CN102242640B - Rapid outburst elimination method for cross cut coal uncovering in coal mine underground - Google Patents
Rapid outburst elimination method for cross cut coal uncovering in coal mine underground Download PDFInfo
- Publication number
- CN102242640B CN102242640B CN 201110185982 CN201110185982A CN102242640B CN 102242640 B CN102242640 B CN 102242640B CN 201110185982 CN201110185982 CN 201110185982 CN 201110185982 A CN201110185982 A CN 201110185982A CN 102242640 B CN102242640 B CN 102242640B
- Authority
- CN
- China
- Prior art keywords
- coal
- fracturing
- water
- pressure break
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
The invention provides a rapid outburst elimination method for cross cut coal uncovering in coal mine underground. The method comprises the following steps: before an outburst coal layer is uncovered by a cross cut, arranging hydraulic fracturing drill holes at the part, the normal distance of which is 5-7m with a coal layer, on a cross cut coal uncovering work face; sealing the fracturing drill holes; fracturing the fracturing drill holes with clear water the injection amount of which is determined according to an outburst elimination range; after fracture is finished, constructing deslagging blowholes, injecting high-pressure water into the fracturing drill holes for punching, and discharging coal and rocks generated from fracturing to the outside through the deslagging blowholes; carrying out gas extraction and drilling on the cross cut coal uncovering work face, sealing the drill holes by use of polyurethane and carrying out gas extraction, wherein the holes are sealed to the top plate/bottom plate of the coal layer; injecting high-pressure nitrogen or air into the fracturing holes, observing the gas flow and concentration change in gas extraction holes, and stopping gas injection if flow increases; if the gas extraction effect reaches the standard, and uncovering the rock cross cut when no outburst danger occurs to the cross cut work face; and if the gas extraction effectis not good, implementing fracturing once again and injecting high-pressure gas to expel and exchange methane. The method has the advantages of accelerating the coal uncovering speed of the cross cutwork face, playing a role in dust suppression, and improving the work conditions of a tunneling work face.
Description
Technical field
The present invention relates to the quick extinction method of stone door punching coal under a kind of coal mine.
Background technology
National security production supervision administrative department, Coal Mine Safety Supervision Bureau of country " the outstanding regulation of control coal and gas " the 81 regulation in August, 2009 " outburst prevention measures of stone door punching coal work plane comprises pre-gas pumping; bleeder off hole; hydraulic flushing in hole; metallic framework; coal body curing or through other through the evidence effective measures ", " according to work plane rock stratum situation; require exposed coal work plane and projecting coal bed minimum normal direction distance to be during implementation face outburst prevention measures: gas pumping in advance; bleeder off hole and hydraulic flushing in hole are 5m, metallic framework; coal body curing measure is 2m.Big when the roadway section, when the catalase degree is higher, also should suitably strengthen distance ".
Although " the outstanding regulation of control coal and gas " enumerated more method and technology to the outburst prevention measures of stone door punching coal, but in implementation process, because the difference of condition of coal seam occurrence, one or more measures wherein are difficult to play the effect of quick extinction in implementation process, influenced the speed of stone door punching coal, and then the digging that has influenced mine is taken over and is kept the safety in production.
Summary of the invention
The quick extinction method that is to provide stone door punching coal under a kind of coal mine of the present invention not only can improve the exposed coal speed of crossdrift work plane, can play the effect of dust suppression simultaneously, improves the condition of work of crossdrift work plane.
To achieve these goals, the utility model adopts following technical scheme: the quick extinction method of stone door punching coal under the coal mine, may further comprise the steps: (1) crossdrift open projecting coal bed before, be that 5 ~ 7 m places arrange fracturing boring at work plane apart from the coal seam vertical distance, the boring number is according to fracturing hole influence basin, drift section size and require the extinction scope to determine; Holing, whole hole penetrates seam roof/base plate and drilling depth is not less than 0.5m; (2) pressure break drilling and sealing uses compressive strength to be not less than 15 MPa Steel Tube Specials, the above high strength cement of 425 labels carries out sealing of hole, sealed borehole length from the aperture to seam roof/base plate; (3) with clear water pressure break is implemented in pressure break boring, injected water pressure and determine according to superincumbent stratum thickness, line loss, coal petrography compressive strength; Injected water volume is not less than 20m3/h; Injected water volume is determined according to the protrusion-dispelling scope, requires the protrusion-dispelling scope more big, needs water injection rate more many; (4) after pressure break is finished, carry out punching with water under high pressure, coal, sillar that pressure break produces are gone out outside the hole with water under high pressure; (5) " the outstanding regulation of coal and gas preventing and control " construction extraction borehole of making in August, 2009 by national security production supervision administrative department, national Coal Mine Safety Supervision Bureau at the stone door punching coal work plane, with the polyurethane sealing of hole and carry out extraction, sealed borehole length is to seam roof/base plate; (6) for improving extraction efficient, inject high pressure nitrogen or air in the pressure break hole, nitrogen or atmospheric pressure are not less than 0.4MPa, observe the variation of extraction hole gas flow and concentration, increase as flow and then can stop gas injection; (7) up to standard when the extraction effect, when the crossdrift work plane does not have outburst hazard, can begin driving; Bad as the extraction effect, can implement pressure break again and inject gases at high pressure and become to changing methane.
