CN105756700B - Large section tunnel wears the construction method and hole sealing structure of coal measure strata section - Google Patents

Large section tunnel wears the construction method and hole sealing structure of coal measure strata section Download PDF

Info

Publication number
CN105756700B
CN105756700B CN201610139185.3A CN201610139185A CN105756700B CN 105756700 B CN105756700 B CN 105756700B CN 201610139185 A CN201610139185 A CN 201610139185A CN 105756700 B CN105756700 B CN 105756700B
Authority
CN
China
Prior art keywords
coal
section
tunnel
pressure break
coal seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610139185.3A
Other languages
Chinese (zh)
Other versions
CN105756700A (en
Inventor
曹美俊
邹永红
王强
李林林
王江
代黔彪
李兆奎
周盛龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201610139185.3A priority Critical patent/CN105756700B/en
Publication of CN105756700A publication Critical patent/CN105756700A/en
Application granted granted Critical
Publication of CN105756700B publication Critical patent/CN105756700B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses construction methods and hole sealing structure that a kind of large section tunnel wears coal measure strata section, this method includes the steps that hydraulic fracturing and gas drainage, hydraulic fracturing successively carries out concentration pressure break to multiple pressure break holes using the Frac unit for being laid in the same area, determine that coal measure strata section concentrates the concentration number of pressure break and at least two coal seams to be traversed of primary concentration pressure break and Coal Seam Prone To Outburst and the bore position once concentrated and depth before pressure break;Gas drainage includes the concentration extraction in more than two coal seams, and to i.e. by the independent extraction in digging coal seam.Hole sealing structure is formed by hole sealing device, and the pressure break pipe inner end of hole sealing device is formed with floral tube section, and floral tube section is divided into section and floral tube outer segment in floral tube, is wound at least one layer of gauze on the outer wall of floral tube outer segment;Sealing section is made of grout cures section and polyurethane seal section.The invention has the advantages that driving method can ensure that tunnel piercing quickly, safety coal measure strata section;The sealing of hole effect of hole sealing structure is good, bearing capacity is strong.

