CN106436517A - Construction method of soft soil anti-collapse concrete road surface - Google Patents

Construction method of soft soil anti-collapse concrete road surface Download PDF

Info

Publication number
CN106436517A
CN106436517A CN201610818074.5A CN201610818074A CN106436517A CN 106436517 A CN106436517 A CN 106436517A CN 201610818074 A CN201610818074 A CN 201610818074A CN 106436517 A CN106436517 A CN 106436517A
Authority
CN
China
Prior art keywords
concrete
cement
construction method
weak soil
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610818074.5A
Other languages
Chinese (zh)
Inventor
王胜
朱思远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingjian Group Co Ltd
Original Assignee
Qingjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingjian Group Co Ltd filed Critical Qingjian Group Co Ltd
Priority to CN201610818074.5A priority Critical patent/CN106436517A/en
Publication of CN106436517A publication Critical patent/CN106436517A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/14Dowel assembly ; Design or construction of reinforcements in the area of joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/48Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/10Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
    • E01C7/14Concrete paving

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a construction method of a soft soil anti-collapse concrete road surface. The construction method is characterized by comprising the following steps of: (1) treating a soft soil matrix: excavating sludge, filling slags, and performing layered rolling for levelling; (2) preparing a semi-rigid base course material: wherein the semi-rigid base course material is cement-stabilized macadam with a cement content of 5%, and is obtained by uniformly mixing cement, water, macadam and stone powder in a mass ratio of the cement to the water, to the macadam and to the stone powder being 102 to 120 to (1390-1400) to (650-660); and (3) performing construction of a semi-rigid base course: laying the cement-stabilized macadam obtained in the step (2) on the soft soil matrix treated in the step (1), performing paving, performing rolling and performing curing. The construction method disclosed by the invention aims to solve the technical problem of providing the construction method of the soft soil anti-collapse concrete road surface, which is good in firmness, few in cracks and high in construction speed, and besides, road materials can be saved, so that the paving cost is further reduced.

