Prior art keywords
chassis
tunnel
emergency
band
trolley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610392834.0A
Other languages
Chinese (zh)
Inventor
温玉辉
刘二强
聂玉文
梁淦波
李国安
王强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Province Communications Planning & Design Institute Co Ltd
Original Assignee
Guangdong Province Communications Planning & Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Province Communications Planning & Design Institute Co Ltd filed Critical Guangdong Province Communications Planning & Design Institute Co Ltd
Priority to CN201610392834.0A priority Critical patent/CN106437759A/en
Publication of CN106437759A publication Critical patent/CN106437759A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a continuous construction method for a tunnel emergency parking strip cast-in-situ lining by quickly disassembling and assembling a trolley. The continuous construction method comprises the steps that (1) the trolley is assembled according to the design size of a tunnel emergency parking strip; (2) after preliminary construction of the tunnel emergency parking strip is completed, square timber and steel rails are laid on the tunnel emergency parking strip; (3) the whole trolley is disassembled into two semi-range trolley bodies; (4) the two semi-range trolley bodies travel along the steel rails in tandem; (5) the two semi-range trolley bodies are reassembled into the integrated trolley; (6) the tunnel emergency parking strip is subjected to cast-in-situ secondary lining concrete; and (7) after the poured concrete meets the design strength requirement, the integrated trolley is separate into the two semi-range trolley bodies again, and cyclic operation from the step (3) to the step (6) is repeated till secondary lining construction of the tunnel emergency parking strip is completed. By means of the method, the time for disassembling and transferring the formwork trolley can be saved, the construction cost is reduced, and the engineering quality is improved.

