CN106436581A - Upstroke type movable mould frame in-situ modularization rapid detaching construction method - Google Patents

Upstroke type movable mould frame in-situ modularization rapid detaching construction method Download PDF

Info

Publication number
CN106436581A
CN106436581A CN201610881786.1A CN201610881786A CN106436581A CN 106436581 A CN106436581 A CN 106436581A CN 201610881786 A CN201610881786 A CN 201610881786A CN 106436581 A CN106436581 A CN 106436581A
Authority
CN
China
Prior art keywords
unit
girder
bridge
crossbeam
drop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610881786.1A
Other languages
Chinese (zh)
Inventor
王兴阔
王小山
王殿学
韩军霞
颜京磊
王化劼
张文哲
王星尧
陈占志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Luqiao Group Co Ltd
Original Assignee
Shandong Luqiao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Luqiao Group Co Ltd filed Critical Shandong Luqiao Group Co Ltd
Priority to CN201610881786.1A priority Critical patent/CN106436581A/en
Publication of CN106436581A publication Critical patent/CN106436581A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides an upstroke type movable mould frame detaching construction method which is rapid, economical, safe and reliable. The upstroke type movable mould frame in-situ modularization rapid detaching construction method comprises the following steps that (1) a hanger rod is released after construction of the last concrete box girder is completed by a movable mould frame, and the processes of mould falling and mould opening are conducted to prepare in-situ detaching construction on the movable mould frame; and (2) each part of the movable mould frame is partitioned into several units including a main girder unit, a nose girder unit, a crossbeam unit and a suspended beam formwork unit, and a movable mould frame system is detached sequentially in the following order: (1) the suspended beam formwork unit, (2) the crossbeam unit, (3) the nose girder unit, (4) the main girder unit and (5) a landing leg unit.