Description

A kind of weak soil collapse concrete pavement construction method
Technical field
The present invention relates to technical field of building construction is and in particular to a kind of weak soil collapse concrete pavement construction method.
Background technology
The reason ftracture in concrete road surface has a lot:Such as:Concrete water-cement ratio is excessive, and the concrete pavement maintenance cycle is not Foot, uneven settlement of foundation, Subgrade Compaction is uneven, and concrete plate area is excessive etc..Regardless of reason, road surface is opened Split and caused due to stress, concrete water-cement ratio is excessive and concrete pavement maintenance cycle deficiency can produce shrinkage stress, ground Base differential settlement and Subgrade Compaction is uneven can produce settlement stress, concrete plate area cross conference produce temperature should Power.The main member of concrete road surface opposing cracking is reinforcing bar, but effect of prestressed is inconspicuous in putting into practice engineering.
Bituminous concrete, as high grade pavement preferred material, has plurality of advantages.But due to being increased by the volume of traffic, ring Border change, temperature change, humidity change, frost action, construction, adopt the factor such as material and maintenance impact, occur in that multiple Asphalt Pavement Damage, the such as crack of bituminous paving, rut and Moisture Damage etc..Those diseases are not only brought various each to road traffic The hidden danger of sample, can cause the intensity decreases on roadbed, road surface, have influence on the normal use of road;Also greatly shorten asphalt road simultaneously The service life in face, and also result in no small economic loss, this is a problem that can not be ignored.
Content of the invention
In view of the shortcomings of the prior art, the technical problem to be solved is to provide that a kind of fastness is good, splits Stitch less, realize speed of application soon, save Load materials simultaneously, reduce the weak soil collapse concrete road surface of cost of paving the way further Construction method.
For solving above-mentioned technical problem, the technical solution used in the present invention is:A kind of weak soil collapse concrete road surface Construction method, comprises the steps:
(1)To weak soil matrix treatments:Desilt, that slag of delaying changes after filling out layered rolling again is smooth;
(2)The preparation of semi-rigid type base raw material:The cement stabilized macadam that semi-rigid type base raw material is 5% for cement content, should be by Cement stabilized macadam mass ratio is 102:120:1390-1400:The cement of 650-660, water, rubble and stone flour mix Arrive;
(3)The construction of semi-rigid type base:By step(2)The cement stabilized macadam obtaining tiles to step(1)Process after soft In soil matrix matter, pave, roll and complete and health;
(4)Pave and vibrate:Concrete for half dry scene mixing once paves the concrete flag allowing to reach Maximum plate thickness is 22~24cm;The maximum gauge that the commerical ready-mixed concrete of plasticity once paves is 26cm;Exceed once During the maximum gauge paving, should pave at twice and vibrate, the interval time of two-layer making must not exceed 3Omin, lower thickness It is approximately more than upper strata, and lower thickness is 3/5;Every time the paving, vibrate, flattening, wiping one's face and should continuously construct, in such as needing of concrete Disconnected, construction joint should be set, its position should be in the seaming position of design code;
(5)Seam is constructed:Pull bar was installed before formwork erection after-pouring concrete, and the pull bar of longitudinal construction joint then passes through drawing of template Rod aperture is installed, and longitudinal joint groove preferably uses joint saw sawing after the concrete is cured;Joint plate can also be imbedded in casting process, wait to mix I.e. formation slot is extracted after solidifying soil initial set;During saw kerf, concrete can be carried out after should reaching 5~10Mpa intensity, also can be by Scene examination saw determines;
(6)Floating and anti-skidding:After cement concrete pavement surface concreting, mechanical troweling is adopted to concrete road surface, and With the trench saw, road surface is sawn into the little translot of deep 5~6mm, wide 2~3mm, spacing 2Omm;
(7)Maintenance and joint filling:After the concrete slab face of doing finishes, uniformly spray Vinylidene Chloride etc. (by superchlorinated polyvinyl chloride resin, molten Agent oil and phthalic acid dibutylester, are formulated by 10%, 88% and 3% weight ratio), make the air-locked film of formation keep film The moisture of inner concrete, wet curing;Using PVC cement and bitumastic, gap can be filled with.
Above-mentioned weak soil collapse concrete pavement construction method, described step(6)Middle cement concrete pavement surface mixes After solidifying soil pours, road pavement sprays JR-01 concrete cement ground metope curing agent, produces chemical reaction by permeating with concrete And and the calcium carbonate of periphery produce chemical reaction, and then the density and hardness of Concrete Structure from the inside to surface.
Above-mentioned weak soil collapse concrete pavement construction method, described step(7)In, joint seal is operated in concrete initial set After carry out, during joint seal, should first remove the debris such as silt particle in clean gap.
Above-mentioned weak soil collapse concrete pavement construction method, described step(2)Cement stabilized macadam by mass ratio For 102:120:1390-1400:The cement of 650-660, water, rubble and stone flour mix and obtain, and preferred mass ratio is 102:120:1393:655.
Above-mentioned weak soil collapse concrete pavement construction method, described step(2)Cement stabilized macadam paving thickness For 35-45cm, preferably 40cm.
Above-mentioned weak soil collapse concrete pavement construction method, described step(2)Conditioned time be 26-30 days, It is preferably 28 days.
