefabricated component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610913784.6A CN106480996A (en) 2016-10-20 2016-10-20 A kind of method are in the milk by docking structure of levels prefabricated component and the faying face to levels prefabricated component

Publications (1)

Publication Number Publication Date
CN106480996A true CN106480996A (en) 2017-03-08

Family

ID=58270403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610913784.6A Pending CN106480996A (en) 2016-10-20 2016-10-20 A kind of method are in the milk by docking structure of levels prefabricated component and the faying face to levels prefabricated component

Country Status (1)

Country Link
CN (1) CN106480996A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211319A (en) * 2020-10-13 2021-01-12 上海城建市政工程(集团)有限公司 Same-layer grouting method for mounting prefabricated shear wall of fabricated building
CN112900773A (en) * 2021-01-27 2021-06-04 斯蒙特节能科技(上海)有限公司 Outer wall lightweight heat preservation and decoration integrated board

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003301526A (en) * 2002-04-12 2003-10-24 Tokyo Tekko Co Ltd Connecting construction method for precast concrete vertical member
CN2621196Y (en) * 2003-04-21 2004-06-23 润弘精密工程事业股份有限公司 Exhaust structure of continuous junction of precast post
CN202430831U (en) * 2012-01-20 2012-09-12 中冶建筑研究总院有限公司 Cement grouting steel bar connecting structure of precast concrete unit
CN103590510A (en) * 2013-11-27 2014-02-19 上海建工五建集团有限公司 Method for fixedly connecting embedded bars in assembly-type structure and cast-in-place structure
CN204418380U (en) * 2014-12-31 2015-06-24 深圳市华阳国际工程设计有限公司 A kind of prefabricated component connector
CN204551820U (en) * 2015-01-27 2015-08-12 安徽同济建设集团有限责任公司 precast wall body
CN105863049A (en) * 2016-05-26 2016-08-17 南京长江都市建筑设计股份有限公司 Prefabricated assembled integral framework column bottom grouting structure
CN206128361U (en) * 2016-10-20 2017-04-26 深圳市鹏城建筑集团有限公司 Attend butt -joint structural of lower floor's prefab

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003301526A (en) * 2002-04-12 2003-10-24 Tokyo Tekko Co Ltd Connecting construction method for precast concrete vertical member
CN2621196Y (en) * 2003-04-21 2004-06-23 润弘精密工程事业股份有限公司 Exhaust structure of continuous junction of precast post
CN202430831U (en) * 2012-01-20 2012-09-12 中冶建筑研究总院有限公司 Cement grouting steel bar connecting structure of precast concrete unit
CN103590510A (en) * 2013-11-27 2014-02-19 上海建工五建集团有限公司 Method for fixedly connecting embedded bars in assembly-type structure and cast-in-place structure
CN204418380U (en) * 2014-12-31 2015-06-24 深圳市华阳国际工程设计有限公司 A kind of prefabricated component connector
CN204551820U (en) * 2015-01-27 2015-08-12 安徽同济建设集团有限责任公司 precast wall body
CN105863049A (en) * 2016-05-26 2016-08-17 南京长江都市建筑设计股份有限公司 Prefabricated assembled integral framework column bottom grouting structure
CN206128361U (en) * 2016-10-20 2017-04-26 深圳市鹏城建筑集团有限公司 Attend butt -joint structural of lower floor's prefab

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112211319A (en) * 2020-10-13 2021-01-12 上海城建市政工程(集团)有限公司 Same-layer grouting method for mounting prefabricated shear wall of fabricated building
CN112900773A (en) * 2021-01-27 2021-06-04 斯蒙特节能科技(上海)有限公司 Outer wall lightweight heat preservation and decoration integrated board

Similar Documents

Publication Publication Date Title
CN107237651B (en) A kind of multi-level grouting water-tight reinforcement means of coal mine underground reservoir and reservoir dam
CN109083649B (en) It is applicable in the water-rich sand layer pre-grouting reinforcement means of complicated urban environment subway tunnel
CN206319886U (en) Tunnel lining structure
CN106499405A (en) Tunnel lining structure
CN102433878A (en) Post-grouting device and construction method for pipe pile foundation
CN104831705A (en) Ultra-deep hole grouting method during underground excavation of tunnel
CN103556646B (en) Method for forming water shutoff walls in sand and gravel layer
CN109538295A (en) Seal groundwater in mining area library system
CN105672241A (en) Device and method for treating deep seismic subsidence loess by combination of loess breakage by air injection and loess squeezing by air bag
CN105649092A (en) Slope supporting method for crumbly strata
CN108130901B (en) The construction method of Karst grouting
CN110644539B (en) Active seepage-proofing control method for subway station structure seepage diseases and underground seepage-proofing body
CN106480996A (en) A kind of method are in the milk by docking structure of levels prefabricated component and the faying face to levels prefabricated component
CN113374440A (en) Rapid plugging method and construction method for water inrush channel of hidden collapse column
CN111005760A (en) Drainage type drainage system for karst tunnel
CN114483109A (en) Curtain grouting advanced large pipe shed penetrating construction method for penetrating tunnel fault fracture zone
CN104790982A (en) Enclosed mud for underground excavation tunnel ultra-deep hole grouting
CN109441486A (en) The grouting method reinforced for tunnel grouting
CN206052653U (en) A kind of rock stone-filled structure based on concrete-pile
CN202247897U (en) Post-grouting device for pipe pile foundation
CN206128361U (en) Attend butt -joint structural of lower floor's prefab
CN106894827A (en) The method that gas is prevented and treated during coal face back production
CN203891785U (en) Special joint pipe assembly for throwing of gravels in pipe of hydrogeological water well
CN106869934B (en) A kind of slip casting recovery method suitable for inclined seam
CN106013094A (en) Method applicable to pouring of concrete for artificial excavating pile body

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170308