CN105221150B - A kind of method of horizontal jet grouting stake reinforced stone door punching coal - Google Patents

A kind of method of horizontal jet grouting stake reinforced stone door punching coal Download PDF

Info

Publication number
CN105221150B
CN105221150B CN201510607942.0A CN201510607942A CN105221150B CN 105221150 B CN105221150 B CN 105221150B CN 201510607942 A CN201510607942 A CN 201510607942A CN 105221150 B CN105221150 B CN 105221150B
Authority
CN
China
Prior art keywords
coal
jet grouting
drilling
exposed
horizontal jet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510607942.0A
Other languages
Chinese (zh)
Other versions
CN105221150A (en
Inventor
林柏泉
郝志勇
宋吴兵
孙炜浩
万元
李博洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201510607942.0A priority Critical patent/CN105221150B/en
Publication of CN105221150A publication Critical patent/CN105221150A/en
Application granted granted Critical
Publication of CN105221150B publication Critical patent/CN105221150B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Earth Drilling (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a kind of method of horizontal jet grouting stake reinforced stone door punching coal, suitable for the horizontal jet grouting stake reinforced stone door punching coal of the medium-thickness seam with outburst hazard.Stop driving before exposed coal working face is less than 7 meters from the minimum normal distance of institute's exposed coal layer, pass through the drilling of roof in exposed coal work surface construction using rig, connection gas pumping pipe carries out gas pumping.In the range of gas bearing capacity and gas pressure are down to permission, horizontal jet grouting construction is carried out to each drilling using rotary churning pile machine, firm horizontal jet grouting stake is formed in drilling, significantly improves the reinforcing scope and fastening strength in coal seam, reduces the outburst hazard in coal seam.It can continue to tunnel forward after horizontal jet grouting stake thoroughly consolidation, until completing whole exposed coal process.This method not only can safely, quickly finish exposed coal work, and also reduce the input of human and material resources and financial resources.