Description

Stopped in emergency the continuous construction with cast-in-place lining cutting using quickly tearing open to close chassis and carry out tunnel Method
Technical field
The cast-in-place liner structure of band the present invention relates to the construction method of bridge tunnel lining cutting, specifically a kind of tunnel are stopped in emergency Construction method.
Background technology
As highway is more to mountain development, there is numerous major long tunnel, the setting number of the band that wherein stops in emergency Amount also accordingly increases.As tunnel stops in emergency, band section is bigger than normal reach, and per meter of input ratio normal reach of its two linings construction is served as a contrast Block is all higher by much and work efficiency is relatively low, often becomes the last operation of constructing tunnel and affects total lever factor.In quality control on construction Aspect, stop in emergency the concrete common quality defect with two linings, and such as faulting of slab ends, piece, concrete run moding shape, big surface evenness etc. also compared with normal reach Two linings are many, it is more difficult to control.
The tunnel band lining construction that stops in emergency commonly uses chassis, i.e. formwork jumbo, existing common chassis institute as shown in Figure 1, Figure 2 Show, including parts such as upper die plate assembly 1, bracket column 2, horizontal brace rod 3, yoke crosstie 5, door frame crossbeams 7, chassis is along steel Rail 18 is walked.
At present both at home and abroad more to the band lining construction that stops in emergency complete using normal reach lining trolley, the band that stops in emergency is widened Hydraulic jumbo, steel arch-shelf add gang form.Adopt and constructed with upper type, the everywhere in tunnel is stopped in emergency and carries widened section equal Formwork jumbo need to be broken, then be assembled to next widened section by carborne, time-consuming.Therefore, it is raising Constructing tunnel level, is necessary for tunnel to be solved and stops in emergency the construction efficiency with secondary lining and improve this biography of construction quality System problem.
Content of the invention
It is an object of the invention to provide being stopped in emergency continuously applying with cast-in-place lining cutting using quickly tearing conjunction chassis open and carrying out tunnel Work method, the method can save the time shared by the fractionation of formwork jumbo, transhipment operation, reducing the construction costs, improve engineering Quality.
The above-mentioned purpose of the present invention is by following technical solution realizing:Close chassis to carry out tunnel urgent using quickly tearing open The continuous construction method of the cast-in-place lining cutting of lay-by, it is characterised in that the method comprises the steps:
(1) according to tunnel stop in emergency band design size come assembled chassis, chassis include upper die plate assembly, bracket stand The parts such as post, horizontal brace rod, yoke crosstie, door frame crossbeam, the chassis is made up of symmetrical two half range chassis, and two Docking pin of the platform half range chassis by upper die plate assembly, yoke crosstie and set by door frame crossbeam correspondence position and to connecting bolt It is connected as a complete chassis;
(2) after tunnel stop in emergency band complete excavation, preliminary bracing, inverted arch filling construction after, by the lumps of wood and steel rail laying Stop in emergency band to tunnel;
(3) removal bracket column and horizontal brace rod, while dismounting upper die plate assembly, yoke crosstie are corresponding with door frame crossbeam Docking pin set by position and to connecting bolt, is rotated down upper die plate assembly, whole chassis is split as two half range platforms Car;
(4) two half range chassis are one in front and one in back walked along rail, treat that previous half range chassis runs to the band that stops in emergency After expanding section part, a rear half range chassis is walked on until concordant with previous half range chassis;
(5) through accurately measuring positioning, by two half range chassis by upper die plate assembly, yoke crosstie and door frame crossbeam pair Answer the docking pin set by position and connecting bolt is reconnected, while bracket column and horizontal brace rod is reset, revert to One complete chassis;
(6) stop in emergency the splash guard of band to tunnel and reinforcing bar is constructed, pump concrete pours tunnel and stops in emergency The secondary lining of band, band that tunnel is stopped in emergency carries out cast-in-place secondary lining concrete;
(7) after the concrete for pouring reaches design strength requirement, two half range chassis are separated into again whole chassis, Repeat step (3) to step (6) circulate operation, using quickly tear open close chassis tunnel is stopped in emergency band carry out continual cast-in-place Lining construction, until tunnel stops in emergency, the Second Lining Construction of band is finished.
In the present invention, the tunnel refers to bridge tunnel.
Compared with prior art, the present invention has following significant effect:
Formwork jumbo can tear conjunction easily and fast open, by 2 docking pins at per width chassis door frame girder and 9 docking spiral shells At bolt, and template vault longitudinal direction floor, 20 bolt connections form an entirety, and it is easy to be laborsaving to tear conjunction open, merges or splits once 1~2 day time is only needed, and dismounting with general chassis needs 7 day time ratio to greatly reduce man-hour and manpower and materials.Form stable, applies Work faulting of slab ends is little, real outer beautiful in concrete.3.5m width job platform is set in chassis one end, stand input is reduced, real chassis is many Functionalization, after chassis precise positioning, facilitates the accurate installation to reinforcing bar, inspection, overcomes tunnel double-lining reinforcing bar positioning to be forbidden A difficult problem.
Description of the drawings
Fig. 1 is the cross-sectional configuration schematic diagram of the chassis of prior art and the present invention;
Fig. 2 is the longitudinal plane structure schematic diagram of the chassis of prior art and the present invention;
Fig. 3 is the present invention to be stopped in emergency in the continuous construction method with cast-in-place lining cutting using quickly tearing conjunction chassis open and carry out tunnel The structural representation of one of work progress;
Fig. 4 is the present invention to be stopped in emergency in the continuous construction method with cast-in-place lining cutting using quickly tearing conjunction chassis open and carry out tunnel The structural representation of the two of work progress;
Fig. 5 is the present invention to be stopped in emergency in the continuous construction method with cast-in-place lining cutting using quickly tearing conjunction chassis open and carry out tunnel The structural representation of the three of work progress;
Fig. 6 is the present invention to be stopped in emergency the continuous construction method with cast-in-place lining cutting using quickly tearing conjunction chassis open and carry out tunnel Integral construction process schematic.
Description of reference numerals
1st, upper die plate assembly;2nd, bracket column;3rd, horizontal brace rod;4th, translation oil cylinder;
5th, yoke crosstie;6th, upper longeron;7th, door frame crossbeam;8th, lower template assembly;
9th, door frame column;10th, door frame diagonal brace;11st, lateral work platformses;12nd, lateral oil cylinder;
13rd, template tie-beam;14th, lateral screw mandrel is very heavy;15th, running gear;
16th, template footing screw mandrel is very heavy;17th, footing template;18th, rail;19th, the lumps of wood;
20th, door frame supports very heavy;21st, staircase;22nd, the longitudinally connected beam of door frame;23rd, longitudiual truss;
24th, vertical oil cylinder;25th, lower longeron;26th, injected hole;27th, working window;
28th, splash guard mounting platform;101st, normal reach excavation face;102nd, stop in emergency band excavation face;
103rd, normal reach secondary lining;104th, stop in emergency band secondary lining.
Specific embodiment
Tunnel of the present invention stop in emergency with the chassis used by cast-in-place lining cutting as shown in Figure 1 and Figure 2, including upper die plate assembly 1, The parts such as bracket column 2, horizontal brace rod 3, yoke crosstie 5, door frame crossbeam 7, chassis is by symmetrical two half range chassis Composition, the docking pin of two half range chassis by upper die plate assembly 1, yoke crosstie 5 and set by 7 correspondence position of door frame crossbeam It is a complete chassis with docking bolt connection.
When removal bracket column 2 and horizontal brace rod 3, while removing upper die plate assembly 1, yoke crosstie 5 and door frame crossbeam 7 Docking pin set by correspondence position and to connecting bolt, after being rotated down upper die plate assembly 1, it is also possible to splits whole chassis For two half range chassis.
The present invention is stopped in emergency the continuous construction method with cast-in-place lining cutting, such as Fig. 3 using quickly tearing conjunction chassis open and carry out tunnel To Fig. 6 shown in, the method comprises the steps:
(1) according to tunnel stop in emergency band design size come assembled chassis, chassis include upper die plate assembly 1, bracket stand The parts such as post 2, horizontal brace rod 3, yoke crosstie 5, door frame crossbeam 7, chassis is made up of symmetrical two half range chassis, and two Docking pin and docking of the platform half range chassis by upper die plate assembly 1, yoke crosstie 5 and set by 7 correspondence position of door frame crossbeam Bolt connection is a complete chassis;
(2) after tunnel stop in emergency band complete excavation, preliminary bracing, inverted arch filling construction after, by the lumps of wood 19 and rail 18 Lay to tunnel and stop in emergency band;
(3) removal bracket column 2 and horizontal brace rod 3, while remove upper die plate assembly 1, yoke crosstie 5 and door frame crossbeam Docking pin set by 7 correspondence positions and to connecting bolt, is rotated down upper die plate assembly 1, whole chassis is split as two Half range chassis, as shown in Figure 3;
(4) two half range chassis are one in front and one in back walked along rail 18, treat that previous half range chassis runs to and stop in emergency After band expands section part, a rear half range chassis is walked on until concordant with previous half range chassis, as shown in Figure 4;
(5) through accurately measuring positioning, by two half range chassis by upper die plate assembly 1, yoke crosstie 5 and door frame crossbeam Docking pin set by 7 correspondence positions and connecting bolt is reconnected, while bracket column 2 and horizontal brace rod 3 is reset, extensive It is a complete chassis again, as shown in Figure 5;
(6) stop in emergency the splash guard of band to tunnel and reinforcing bar is constructed, pump concrete pours tunnel and stops in emergency The secondary lining of band, band that tunnel is stopped in emergency carries out cast-in-place secondary lining concrete, as shown in Figure 5;
(7) after the concrete for pouring reaches design strength requirement, two half range chassis are separated into again whole chassis, Repeat step (3) to step (6) circulate operation, using quickly tear open close chassis tunnel is stopped in emergency band carry out continual cast-in-place Lining construction, until tunnel stops in emergency, the Second Lining Construction of band is finished.
Tunnel in the present embodiment refers to bridge tunnel, and the construction method is suitable for existing bridge tunnel and stops in emergency band now Pour lining cutting.
The above embodiment of the present invention is not limiting the scope of the present invention, and embodiments of the present invention are not limited to This, all this kind according to the above of the present invention, according to ordinary technical knowledge and the customary means of this area, without departing from this Modification, replacement or change under the premise of inventing above-mentioned basic fundamental thought, to other various ways that said structure of the present invention is made More, all should fall within the scope and spirit of the invention.

Claims (2)

1. stopped in emergency continuous construction method with cast-in-place lining cutting using quickly tearing conjunction chassis open and carry out tunnel, it is characterised in that this Method comprises the steps:
(1) according to tunnel stop in emergency band design size come assembled chassis, chassis includes upper die plate assembly, bracket column, water The parts such as flushconnection bar, yoke crosstie, door frame crossbeam, the chassis is made up of symmetrical two half range chassis, and two and half Docking pin of the width chassis by upper die plate assembly, yoke crosstie and set by door frame crossbeam correspondence position and docking bolt connection For a complete chassis;
(2) after tunnel stop in emergency band complete excavation, preliminary bracing, inverted arch filling construction after, by the lumps of wood and steel rail laying to tunnel Stop in emergency band in road;
(3) removal bracket column and horizontal brace rod, while remove upper die plate assembly, yoke crosstie and door frame crossbeam correspondence position Set docking pin and to connecting bolt, is rotated down upper die plate assembly, whole chassis is split as two half range chassis;
(4) two half range chassis are one in front and one in back walked along rail, treat that previous half range chassis runs to the band that stops in emergency and expand After section part, a rear half range chassis is walked on until concordant with previous half range chassis;
(5) through positioning is accurately measured, two half range chassis are passed through upper die plate assembly, yoke crosstie position corresponding with door frame crossbeam Put set docking pin and connecting bolt is reconnected, while bracket column and horizontal brace rod is reset, revert to one Complete chassis;
(6) stop in emergency the splash guard of band to tunnel and reinforcing bar is constructed, pump concrete pours tunnel and stops in emergency band Secondary lining, band that tunnel is stopped in emergency carries out cast-in-place secondary lining concrete;
(7) after the concrete for pouring reaches design strength requirement, two half range chassis are separated into again whole chassis, repeat Step (3) is closed chassis tunnel is stopped in emergency band and carries out continual cast-in-place lining cutting using quickly tearing open to step (6) circulate operation Construction, until tunnel stops in emergency, the Second Lining Construction of band is finished.
2. according to claim 1 stopped in emergency the continuous construction with cast-in-place lining cutting using quickly tearing conjunction chassis open and carry out tunnel Method, it is characterised in that:The tunnel refers to bridge tunnel.
CN201610392834.0A 2016-06-03 2016-06-03 Continuous construction method for tunnel emergency parking strip cast-in-situ lining by quickly disassembling and assembling trolley Pending CN106437759A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610392834.0A CN106437759A (en) 2016-06-03 2016-06-03 Continuous construction method for tunnel emergency parking strip cast-in-situ lining by quickly disassembling and assembling trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610392834.0A CN106437759A (en) 2016-06-03 2016-06-03 Continuous construction method for tunnel emergency parking strip cast-in-situ lining by quickly disassembling and assembling trolley

Publications (1)

Publication Number Publication Date
CN106437759A true CN106437759A (en) 2017-02-22

Family

ID=58183827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610392834.0A Pending CN106437759A (en) 2016-06-03 2016-06-03 Continuous construction method for tunnel emergency parking strip cast-in-situ lining by quickly disassembling and assembling trolley

Country Status (1)

Country Link
CN (1) CN106437759A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869352A (en) * 2017-09-18 2018-04-03 贵州路桥集团有限公司 A kind of combined tunnel double-lining trolley device and its construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001164894A (en) * 1999-12-10 2001-06-19 Tekken Constr Co Ltd Tunnel concrete placing method by form with variable cross sectional shape and its device
CN101230785A (en) * 2008-02-22 2008-07-30 中铁二局股份有限公司 Construction method for large section and multiple sections tunnel lining
CN102296971A (en) * 2011-08-08 2011-12-28 湖南五新重型装备有限公司 Lining method for tunnel emergency turnout strips and tunnel-lining trolley
CN202483587U (en) * 2011-12-30 2012-10-10 中铁隧道股份有限公司 Special-shaped lining trolley applied to occasion of non-disassembling support construction lining
CN103225513A (en) * 2013-03-08 2013-07-31 中铁十二局集团有限公司 Integral pouring construction method of ventilation inclined shaft provided with mid-partition and integral trolleys
CN103470272A (en) * 2013-10-11 2013-12-25 北京住总集团有限责任公司 Trolley for concrete construction on multiple sections by employing mining method and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001164894A (en) * 1999-12-10 2001-06-19 Tekken Constr Co Ltd Tunnel concrete placing method by form with variable cross sectional shape and its device
CN101230785A (en) * 2008-02-22 2008-07-30 中铁二局股份有限公司 Construction method for large section and multiple sections tunnel lining
CN102296971A (en) * 2011-08-08 2011-12-28 湖南五新重型装备有限公司 Lining method for tunnel emergency turnout strips and tunnel-lining trolley
CN202483587U (en) * 2011-12-30 2012-10-10 中铁隧道股份有限公司 Special-shaped lining trolley applied to occasion of non-disassembling support construction lining
CN103225513A (en) * 2013-03-08 2013-07-31 中铁十二局集团有限公司 Integral pouring construction method of ventilation inclined shaft provided with mid-partition and integral trolleys
CN103470272A (en) * 2013-10-11 2013-12-25 北京住总集团有限责任公司 Trolley for concrete construction on multiple sections by employing mining method and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869352A (en) * 2017-09-18 2018-04-03 贵州路桥集团有限公司 A kind of combined tunnel double-lining trolley device and its construction method

Similar Documents

Publication Publication Date Title
CN108468430B (en) Hoisting and sliding construction method for large-span unequal-height support steel truss structure
CN103967050A (en) Construction system of subway station
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN104564104B (en) A kind of table system for tunnel-liner
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN104763446B (en) The multi-functional chassis of metro station construction
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN103924525B (en) Urban interchange industrialization short-term precast assembly construction method
CN110700105B (en) Synchronous construction method for high pier column and tie beam and template used in same
CN105350454A (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN102392536A (en) Construction method for long-span hanging vestibule type template support system
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN103952979B (en) A kind of steel concrete superposed beam top board erection without scaffolding device and construction method
CN102286932B (en) Construction method for off-site assembling and automatic mounting on bridge of mobile mould bridge abutment
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN103452328B (en) Post brutal bracing means and method is subtracted for reinforced concrete member
CN107386246A (en) A kind of lock chamber wall Construction Through Form on Traveler method
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN202064281U (en) Slip form frame
CN211547804U (en) Cantilever type retaining wall rapid construction device
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN106013783A (en) Formwork support and erecting method thereof
CN202401753U (en) Sliding die device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170222

RJ01 Rejection of invention patent application after publication