Description

Upstroke movable framework original position modularization fast quick-detach construction method
Technical field
The invention belongs to technical field of bridge construction is and in particular to a kind of upstroke movable framework original position modularization is quickly torn open Unload construction method.
Background technology
Mobile formwork is that one kind carries template, by the use of cushion cap or pier stud as supporting, bridge is carried out with the elder generation of cast in situs Enter construction machinery, be widely used in the Construction of continuous beam of highway bridge, railway bridge, it has short construction period, easy and simple to handle, construction Safe and reliable, live civilized succinct the features such as.Because the dead load of mobile formwork is big, component is many, construction is complicated, box girder webs After the completion of construction, how quickly, economic, safe, orderly the dismounting completing mobile formwork is a critical process, due to up The girder of formula mobile formwork, nose girder and crossbeam are arranged at more than bridge floor, can be square using pouring the concrete box girder completing Carrying out just removes, transports, and therefore, the heavy difficult point of upstroke movable framework dismounting is the template of bridge floor bottom, the dismounting of drop in beam.
It is bottom-up that upstroke movable framework dismounting construction method of the prior art mainly uses ground lifting equipment Template, drop in beam and crossbeam of mobile formwork etc. are removed in midair disintegration successively.It is big that this kind of dismounting mode needs workman to release in high-altitude Amount connecting bolt, to template using removing section by section, operational sequence complexity, activity duration length, low construction efficiency and security risk is big.
Content of the invention
It is an object of the present invention to provide a kind of quick, economic, safe and reliable upstroke movable framework dismantles construction method.
To achieve these goals, the present invention employs the following technical solutions:
A kind of fast quick-detach construction method of upstroke movable framework original position modularization, mobile formwork includes supporting leg, is arranged on supporting leg On girder, the bridge of the nose being arranged on girder, the drop in beam template on the crossbeam connecting girder and setting crossbeam, drop in beam template with horizontal Connected by suspension rod between beam it is characterised in that:This construction method comprises the following steps:
1)Mobile formwork completes last after concrete box girder construction, releases suspension rod and carries out stamping die, die sinking operation, it is right to prepare Mobile formwork carries out dismantling construction in situ;
2)Mobile formwork each several part is divided some units, including girder unit, bridge of the nose unit, crossbeam unit and drop in beam template list Unit, is removed successively to mobile formwork system in the following order:1. the bridge of the nose list of the crossbeam unit of drop in beam modular unit → 2. → 3. The supporting leg unit of girder unit → 5. of unit → 4..
The preferred embodiment of the invention, removes drop in beam modular unit process as follows:After releasing suspension rod, by whole drop in beam template Unit is divided into multiple subelements, and each subelement includes two groups of drop in beams and its template being in homonymy, and each subelement is as whole Body is removed, and is calculated the position of centre of gravity of drop in beam template subelement using software, is rationally set according to position of centre of gravity before removing Put hanger it is necessary to hanger be arranged on the center of gravity both sides of subelement, remove drop in beam template successively using ground lifting equipment single Unit, until completing the dismounting of whole drop in beam modular unit, needs left and right sides symmetrical construction in demolishing process.
The preferred embodiment of the invention, removes crossbeam unit process as follows:Workman removes between each section crossbeam in bridge floor After crossbeam connecting bolt, both sides are lifted up respectively by ground lifting equipment and respectively save after crossbeam certain distance, outside pull, make two Side crossbeam and girder safe escape, need left and right sides symmetrical construction in demolishing process, repeat above procedure, until completing all horizontal strokes The dismantlement work of beam.
The preferred embodiment of the invention, removes bridge of the nose unit process as follows:Mobile formwork voluntarily retreats certain distance, makes nose Beam is integrally located at more than bridge floor, increases supporting trolley as temporary support, fix front end using ground lifting equipment on rear side of girder The first segment bridge of the nose, after bridge floor releases bridge of the nose connecting bolt, lifting appliance lifts the first segment bridge of the nose to bridge floor transport vehicle to workman, Repeat the dismantlement work that this process is sequentially completed all bridge of the noses.
The preferred embodiment of the invention, removes girder unit process as follows:Using temporary cushion block, each section girder is supported on On bridge floor, release each section girder connecting bolt, lifted each section girder to bridge floor transport vehicle successively using ground lifting equipment, complete Become the dismantlement work of girder unit.
The preferred embodiment of the invention, removes supporting leg unit process as follows:Using truck crane successively remove front leg strut and and Middle supporting leg, completes the dismantlement work of a whole set of mobile formwork.
The invention has the beneficial effects as follows:
1st, simple to operate, dismounting short time limit:Mobile formwork is integrally divided into some units by the present invention, carries out mould to unit Blockization is removed, and greatly reduces the quantity disassembling bolt and dismounting part compared with traditional dismounting mode, and disassembling section is simpler Just and can effectively shorten dismounting the duration;
