CN107542469A - A kind of underground mould bag stake method for protecting support - Google Patents

A kind of underground mould bag stake method for protecting support Download PDF

Info

Publication number
CN107542469A
CN107542469A CN201710196485.XA CN201710196485A CN107542469A CN 107542469 A CN107542469 A CN 107542469A CN 201710196485 A CN201710196485 A CN 201710196485A CN 107542469 A CN107542469 A CN 107542469A
Authority
CN
China
Prior art keywords
mould bag
grouting
mould
grouting pipe
slurry outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710196485.XA
Other languages
Chinese (zh)
Inventor
唐珺
李旺雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Qingneng Wang Technology Co Ltd
Tsinghua Research Institute (xiamen)
Original Assignee
Xiamen Qingneng Wang Technology Co Ltd
Tsinghua Research Institute (xiamen)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Qingneng Wang Technology Co Ltd, Tsinghua Research Institute (xiamen) filed Critical Xiamen Qingneng Wang Technology Co Ltd
Priority to CN201710196485.XA priority Critical patent/CN107542469A/en
Publication of CN107542469A publication Critical patent/CN107542469A/en
Pending legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a kind of underground mould bag stake method for protecting support, comprise the following steps:1) rig pore-forming is utilized, forms mould pocket;Grouting Pipe is set in mould pocket, the Grouting Pipe sets slurry outlet;Separator is provided with the Grouting Pipe, the posterior segment of the Grouting Pipe sets mould bag, and Grouting Pipe leads to mould bag provided with an at least slurry outlet;It is drainpipe between mould bag rear end and the outer wall of Grouting Pipe;Grouting Pipe leading portion is surrounded by segmentation mould bag;2) the first grouting equipment is used first, Grouting Pipe is injected into the first grouting, to mould bag saturation;Then the second grouting equipment is used, Grouting Pipe is injected into the second grouting, second grouting flows out Grouting Pipe from preceding slurry outlet;3) slip casting alternately is carried out to the stake of I sequence mould bags first to mould pocket slip casting, treats that I sequence mould bags fully expand and reach some strength and then to II sequence mould bag stake slip castings, extremely form mould bag stake supporting wall structure.The present invention has the advantages that sedimentation is excavated in good stress condition, sealing effect, effectively control.