Above-mentioned weak soil collapse concrete pavement construction method, described step(2)Semi-rigid type base surface spray thoroughly Layer oil.
The advantage of weak soil collapse concrete pavement construction method of the present invention is:
1st, weak soil collapse concrete pavement construction method of the present invention, the JR-01 concrete cement ground metope hardening of employing The easy construction of agent, only need to spray and brush on road surface that i.e. achievable concrete road surface is preferably wear-resisting, Hardening and blast Effect.
2nd, weak soil collapse concrete pavement construction method of the present invention, improves the energy that prolonged and repeated deformation resisted by concrete Power, the temperature of concrete road surface surrounding environment, the temperature moment is among variation, and the dilatation of concrete plate is subject to structure again The constraint of layer, thus the Forces of plate also the moment is among tension and compression change repeatedly, concrete tensile strength will be caused Reduce.And adopt prestressed concrete pavement, make concrete synchronous that tension to occur, there is not problem of Cracking, also due to draw should The number of times that power occurs is few, greatly reduces the possibility of concrete drawing crack, thus improves the serviceability of concrete road surface.Work Journey practice have shown that, even if indivedual cracks, as long as the stress of cold-drawn low-carbon wire is within proportional limit, these cracks will be with The disappearance of the temperature difference and close, concrete still can be subject to compressive pre-stress.
Specific embodiment
Below the present invention is described in further detail.
Embodiment one, a kind of weak soil collapse concrete pavement construction method, comprise the steps:
(1)To weak soil matrix treatments:Desilt, that slag of delaying changes after filling out layered rolling again is smooth;
(2)The preparation of semi-rigid type base raw material:The cement stabilized macadam that semi-rigid type base raw material is 5% for cement content, should be by Cement stabilized macadam mass ratio is 102:120:1390-1400:The cement of 650-660, water, rubble and stone flour mix Arrive;
(3)The construction of semi-rigid type base:By step(2)The cement stabilized macadam obtaining tiles to step(1)Process after soft In soil matrix matter, pave, roll and complete and health;
(4)Pave and vibrate:Concrete for half dry scene mixing once paves the concrete flag allowing to reach Maximum plate thickness is 22~24cm;The maximum gauge that the commerical ready-mixed concrete of plasticity once paves is 26cm;Exceed once During the maximum gauge paving, should pave at twice and vibrate, the interval time of two-layer making must not exceed 3Omin, lower thickness It is approximately more than upper strata, and lower thickness is 3/5;Every time the paving, vibrate, flattening, wiping one's face and should continuously construct, in such as needing of concrete Disconnected, construction joint should be set, its position should be in the seaming position of design code;
(5)Seam is constructed:Pull bar was installed before formwork erection after-pouring concrete, and the pull bar of longitudinal construction joint then passes through drawing of template Rod aperture is installed, and longitudinal joint groove preferably uses joint saw sawing after the concrete is cured;Joint plate can also be imbedded in casting process, wait to mix I.e. formation slot is extracted after solidifying soil initial set;During saw kerf, concrete can be carried out after should reaching 5~10Mpa intensity, also can be by Scene examination saw determines;
(6)Floating and anti-skidding:After cement concrete pavement surface concreting, mechanical troweling is adopted to concrete road surface, and With the trench saw, road surface is sawn into the little translot of deep 5~6mm, wide 2~3mm, spacing 2Omm;
(7)Maintenance and joint filling:After the concrete slab face of doing finishes, uniformly spray Vinylidene Chloride etc. (by superchlorinated polyvinyl chloride resin, molten Agent oil and phthalic acid dibutylester, are formulated by 10%, 88% and 3% weight ratio), make the air-locked film of formation keep film The moisture of inner concrete, wet curing;Using PVC cement and bitumastic, gap can be filled with.
Above-mentioned weak soil collapse concrete pavement construction method, described step(6)Middle cement concrete pavement surface mixes After solidifying soil pours, road pavement sprays JR-01 concrete cement ground metope curing agent, produces chemical reaction by permeating with concrete And and the calcium carbonate of periphery produce chemical reaction, and then the density and hardness of Concrete Structure from the inside to surface.
Above-mentioned weak soil collapse concrete pavement construction method, described step(7)In, joint seal is operated in concrete initial set After carry out, during joint seal, should first remove the debris such as silt particle in clean gap.
Above-mentioned weak soil collapse concrete pavement construction method, described step(2)Cement stabilized macadam by mass ratio For 102:120:1390-1400:The cement of 650-660, water, rubble and stone flour mix and obtain, and preferred mass ratio is 102:120:1393:655.
Above-mentioned weak soil collapse concrete pavement construction method, described step(2)Cement stabilized macadam paving thickness For 35-45cm, preferably 40cm.
Above-mentioned weak soil collapse concrete pavement construction method, described step(2)Conditioned time be 26-30 days, It is preferably 28 days.
Above-mentioned weak soil collapse concrete pavement construction method, described step(2)Semi-rigid type base surface spray thoroughly Layer oil.
Certainly, described above is not limitation of the present invention, and the present invention is also not limited to the example above, the art Those of ordinary skill, in the essential scope of the present invention, the change made, change, add or replace, all should belong to the present invention Protection domain.