In the described step (2), the compressive strength of Steel Tube Special is more than the 15MPa, and it is more than the 30MPa that high strength cement solidifies back compressive strength.
In the described step (3), water injection rate is 2% ~ 4% of the interior coal body volume of pressure break scope, can think that after the water of this amount of injection water filling finishes; Simultaneously, in fracturing process, to observe the situation of change of injection pump pressure closely, reach 30% in case find the decline of water injecting pump pressure break, then will improve injection rate by the gear that changes water injecting pump, so repeatedly, be as the criterion until finishing the water filling design.
In the described step (1), crossdrift open projecting coal bed before, be that 5 m places arrange fracturing boring at work plane apart from the coal seam vertical distance.
The present invention is by implementing to press, dash, drive processing steps such as (pressure break, punching, purgings) to crossdrift, change present situations such as present stone door punching coal speed is slow, the borehole engineering amount is big, operation inconvenience, can solve problems such as crossdrift work plane outburst hazard is big, coal-bed gas extraction difficulty.Not only can accelerate the exposed coal speed of crossdrift work plane, can play the effect of dust suppression simultaneously, improve the condition of work of crossdrift work plane.
Description of drawings
Fig. 1 is the schematic diagram in pressure break stage;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the schematic diagram in punching stage;
Fig. 4 is the schematic diagram in extraction stage;
Fig. 5 is the schematic diagram in purging stage.
The specific embodiment
Embodiment: shown in Fig. 1-5, the quick extinction method of stone door punching coal may further comprise the steps under a kind of coal mine:
(1) crossdrift open projecting coal bed before, work plane apart from the coal seam 5 ~ 7 m places (hang down apart from) arrange fracturing boring (adopting 5m in the present embodiment), the boring number is according to fracturing hole influence basin, drift section size and require the extinction scope to determine; The whole hole of holing penetrates the top in coal seam (end) plate and is not less than 0.5m.
" the outstanding regulation of control coal and gas " the 82 stipulates that " when crossdrift and uncovering coal in vertical shaft work plane adopted pre-gas pumping, degassing hole outburst prevention measures, bore diameter was generally 75 ~ 120 mm.The control range of stone door punching coal work plane boring is: the both sides of crossdrift and upper wheels profile be at least 5 m outward, bottom at least 3 m.Uncovering coal in vertical shaft work plane boring control range is: nearly level, gentle dip, inclined seam are outline line 5m at least outward around the pit shaft; Half-edge coal seam across pitch both sides and outside the inclined upper outline line at least 5 m, the lower wheel profile is at least 3 m outward.”。
Therefore, when implementing pressure break, the required control range of pressure break is got maximum value: the both sides of crossdrift and top and the bottom outline line are got 5 m at least.According to the experience of construction fracturing boring was as can be known in the coal seam in the past, the fracturing effective radius is not less than 10 m, therefore, even consider the size of crossdrift area, the pressure break of only constructing at the crossdrift middle part is holed, and the influence basin of pressure break also can reach predetermined requirement; Certainly in order to make the extinction scope reach requirement early, can arrange that also 2 ~ 3 pressure break holes inject water under high pressure simultaneously.
(2) pressure break drilling and sealing uses Steel Tube Special (compressive strength is as more than the 15MPa), special cement (solidifying more than the compressive strength 30MPa of back) to carry out sealing of hole, sealed borehole length from the aperture to top (end) plate in coal seam;
The tight degree of sealed borehole length and sealing of hole is directly connected to the success or failure of water filling, and sealed borehole length should guarantee the sealed borehole length maximization under the prerequisite that does not seal the coal seam.