2nd, good economy performance:Decrease the large number quipments in unloading process and human input, there is good economy;
3rd, construction safety is reliable:Due to the construction of overall original position Modularized dismounting, most of dismounting operation is carried out in bridge floor, and existing Dismounting technique compare, decrease substantial amounts of work high above the ground construction, safe and reliable and improve efficiency of construction.
Brief description
Fig. 1 is upstroke movable framework longitudinal direction general assembly drawing;
Fig. 2 is the horizontal general assembly drawing of upstroke movable framework;
Fig. 3 molds for upstroke movable framework, stamping die state diagram;
Fig. 4 is drop in beam template position of centre of gravity figure;
Fig. 5 removes operating mode schematic diagram for drop in beam modular unit;
Fig. 6 removes operating mode schematic diagram for crossbeam unit;
Fig. 7 removes operating mode schematic diagram for bridge of the nose unit;
Based on Fig. 8, beam element removes operating mode schematic diagram.
Wherein, 1- girder;The 2- bridge of the nose;Supporting leg in 3-;4- front leg strut;5- crossbeam connecting bolt;6- suspension rod;7- crossbeam;8- Drop in beam template;9- supporting trolley;10- temporary cushion block;11- hanger;12- bridge of the nose connecting bolt;13- girder connecting bolt;14- ground Face lifting appliance.
Specific embodiment
For making the objects, technical solutions and advantages of the present invention become more apparent, develop simultaneously embodiment referring to the drawings, right The present invention further describes.
As Fig. 1 and Fig. 2, the movement of the upstroke movable framework original position modularization fast quick-detach construction method application of the present invention Mould bases includes supporting leg, the girder 1 being arranged on supporting leg, is arranged on the bridge of the nose 2 of girder 1 front end, connects the crossbeam 7 of girder 1 and set Put the drop in beam template 8 on crossbeam 7, be connected by suspension rod 6 between drop in beam template 8 and crossbeam 7, comprise the following steps:
1)Mobile formwork completes last after concrete box girder construction, as shown in figure 3, releasing suspension rod 6 and carrying out stamping die, die sinking Operation, prepares mobile formwork to be carried out dismantle construction in situ;
2)By mobile formwork each several part divide some units, including supporting leg unit, girder unit, bridge of the nose unit, crossbeam unit and Drop in beam modular unit, is removed successively to mobile formwork system in the following order:1. the crossbeam unit of drop in beam modular unit → 2. → 3. supporting leg the unit of the girder unit of bridge of the nose unit → 4. → 5..
Unit demolishing process is as follows:
Remove drop in beam modular unit process as follows:After releasing suspension rod 6, whole drop in beam modular unit is divided into multiple subelements, often Individual subelement includes two groups of drop in beams and its template being in homonymy, and each subelement is removed as overall, utilizes before removing Software be calculated the position of centre of gravity of drop in beam template subelement as shown in figure 4, hanger 11 is rationally arranged according to position of centre of gravity it is necessary to Hanger 11 is arranged on the center of gravity both sides of subelement, prevents run-off the straight in unloading process, using ground lifting equipment 14 successively Remove drop in beam template subelement, until completing the dismounting of whole drop in beam modular unit, as shown in figure 5, needing left and right in demolishing process Both sides symmetrical construction, prevents mobile formwork in demolishing process overall due to the eccentric run-off the straight of deadweight.
Remove crossbeam unit process as follows:With reference to Fig. 6, workman removes the crossbeam between each section crossbeam 7 in bridge floor and connects spiral shell After bolt 5, both sides are lifted up respectively by ground lifting equipment 14 and respectively save after crossbeam 7 certain distance, outside pull, make both sides crossbeam 7 with girder safe escape, need left and right sides symmetrical construction in demolishing process, repeat above procedure, until completing all crossbeams 7 Dismantlement work.
Remove bridge of the nose unit process as follows:With reference to Fig. 7, mobile formwork voluntarily retreat a span from,(Make scope 35- into 50m), make the bridge of the nose be integrally located at more than bridge floor, increase supporting trolley 9 on rear side of girder as temporary support, set using ground lifting The standby 14 fixing front end first segment bridge of the noses, after bridge floor releases bridge of the nose connecting bolt 12, lifting appliance 14 is by the first segment bridge of the nose for workman Lift to bridge floor transport vehicle, repeat the dismantlement work that this process is sequentially completed all bridge of the noses.
Remove girder unit process as follows:With reference to Fig. 8, using temporary cushion block 10, each section girder is supported on bridge floor, solution Except each section girder connecting bolt 13, using ground lifting equipment 14, each section girder is lifted successively to bridge floor transport vehicle, complete to lead The dismantlement work of beam element.
Remove supporting leg unit process as follows:Using truck crane successively remove front leg strut and and middle supporting leg 3, complete a whole set of movement The dismantlement work of mould bases.
Above-mentioned specific embodiment is only the concrete case of the present invention, is not the restriction that the present invention is made with other forms, Any those skilled in the art are changed or are modified as equivalent variations possibly also with the technology contents of the disclosure above Equivalent implementations.But on the premise of every principle without departing from the technology of the present invention, according to the present invention technical spirit to more than Any simple modification, equivalent variations and remodeling that embodiment is made, all should fall into the scope of patent protection of the present invention.