Claims (7)

1. a kind of weak soil collapse concrete pavement construction method it is characterised in that:Comprise the steps:
(1)To weak soil matrix treatments:Desilt, that slag of delaying changes after filling out layered rolling again is smooth;
(2)The preparation of semi-rigid type base raw material:The cement stabilized macadam that semi-rigid type base raw material is 5% for cement content, should It is 102 by cement stabilized macadam mass ratio:120:1390-1400:The cement of 650-660, water, rubble and stone flour mixing are all Even obtain;
(3)The construction of semi-rigid type base:By step(2)The cement stabilized macadam obtaining tiles to step(1)Process after soft In soil matrix matter, pave, roll and complete and health;
(4)Pave and vibrate:Concrete for half dry scene mixing once paves the concrete flag allowing to reach Maximum plate thickness is 22~24cm;The maximum gauge that the commerical ready-mixed concrete of plasticity once paves is 26cm;Exceed once During the maximum gauge paving, should pave at twice and vibrate, the interval time of two-layer making must not exceed 3Omin, lower thickness It is approximately more than upper strata, and lower thickness is 3/5;Paving, vibrate, flattening, wiping one's face and should continuously construct of each concrete, such as needs Interrupt, construction joint should be set, its position should be in the seaming position of design code;
(5)Seam is constructed:Pull bar was installed before formwork erection after-pouring concrete, and the pull bar of longitudinal construction joint then passes through template Tie rod hole is installed, and longitudinal joint groove preferably uses joint saw sawing after the concrete is cured;Joint plate can also be imbedded in casting process, I.e. formation slot is extracted after concrete initial set;During saw kerf, concrete can be carried out after should reaching 5~10Mpa intensity, Also can be determined by scene examination saw;
(6)Floating and anti-skidding:After cement concrete pavement surface concreting, mechanical troweling is adopted to concrete road surface, and With the trench saw, road surface is sawn into the little translot of deep 5~6mm, wide 2~3mm, spacing 2Omm;
(7)Maintenance and joint filling:After the concrete slab face of doing finishes, uniformly spray Vinylidene Chloride etc. (by superchlorinated polyvinyl chloride resin, Solvent naphtha and phthalic acid dibutylester, are formulated by 10%, 88% and 3% weight ratio), so that the air-locked film of formation is kept The moisture of film inner concrete, wet curing;Using PVC cement and bitumastic, gap can be filled with.
2. the weak soil collapse concrete pavement construction method according to claim 1 it is characterised in that:Described step (6)After middle cement concrete pavement surface concreting, road pavement sprays the metope hardening of JR-01 concrete cement ground Agent, by with concrete permeate produce chemical reaction and and periphery calcium carbonate produce chemical reaction, and then from the inside to surface enhancing coagulation The density and hardness of soil.
3. the weak soil collapse concrete pavement construction method according to claim 2 it is characterised in that:Described step(7) In, joint seal is carried out after being operated in concrete initial set, during joint seal, should first remove the debris such as silt particle in clean gap.
4. weak soil collapse concrete pavement construction method according to claim 3 it is characterised in that:Described step(2) Cement stabilized macadam by mass ratio be 102:120:1390-1400:The cement of 650-660, water, rubble and stone flour mixing are all Even obtain, preferred mass is than for 102:120:1393:655.
5. the weak soil collapse concrete pavement construction method according to claim 4 it is characterised in that:Described step(2) Cement stabilized macadam paving thickness be 35-45cm, preferably 40cm.
6. the weak soil collapse concrete pavement construction method according to claim 5 it is characterised in that:Described step(2) Conditioned time be 26-30 days, preferably 28 days.
7. the weak soil collapse concrete pavement construction method according to claim 6 it is characterised in that:Described step(2) Semi-rigid type base surface spray priming oil.
CN201610818074.5A 2016-09-13 2016-09-13 Construction method of soft soil anti-collapse concrete road surface Pending CN106436517A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610818074.5A CN106436517A (en) 2016-09-13 2016-09-13 Construction method of soft soil anti-collapse concrete road surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610818074.5A CN106436517A (en) 2016-09-13 2016-09-13 Construction method of soft soil anti-collapse concrete road surface