Description

A kind of underground mould bag stake method for protecting support
Technical field
The present invention relates to a kind of underground mould bag stake method for protecting support, more particularly to one kind between ink feed conduits and inkjet mouth Underground mould bag stake method for protecting support provided with air indwelling chamber, air is set more particularly to one kind between jet orifice and inkjet mouth The underground mould bag stake method for protecting support of indwelling chamber.
Background technology
In Support System in Soft Rock Tunnels digging process, in order to prevent the addresses such as Tunnel Landslide water burst, wall rock loosening, ground settlement Disaster, need to carry out pre-reinforcement construction before excavation.The more common and ripe engineering method of weak surrounding rock pre support construction at present has Pipe shed method, pipe-roof method construction, small-lead-tube advanced slip-casting method, horizontal jet grouting or paddling process, shield method, freezing etc..Its middle pipe canopy It is that Support System in Soft Rock Tunnels excavates the most frequently used pre support reinforcement technique that method is combined with grouting with small pipe method.
Referring to Fig. 1, piped shed conslruction method is as follows:The arch area that pipe roof construction is intended excavating first with rig in tunnel According to design aperture, spacing and deep drilling, embedded steel pipe (tube wall preboring perforation) simultaneously passes through the grouting and reinforcing soil body and raising The rigidity of steel pipe so that intend tunneling arch and be pre-formed advanced pre support system.Because pipe canopy combining structure has in itself There is shear behavior, can effectively carry the load of top relaxation Soft Soil Layer, maintain stable face, control stratum deformation, pre- avalanche prevention Collapse roof fall accident.But due to poor sealing performance, generally require to be applied in combination with small-lead-tube advanced slip-casting reinforcement technique.
The shortcomings that pipe roof construction method:Pile body self-strength is poor, poor to surrounding rock consolidation effect, and water-stagnating effect is poor, most of feelings Condition needs to coordinate per-fore pouring liquid with small pipe to reinforce but adds the disturbance to country rock.
Per-fore pouring liquid with small pipe is reinforced, it is necessary to be used cooperatively with steel arch-shelf.Will be small according to certain angle around working face Conduit, which is beaten and (bored, pressure), to be entered in stratum, slurries is permeated by ductule using grouting pump, is diffused into formation void, crack or soft In weak stratum, improve the physical and mechanical properties of the soil body to a certain extent, play certain sealing and improve the carrying of country rock The effect of power.But there is the shortcomings of slip casting effect is poor, and reinforcing scope is small.
The content of the invention
It is above-mentioned present in prior art to solve it is an object of the invention to provide a kind of underground mould bag stake method for protecting support Problem.
Technical scheme provided by the invention is as follows:
A kind of underground mould bag stake method for protecting support, comprises the following steps:
1) rig is utilized, along tunneling direction pore-forming, to form mould pocket (31) in tunnel;Grouting Pipe is set in mould pocket (31) (32), the Grouting Pipe (32) sets slurry outlet (35);Grouting Pipe (32) Inner Front End is provided with preceding separator (38), after middle part is provided with Separator (36), the posterior segment of the Grouting Pipe (32) set mould bag (34);Between the outer wall of mould bag (34) rear end and Grouting Pipe (32) For drainpipe (33);Grouting Pipe (32) leading portion is surrounded by segmentation mould bag (37);Grouting Pipe (32) leads to mould provided with an at least slurry outlet Bag (34), a slurry outlet lead to segmentation mould bag (37), and a slurry outlet leads between mould bag (34) and segmentation mould bag (37) Gap;Separator (36) is located at towards the slurry outlet of mould bag (34) and towards between mould bag (34) and segmentation mould bag (37) afterwards Between the slurry outlet of gap;
2) the first grouting equipment is used first, Grouting Pipe (32) is injected into the first grouting, and first grouting is from slurry outlet stream Enter mould bag (34), to mould bag (34) saturation;
Then the second grouting equipment is used, separator (36) is destroyed, Grouting Pipe (32) is injected into the second grouting, this second The gap being segmented between mould bag (37), and mould bag (34) and segmentation mould bag (37) is injected in grouting from slurry outlet;
3) alternately is carried out by slip casting to I sequences (1,3,5,7 ...) mould bag stake first, treats that I sequence mould bags are fully swollen for mould pocket slip casting It is swollen and reach some strength and then to the bag stake slip casting of II sequences (2,4,6,8 ...) mould, to forming mould bag stake supporting wall structure.
The described mould bag stake of I sequences and II sequence mould bag stakes, respectively by odd number of arrayed position and the mould bag of even number arrangement position Stake.
In the present invention, aperture is chosen according to Theoretical Design, and boring direction is outside along driving tunnel contour line is intended Into certain inclination angle.Preferably, can be 20-40 degree.
In the present invention, drill hole inclination control within certain limit (preferably, less than 30 degree), drilling is divided to two sequences Construction (is constructed) every hole.After drilling construction is completed, sediment in flushing hole so that stake holes meets that the decentralization of mould bag requires.
In the preferred embodiment, before the side of the Grouting Pipe (32) in after set a slurry outlet respectively, be respectively Preceding slurry outlet (353), middle slurry outlet (352) and rear slurry outlet (351);Between preceding slurry outlet (353) and middle slurry outlet (352) Provided with separator (36), the posterior segment of the Grouting Pipe (32) sets mould bag (34), the mould bag (34) cladding in slurry outlet (352) and after Slurry outlet (353).
In the preferred embodiment, divider disruption can be used raising grouting pressure or mechanicalness to break by step 2) It is bad.Described mechanical destruction, it can use and such as puncture mode.
In the preferred embodiment, after step 2) gap is full of, Grouting Pipe is also filled into grouting.
In the preferred embodiment, grouting order and grouting way.The stake of mould bag and controlling cement grout are adopted Constructed with a point sequence.After mould bag reaches certain degree of saturation, small grouting pump is changed according to full situation and carries out supplementary irrigation construction.
In the preferred embodiment, grouting control and ending standard.A. during mould bag stake slip casting pressure up to 0.5~ Do not enter slurry after 1.5MPa, terminate after stablizing 5 minutes, the control of the rate of climb to grout absorption and pressure, slip casting are paid attention to during mud jacking Speed should be controlled in 30~50L/min, it is ensured that mould bag has the filter water discharge time of abundance, and small pump is changed after reaching certain degree of saturation Supplementary irrigation construction is carried out, supplementary irrigation injection speed is controlled in 10L~15L/min;Injection rate is typically averaged according to mould bag volume per linear meter(lin.m.) 200~300kg of cement mixed weight.B. controlling cement grout enters to starch pressure up to maximum under the premise of ensuring not lift, and enters slurry Rate drops to after 2L/min to stablize and can terminate within 5 minutes to be in the milk, actually the closely knit situation regulation of the amount of pouring into manufacture bases geology, to reach For the purpose of soil layer consolidation effect.
Advantages of the present invention is as follows:
1. good stress condition.Underground mould bag stake arching wall construction equivalent to having built one in advance in Soft Soil Layer Individual reinforced concrete supporting arch, the compression strength of mould bag cement calculus can reach more than 40MPa, have very high bearing capacity and resist Damage capability, it can ensure that the safety of tunnel excavation in Soft Soil Layer.
2. good sealing effect.Underground mould bag stake arching wall protection structure itself has good sealing effect, and The effect (the c values and φ values that improve the soil body) of compacted compacting and draining hardening is served to the Soft Soil Layer of surrounding, with mould bag stake Arch ring supporting construction forms overall shared upper load and sealing, effectively raises integrated carrying ability and reduces seepage Water risk.
3. effectively sedimentation is excavated in control.Due to can effectively solve leakage problem in work progress, so being avoided that underground Problem is settled and collapsed caused by water level decreasing, it is ensured that construction safety.Underground mould bag stake arching wall total bearing capacity is strong, The relaxation deformation on stratum can be greatly improved, ensures that sedimentation and deformation does not occur in digging process.
4. effective console dynamic deformation.This technology is smaller to soil layer disturbing influence around by brand-new technology, Can effective console dynamic deformation, do not interfere with the safety of upper building, do not influence the safe operation of top railway.
5. it is convenient to construct.This new technology uses small, dedicated equipment, quick construction, place strong applicability.
6. multiple action.Reduce and repeat disturbance of the drilling to country rock, once construct with regard to supporting, reinforcing, sealing can be played Multiple effect.
Brief description of the drawings
Fig. 1 is piped shed conslruction schematic diagram in the prior art;
1 '-steel grating 2 '-ductule arrow is tunneling direction
Fig. 2 mould bag stake holes bit plans of the present invention;
Fig. 3 is mould bag stake plane of arrangement figure of the present invention;
Fig. 4 is mould bag colligation schematic diagram of the present invention;
Fig. 5 is mould bag stake grouting sequence schematic diagram of the present invention;
Fig. 6 is I sequences mould bag stake slip casting of the present invention;
Fig. 7 is that II sequence mould bag stakes slip casting forms braced wall;
Fig. 8 is underground mould bag stake supporting wall structure schematic diagram.
Fig. 9 is mould bag stake braced wall extrusion forming design sketch;
In figure
1- tunnels
11- intends excavation contour line 12- faces
2- steel arch-shelfs
3- mould bag pile elements
31- mould pocket 32- Grouting Pipe 33- drainpipe 34- mould bags
The slurry outlets of the 3rd slurry outlet 354- of 35- slurry outlets 351- the first slurry outlet 352- the second slurry outlet 353- the 4th
Separator 37- is segmented separator before mould bag 38- after 36-
Embodiment
In describing below, using the bottom hole direction of drilling as front end, aperture direction is rear end.
Referring to Fig. 3 and Fig. 4, the structure of mould bag pile element 3 is as follows:It includes mould pocket 31, and slip casting is provided with mould pocket 31 Pipe 32, the side of the Grouting Pipe 32 set four slurry outlets 35 from rear to preceding, respectively are the first slurry outlet 351, the second slurry outlet 352nd, the 3rd slurry outlet 353 and the 4th slurry outlet 354.Wherein the 4th slurry outlet 354 is at Grouting Pipe front end exit.In slip casting Pipe front end exit is provided with preceding separator 38, and Grouting Pipe is in the portion perimeter cladding segmentation mould bag 37 provided with the 4th slurry outlet 354;
For Grouting Pipe in posterior segment cladding mould bag 34, the mould bag covers the first slurry outlet 351 and the second slurry outlet 352, and second Rear separator 36 is set between the slurry outlet 353 of slurry outlet 352 and the 3rd.
It is drainpipe 33 between the outer wall of the rear end of mould bag 34 and Grouting Pipe 32.
Pile hole construction
Referring to Fig. 2 and Fig. 3, using rig pore-forming, mould pocket 31 is formed, aperture is chosen (with straight according to Theoretical Design Exemplified by the 500mm of footpath), boring direction is along plan driving tunnel contour line outwards into certain inclination angle.Preferably, can be 20-40 Degree.
Drill hole inclination is controlled within certain limit (preferably, less than 30 degree), and drilling is divided to the construction of two sequences (to be applied every hole Work).After drilling construction is completed, sediment in flushing hole so that stake holes meets that the decentralization of mould bag requires.
2. the colligation of mould bag and the decentralization of mould bag
(1) Mo Dai pile center steel pipe (Grouting Pipe 32) selects diameter 50mm, and wall thickness 4mm seamless steel pipes, mould bag 34 is from straight Footpath 500mm straight barrel types geotextiles (nominal fracture strength is 50kN/m).Center steel pipe plays slip casting passage and mould bag is oriented to, supported Effect, according to stake deeply design set mould bag colligation length.
(2) after pore-forming, verification hole position, hole depth etc., after being satisfied by design requirement, start to bury and put mould bag steel pipe.Mould bag stake Process and bury to put and be responsible for by special messenger, mould bag stake will avoid winding or scratching in decentralization process.Such as because of collapse hole or bottom hole deposit, Bury and put again after palpus borehole cleaning.
Referring to Fig. 5 to Fig. 7, construction method of the present invention is as follows:
(1) grouting material and grouting equipment.Mould bag stake grouting material is intended selecting P.O42.5 Portland cement slurries, Controlling cement grout is P.O42.5 Portland cements and Chemical Control liquid using material.Cement grout is formulated as water ash Than 0.8:1, in Chemical Control liquid addition content and opportunity window depending on boosting situation and grout absorption change, generally cement grout 8~10%.For grouting equipment using 3SNS grouting pumps and the self-control small pump of hydraulic pressure, pulping equipment is self-control twin-tub mixer.3SNS is filled Stock pump pours into cement grout, and the self-control small pump of hydraulic pressure pours into Chemical Control liquid.
(2) grouting order and grouting way.
As shown in Fig. 5 to Fig. 8, mould bag stake grouting material is inputted by Grouting Pipe 32 using grouting pump first, due to rear separation The stop of device 36, mould bag stake grouting material enter mould bag 34 from the first slurry outlet 351, the second slurry outlet 352.Mould bag 34 reaches one After determining degree of saturation, small grouting pump is changed according to full situation and carries out supplementary irrigation construction.After the completion of mould bag stake mud jacking, pipe is washed in punching, Being controlled property cement grout again, the strict relation for controlling grouting amount and pressure.When pressure reaches to a certain degree, rear separator 36 is destroyed, and cement grout enters segmentation mould bag 37 from the 4th slurry outlet 354, while enters mould bag 34 from the 3rd slurry outlet 353 Gap and outside between segmentation mould bag 37.
Finally, Grouting Pipe 32 is full of.
(3) pressure is set.Pressure is influenceed by soil layer geology, and pressure change can only qualitatively judge mould bag in grouting pressure in hole Whether opened under effect, it is impossible to which quantitative analysis mould bag deploys and turgor.Each section of grouting setting pressure such as table 1:
Each section of grouting setup pressure value of table 1
4) grouting control and ending standard.A. pressure up to slurry is not entered after 0.5~1.5MPa, stablizes 5 points during mould bag stake slip casting Terminate after clock, the control of the rate of climb to grout absorption and pressure is paid attention to during mud jacking, injection speed should be controlled in 30~50L/ Min, it is ensured that mould bag has the filter water discharge time of abundance, and small pump progress supplementary irrigation construction, supplementary irrigation note are changed after reaching certain degree of saturation Speed control is starched in 10L~15L/min;Injection rate according to mould bag volume typically per linear meter(lin.m.) average cement mixed weight 200~ 300kg.B. controlling cement grout enters to starch pressure up to maximum under the premise of ensuring not lift, and enters after slurry rate drops to 2L/min Stablizing can terminate to be in the milk for 5 minutes, actually the closely knit situation regulation of the amount of pouring into manufacture bases geology, to reach soil layer consolidation effect as mesh 's.
(5) mould bag stake supporting wall structure.
Slip casting (Fig. 7) is carried out to I sequences (1,3,5,7 ...) mould bag stake first, treats that I sequence mould bags fully expand and reach certain strong Spend and then to II sequences (2,4,6,8 ...) mould bag stake slip casting (Fig. 8).Between mould bag stake, between the stake of mould bag and surrounding soil mutually Extruding, the cement calculus under high pressure effect in mould bag can reach very high intensity (the average 40MPa of compression strength).In addition, It is overall that each mould bag stake forms continuous braced wall under self extrusion and controlling slip casting effect, the interior friction man of the soil body and viscous Poly- power also has significant improvement, on the whole with high intensity, high stability, strong sealing the characteristics of.
The specific embodiment of the present invention is above are only, but the design concept of the present invention is not limited thereto, all utilizations This design carries out the change of unsubstantiality to the present invention, all should belong to the behavior for invading the scope of the present invention.

Claims (8)

1. a kind of underground mould bag stake method for protecting support, comprises the following steps:
1) rig is utilized, along tunneling direction pore-forming, to form mould pocket (31) in tunnel;Grouting Pipe (32) is set in mould pocket (31), should Grouting Pipe (32) sets slurry outlet (35);Grouting Pipe (32) Inner Front End is provided with preceding separator (38), and middle part is provided with rear separator (36), the posterior segment of the Grouting Pipe (32) sets mould bag (34);It is draining between the outer wall of mould bag (34) rear end and Grouting Pipe (32) Manage (33);Grouting Pipe (32) leading portion is surrounded by segmentation mould bag (37);Grouting Pipe (32) leads to mould bag (34) provided with an at least slurry outlet, One slurry outlet leads to segmentation mould bag (37), and a slurry outlet leads to mould bag (34) and the gap being segmented between mould bag (37);Afterwards Separator (36) is located at towards the slurry outlet of mould bag (34) and going out towards the gap between mould bag (34) and segmentation mould bag (37) Between slurry hole;
2) the first grouting equipment is used first, Grouting Pipe (32) is injected into the first grouting, and first grouting flows into mould from slurry outlet Bag (34), to mould bag (34) saturation;
Then the second grouting equipment is used, separator (36) is destroyed, Grouting Pipe (32) is injected into the second grouting, second grouting From the gap that slurry outlet is injected between segmentation mould bag (37), and mould bag (34) and segmentation mould bag (37);
3) slip casting alternately is carried out to the stake of I sequence mould bags first to mould pocket slip casting, treats that I sequence mould bags fully expand and reach certain strong Spend and then to II sequence mould bag stake slip castings, to formation mould bag stake supporting wall structure.
A kind of 2. underground mould bag stake method for protecting support as claimed in claim 1, it is characterised in that:Boring direction tunnels tunnel along plan For road contour line outwards into certain inclination angle, described inclination angle is 20-40 degree.
A kind of 3. underground mould bag stake method for protecting support as claimed in claim 1, it is characterised in that:Drill hole inclination control is less than 30 Degree, drilling are divided to two sequences to construct.
A kind of 4. underground mould bag stake method for protecting support as claimed in claim 1, it is characterised in that:Before the side of the Grouting Pipe (32) In after set a slurry outlet respectively, slurry outlet (353) before being respectively, middle slurry outlet (352) and rear slurry outlet (351);In preceding pulp Separator (36) is provided between hole (353) and middle slurry outlet (352), the posterior segment of the Grouting Pipe (32) sets mould bag (34), the mould Slurry outlet (352) and rear slurry outlet (353) in bag (34) cladding.
A kind of 5. underground mould bag stake method for protecting support as claimed in claim 1, it is characterised in that:Grouting order and grouting way. The stake of mould bag and controlling cement grout are constructed using a point sequence.After mould bag reaches certain degree of saturation, changed according to full situation Small grouting pump carries out supplementary irrigation construction.
A kind of 6. underground mould bag stake method for protecting support as claimed in claim 1, it is characterised in that:Step 2) adopts divider disruption With raising grouting pressure or mechanical destruction.
A kind of 7. underground mould bag stake method for protecting support as claimed in claim 1, it is characterised in that:After step 2) gap is full of, Grouting Pipe is also filled into grouting.
A kind of 8. underground mould bag stake method for protecting support as claimed in claim 1, it is characterised in that:Grouting control and ending standard:
A. pressure up to slurry is not entered after 0.5~1.5MPa, terminates after stablizing 5 minutes during mould bag stake slip casting, and control is to entering slurry during mud jacking The rate of climb of amount and pressure, injection speed should be controlled in 30~50L/min, it is ensured that mould bag has the filter water discharge time of abundance, reaches Small pump is changed after to certain degree of saturation and carries out supplementary irrigation construction, supplementary irrigation injection speed is controlled in 10L~15L/min;Injection rate root According to mould bag volume typically 200~300kg of every average cement mixed weight of linear meter(lin.m.);
B. controlling cement grout enters to starch pressure up to maximum under the premise of ensuring not lift, and enters slurry rate and drops to after 2L/min surely It can terminate to be in the milk within fixed 5 minutes, actually the closely knit situation regulation of the amount of pouring into manufacture bases geology, to reach soil layer consolidation effect as mesh 's.
CN201710196485.XA 2017-03-29 2017-03-29 A kind of underground mould bag stake method for protecting support Pending CN107542469A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710196485.XA CN107542469A (en) 2017-03-29 2017-03-29 A kind of underground mould bag stake method for protecting support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710196485.XA CN107542469A (en) 2017-03-29 2017-03-29 A kind of underground mould bag stake method for protecting support

Publications (1)

Publication Number Publication Date
CN107542469A true CN107542469A (en) 2018-01-05

Family

ID=60966895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710196485.XA Pending CN107542469A (en) 2017-03-29 2017-03-29 A kind of underground mould bag stake method for protecting support

Country Status (1)

Country Link
CN (1) CN107542469A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108999198A (en) * 2018-09-06 2018-12-14 蔡荪萍 A kind of New-type mould bag soil nailing pile constructing process
CN109026015A (en) * 2018-06-27 2018-12-18 山东大学 A kind of pre-grouting control method suitable for urban subway tunnel
CN109653753A (en) * 2018-12-07 2019-04-19 山东大学 A kind of shield urgency curve driving auxiliary turning construction method
CN113833493A (en) * 2021-09-29 2021-12-24 铁科院(深圳)研究设计院有限公司 Ground layer consolidates uses utricule pipe canopy

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001200528A (en) * 1999-11-12 2001-07-27 Denki Kagaku Kogyo Kk Injection apparatus and ground injecting method
KR20020005891A (en) * 2000-07-10 2002-01-18 최춘식 Method for reinforcement of reclamation land filling up waste material and its apparatus
JP2005314940A (en) * 2004-04-28 2005-11-10 Kyokado Eng Co Ltd Chemical grouting device
CN102003189A (en) * 2010-12-20 2011-04-06 中铁隧道集团有限公司 Mold bag grouting method and device for quickly and uniformly reinforcing soft stratum
CN102979478A (en) * 2012-12-05 2013-03-20 山东大学 Water stopping device for water inrush borehole drilling
CN104314587A (en) * 2014-10-27 2015-01-28 山东科技大学 Targeted domain-control grouting device and grouting process
CN105177282A (en) * 2015-09-11 2015-12-23 四川共拓岩土科技股份有限公司 Liquid injection device for preventing ion-type rare earth mine bodies from slipping
CN105971553A (en) * 2016-07-14 2016-09-28 山东科技大学 Portable gas drilling hole-sealing device and using method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001200528A (en) * 1999-11-12 2001-07-27 Denki Kagaku Kogyo Kk Injection apparatus and ground injecting method
KR20020005891A (en) * 2000-07-10 2002-01-18 최춘식 Method for reinforcement of reclamation land filling up waste material and its apparatus
JP2005314940A (en) * 2004-04-28 2005-11-10 Kyokado Eng Co Ltd Chemical grouting device
CN102003189A (en) * 2010-12-20 2011-04-06 中铁隧道集团有限公司 Mold bag grouting method and device for quickly and uniformly reinforcing soft stratum
CN102979478A (en) * 2012-12-05 2013-03-20 山东大学 Water stopping device for water inrush borehole drilling
CN104314587A (en) * 2014-10-27 2015-01-28 山东科技大学 Targeted domain-control grouting device and grouting process
CN105177282A (en) * 2015-09-11 2015-12-23 四川共拓岩土科技股份有限公司 Liquid injection device for preventing ion-type rare earth mine bodies from slipping
CN105971553A (en) * 2016-07-14 2016-09-28 山东科技大学 Portable gas drilling hole-sealing device and using method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李旺雷等: "压密式注浆在地基防渗堵漏中的应用", 《地下空间工程防水与渗漏治理技术研讨会》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109026015A (en) * 2018-06-27 2018-12-18 山东大学 A kind of pre-grouting control method suitable for urban subway tunnel
CN108999198A (en) * 2018-09-06 2018-12-14 蔡荪萍 A kind of New-type mould bag soil nailing pile constructing process
CN109653753A (en) * 2018-12-07 2019-04-19 山东大学 A kind of shield urgency curve driving auxiliary turning construction method
CN109653753B (en) * 2018-12-07 2019-11-15 山东大学 A kind of shield urgency curve driving auxiliary turning construction method
CN113833493A (en) * 2021-09-29 2021-12-24 铁科院(深圳)研究设计院有限公司 Ground layer consolidates uses utricule pipe canopy
CN113833493B (en) * 2021-09-29 2024-06-04 铁科院(深圳)研究设计院有限公司 Bag body pipe shed for rock and soil layer reinforcement

Similar Documents

Publication Publication Date Title
CN101962949B (en) Long spiral double-pipe high-pressure stir-jet grouting pile construction method and device
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN101245600B (en) Construction method for generating horizontal reinforcing body by high-pressure-double-liquid rotary spray technique
CN101230573B (en) Construction equipment for four-layer pipe ground layer depression type double-liquid horizontal jet grouting
CN108708743B (en) Method for treating tunnel collapse by grouting
CN203452083U (en) Rotary expanding pile construction equipment and grout feeding device
CN112412475A (en) Method for reinforcing and excavating surrounding rock of ice water accumulation body tunnel under influence of seasonal rainfall and surrounding rock support
CN107542469A (en) A kind of underground mould bag stake method for protecting support
CN101525881B (en) Structure of karst strata pile holes protecting wall and method for constructing pile holes
CN107339108B (en) The layer of sand location subway pipe shed construction method of underground water enrichment
CN105951749B (en) The construction method of the steel pipe pile reinforced processing of soft damage in a kind of restricted clearance
CN107417182B (en) Expansion type high polymer cement slurry, grouting reinforcement device and grouting reinforcement method
CN107725056A (en) One kind passes through silly stratum tunnel loopful quick grouting construction method in advance
CN113153308A (en) Construction method for double arch tunnel collapse section
CN108374672B (en) A method of reinforcing Deep Mine soft coal level roadway surrounding rock
CN108678772A (en) A kind of multilevel hierarchy suspension device and its construction method for rich water sandy gravel stratum tunnel
CN1236146C (en) Method and apparatus for forming shaped pile by drilling, high-pressure letting to enlarge hole and pressure pouring of concrete
CN108265706A (en) Engineering pile in karst cave geology and pile forming process
CN115306439A (en) Surrounding rock pre-reinforcement construction method suitable for large-span extension tunnel
CN108952727B (en) A kind of grouting water blocking method of the vertical creviced formation of high inclination-angle
CN107740434A (en) It is a kind of to be used for sandy gravel, the construction method of dolomite crushed zone dam foundation ditch water protecting curtain
CN112145203A (en) Full-face advancing type sectional grouting construction method and overlapped tunnel construction method
CN109440757A (en) A kind of foundation reinforcement method for karst region
KR101057487B1 (en) Grouting Method Using Enlarged Concrete Consolidation Grouting Apparatus
CN112177635A (en) Construction method of step multiple advanced small guide pipe and construction method of overlapped tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180105

RJ01 Rejection of invention patent application after publication