(3) with clear water pressure break is implemented in pressure break boring, injected water pressure and can determine according to superincumbent stratum thickness, line loss, coal petrography compressive strength; Injected water volume is not less than 20m3/h; Injected water volume is determined according to the protrusion-dispelling scope, requires the protrusion-dispelling scope more big, needs water injection rate more many.
Determining and can determining according to coal body cranny development degree and porosity in the scope of need extinction coal seam of water injection rate is generally 2% ~ 4% of the interior coal body volume of pressure break scope, can think that after the water of this amount of injection water filling finishes.Simultaneously, in fracturing process, to observe the situation of change of injection pump pressure closely, descend 30% in case find the water injecting pump pressure break, then will improve injection rate by the gear that changes water injecting pump.So repeatedly, be as the criterion until finishing the water filling design.
(4) after fracturing is finished, can execute limit construction mud hole at pressure break hole periphery, by using equipment such as high-pressure pump that punching is carried out in the pressure break hole, the coal that has broken after pressure break is finished, rock mass are gone out outside the hole by mud hole and pressure break hole, play the anti-reflection effect of the place ahead coal mass relief.
(5) at the stone door punching coal work plane by " coal and the gas preventing and control outstanding regulation " extraction borehole of constructing, with the polyurethane sealing of hole and carry out extraction, sealed borehole length is to the end (top) plate in coal seam;
(6) for improving extraction efficient, inject high pressure nitrogen or air in the pressure break hole, nitrogen or atmospheric pressure are not less than 0.4MPa, observe the variation of extraction hole gas flow and concentration, increase as flow and then can stop gas injection;
High-pressure nitrogen bottle can be transported to the down-hole, and by pipeline gas injection in the pressure break hole, operating personnel to be with Frostbite preventing gloves and mask during gas injection, in order to avoid health is damaged.
(7) up to standard when the extraction effect, when driving face does not have outburst hazard, can begin driving, bad as the extraction effect, can implement pressure break again and inject gases at high pressure and become to changing methane.
The present invention proposes the stone door punching coal outburst prevention measures of " fracturing, punching, the nitrogen that becomes are replaced ", present situations such as present stone door punching coal speed is slow in the hope of changing, the borehole engineering amount is big, operation inconvenience.
Fig. 1 is the schematic diagram in pressure break stage, in the 3 construction pressure break borings 1,2 of stone door punching coal work plane, injects water under high pressure pressure break is carried out in the coal seam, plays the effect of opening crack, coal seam, the coal body that breaks.Hole, pressure break hole length penetrates the coal seam, and the aperture is between 75 ~ 120mm.Be the pressure break smooth implementation that guarantees, need sealing of hole is carried out in the pressure break hole that compressive strength is not less than 20MPa behind the sealing of hole.Fig. 2 is the A-A sectional view of Fig. 1, and 4 is crossdrift, and 5 is coal body.
Fig. 3 is the schematic diagram in punching stage, after pressure break is finished, in pressure break hole 1,2 peripheral different distance construction mud holes 6, after construction is finished by the operation of washing by water of high-pressure hydraulic pump 8 and 7 pairs of pressure break holes of outlet pipe, the coal petrography piece that produces in the pressure break stage is gone out outside the hole by mud hole 6, played the purpose of loose coal body, release, increase coal body gas permeability.
Fig. 4 is the schematic diagram in extraction stage, after punching is finished, in crossdrift work plane 3 construction extractions 9 holes, and with polyurethane mud hole and extraction hole is carried out sealing of hole, links the extraction system and carries out extraction.
Fig. 5 is the schematic diagram in purging stage, bad as the extraction effect, can use high-pressure nitrogen bottle 11 to carry out purging by 10 pairs of borings of purging pipe, nitrogen cylinder is connected with boring with pipeline, beginning is to the interior nitrogen injection of boring, order about the Gas Flow in the coal body, extraction is carried out in the easy extraction that becomes again after purging is finished.
Claims (4)
1. the quick extinction method of stone door punching coal under the coal mine, it is characterized in that: may further comprise the steps: (1) crossdrift open projecting coal bed before, be that 5 ~ 7 m places arrange fracturing boring at work plane apart from the coal seam vertical distance, the boring number is according to fracturing hole influence basin, drift section size and require the extinction scope to determine; Holing, whole hole penetrates seam roof/base plate and drilling depth is not less than 0.5m; (2) pressure break drilling and sealing uses compressive strength to be not less than 15 MPa Steel Tube Specials, the above high strength cement of 425 labels carries out sealing of hole, sealed borehole length from the aperture to seam roof/base plate; (3) with clear water pressure break is implemented in pressure break boring, injected water pressure and determine according to superincumbent stratum thickness, line loss, coal petrography compressive strength; Injected water volume is not less than 20m3/h; Injected water volume is determined according to the protrusion-dispelling scope, requires the protrusion-dispelling scope more big, needs water injection rate more many; (4) after pressure break is finished, carry out punching with water under high pressure, coal, sillar that pressure break produces are gone out outside the hole with water under high pressure; (5) " the outstanding regulation of coal and gas preventing and control " construction extraction borehole of making in August, 2009 by national security production supervision administrative department, national Coal Mine Safety Supervision Bureau at the stone door punching coal work plane, with the polyurethane sealing of hole and carry out extraction, sealed borehole length is to seam roof/base plate; (6) for improving extraction efficient, inject high pressure nitrogen or air in the pressure break hole, nitrogen or atmospheric pressure are not less than 0.4MPa, observe the variation of extraction hole gas flow and concentration, increase as flow and then can stop gas injection; (7) up to standard when the extraction effect, when the crossdrift work plane does not have outburst hazard, can begin driving; Bad as the extraction effect, can implement pressure break again and inject gases at high pressure and become to changing methane.
2. the quick extinction method of stone door punching coal under the coal mine according to claim 1, it is characterized in that: in the described step (2), the compressive strength of Steel Tube Special is more than the 15MPa, it is more than the 30MPa that high strength cement solidifies back compressive strength.
3. the quick extinction method of stone door punching coal under the coal mine according to claim 1 and 2 is characterized in that: in the described step (3), water injection rate be in the pressure break scope coal body volume 2% ~ 4%, after the water of this amount of injection, can think the water filling end; Simultaneously, in fracturing process, to observe the situation of change of injection pump pressure closely, reach 30% in case find the decline of water injecting pump pressure break, then will improve injection rate by the gear that changes water injecting pump, so repeatedly, be as the criterion until finishing the water filling design.
4. the quick extinction method of stone door punching coal under the coal mine according to claim 3 is characterized in that: in the described step (1), crossdrift open projecting coal bed before, be that 5 m places arrange fracturing boring at work plane apart from the coal seam vertical distance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110185982 CN102242640B (en) | 2011-07-05 | 2011-07-05 | Rapid outburst elimination method for cross cut coal uncovering in coal mine underground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110185982 CN102242640B (en) | 2011-07-05 | 2011-07-05 | Rapid outburst elimination method for cross cut coal uncovering in coal mine underground |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102242640A CN102242640A (en) | 2011-11-16 |
CN102242640B true CN102242640B (en) | 2013-09-25 |
Family
ID=44960864
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110185982 Expired - Fee Related CN102242640B (en) | 2011-07-05 | 2011-07-05 | Rapid outburst elimination method for cross cut coal uncovering in coal mine underground |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102242640B (en) |
Families Citing this family (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103291301A (en) * | 2012-02-22 | 2013-09-11 | 重庆巨能建设(集团)有限公司 | Pilot-tunneling method for coal uncovering |
CN102635391B (en) * | 2012-04-28 | 2014-02-12 | 陈凤平 | Method for preventing and controlling gas outburst |
CN102678167B (en) * | 2012-06-11 | 2014-07-16 | 中国矿业大学 | Hydraulic-fracturing rock cross-cut coal uncovering method for short-distance coal beds |
CN103306677B (en) * | 2013-05-26 | 2016-01-27 | 贵州省矿山安全科学研究院 | Rapid rock cross-cut coal uncovering process and outburst prevention method |
CN103806914B (en) * | 2014-01-27 | 2015-11-11 | 冀中能源峰峰集团有限公司大淑村矿 | A kind of coal and gas outburst mine coal-mining method |
CN104213932B (en) * | 2014-08-07 | 2016-03-02 | 中国矿业大学 | A kind of projecting coal bed waterpower phase transformation fracturing coal uncovering method |
CN104763462A (en) * | 2015-04-07 | 2015-07-08 | 中国矿业大学 | Method for extracting high-pressure hydraulic cave-manufacturing gas from rock roadway crossing hole |
CN105065000A (en) * | 2015-07-17 | 2015-11-18 | 中铁四局集团第四工程有限公司 | Rapid coal uncovering process and outburst prevention method of large-section tunnel |
CN105003294B (en) * | 2015-07-30 | 2017-09-29 | 山东科技大学 | One kind is based on hydrothermal reaction coupling pressure break coal body coal uncovering method |
CN106437823B (en) * | 2015-08-12 | 2020-02-14 | 陈信平 | Method for eliminating outburst and standard exceeding of coal mine gas explosion |
CN105221182B (en) * | 2015-09-21 | 2017-11-17 | 河南理工大学 | Coal uncovering method under the complex geological condition of pole |
CN105221150B (en) * | 2015-09-22 | 2018-02-13 | 中国矿业大学 | A kind of method of horizontal jet grouting stake reinforced stone door punching coal |
CN105756700B (en) * | 2016-03-11 | 2019-01-22 | 中铁十八局集团有限公司 | Large section tunnel wears the construction method and hole sealing structure of coal measure strata section |
CN106401590B (en) * | 2016-11-18 | 2019-04-30 | 华北科技学院 | Surrounding Rock Strength control device and method before a kind of stone door punching coal |
CN109209293B (en) * | 2018-11-16 | 2020-09-08 | 辽宁工程技术大学 | Comprehensive outburst prevention construction method for rock cross-cut outburst coal seam |
CN109441452A (en) * | 2018-12-30 | 2019-03-08 | 平煤神马建工集团有限公司 | Exempt from the construction method that exposed coal tunnel passes rapidly through high prominent down-hole coal seam |
CN112709572A (en) * | 2019-10-24 | 2021-04-27 | 西安闪光能源科技有限公司 | Rock cross-cut coal uncovering method based on controllable shock wave permeability increase |
CN111075496B (en) * | 2020-03-09 | 2021-04-02 | 河南理工大学 | Device for comprehensively eliminating and suppressing outburst and dust of coal bed by injecting flue gas absorption liquid at low pressure and outburst-eliminating and dust-suppressing method |
CN111520140A (en) * | 2020-04-27 | 2020-08-11 | 中国矿业大学 | Rock cross-cut coal uncovering method based on gas injection displacement enhanced electric pulse fracturing |
CN112360543B (en) * | 2020-08-24 | 2024-03-19 | 中国石油大学(华东) | Outburst elimination method for coal seam water injection |
CN112430457B (en) * | 2020-11-20 | 2023-01-24 | 中国煤炭地质总局地球物理勘探研究院 | Gas dissolving composition, dissolving agent and application thereof |
CN115163172B (en) * | 2022-08-10 | 2023-03-07 | 河南理工大学 | Advanced pre-extraction rapid coal uncovering method for gas tunnel |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1168734A1 (en) * | 1984-04-19 | 1985-07-23 | Институт Геотехнической Механики Ан Усср | Method of controlling spontaneous outbursts of coal and gas when opening-up outburst-hazardous seam with a mine working |
UA30034U (en) * | 2007-09-24 | 2008-02-11 | Государственный Макеевский Научно-Исследовательский Институт По Безопасности Работ В Горной Промышленности | Method for prevention of sudden outbursts of coal and gas |
CN101575983A (en) * | 2009-02-27 | 2009-11-11 | 河南省煤层气开发利用有限公司 | Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof. |
CN101598030A (en) * | 2009-07-14 | 2009-12-09 | 中国矿业大学 | Method for realizing fast coal exposing of coal seam rock cross with outburst danger |
CN101603431A (en) * | 2009-07-14 | 2009-12-16 | 中国矿业大学 | A kind of method for reinforcing outburst-prone coal seam cross-cut coal uncovering |
EA200801780A1 (en) * | 2008-07-14 | 2010-02-26 | Открытое Акционерное Общество "Белгорхимпром" (Оао "Белгорхимпром") | METHOD OF UNDERGROUND DEVELOPMENT OF STONE CARBON MONEY |
CN101979835A (en) * | 2010-09-21 | 2011-02-23 | 安徽省煤田地质局第一勘探队 | Method for preventing coal and gas burst by drill communicated coal mining exhaust |
CN102094668A (en) * | 2010-12-20 | 2011-06-15 | 郑州大学 | High-pressure hydraulic drilling, pressure releasing and protrusion removing method for upper drainage roadway |
-
2011
- 2011-07-05 CN CN 201110185982 patent/CN102242640B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1168734A1 (en) * | 1984-04-19 | 1985-07-23 | Институт Геотехнической Механики Ан Усср | Method of controlling spontaneous outbursts of coal and gas when opening-up outburst-hazardous seam with a mine working |
UA30034U (en) * | 2007-09-24 | 2008-02-11 | Государственный Макеевский Научно-Исследовательский Институт По Безопасности Работ В Горной Промышленности | Method for prevention of sudden outbursts of coal and gas |
EA200801780A1 (en) * | 2008-07-14 | 2010-02-26 | Открытое Акционерное Общество "Белгорхимпром" (Оао "Белгорхимпром") | METHOD OF UNDERGROUND DEVELOPMENT OF STONE CARBON MONEY |
CN101575983A (en) * | 2009-02-27 | 2009-11-11 | 河南省煤层气开发利用有限公司 | Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof. |
CN101598030A (en) * | 2009-07-14 | 2009-12-09 | 中国矿业大学 | Method for realizing fast coal exposing of coal seam rock cross with outburst danger |
CN101603431A (en) * | 2009-07-14 | 2009-12-16 | 中国矿业大学 | A kind of method for reinforcing outburst-prone coal seam cross-cut coal uncovering |
CN101979835A (en) * | 2010-09-21 | 2011-02-23 | 安徽省煤田地质局第一勘探队 | Method for preventing coal and gas burst by drill communicated coal mining exhaust |
CN102094668A (en) * | 2010-12-20 | 2011-06-15 | 郑州大学 | High-pressure hydraulic drilling, pressure releasing and protrusion removing method for upper drainage roadway |
Non-Patent Citations (4)
Title |
---|
张春华等.石门对掘揭开急倾斜煤层突出与爆破增透消突技术.《煤炭学报》.2010,第35卷(第01期), |
水力压裂与强化抽放石门快速揭煤技术;王文选等;《煤矿安全》;20100731(第07期);27-30 * |
王文选等.水力压裂与强化抽放石门快速揭煤技术.《煤矿安全》.2010,(第07期), |
石门对掘揭开急倾斜煤层突出与爆破增透消突技术;张春华等;《煤炭学报》;20100131;第35卷(第01期);85-88 * |
Also Published As
Publication number | Publication date |
---|---|
CN102242640A (en) | 2011-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102242640B (en) | Rapid outburst elimination method for cross cut coal uncovering in coal mine underground | |
CN103195467B (en) | Hydraulic fracturing and grouting solidification combined rock cross-cut coal uncovering method | |
CN108952796B (en) | Comb-shaped bottom plate through-layer drilling fracturing permeability-increasing-based modular extraction method | |
CN101575983B (en) | Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof. | |
CA3022748C (en) | Method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars | |
CN102619552B (en) | Directional hydraulic pressing penetration, permeability increase and outburst elimination method of guide groove | |
CN104533452B (en) | A kind of underground coal mine crushes coal body stagewise grouting strengthening method | |
CN102434194B (en) | Gas drainage drill hole structure formed in coal layer and method for fabricating same | |
CN107304676A (en) | A kind of prevention and controls for leaving bump under coal column | |
CN103510957A (en) | Combined rock cross-cut coal uncovering method | |
CN101603431A (en) | A kind of method for reinforcing outburst-prone coal seam cross-cut coal uncovering | |
CN106812540B (en) | Shield initial plain wall sealing water-stopping reinforcing structure and construction process | |
CN210564348U (en) | Drilling device for underground gas hole | |
WO2020030043A1 (en) | High-pressure air ramming device for oil well, and method | |
RU2419723C1 (en) | Degasation method of developed coal beds | |
CN107816365A (en) | A kind of quick-fried pumping integration anti-burst method of coal seam drilling | |
CN102704986A (en) | Pressure-controlled hole sealing method for gas drainage hole | |
CN110259465A (en) | A kind of method that list shield double mode TBM pre-grouting reinforces fault belt | |
RU2506423C1 (en) | Method for underground block leaching of useful minerals | |
CN104696006A (en) | Method for extracting residual coal bed gas in multiple layers of goafs by drilling well from ground and penetrating through residual coal pillars | |
CN112412422A (en) | Freezing fracturing cooperated coal seam hydraulic cavitation permeability increasing and pumping promoting method | |
CN110924900A (en) | Method for hydraulic power-liquid nitrogen composite uniform fracturing of coal body | |
CN103899268A (en) | Method for improving gas extraction hole sealing tightness | |
CN214697785U (en) | Device for solidifying coal bed by utilizing microorganisms in cross-cut coal uncovering process | |
CN112855073B (en) | Device and method for solidifying coal bed by using microorganisms in cross-cut coal uncovering process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130925 Termination date: 20150705 |
|
EXPY | Termination of patent right or utility model |