Publications (1)

Publication Number Publication Date
CN106436517A true CN106436517A (en) 2017-02-22

Family

ID=58168759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610818074.5A Pending CN106436517A (en) 2016-09-13 2016-09-13 Construction method of soft soil anti-collapse concrete road surface

Country Status (1)

Country Link
CN (1) CN106436517A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109740278A (en) * 2019-01-14 2019-05-10 青岛理工大学 A kind of Bracking-resistant method in the construction of top Overlong Concrete Structure
CN110656546A (en) * 2019-09-24 2020-01-07 齐鲁交通发展集团有限公司 Water-permeable concrete block and ultra-soft foundation shallow layer treatment method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109740278A (en) * 2019-01-14 2019-05-10 青岛理工大学 A kind of Bracking-resistant method in the construction of top Overlong Concrete Structure
CN109740278B (en) * 2019-01-14 2022-11-11 青岛理工大学 Anti-cracking method for construction of upper ultra-long concrete structure
CN110656546A (en) * 2019-09-24 2020-01-07 齐鲁交通发展集团有限公司 Water-permeable concrete block and ultra-soft foundation shallow layer treatment method

Similar Documents

Publication Publication Date Title
WO1997013923A1 (en) Method for constructing block paving
CN103321257A (en) Anti-cracking seepage-proof construction method for ultra-long mass concrete structure basement
CN106759126B (en) Construction method of side slope support drainage channel
CN107653894A (en) A kind of construction technology that foundation platform is made by precast concrete
CN105569071B (en) A kind of slip casting under water of cement-based material or mud jacking block ground mass foundation construction
US10501935B2 (en) Layered architectural pervious concrete
CN111350268A (en) Construction method of concrete structure self-waterproof system in sewage treatment engineering
CN104929365A (en) Composite surface construction technology for garbage discharging platform of garbage incineration power plant
CN106223151B (en) Large area wing square stone material in severe cold area is mated formation prevention and cure of crack method
CN104927759B (en) A kind of interface adhesive material and black overlay structure and its construction technology of changing in vain based on the material
CN106436517A (en) Construction method of soft soil anti-collapse concrete road surface
Wilmers Restoration of masonry arch bridges
CN204940039U (en) Plant stone Bridge Surface Paving by Cement structure for one kind
CN104878672A (en) Stone-planted cement concrete bridge deck paving structure and method
CN101343154B (en) Anticlastic supplementary material for pump concrete and method of preparing the same
CN114960331A (en) Rigid-flexible composite pavement structure and construction method thereof
JP2909929B2 (en) How to build a block pavement
CN113186768A (en) Construction method for improving roadbed backfill quality after existing line demolition of frame structure
CN107514009A (en) A kind of integrated control method in base plate of foundation pit winter construction of mass concrete crack
Alonso-Franco et al. RCC dams in Spain–present and future
CN106187057A (en) A kind of cement-based self-leveling dry powder and mortar and preparation method thereof
CN206428708U (en) It is a kind of to use six ribs block with holes and the combination protective slope structure of soil nailing
JPH0136963Y2 (en)
CN112391910A (en) Municipal road concrete pavement construction method
Guyer et al. An Introduction to Special Concretes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170222