Description

Large section tunnel wears the construction method and hole sealing structure of coal measure strata section
Technical field
The present invention relates to a kind of super large end face tunnel piercing technology, especially a kind of large section tunnel wears coal measure strata section Construction method and for the hydraulic fracturing drilling and sealing structure in this method.
Background technique
With the development of China's communication, more and more, the high methane tunnel of the case where tunnel is built on stratum containing gas is passed through Road quantity is also being continuously increased.Although the gas tunnel of domestic construction there are Gas Outburst, has mostly based on high methane at present Gas Outburst phenomenon it is less, the general method using conventional coal mine roadway driving, construction rate is low, and the duration is longer.According to endless Full statistics, the country, which includes coal and the prominent dangerous tunnel of gas, hair ear vcehicular tunnel, Wumeng Shan Mountain railway tunnel etc., but not completely A set of process about coal and the prominent constructing tunnel of gas is formed, external gas tunnel construction referential experience is less.For This, need it is a kind of safety, quickly through the construction technology of coal measure strata section.
Summary of the invention
The first object of the present invention is in view of the deficiencies of the prior art, to provide a kind of large section tunnel and wear coal measure strata section Construction method reduce fracturing unit and turn in such a way that the same area is once concentrated multiple pressure break to multiple coal seams Number is moved, pressure break preparation amount is substantially reduced, so that tunnel boring efficiency is improved, it is good to be laid quickly through coal measure strata section Good basis;And the judgement by carrying out gas drainage at the distance set away from coal seam at least two to be dug and tunneling safely, really Protect tunnel piercing safety.The second object of the present invention is to provide the concentration hydraulic fracturing that a kind of large section tunnel passes through multiple seam Drilling and sealing structure forms the fracturing borehole of the hole sealing structure, and sealing of hole speed is fast, sealing of hole is secured, sealing effect is good, can be square Just, reliably realize and concentrate hydraulic fracturing, be conducive to improve tunnel boring efficiency, to provide reliable guarantor quickly through coal measure strata section Barrier.
To realize the first purpose, the present invention adopts the following technical scheme:
A kind of large section tunnel wears the construction method of coal measure strata section, includes the steps that hydraulic fracturing and gas drainage,
The hydraulic fracturing successively concentrates multiple pressure break holes using the Frac unit for being laid in tunnel the same area Pressure break surveys data according to the ground of coal measure strata section to be traversed before pressure break, determines that coal measure strata section concentrates the concentration number of pressure break Primary at least two coal seams to be traversed for concentrating pressure break, and first in the first coal seam to be traversed for once concentrating hydraulic fracturing sets At set a distance, smart spy is carried out to coal seam to be traversed, to obtain the accurate parameter of respectively coal seam thickness to be taken off and adjacent coal bed spacing, with And each Gas Outburst parameter to the Methane Diffusion speed of exposed coal layer and pressure;Outburst coal is determined according to Gas Outburst parameter Layer and the primary fracturing borehole position for concentrating hydraulic fracturing and depth, and fracturing borehole is carried out to apply brill and sealing of hole;
The gas drainage includes the concentration extraction after hydraulic fracturing to more than two coal seams, and in tunnel piercing to appointing To i.e. by the independent extraction in the coal seam to be dug of digging at second set distance in one coal seam.
The present invention by adopting the above technical scheme, by once being concentrated multiple pressure break to multiple coal seams in the same area Mode, reduce fracturing unit transfer number, substantially reduce pressure break preparation amount, be fast to improve tunnel boring efficiency Speed lays good basis by coal measure strata section;And by carrying out gas pumping at the distance set away from coal seam at least two to be dug The judgement adopted and tunneled safely, it is ensured that tunnel piercing safety.
Preferably, the independent extraction further include tunnel piercing to away from i.e. by the third in the coal seam to be dug of digging set away from It is carried out from place.Further increase the safety of tunnel piercing.
It is further preferred that the third set distance is 2.5~3.5m.Further increase the reliable of driving safety Property.
It preferably, further include Gas Outburst parameter detecting after the gas drainage, to judge whether tunnel can carry out safety Driving;It is then to continue to tunnel;It is no, then continue extraction, and judge whether tunnel can carry out again by Gas Outburst parameter detecting Safety driving.Use for reference the Gas Outburst judgment criteria and method of Gas-bearing Coal Seams exploitation in coal mine sweat, it is ensured that the safety of driving Property.
It preferably, further include the Gas Outburst parameter prediction of constructing in coal seam when tunnel piercing is opened to coal seam The prediction drilling of concordant coal seam predicts that drilling carries out the prominent parameter prediction of coal-bed gas by concordant coal seam, and whether judges tunnel Safe coal-openning can be carried out, is, then continues exposed coal to passing through this coal seam;It is no, then gas drainage is carried out, and carry out coal-bed gas again It protrudes parameter prediction and whether can carry out safe coal-openning judgement.To carry out safety driving judgement again after opening coal seam, it is ensured that Safety of the tunnel in the tunneling process of coal seam.
Preferably, first set distance is 10~12m;It is 5~6m at second set distance.To obtain coal seam The accurate data of thickness and Gas Outburst, tunnel piercing does not provide safeguard safely.
Preferably, the sealing section of at least one in multiple pressure break holes has the portion in the coal seam passed through Point.To carry out pressure break to target coal seam in pressure break, and ensures once to concentrate and gradation pressure at least is carried out to two target coal seams, It reduces and concentrates number and pressure break preparation amount, improve tunnel boring efficiency.