Description

A kind of method of horizontal jet grouting stake reinforced stone door punching coal
Technical field
It is especially a kind of to be applied to the medium-thickness seam with outburst hazard the present invention relates to a kind of method of stone door punching coal Horizontal jet grouting stake reinforced stone door punching coal method.
Background technology
So far, projecting coal bed method for uncovering coal mainly from release and reinforce coal seam the two aspect progress, coal seam is unloaded Press anti-reflection mode mainly there are the measures such as hydraulic flushing in hole, hydraulic fracturing and hydraulic slotted liner technique, mainly have metallic framework in terms of the reinforcing of coal seam With the measure such as grouting and reinforcing.These measures achieve some effects in stone door punching coal protrusion-dispelling, but there is also deficiency, especially exist It is even more so in terms of the reinforcing of coal seam.Conventional grouting and reinforcing can improve coal strength to a certain extent, but due to coal body Crack is smaller, and cement grout dilation angle is limited, can only small range raising exposed coal regional coal-seam intensity, larger area can not be realized The reinforcing in domain.Accordingly, it is desirable to provide a kind of coal uncovering method, can strengthen reinforcing coal strength and expand reinforcing scope, Realize safely and fast exposed coal.
The content of the invention
Technical problem:The purpose of invention is overcome the deficiencies in the prior art part, there is provided a kind of method is simple, can significantly carry The method of the horizontal jet grouting stake reinforced stone door punching coal of high reinforcing scope and fastening strength.
Technical scheme:A kind of method of horizontal jet grouting stake reinforced stone door punching coal of patent of the present invention, comprises the following steps:
A. before exposed coal working face is less than 7 meters from the minimum normal distance of institute's exposed coal layer, adjusted using messenger wire and horizon rule Examination installs hole making drill, carries out pre-drilled cavity to coal seam direction, the hole that a root long degree is slightly less than perforate length is buried in pre-drilled cavity Mouth pipe, and it is bonded and sealed with hole wall using resin, then constructed through multiple drillings in coal seam, applied along pre-drilled cavity with rig Work carries out gas pumping after terminating to drilling;
B. when the gas pressure and gas bearing capacity in coal seam are down to below prominent boundary line, using rotary churning pile machine to it is each drill into The flat rotary-spraying construction of water-filling, the drill bit of the rotary churning pile machine and drilling rod use can spray high-pressure water jet, compressed air, cement grout Triple tubular constructions of jet, wherein the nozzle of 2 playpipes cuts coal to high-pressure water jet and compressed air while horizontal churning Body, and discharge coal slime by compressed air;Meanwhile the churning of cement grout jet is injected coal body by the nozzle of another playpipe In, cement grout is mixed to form horizontal jet grouting stake with coal body, so as to reinforce coal seam and reduce the outburst hazard in coal seam;
C. start exposed coal after horizontal jet grouting stake solidification, exposed coal since exposed coal working face up through roof when stop Only, whole exposed coal work is completed.
The multiple pre-drilled cavities constructed to coal seam direction are 4, and perforate depth is 1~1.5m.
The ratio of mud of described cement grout is 1:1.
The pressure of described high-pressure water jet is 5~8MPa, flow 20L/min, the pressure of compressed air for 0.5~ 1MPa, flow 0.5m3/ min, cement grout jet pressure are 1~2MPa, flow 20L/min, the pull rate of drilling rod 0.4~0.8m/min, 10~15r/min of rotary speed.
In the journey of the construction drill, the measurement of 2m use levels guide instrument is often crept into once, to prevent hole scattering.
Beneficial effect:By adopting the above-described technical solution, when the present invention solves current stone door punching coal, conventional slip casting The problems such as reinforcing scope that coal seam occurs is smaller, fastening strength is not high is reinforced, rotary churning pile machine produces high-pressure water jet and compression is empty Gas is cut coal body and expands the diameter of drilling, while produces cement grout and coal body is further cut and formed Horizontal jet grouting stake, and caused high pressure can promote cement grout to enter in the crack of coal body.The horizontal jet grouting so formed Stake can not only expand the reinforcing scope in coal seam, moreover it is possible to improve the fastening strength in coal seam.This method not only can safely, quickly it is complete Worked into exposed coal, and also reduce the input of human and material resources and financial resources, there is wide applicability.
Brief description of the drawings
Fig. 1 be the present invention drilling machine construction after formed drill structural representation.
Fig. 2 is the structural representation after the completion of horizontal jet grouting stake of the present invention.
Fig. 3 is that the present invention completes the structural representation after whole exposed coal.
Fig. 4 is the arrangement schematic diagram that the present invention carries out high-pressure rotary-spray in drilling
In figure:1- digging laneways, 2- exposed coal working faces, 3- drillings, 4- coal seams, 5- horizontal jet grouting stakes, 6- cement Slurries jet, 7- high-pressure water jets and compressed air, 8- drilling rods, 9- drill bits.
Embodiment
One embodiment of patent of the present invention is further described below in conjunction with the accompanying drawings:
The method of the horizontal jet grouting stake reinforced stone door punching coal of the present invention, using devices such as rig, high-pressure horizontal rotary churning pile machines Tool, and use high-pressure water jet and compressed air, cement grout to be comprised the following steps that as churning material:
Tunneled along the exposed coal working face 2 in the front of digging laneway 1, in minimum normal direction of the exposed coal working face 2 from the coal seam 4 taken off Distance is less than before 7 meters, using messenger wire and the good hole making drill of horizon rule adjustment and installation, to the multiple pre-drilled cavities of coal seam direction construction, institute It is 4 to state the multiple pre-drilled cavities constructed to coal seam direction, and perforate depth is 1~1.5m, as shown in Figure 1.In each pre-drilled cavity An embedded root long degree is slightly less than the orifice tube of perforate length, and orifice tube is bonded and sealed with hole wall using resin, then with brill Machine is constructed through the drilling 3 in coal seam 4 along pre-drilled cavity forward horizontal, during construction drill 3, often creeps into 2m horizontally-guided instrument Measurement once, to prevent hole scattering, once finding that deflection will rectify a deviation in time, after the construction of drilling 3 terminates, routinely arranges extraction Pipe carries out gas pumping to drilling;
When the gas pressure and gas bearing capacity in coal seam 4 are down to below prominent boundary line, i.e., when gas bearing capacity and gas pressure drop To permission, horizontal jet grouting construction is carried out in drilling 3 using rotary churning pile machine, by the drill bit 9 of rotary churning pile machine, drilling rod 8 3 bottoms of drilling are extended, are lifted outward on one side, one side churning high-pressure water jet and compressed air, cement grout.The rotary churning pile machine Drill bit 9 and the use of drilling rod 8 can spray triple tubular constructions of high-pressure water jet, compressed air, cement grout jet, such as Fig. 4 institutes Show, wherein the nozzle of 2 playpipes is to high-pressure water jet and compressed air 7, while horizontal churning cutting coal body, and by compression Air discharges coal slime;Meanwhile the nozzle of another playpipe injects the churning of cement grout jet 6 in coal body, makes cement grout Horizontal jet grouting stake 5 is mixed to form with coal body, as shown in Fig. 2 this can not only play the effect of reaming, and is formed in drilling Firm horizontal jet grouting stake, the reinforcing scope and fastening strength in coal seam are significantly improved, so as to reinforce coal seam 4 and reduce coal seam 4 Outburst hazard;According to the ratio of mud 1 before construction:1 prepares cement grout, and slurries stirring must stir evenly, and mixing time must not be low In 5 minutes, once stir usage time and also control within 3h;The pressure of described high-pressure water jet is 5~8MPa, and flow is 20L/min, the pressure of compressed air is 0.5~1MPa, flow 0.5m3/ min, the pressure of cement grout jet 6 are 1~2MPa, Flow is 20L/min, 0.4~0.8m/min of pull rate of drilling rod 8,10~15r/min of rotary speed;
Start exposed coal after the solidification of horizontal jet grouting stake 5, exposed coal since exposed coal working face 2 up through 4 top plate of coal seam when Stop, as shown in figure 3, completing whole exposed coal work.

Claims (1)

  1. A kind of 1. method of horizontal jet grouting stake reinforced stone door punching coal, it is characterised in that comprise the following steps:
    A. in exposed coal working face(2)From institute's exposed coal layer(4)Minimum normal distance be less than 7 meters before, using messenger wire and horizon rule The good hole making drill of adjustment and installation, to the multiple pre-drilled cavities of coal seam direction construction, a root long degree is buried in pre-drilled cavity and is slightly less than perforate length The orifice tube of degree, and orifice tube is bonded and sealed with hole wall using resin, then constructed forward through coal along pre-drilled cavity with rig Layer(4)Drilling(3), the construction drill(3)During, the measurement of 2m use levels guide instrument is often crept into once, to prevent Hole scattering;Construct after terminating to drilling(3)Carry out gas pumping;
    B. coal seam is worked as(4)Gas pressure and gas bearing capacity be down to below prominent boundary line, using rotary churning pile machine to each drilling (3)Horizontal jet grouting construction is carried out, according to the ratio of mud 1 before construction:1 prepares cement grout, and slurries stirring must stir evenly, mixing time It must not be less than 5 minutes, once stir usage time and also control within 3h;The drill bit (9) of rotary churning pile machine, drilling rod (8) are extended Drill (3) bottom, lifts outward on one side, one side churning high-pressure water jet and compressed air, cement grout;The rotary churning pile machine Drill bit(9)And drilling rod(8)Using the triple tubular constructions that can spray high-pressure water jet, compressed air, cement grout jet, wherein 2 The nozzle of individual playpipe is to high-pressure water jet and compressed air(7), while horizontal churning cutting coal body, and will by compressed air Coal slime is discharged;Meanwhile the nozzle of another playpipe is by cement grout jet(6)In churning injection coal body, make cement grout and coal Body is mixed to form horizontal jet grouting stake(5), so as to reinforce coal seam(4)And reduce coal seam(4)Outburst hazard;
    C. when horizontal jet grouting stake(5)Start exposed coal after solidification, exposed coal is from exposed coal working face(2)Start up through coal seam(4)Top Stop during plate, complete whole exposed coal work;
    The multiple pre-drilled cavities constructed to coal seam direction are 4, and perforate depth is 1 ~ 1.5m;
    The pressure of described high-pressure water jet is 5 ~ 8MPa, and flow 20L/min, the pressure of compressed air is 0.5 ~ 1MPa, stream Measure as 0.5m3/min, cement grout jet(6)Pressure is 1 ~ 2MPa, flow 20L/min, drilling rod(8)Pull rate 0.4 ~ 0.8m/min, 10 ~ 15r/min of rotary speed.
CN201510607942.0A 2015-09-22 2015-09-22 A kind of method of horizontal jet grouting stake reinforced stone door punching coal Active CN105221150B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510607942.0A CN105221150B (en) 2015-09-22 2015-09-22 A kind of method of horizontal jet grouting stake reinforced stone door punching coal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510607942.0A CN105221150B (en) 2015-09-22 2015-09-22 A kind of method of horizontal jet grouting stake reinforced stone door punching coal

Publications (2)

Publication Number Publication Date
CN105221150A CN105221150A (en) 2016-01-06
CN105221150B true CN105221150B (en) 2018-02-13

Family

ID=54990373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510607942.0A Active CN105221150B (en) 2015-09-22 2015-09-22 A kind of method of horizontal jet grouting stake reinforced stone door punching coal

Country Status (1)

Country Link
CN (1) CN105221150B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374672B (en) * 2018-02-27 2019-04-30 中国矿业大学 A method of reinforcing Deep Mine soft coal level roadway surrounding rock
CN113236349A (en) * 2021-06-30 2021-08-10 西南交通大学 Construction method of outburst-prevention rotary spraying enclosure pile for coal-series stratum railway gas tunnel

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101603431B (en) * 2009-07-14 2011-05-11 中国矿业大学 Method for reinforcing outburst-prone coal seam cross-cut coal uncovering
CN101598030B (en) * 2009-07-14 2012-02-01 中国矿业大学 Method for realizing fast coal exposing of coal seam rock cross with outburst danger
CN102242640B (en) * 2011-07-05 2013-09-25 河南煤业化工集团研究院有限责任公司 Rapid outburst elimination method for cross cut coal uncovering in coal mine underground
CN102536243A (en) * 2012-02-28 2012-07-04 重庆市能源投资集团科技有限责任公司 Coal seam freezing type cross-drift coal uncovering method
CN104213921B (en) * 2014-08-07 2016-03-30 中国矿业大学 Based on the freezing type coal uncovering method of hydraulic slotted liner technique

Also Published As

Publication number Publication date
CN105221150A (en) 2016-01-06

Similar Documents

Publication Publication Date Title
CN104747075B (en) Anti-collapsing drilling method for grout spraying of soft coal seam
CN101230573B (en) Construction equipment for four-layer pipe ground layer depression type double-liquid horizontal jet grouting
CN104929114A (en) High pressure jet grouting pile waterproof curtain construction device and method
CN104790873B (en) Soft rock layer jet is oriented to the integrated drilling method of the anti-collapse hole of pore-forming reaming
CN101245599B (en) Construction equipment for generating horizontal jet grouting reinforcing body by injecting double-liquid liquid with high-pressure
CN104631480B (en) Adopt the method that jet grouting pile driving machine carries out water seal for deep foundation pit curtain construction
CN204753574U (en) High pressure jet grouting pile stagnant water curtain construction equipment
CN107476814A (en) A kind of self-vibration jet grouted anchor bar integrated construction device and method
CN107246267A (en) Mine Shaft Lining, constructing device and method in a kind of poor strata
CN103806479A (en) Pile foundation combined grouting reinforcement construction method combining waterproof curtain
US20220081863A1 (en) Drilling apparatus and phc pipe cased pile, and method of drilling with phc pipe cased pile
CN104563099A (en) Porous pipe method large-diameter high-pressure jet grouting pile construction method
CN107217987A (en) Colliery flood administers well boring method
CN102979091B (en) Method for constructing cement jet grouting pile with fine aggregate concrete core
CN107338790B (en) Construction method of rotary spraying stirring composite pile
CN105221150B (en) A kind of method of horizontal jet grouting stake reinforced stone door punching coal
CN105731978A (en) Grouting slurry for reinforcing tunnel face of jacking culvert of fine-sand layer and grouting method
CN107542469A (en) A kind of underground mould bag stake method for protecting support
CN213061989U (en) High-pressure rotary spraying device
CN103074887A (en) Drilling/spraying integrated foundation treatment method and special drilling rig component
CN212671560U (en) High-pressure jet grouting pile hole guiding construction integrated device
CN105178966A (en) Grouting process for water blocking by wall breaking for mine vertical shafts
CN106593489A (en) Difficult mining coal seam bottom plate thin layer limestone high-pressure strong aquifer karst fissure aggregate perfusion method
CN109137893A (en) Self-feeding anchor pile construction technology
CN104500108B (en) Method for treating tunnel base water return point

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant