CN106593489A - Difficult mining coal seam bottom plate thin layer limestone high-pressure strong aquifer karst fissure aggregate perfusion method - Google Patents

Difficult mining coal seam bottom plate thin layer limestone high-pressure strong aquifer karst fissure aggregate perfusion method Download PDF

Info

Publication number
CN106593489A
CN106593489A CN201611101491.4A CN201611101491A CN106593489A CN 106593489 A CN106593489 A CN 106593489A CN 201611101491 A CN201611101491 A CN 201611101491A CN 106593489 A CN106593489 A CN 106593489A
Authority
CN
China
Prior art keywords
aggregate
thin layer
plate thin
perfusion
karst
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611101491.4A
Other languages
Chinese (zh)
Inventor
倪建明
郑士田
胡杰
王威
孙宜龙
石志远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaibei Mining Co Ltd
Original Assignee
Huaibei Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Mining Co Ltd filed Critical Huaibei Mining Co Ltd
Priority to CN201611101491.4A priority Critical patent/CN106593489A/en
Publication of CN106593489A publication Critical patent/CN106593489A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a difficult mining coal seam bottom plate thin layer limestone high-pressure strong aquifer karst fissure aggregate perfusion method. The difficult mining coal seam bottom plate thin layer limestone high-pressure strong aquifer karst fissure aggregate perfusion method comprises the following steps that (1) aggregates are perfused at an opening of a drilling horizontal section, and aggregate perfusion is stopped after hole sealing of the aggregates; (2) hole sweeping is conducted, and then mixed slurry is perfused; (3) grouting is continued after an orifice device is added at a drilling opening, and cement slurry is injected; and (4) the cement slurry is injected to the opening, and when an orifice is at the normal pressure, perfusion is continued for 1 h. By adopting the technical scheme, the aggregate perfusion technology can rapidly fill large karst fissures; by means of the filling mode, a water resistant body is formed after aggregate filling, the filling process is shortened, and meanwhile, the defect that the perfusion plugging aggregates cannot reach the fissures easily due to repeated hole sweeping in the prior art is effectively overcome; the perfusion efficiency is improved; working face extraction is ensured; the water burst phenomenon is avoided; and the mining safety is ensured.

Description

A kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate perfusion Method
Technical field
The invention belongs to coal mining field, it is more particularly related to a kind of hard-to-recovery reserve base plate thin layer limestone High pressure strong aquifer Karst Fissures aggregate method for filling.
Background technology
In process of coal mining, meet large-scale cranny structure and adopt in drilling and split in working face drilling filler aggregate blocking karst Easily there is aggregate blocking drilling in gap, this filling mode, aggregate is difficult to reach at Karst Fissures, and prior art is adopted and swept repeatedly Hole, perfusion closure, this closure efficiency is low, and aggregate is difficult to reach and closure is completed at crack, causes the puzzlement of working face running pulp, splits Gush outside substantial amounts of underground water at gap, water burst phenomenon occurs in the back production for causing the generation of water leak accident, working face, even results in landslide Etc. accident, to mining potential safety hazard is brought.
The content of the invention
The technical problem to be solved is to provide the groundwater resources that water outlet band is concentrated in a kind of blocking, effectively closure The hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate method for filling of water-bearing layer Karst Fissures.
To achieve these goals, the technical scheme taken of the present invention is:A kind of hard-to-recovery reserve base plate thin layer for being provided Limestone high pressure strong aquifer Karst Fissures aggregate method for filling, comprises the steps:
1) the open injecting aggregate of drilling horizontal section, after aggregate sealing of hole injecting aggregate is stopped;
2) cleaning bottom of hole, then irrigates mixed serum;
3) hole month adds and continues slip casting after the device of aperture, injects cement grout;
4) cement grout is injected to oral area, when aperture is normal pressure, continue to irrigate 1h.
A kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate method for filling disclosed by the invention, Step 1) in drill open injecting aggregate when pressure value be≤2MPa;Aggregate rate of flooding is 2m3/h。
A kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate method for filling disclosed by the invention, Step 2) in cleaning bottom of hole be the aggregate cleared up at aperture to Karst Fissures, now the pressure in hole is≤2MPa.
A kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate method for filling disclosed by the invention, Step 2) in mixed serum add flyash for cement, cement and flyash quality ratio=(1~2) 1;The ratio of the mixed serum of perfusion Weight is 1.4~1.6kg/l.
A kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate method for filling disclosed by the invention, Step 3) injection cement grout, the wherein proportion of cement grout is 1.4~1.6kg/l.
A kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate method for filling disclosed by the invention, Aggregate is yellow ground, and the granularity of yellow ground is 1~10mm.
Using technical scheme, open slip casting fills large-scale crack using big flow aggregate, and drilling horizontal section is filled Note aggregate, aggregate is yellow ground, and the good conduit pipe of cracks aperture is gradually blocked up yellow ground reality densification, completes big crack closure;Bone The body that blocks water is formed after the completion of material filling, the groundwater resources for concentrating water outlet band have been blocked, water-bearing layer karst has effectively been blocked and has been split Then gap, cleaning bottom of hole irrigates mixed serum, and cement/pulverized fuel ash slurry enters exhalant canal, and rapid filling fracture has reached quick The purpose of closure water burst;Hole month adds and continues slip casting after the device of aperture, injects cement grout, and reinforcing blocks water body, is formed with certain The body that blocks water of the similar rock mass of intensity, effectively cut-off the prominent of underground water is gushed;Aggregate perfusion technique can enter to large-scale Karst Fissures Row Fast Filling, this filling method shortens stowing operation, while being prevented effectively from using the body that blocks water is formed after the completion of aggregate filling Prior art cleaning bottom of hole repeatedly, irrigates aggregate of plugging material and is difficult to reach the defect at crack, improves charging efficiency, it is ensured that working face Back production avoids the generation of water burst phenomenon, it is ensured that the safety of mining.
Below with reference to embodiment, the present invention is described in detail.
Description of the drawings
The content and the mark in figure expressed by each width accompanying drawing of this specification is briefly described below:
Fig. 1 is a kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate method for filling injecting aggregate The design sketch of the body that blocks water is formed afterwards.
Specific embodiment
Below by the description to embodiment, the shape of each component for example involved to the specific embodiment of the present invention, Construction, the mutual alignment between each several part and annexation, the effect of each several part and operation principle, manufacturing process and operate with Method etc., is described in further detail, to help those skilled in the art to have inventive concept of the invention, technical scheme More complete, accurate and deep understanding.
A kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate method for filling of the present invention, including such as Lower step:
1) the open injecting aggregate of drilling horizontal section, after aggregate sealing of hole injecting aggregate is stopped;Press during the open injecting aggregate that drills Force value is≤2MPa;Aggregate rate of flooding is 2m3/h;Aggregate is yellow ground, and the granularity of yellow ground is 1~10mm;
2) cleaning bottom of hole, cleaning bottom of hole is the aggregate cleared up at aperture to Karst Fissures, and now the pressure in hole is≤2MPa;Then fill Note mixed serum, mixed serum adds flyash, cement and flyash quality ratio=(1~2) 1 for cement;The mixed serum of perfusion Proportion be 1.4~1.6kg/l;
3) hole month adds and continues slip casting after the device of aperture, injects cement grout, and the proportion of cement grout is 1.4~1.6kg/ l;
4) cement grout is injected to oral area, when aperture is normal pressure, continue to irrigate 1h.
Fig. 1 is a kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate method for filling injecting aggregate The design sketch of the body that blocks water is formed afterwards.
It can be seen that using technical scheme, open slip casting is split using the filling of big flow aggregate is large-scale Gap, drilling horizontal section injecting aggregate, aggregate is yellow ground, and the good conduit pipe of cracks aperture is gradually blocked up yellow ground reality densification, complete Into the closure of big crack;The body that blocks water is formed after the completion of aggregate filling, the groundwater resources for concentrating water outlet band have been blocked, is effectively blocked Then water-bearing layer Karst Fissures, cleaning bottom of hole irrigates mixed serum, and cement/pulverized fuel ash slurry enters exhalant canal, and rapid filling is split Gap, has reached the purpose of quick blocking water burst;Hole month adds and continues slip casting after the device of aperture, injects cement grout, and reinforcing blocks water Body, is formed with the body that blocks water of the similar rock mass of some strength, and effectively cut-off the prominent of underground water is gushed;Aggregate perfusion technique can be to big Type Karst Fissures carry out Fast Filling, and this filling method shortens stowing operation using the body that blocks water is formed after the completion of aggregate filling, Prior art cleaning bottom of hole repeatedly is effectively prevent simultaneously, aggregate of plugging material is irrigated and is difficult to reach the defect at crack, improve perfusion effect Rate, it is ensured that working face extraction avoids the generation of water burst phenomenon, it is ensured that the safety of mining.
The present invention is exemplarily described above in conjunction with embodiment, it is clear that the present invention is implemented and do not receive above-mentioned side The restriction of formula, if the improvement of the various unsubstantialities that method of the present invention design and technical scheme are carried out is employed, or without Improve and the design of the present invention and technical scheme are directly applied to into other occasions, within protection scope of the present invention.

Claims (6)

1. a kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate method for filling, it is characterised in that:Bag Include following steps:
1) the open injecting aggregate of drilling horizontal section, after aggregate sealing of hole injecting aggregate is stopped;
2) cleaning bottom of hole, then irrigates mixed serum;
3) hole month adds and continues slip casting after the device of aperture, injects cement grout;
4) cement grout is injected to oral area, when aperture is normal pressure, continue to irrigate 1h.
2. irrigate according to a kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate described in claim 1 Method, it is characterised in that:Described step 1) in drill open injecting aggregate when pressure value be≤2MPa;Aggregate rate of flooding is 2m3/h。
1.4~1.5kg/l of cement mortar proportion in the step, slurry flow is 0.5~1 times of wastage.
3. irrigate according to a kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate described in claim 1 Method, it is characterised in that:Described step 2) in cleaning bottom of hole be the aggregate cleared up at aperture to Karst Fissures, the now pressure in hole For≤2MPa.
4. irrigate according to a kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate described in claim 1 Method, it is characterised in that:Described step 2) in mixed serum add flyash for cement, cement and flyash quality than=(1~ 2):1;The proportion of the mixed serum of perfusion is 1.4~1.6kg/l.
5. irrigate according to a kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate described in claim 1 Method, it is characterised in that:Described step 3) injection cement grout, the wherein proportion of cement grout is 1.4~1.6kg/l.
6. irrigate according to a kind of hard-to-recovery reserve base plate thin layer limestone high pressure strong aquifer Karst Fissures aggregate described in claim 1 Method, it is characterised in that:Described aggregate is yellow ground, and the granularity of yellow ground is 1~10mm.
CN201611101491.4A 2016-12-02 2016-12-02 Difficult mining coal seam bottom plate thin layer limestone high-pressure strong aquifer karst fissure aggregate perfusion method Pending CN106593489A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611101491.4A CN106593489A (en) 2016-12-02 2016-12-02 Difficult mining coal seam bottom plate thin layer limestone high-pressure strong aquifer karst fissure aggregate perfusion method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611101491.4A CN106593489A (en) 2016-12-02 2016-12-02 Difficult mining coal seam bottom plate thin layer limestone high-pressure strong aquifer karst fissure aggregate perfusion method

Publications (1)

Publication Number Publication Date
CN106593489A true CN106593489A (en) 2017-04-26

Family

ID=58594806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611101491.4A Pending CN106593489A (en) 2016-12-02 2016-12-02 Difficult mining coal seam bottom plate thin layer limestone high-pressure strong aquifer karst fissure aggregate perfusion method

Country Status (1)

Country Link
CN (1) CN106593489A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832767A (en) * 2021-01-05 2021-05-25 河南理工大学 Coal seam roof reinforcing apparatus based on high pressure gas-solid mixture is filled
CN113338847A (en) * 2021-06-08 2021-09-03 中国矿业大学(北京) Hole sealing aggregate, filling bag and hole sealing method for overburden three-zone detection drilling
CN114320412A (en) * 2021-11-26 2022-04-12 淮北矿业股份有限公司 Grouting anchor rod hole sealing tray

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5671581A (en) * 1994-12-07 1997-09-30 Nagahama; Shigeo Water cut-off process for concrete structure
RU2112881C1 (en) * 1996-07-19 1998-06-10 Кузбасский государственный технический университет Method for strengthening of rock matter
RU2316649C1 (en) * 2006-08-21 2008-02-10 Дальневосточный государственный технический университет Underground gasification method
CN102704933A (en) * 2012-05-25 2012-10-03 中国矿业大学 Isolated-section grouting filling coal-mining method for mining overburden rock
CN103742172A (en) * 2013-12-02 2014-04-23 陕西煤业化工技术研究院有限责任公司 Method for blocking hydrogen-sulfide-contained water bursting point on bottom plate in grouting mode

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5671581A (en) * 1994-12-07 1997-09-30 Nagahama; Shigeo Water cut-off process for concrete structure
RU2112881C1 (en) * 1996-07-19 1998-06-10 Кузбасский государственный технический университет Method for strengthening of rock matter
RU2316649C1 (en) * 2006-08-21 2008-02-10 Дальневосточный государственный технический университет Underground gasification method
CN102704933A (en) * 2012-05-25 2012-10-03 中国矿业大学 Isolated-section grouting filling coal-mining method for mining overburden rock
CN103742172A (en) * 2013-12-02 2014-04-23 陕西煤业化工技术研究院有限责任公司 Method for blocking hydrogen-sulfide-contained water bursting point on bottom plate in grouting mode

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
中国煤炭工业协会编: "《煤矿防治水技术》", 31 March 2014 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832767A (en) * 2021-01-05 2021-05-25 河南理工大学 Coal seam roof reinforcing apparatus based on high pressure gas-solid mixture is filled
CN113338847A (en) * 2021-06-08 2021-09-03 中国矿业大学(北京) Hole sealing aggregate, filling bag and hole sealing method for overburden three-zone detection drilling
CN113338847B (en) * 2021-06-08 2022-02-25 中国矿业大学(北京) Filling bag for overburden three-zone detection drilling and hole sealing method
US11459849B1 (en) 2021-06-08 2022-10-04 China University Of Mining And Technology, Beijing Filling bag and sealing method for drilled hole for detection in three zones of overburden
CN114320412A (en) * 2021-11-26 2022-04-12 淮北矿业股份有限公司 Grouting anchor rod hole sealing tray

Similar Documents

Publication Publication Date Title
CN104453946B (en) Advanced reinforcing construction method for building tunnel in soft surrounding rock
CN100510274C (en) Construction method of enclosing level rotary-jet pile hole-mouth using double-liquid slip jection method
CN105484269B (en) Foundation pit enclosure structure seepage prevention and treatment construction method under blasting condition
CN103912003B (en) The method of water and hole is moved on a kind of simple and efficient shutoff stratum
CN101525881B (en) Structure of karst strata pile holes protecting wall and method for constructing pile holes
CN105386435B (en) It is a kind of to be used for the double-liquid grouting system and its construction technology of cement and water glass solution
CN206667278U (en) Lava crack Tunnel gushing treatment constructing structure
CN105888673B (en) The operating method of deep hole modeling pipe high-pressure slip-casting explosion-protection equipment in soft rich water country rock
CN103334770A (en) Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN103899323A (en) Construction method of shield passing through railway yard
CN108130911A (en) Upright controling slip casting steel floral tube bar planting mini pile and its construction method
CN103362117A (en) Full-section grouting method for grouting section
CN103291354B (en) Filling and reinforcing method for floor roadway cross-layer pressure-relief borehole
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN106593489A (en) Difficult mining coal seam bottom plate thin layer limestone high-pressure strong aquifer karst fissure aggregate perfusion method
CN106761748A (en) A kind of deep mining coal seam Hidden Karst Under karst collapse col umn method for blocking
CN112281927A (en) Construction method for treating leakage of independent foundation of frame column
CN102877470A (en) Combined soil nailing construction method
CN103742162B (en) Shield tail top is provided with shield machine and the synchronous grouting device of synchronous grouting device
CN103174135B (en) Repair method of unqualified post-grouting bored concrete pile
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN105350516A (en) Method for modifying and reinforcing rock and soil layer by injecting materials
CN105221158B (en) Shield export & import notes dual slurry construction method
CN104612137A (en) Perforated pipe method super-deep, fast, and super-large diameter high pressure chemical churning pile construction method
CN105781580A (en) Tunnel crack repair method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426