It preferably, further include the coal body to coal measure strata section in the tunneling process of the Tunnel Passing coal measure strata section It is segmented with rock mass and carries out advance support processing, which includes entering steel pipe in the coal and rock embedded in hole of coal measure strata section, It is consolidated using cement grout, multiple steel pipes are in the setting regions outside the outline excavation control line of tunnel middle and upper part and lateral wall Form canopy formula advance support structure.To prevent in tunneling process rock mass or coal and rock to collapse because soft, driving is further ensured that Safety.
To realize that the second purpose, the present invention adopt the following technical scheme that.
A kind of large section tunnel passes through the concentration hydraulic fracturing drilling and sealing structure of multiple seam, including presses with primary concentrate Multiple fracturing boreholes that number is equal to each other are split, a hole sealing device are correspondingly arranged in each fracturing borehole, and pass through corresponding envelope Aperture apparatus forms hole sealing structure, and hole sealing device protrudes into corresponding coal seam by roof direction, and hole sealing device includes pressure break pipe, grouting Pipe, pressure break pipe inner end are formed with the floral tube section of setting length, and floral tube section is separated by the tie part that horsetail form drag starches structure Section and floral tube outer segment in floral tube, section is discharged for hydraulic fracturing in floral tube, is wound at least one layer of yarn on the outer wall of floral tube outer segment Cloth;Horsetail form drag slurry structure is formed by the cotton yarn or fabric item being banded on pressure break pipe, and is located in roof, Sealing section is made of grout cures section and polyurethane seal section.
Using preceding solution hole sealing structure, it can be achieved that multiple coal seams primary concentration gradation pressure break, formed sealing of hole The hole sealing device structure of structure is simple, and sealing of hole is convenient, and sealing section sealing effect is good, and bearing capacity is strong.Wherein, section is used in floral tube Frac water water outlet, floral tube section outer segment are used for cement slurry draining;Horsetail and gauze have permeable and resistance sand effect, are conducive to prevent water In the coal seam and pressure break pipe of mud flow drilling inner end, and is conducive to the cement slurry near horsetail and floral tube outer segment and accelerates admittedly Change.When hole sealing device merging drilling, preferably pressure break pipe and grout pipe are fixed together by fixing pieces such as pipe clamps, to improve behaviour The convenience of work.Meanwhile using the soft characteristic of gauze, high pressure water mud can fill to form hole to section floral tube bore portion in floral tube Plug, can be improved the fastness combined between pressure break pipe and cement slurry seal section.
Preferably, the horsetail form drag starches at least 1 meter of structure length, is welded with horsetail shape at the tie part of pressure break pipe Plasma resistance structure is tied up with multiple anti-skid studs or anti-slop serrations;Outer at least 1 meter of the segment length of the floral tube;The polyurethane sealing of hole segment length At least 1.5 meters.To ensure that sealing section has the bearing capacity not less than 35MPa.
Compared with the prior art, the invention has the advantages that driving method can ensure that tunnel piercing quickly, safety Coal measure strata section;The sealing of hole effect of hole sealing structure is good, bearing capacity is strong.
Detailed description of the invention
Fig. 1 is carried out in tunnel piercing using the method for the present invention, true by exploration data in the coal measure strata that tunnel is passed through Fixed multiple digital well logging structural schematic diagrams.
Fig. 2 is the distribution schematic diagram that multiple pressure break holes are once concentrated in the method for the present invention.
Fig. 3 is advance support structural schematic diagram in the method for the present invention.
Fig. 4 is the structural schematic diagram of hole sealing structure of the present invention.
Specific embodiment
The present invention will be further described below with reference to the drawings, but does not therefore limit the present invention to the implementation Among range.
Embodiment 1, a kind of large section tunnel wear the construction method of coal measure strata section, including hydraulic fracturing and gas drainage The step of, this method is used to pass through the tunnel piercing in totally 9 coal seams K1~K9 in certain design, by K1~K9 of geological exploration result Digital well logging and spacing, as shown in Figure 1, wherein thickness and spacing units are m.
Data is surveyed according to the ground of aforementioned coal measure strata section to be traversed, determines that 9 coal seams of coal measure strata section use and collects twice The mode of middle pressure break carries out gradation pressure break to multiple coal seams, wherein concentrates pressure break to the coal seam K9~K4, second of concentration for the first time Pressure break carries out the coal seam K3~K1.
When tunnel excavation working face is to away from K9 and K3 roof minimum perpendicular distance 10m, pass through drill hole sampling respectively Analysis obtain the coal seam K9~K1 be averaged digital well logging be respectively 0.94m, 0.82m, 0.71m, 0m, 2.60m, 1.65m, 0.1m, 1.21m,0.35m;It is that the coal seam 2.41m, K7 and K5 spacing is that K9 and the coal seam K8 spacing, which are 1.87m, K8 and K7 coal seam spacing, It is 7.49m, K3 and K2 coal seam spacing is 25.72m that the coal seam 13.3m, K5 and K4 spacing, which is 0.7m, K4 and K3 coal seam spacing, K2 with The coal seam K1 spacing is 6.95m;Wherein, K6 coal seam thickness is 0, i.e., non-coal seam, K3 coal seam thickness is that 0.1 meter of thinning is that seam can neglect Slightly disregard, and by being sampled to all coal seams passed through, original watt of coal seam is measured using DGC rapid measurement device for gas content This content, inverse gas pressure;Using WFC-2 type gas diffusion initial speed automatic analyzer, smash cylinder, hopper, day equality to pieces Instrument is measured Δ P, f value;And the Failure type in coal seam is analyzed in location of the coring procedure.Whether to determine place work area For Gas Outburst work area.With specific reference to the related request of " super-long railway tunnel technical specification ", as long as gas tunnel, which has at one, to be had Outburst danger, the place work area be Gas Outburst work area.It is determined as that Gas Outburst must meet following 4 indexs simultaneously: (1) gas pressure P >=0.74MPa;(2) P >=10 gas diffusion initial speed △;(3) solid coefficient