Claims (6)

1. the fast quick-detach construction method of a kind of upstroke movable framework original position modularization, mobile formwork includes supporting leg, is arranged on Girder on leg, the bridge of the nose being arranged on girder, connect girder crossbeam and setting crossbeam on drop in beam template, drop in beam template with Connected by suspension rod between crossbeam it is characterised in that:This construction method comprises the following steps:
1)Mobile formwork completes last after concrete box girder construction, releases suspension rod and carries out stamping die, die sinking operation, it is right to prepare Mobile formwork carries out dismantling construction in situ;
2)Mobile formwork each several part is divided some units, including girder unit, bridge of the nose unit, crossbeam unit and drop in beam template list Unit, is removed successively to mobile formwork system in the following order:1. the bridge of the nose list of the crossbeam unit of drop in beam modular unit → 2. → 3. The supporting leg unit of girder unit → 5. of unit → 4..
2. the fast quick-detach construction method of upstroke movable framework original position modularization as claimed in claim 1 is it is characterised in that remove Drop in beam modular unit process is as follows:After releasing suspension rod, whole drop in beam modular unit is divided into multiple subelements, each subelement bag Include two groups of drop in beams being in homonymy and its template, each subelement is removed as overall, calculates using software before removing To the position of centre of gravity of drop in beam template subelement, hanger is rationally arranged it is necessary to hanger is arranged on subelement according to position of centre of gravity Center of gravity both sides, remove drop in beam template subelement successively using ground lifting equipment, until completing tearing open of whole drop in beam modular unit Remove, in demolishing process, need left and right sides symmetrical construction.
3. the fast quick-detach construction method of upstroke movable framework original position modularization as claimed in claim 1 is it is characterised in that remove Crossbeam unit process is as follows:Workman, after bridge floor removes the crossbeam connecting bolt between each section crossbeam, is divided by ground lifting equipment It is not lifted up after both sides respectively save crossbeam certain distance, outside pull, make both sides crossbeam and girder safe escape, in demolishing process Need left and right sides symmetrical construction, repeat above procedure, until completing the dismantlement work of all crossbeams.
4. the fast quick-detach construction method of upstroke movable framework original position modularization as claimed in claim 1 is it is characterised in that remove Bridge of the nose unit process is as follows:Mobile formwork voluntarily retreats certain distance, makes the bridge of the nose be integrally located at more than bridge floor, increases on rear side of girder As temporary support, using the ground lifting equipment fixing front end first segment bridge of the nose, workman releases the bridge of the nose even in bridge floor to supporting trolley After connecting bolt, lifting appliance lifts the first segment bridge of the nose to bridge floor transport vehicle, repeats this process and is sequentially completed tearing open of all bridge of the noses Unload work.
5. the fast quick-detach construction method of upstroke movable framework original position modularization as claimed in claim 1 is it is characterised in that remove Girder unit process is as follows:Using temporary cushion block, each section girder is supported on bridge floor, releases each section girder connecting bolt, utilize Ground lifting equipment lifts each section girder successively to bridge floor transport vehicle, completes the dismantlement work of girder unit.
6. the fast quick-detach construction method of upstroke movable framework original position modularization as claimed in claim 1 is it is characterised in that remove Supporting leg unit process is as follows:Using truck crane successively remove front leg strut and and middle supporting leg, complete the dismounting work of a whole set of mobile formwork Make.
CN201610881786.1A 2016-10-10 2016-10-10 Upstroke type movable mould frame in-situ modularization rapid detaching construction method Pending CN106436581A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610881786.1A CN106436581A (en) 2016-10-10 2016-10-10 Upstroke type movable mould frame in-situ modularization rapid detaching construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610881786.1A CN106436581A (en) 2016-10-10 2016-10-10 Upstroke type movable mould frame in-situ modularization rapid detaching construction method

Publications (1)

Publication Number Publication Date
CN106436581A true CN106436581A (en) 2017-02-22

Family

ID=58172241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610881786.1A Pending CN106436581A (en) 2016-10-10 2016-10-10 Upstroke type movable mould frame in-situ modularization rapid detaching construction method

Country Status (1)

Country Link
CN (1) CN106436581A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055908A (en) * 2019-05-05 2019-07-26 中国铁建大桥工程局集团有限公司 A kind of Demolition Construction method of bridge construction upstroke movable framework

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008274637A (en) * 2007-04-27 2008-11-13 Ps Mitsubishi Construction Co Ltd Construction method for continuous viaduct
CN101818479A (en) * 2009-10-10 2010-09-01 中交二公局第二工程有限公司 Construction process for overhead back-up movement and dismantlement of movable shuttering form
CN102653938A (en) * 2011-12-29 2012-09-05 中交第四公路工程局有限公司 Offshore dismantling construction method of descending form traveler
CN105297637A (en) * 2015-11-25 2016-02-03 中铁二十局集团有限公司 Method for integrally disassembling descending movable formwork bridging machine
CN105887690A (en) * 2016-05-05 2016-08-24 中建五局土木工程有限公司 Construction method for removing upward movable formwork in situ

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008274637A (en) * 2007-04-27 2008-11-13 Ps Mitsubishi Construction Co Ltd Construction method for continuous viaduct
CN101818479A (en) * 2009-10-10 2010-09-01 中交二公局第二工程有限公司 Construction process for overhead back-up movement and dismantlement of movable shuttering form
CN102653938A (en) * 2011-12-29 2012-09-05 中交第四公路工程局有限公司 Offshore dismantling construction method of descending form traveler
CN105297637A (en) * 2015-11-25 2016-02-03 中铁二十局集团有限公司 Method for integrally disassembling descending movable formwork bridging machine
CN105887690A (en) * 2016-05-05 2016-08-24 中建五局土木工程有限公司 Construction method for removing upward movable formwork in situ

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110055908A (en) * 2019-05-05 2019-07-26 中国铁建大桥工程局集团有限公司 A kind of Demolition Construction method of bridge construction upstroke movable framework

Similar Documents

Publication Publication Date Title
CN106759845B (en) A kind of construction method of Steel corridor
CN202755634U (en) Suspension type operational platform
CN103556578A (en) Casting mold system for straight line section and side span closure section of continuous beam and building method thereof
CN106677542A (en) Construction method of roof base truss structure
CN203855899U (en) Non-counterweight self-balance movable die carrier
CN202848940U (en) Chamber roof truss overall declining removal device of large gas chamber
CN204531469U (en) A kind of steel work overhanging component temporary support of tool-type and discharge mechanism
CN106499173B (en) The aluminum alloy mould plate mechanism of building floor construction is used for based on BIM technology
CN101818479A (en) Construction process for overhead back-up movement and dismantlement of movable shuttering form
CN106436581A (en) Upstroke type movable mould frame in-situ modularization rapid detaching construction method
CN102330413B (en) Construction method for enabling bridge girder erection machine to independently go up and down girder carrier
CN205152807U (en) Downgoing movable formwork bridge construction machine is demolishd and is hoisted construction structures with girder
CN103866699A (en) Rail-free type walking hanging basket
CN204738233U (en) Assembled frame scaffold
CN205205675U (en) Downgoing movable formwork bridge construction machine is demolishd with whole system of transferring
CN105887690B (en) A kind of upstroke movable framework Demolition Construction method in situ
CN205188823U (en) Construction of light rail prestressing force bent cap and end -blocking work platform
CN212404859U (en) Auxiliary device for falling of bottom die of bent cap
CN204185146U (en) Construction of Steel Structure overhang crane between skyscraper two tall buildings
CN204570396U (en) D type is the traversing door frame of beam just
CN204112226U (en) A kind of holes connects does section assembling bridge manufacturing machine
CN208219432U (en) Cast-in-place support device for 0# block of box girder of continuous rigid frame bridge
CN202644407U (en) Demoulding device for bottom plate bracket of capping beam constructed by hoop method
CN203530862U (en) Casting mold system for straight section and side span closure section of continuous beam
CN207392059U (en) A kind of upstroke movable framework template overall pulling down hanging system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170222