f≤0.5 of coal;(4) coal Failure type be III class or more.In deterministic process, since the gas pressure measurement period is longer, according to " prevention and treatment coal and gas Prominent regulation " requirement, take the data such as actual measurement gas bearing capacity and industrialness analysis result to carry out inverse gas pressure.Obtain K9, K5, K4 and K2 be it is projecting coal bed, remaining is non-protruding coal seam.Then, determine for the first time concentrate pressure break respectively to K9, K8, K7, K5, K4 coal bed fracturing, and creeping into three pressure break holes is respectively 1#, 2# and 3#, as shown in Fig. 2, 1# pressure break hole is by K9 roof Direction passes through the coal seam K9, K8, K7, K5 and is drilled into the coal seam K4, and 2 # pressure break holes pass through K9, K8, K7 coal seam drilling by K9 roof direction To the coal seam K5,3# pressure break hole passes through the coal seam K9 and K8 by K9 roof direction and is drilled into the coal seam K7;Due to K9 and K8 and K8 and K7 Coal seam spacing is smaller, at this point, K9, K8 and K7 are considered as same coal seam.By three determining pressure break holes by the area of tunnel piercing Face is crept into, and sealing of hole is carried out after the completion of drilling, wherein 1# pressure break hole sealing of hole to K4 roof, 2# pressure break hole sealing of hole to K5 Roof, 3# pressure break hole sealing of hole to K9 roof, and ensure the pressure-bearing of sealing section not less than 35MPa.
Gas drainage includes the concentration extraction after hydraulic fracturing to tetra- coal seams K9, K8, K7, K5 and K4, and in tunnel To i.e. by the independent extraction in the coal seam to be dug of digging at driving to 5~6m away from coal seam any in K9, K5 and K4, wherein individually Extraction further include tunnel piercing to away from i.e. will at the 2.5~3.5m in the coal seam to be dug K9, K5 and K4 of digging progress.Gas drainage After further include Gas Outburst parameter detecting, to judge whether tunnel can carry out safe driving;It is then to continue to tunnel;It is no, then continue Extraction, and judge whether tunnel can carry out safe driving again by Gas Outburst parameter detecting.
When tunnel piercing is opened to the coal seam K9, K5 and K4, the concordant for Gas Outburst parameter prediction of constructing in coal seam Coal seam prediction drilling predicts that drilling carries out the prominent parameter prediction of coal-bed gas by concordant coal seam, and judges whether tunnel can be into Row safe coal-openning is then to continue exposed coal to passing through this coal seam;It is no, then gas drainage is carried out, and it is prominent to carry out coal-bed gas again Parameter prediction and whether can carry out safe coal-openning judgement.
As shown in figure 3, further including the coal to coal measure strata section in the tunneling process of the Tunnel Passing coal measure strata section Body and rock mass segmentation carry out advance support processing, which includes 9 being built into nothing in the coal and rock drilling of coal measure strata section Steel pipe is stitched, is consolidated using cement grout, multiple seamless steel pipes are outside the outline excavation control line of tunnel middle and upper part and lateral wall Setting regions in be interspersed by inside and outside two rows, and form canopy formula advance support structure.And in the advance support, seamless steel Pipe is when meeting coal seam with being pierced by the coal seam at least part of 1.0m;9 diameters that drill are 89mm, and the latus rectum of seamless steel pipe is 50mm, 9 spacing of adjacent drilling of same row is 0.6~0.8m, and row's spacing of two row hole drillings 9 is 0.25~0.40m.
Since K3 thinning is seam, K1 is non-protruding coal seam, and therefore, second of concentration pressure break only needs to press the coal seam K2 Split anti-reflection, therefore, in tunnel piercing to when setting 10m away from K2, fracturing borehole of constructing, and pressure break is anti-reflection after sealing of hole, and to K2 and K1 layers carry out concentration extraction, carry out, are carried out respectively twice at tunnel piercing to 5~6m away from the coal seam K2 and at 2.5~3.5m Gas drainage further includes Gas Outburst parameter detecting after gas drainage, to judge whether tunnel can carry out safe driving;It is, then Continue to tunnel;It is no, then continue extraction, and judge whether tunnel can carry out safe driving again by Gas Outburst parameter detecting.
When tunnel piercing is opened to the coal seam K2, the concordant coal seam prediction for Gas Outburst parameter prediction of constructing in coal seam Drilling predicts that drilling carries out the prominent parameter prediction of coal-bed gas by concordant coal seam, and judges whether tunnel can be taken off safely Coal is then to continue exposed coal to passing through this coal seam;It is no, then gas drainage is carried out, and carry out the prominent parameter prediction of coal-bed gas again Whether safe coal-openning judgement can be carried out.
Embodiment 2, referring to fig. 4, a kind of large section tunnel pass through the concentration hydraulic fracturing drilling and sealing structure of multiple seam, Including the multiple fracturing boreholes 1 being equal to each other with primary concentration pressure break number, sealing of hole dress is correspondingly arranged in each fracturing borehole 1 It sets, and hole sealing structure is formed by corresponding hole sealing device, hole sealing device protrudes into corresponding coal seam 3, sealing of hole by 2 direction of roof Device includes pressure break pipe 4, grout pipe 5, and 4 inner end of pressure break pipe is formed with the floral tube section 4a of setting length, and floral tube section 4a passes through horse hair Bars 6 are separated into section and floral tube outer segment in floral tube with tie part, and section is discharged for hydraulic fracturing in floral tube, on the outer wall of floral tube outer segment It is wound at least one layer of gauze;Horsetail 6 is formed by the cotton yarn or fabric item being banded on pressure break pipe 4, and is located at coal In layer top plate 2, sealing section is made of grout cures section 7 and polyurethane seal section 8.
Wherein, at least 1 meter of 6 length of horsetail is welded with horsetail 6 at the tie part of pressure break pipe 4 and ties up silk fastening with hanging Nail;Outer at least 1 meter of the segment length of floral tube;At least 1.5 meters of 8 length of polyurethane sealing hole section.
Although combining attached drawing above describes embodiments of the present invention, those skilled in the art can also be with Recognize to various changes can be made in scope of the appended claims or modification, these modifications and variations are understood as in this hair Within bright range and intention.

Claims (5)

1. a kind of large section tunnel passes through the construction method of coal measure strata section, include the steps that hydraulic fracturing and gas drainage, It is characterized in that,
The hydraulic fracturing successively carries out concentration pressure break to multiple pressure break holes using the Frac unit for being laid in tunnel the same area, Before pressure break, data is surveyed according to the ground of coal measure strata section to be traversed, determines that coal measure strata section concentrates the concentration number of pressure break primary At least two coal seams to be traversed of pressure break are concentrated, and the of the first coal seam 10m~12m to be traversed for once concentrating hydraulic fracturing At one set distance, smart spy is carried out to coal seam to be traversed, to obtain the accurate ginseng of respectively coal seam thickness to be taken off and adjacent coal bed spacing Number, and the respectively Gas Outburst parameter to the Methane Diffusion speed of exposed coal layer and pressure;Gas is determined according to Gas Outburst parameter The projecting coal bed and primary fracturing borehole position for concentrating hydraulic fracturing and depth, and fracturing borehole is carried out to apply brill and sealing of hole;
The gas drainage includes the concentration extraction after hydraulic fracturing to more than two coal seams, and in tunnel piercing to any coal To i.e. by the independent extraction in the coal seam to be dug of digging at the second set distance of layer 5m~6m;
The independent extraction further includes in tunnel piercing to i.e. by the third set distance of coal seam 2.5m~3.5m to be dug of digging Place carries out.
2. the construction method that large section tunnel according to claim 1 passes through coal measure strata section, which is characterized in that described It further include Gas Outburst parameter detecting after gas drainage, to judge whether tunnel can carry out safe driving;It is then to continue to tunnel; It is no, then continue extraction, and judge whether tunnel can carry out safe driving again by Gas Outburst parameter detecting.
3. the construction method that large section tunnel according to claim 1 passes through coal measure strata section, which is characterized in that also wrap It includes when tunnel piercing is opened to coal seam, drilling is predicted in the concordant coal seam for Gas Outburst parameter prediction of constructing in coal seam, is led to It crosses the prediction drilling of concordant coal seam and carries out the prominent parameter prediction of coal-bed gas, and judge whether tunnel can carry out safe coal-openning, be, then Continue exposed coal to passing through this coal seam;It is no, then gas drainage is carried out, and carry out the prominent parameter prediction of coal-bed gas again and whether may be used Carry out safe coal-openning judgement.
4. large section tunnel described in claim passes through applying for coal measure strata section according to claim 1~any one of 3 Work method, which is characterized in that the sealing section of at least one in multiple pressure break holes has the coal seam passed through Part.
5. large section tunnel described in claim passes through applying for coal measure strata section according to claim 1~any one of 3 Work method, which is characterized in that further include the coal to coal measure strata section in the tunneling process of the Tunnel Passing coal measure strata section Body and rock mass segmentation carry out advance support processing, which includes entering steel in the coal and rock embedded in hole of coal measure strata section Pipe, is consolidated, setting area of multiple steel pipes outside the outline excavation control line of tunnel middle and upper part and lateral wall using cement grout Canopy formula advance support structure is formed in domain.
CN201610139185.3A 2016-03-11 2016-03-11 Large section tunnel wears the construction method and hole sealing structure of coal measure strata section Active CN105756700B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610139185.3A CN105756700B (en) 2016-03-11 2016-03-11 Large section tunnel wears the construction method and hole sealing structure of coal measure strata section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610139185.3A CN105756700B (en) 2016-03-11 2016-03-11 Large section tunnel wears the construction method and hole sealing structure of coal measure strata section

Publications (2)

Publication Number Publication Date
CN105756700A CN105756700A (en) 2016-07-13
CN105756700B true CN105756700B (en) 2019-01-22

Family

ID=56332946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610139185.3A Active CN105756700B (en) 2016-03-11 2016-03-11 Large section tunnel wears the construction method and hole sealing structure of coal measure strata section

Country Status (1)

Country Link
CN (1) CN105756700B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968675A (en) * 2017-03-20 2017-07-21 中铁十五局集团有限公司 The construction method in gas tunnel goaf
CN106869894B (en) * 2017-03-21 2019-07-02 阳泉煤业(集团)有限责任公司 Weak seam top plate concordant rock long drilled holes pump more coordinates pressure break anti-reflection method
CN107091111A (en) * 2017-04-18 2017-08-25 中交路桥华南工程有限公司 The gas preprocess method in tunnel
CN110067591A (en) * 2018-01-24 2019-07-30 中铁二院工程集团有限责任公司 Tunnel and flat lead pass through coal seam construction gas drainage method
CN109252829A (en) * 2018-10-16 2019-01-22 中铁十九局集团第二工程有限公司 Karst method for treating water in team road
GB2582376B (en) * 2019-03-22 2021-06-09 Hypertunnel Ip Ltd Method and system of constructing an underground tunnel
CN110344830B (en) * 2019-07-17 2020-10-30 中铁二院重庆勘察设计研究院有限责任公司 Coal uncovering outburst prevention operation flow for continuous and multiple coal penetrating tunnel under complex structure condition
CN111335939A (en) * 2020-04-08 2020-06-26 中国建筑第四工程局有限公司 Hydraulic fracturing permeability-increasing process for super-thick coal seam of highway gas outburst tunnel
CN111779463A (en) * 2020-08-18 2020-10-16 中国建筑第四工程局有限公司 Coal uncovering outburst prevention construction method for super-thick coal seam of gas outburst tunnel of highway

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121395A (en) * 2011-01-24 2011-07-13 平顶山天安煤业股份有限公司十矿 Method for integrated comprehensive management of gas in low-permeability single coal bed
CN204827355U (en) * 2015-08-11 2015-12-02 重庆市能源投资集团科技有限责任公司 Nearly competent pressure -bearing drilling hole sealing structure

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155254B (en) * 2011-02-28 2013-05-22 中国矿业大学 Method for extracting gas in low air permeability coal layer by pulse fracture anti-reflection
CN102242640B (en) * 2011-07-05 2013-09-25 河南煤业化工集团研究院有限责任公司 Rapid outburst elimination method for cross cut coal uncovering in coal mine underground
CN102720528B (en) * 2012-07-03 2014-05-14 中国矿业大学 Underground coal mine repeating pulsation hydrofracture strengthened gas extracting method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121395A (en) * 2011-01-24 2011-07-13 平顶山天安煤业股份有限公司十矿 Method for integrated comprehensive management of gas in low-permeability single coal bed
CN204827355U (en) * 2015-08-11 2015-12-02 重庆市能源投资集团科技有限责任公司 Nearly competent pressure -bearing drilling hole sealing structure

Also Published As

Publication number Publication date
CN105756700A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN105756700B (en) Large section tunnel wears the construction method and hole sealing structure of coal measure strata section
CN110242301B (en) Two-step grouting modification water-retention coal mining method for roof aquifer
CN104694746B (en) A kind of method of ion adsorption type re in_situ leaching and leaching ore deposit system thereof
CN103291325B (en) The preventing control method of Coal-mining Above Confined-water floor strata gushing water
CN106194244B (en) Lower permeability seam liquid phase CO2Phase transformation fracturing is anti-reflection grid type gas pumping method
CN103821544B (en) Tunneling and underground engineering high-pressure high-flow is dashed forward Water outburst treatment method
CN108678777A (en) The method for protecting support of Tunnel Crushed Zone section
CN106979012B (en) Hidden conduit pipe Comprehensive Treatment method in shaft of vertical well freezing hole
CN108894727A (en) The water-retaining method of ground level directional drilling slip casting closure overlying strata water producing fractures main channel
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN103867229B (en) A kind of coal mine large-mining is dark prevents and treats comprehensive treatment method for water with lower group of coal mining
CN109209293A (en) A kind of crossdrift takes off projecting coal bed comprehensive outburst control construction method
CN105909254B (en) Projecting coal bed bottom plate, which is faced upward, wears the advanced area cover coal roadway tunneling method of layer directional hole
CN109162731B (en) Water inrush grouting treatment method for deep mining of iron mine area
CN103089275A (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN105155563A (en) Reinforcing and treating method for water burst of soft-flow muddy stratum of foundation pit
CN101709651A (en) Grouting water blocking method for undersea tunnel
CN109098714A (en) A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
Li et al. A novel treatment method and construction technology of the pipeline gushing water geohazards in karst region
CN108868776B (en) The high pressure-bearing broken rock of deep-well induces pre-pouring grout reinforcement means in advance
CN105909259B (en) Existing shield tunnel pipe curtain construction settlement control system and method are closely worn down
CN106917627A (en) The advanced support method of pilot tunnel under a kind of water rich strata boring construction
CN109488329A (en) A kind of broken water drenching country rock administering method of Deep Soft Rock Tunnel large deformation
CN207813651U (en) A kind of ground water drainage system for double-hole tunnel
CN106381405A (en) Rare earth mine liquid collection system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant