CN107653894A - A kind of construction technology that foundation platform is made by precast concrete - Google Patents
A kind of construction technology that foundation platform is made by precast concrete Download PDFInfo
- Publication number
- CN107653894A CN107653894A CN201710612988.0A CN201710612988A CN107653894A CN 107653894 A CN107653894 A CN 107653894A CN 201710612988 A CN201710612988 A CN 201710612988A CN 107653894 A CN107653894 A CN 107653894A
- Authority
- CN
- China
- Prior art keywords
- cushion cap
- precast concrete
- foundation
- construction
- moulding bed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 32
- 239000011178 precast concrete Substances 0.000 title claims abstract description 29
- 238000005516 engineering process Methods 0.000 title claims abstract description 15
- 238000000465 moulding Methods 0.000 claims abstract description 24
- 238000009412 basement excavation Methods 0.000 claims abstract description 14
- 238000000034 method Methods 0.000 claims abstract description 11
- 238000010923 batch production Methods 0.000 claims abstract description 7
- 239000000463 material Substances 0.000 claims description 12
- 239000004567 concrete Substances 0.000 claims description 10
- 238000005520 cutting process Methods 0.000 claims description 4
- 238000006073 displacement reaction Methods 0.000 claims description 4
- 239000011083 cement mortar Substances 0.000 claims description 3
- 238000005056 compaction Methods 0.000 claims description 3
- 231100001004 fissure Toxicity 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims description 2
- 239000011449 brick Substances 0.000 abstract description 10
- 238000009435 building construction Methods 0.000 abstract description 2
- 239000004568 cement Substances 0.000 description 6
- 239000004570 mortar (masonry) Substances 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 239000004576 sand Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000002994 raw material Substances 0.000 description 2
- 230000003014 reinforcing Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 1
- 241000196324 Embryophyta Species 0.000 description 1
- 210000000282 Nails Anatomy 0.000 description 1
- 241000736192 Ostrya virginiana Species 0.000 description 1
- 239000011398 Portland cement Substances 0.000 description 1
- 235000015450 Tilia cordata Nutrition 0.000 description 1
- 235000011941 Tilia x europaea Nutrition 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 229910052570 clay Inorganic materials 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000004571 lime Substances 0.000 description 1
- 239000011404 masonry cement Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000002965 rope Substances 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/10—Deep foundations
- E02D27/12—Pile foundations
- E02D27/14—Pile framings, i.e. piles assembled to form the substructure
Abstract
The present invention relates to technical field of building construction, and in particular to a kind of construction technology that foundation platform is made by precast concrete.A kind of construction technology that foundation platform is made by precast concrete, comprises the following steps:Precast concrete is processed in batch production, surveying setting-out, earth excavation, is poured cushion cap or ground beam, is put loose tool line, installs prefabricated moulding bed plate, cushion cap or the backfill of ground beam sides are smooth, and check of foundation subsoil pours blinding layer;The technique substitutes this construction method of brick mold using precast concrete, shortens the duration, improves speed of application, improve work efficiency, saved cost, green construction, and achieves good economic benefit.
Description
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of construction that foundation platform is made by precast concrete
Technique.
Background technology
Nowadays among engineering process in itself, foundation engineering is as most important link, in the quality and progress of engineering
Very important effect is played in control process.Therefore how preferably to lift the quality of foundation engineering and speed up the work simultaneously
It is capable of the cost-effective of maximum, is a problem in engineering construction.
Brick mold is to replace plank sheathing or steel form to be mainly used in foundation beam, hold come a kind of method of formwork with brick setting
The side forms such as platform, elevator, catch pit are not easy the position removed, and are a kind of traditional construction technologies.But brick mold builds work by laying bricks or stones
Journey amount is larger, and input manpower is more, work efficiency is low, speed of application is slow, cost is higher.
The content of the invention
The invention aims to solve the above problems, there is provided a kind of construction that foundation platform is made by precast concrete
Technique is specially a kind of by the directly assembled making foundation platform of precast concrete(Grade beam)Construction technology.It can effectively be prevented
The problems such as brick mold that backfill is extruded and occurred is collapsed, deformed, crack occurs, and it is fast to shorten duration, speed of application, work efficiency
Height, cost-effective, green construction, achieve good economic benefit.
In order to reach foregoing invention purpose, the present invention uses following technical scheme:
A kind of construction technology that foundation platform is made by precast concrete, comprises the following steps:Precast concrete is processed in batch production, is surveyed
Unwrapping wire is measured, earth excavation, cushion cap or ground beam is poured, puts loose tool line, prefabricated moulding bed plate is installed, cushion cap or the backfill of ground beam sides are flat
Whole, check of foundation subsoil pours blinding layer;
Precast concrete is processed in batch production, that is, processes prefabricated moulding bed plate;
Earth excavation, more than mechanical earth excavation to cushion cap bottom 200 ㎜ are artificial clear native, smooth;Foundation ditch finishing soil after excavation
Bar dowel head is stamped on face, as bed course position and thickness control point;
Pour cushion cap or ground beam, the foundation ditch or groove of cushion cap or grade beam excavate and check of foundation subsoil after, construction bearing platform and grade beam heelpiece
Layer, bed course side extends out 100mm than cushion cap and grade beam sideline;
Loose tool line is put, after blinding concrete intensity reaches 1.5Mpa, upper people's surveying setting-out, prefabricated moulding bed plate is ejected with ink fountain and installs
Line, installation control line, cushion cap or grade beam axis;
Prefabricated moulding bed plate is installed, specially arranged sheet material by live length, short slab is cut using portable cutting machine, under plate mouth with connect
Cement mortar seat slurry is laid at head, highly more than 0.6m or length is more than 3.0m and sets fourth plate, and the upper and lower fissure of displacement, fourth in lower floor
Plate termination is blocked using concrete, and concrete prefabricated board both sides are fixed using bar dowel head and prevent from shifting, and seam is pasted grid and prevented
Split band;The height of prefabricated moulding bed plate is lower 2cm than depth of beam;
(7)Cushion cap or the backfill of ground beam sides are smooth;With 2 between prefabricated moulding bed plate and side slope:8 dirt are filled, compaction in layers,
(8)Check of foundation subsoil pours blinding layer.
Preferably, when pouring cushion cap bed course, positioning hole, position of the positioning hole along prefabricated moulding bed plate are reserved on cushion cap bedding plane
Put and be uniformly distributed, and be two row.
Preferably, the precast concrete material size is 3 × 0.6 × 0.09m.
Preferably, work technique is applied to the construction at the position such as foundation beam, cushion cap, catch pit in architectural engineering.
Preferably, the height at the position such as the foundation beam, cushion cap, catch pit is less than or equal to 1.2m.
Compared with prior art, beneficial effect is the present invention:
This construction method of brick mold is substituted using precast concrete, the duration is shortened, improves speed of application, improve work efficiency,
Cost, green construction have been saved, and has achieved good economic benefit.
Specifically, substantial amounts of construction brick and cement have been saved, energy-conserving and environment-protective, and by shaping sheet material assembling i.e. dress i.e.
With, without waiting for masonry cement solidify, shorten construction period.By reinforcing on the outside of brick mold, effectively prevent because backfill is squeezed
The problems such as brick mold pressed and occurred is collapsed, deformed, crack occurs.Assembling between splice plate is rapid and firm, saves a large amount of
Engineering time.
Brief description of the drawings
Fig. 1-4 is that the precast concrete of the present invention makes the construction technological process figure of foundation platform or grade beam;
Fig. 5-6 is that the precast concrete of the present invention makes the reinforcing joint detail drawing of foundation platform or grade beam.
In figure:1 cushion cap or ground beam, 2 prefabricated moulding bed plates.
Embodiment
Explanation is further described to technical scheme below by specific embodiment.
If without specified otherwise, the raw material employed in embodiments of the invention is raw material commonly used in the art, is implemented
Method employed in example, it is the conventional method of this area.
Embodiment:
A kind of construction technology that foundation platform is made by precast concrete, comprises the following steps:Precast concrete is processed in batch production, is surveyed
Unwrapping wire is measured, earth excavation, cushion cap or ground beam is poured, puts loose tool line, prefabricated moulding bed plate is installed, cushion cap or the backfill of ground beam sides are flat
Whole, check of foundation subsoil pours blinding layer;
Material:
According to material planning and job site scheduling situation, be equipped with enough concrete prefabricated boards and sand, lime, cement,
The materials such as steel nail, steel wire rope, wooden wedge.
Plant:
Portable sheet cutting machine, electric saw for woodworking, electric hand drill, hophornbeam hammer, horizon rule, steel tape, cable inlet bracket, line pendant, iron are smeared
Son, sieve, trolley etc..
Cement:
Using No. 32.5 Portland cements, cement must not make moist caking.
Sand:
Middle sand, should cross the sieve in 5mm apertures, and clay content cannot be greater than 5%.
Water:
Using running water.
Mortar:
Mortar strength is used as M7.5(Antifreezing agent is mixed in winter construction).
Material of marching into the arena must have product certificate and test report, and undesirable material is forbidden to march into the arena, prefabricated board
It can just be dispatched from the factory after reaching curing age, prefabricated moulding bed plate handling are steady, avoid colliding.
Cement masonry mortar carries out live mixing, and with using, mortar should have good workability and water-retaining property, cement
Masonry mortar must after mixing in 3 hours using finishing(When same day temperature degree is more than 30 DEG C, it should make after mixing in 2 hours
With finishing), forbid using mortar overnight.
In specific processing step, as shown in figures 1 to 6:
Precast concrete is processed in batch production, that is, processes prefabricated moulding bed plate;The precast concrete material size is 3 × 0.6 × 0.09m.
Earth excavation, more than mechanical earth excavation to cushion cap bottom 200 ㎜ are artificial clear native, smooth;Foundation ditch after excavation is repaiied
Bar dowel head is stamped on whole native face, as bed course position and thickness control point;The earth excavation stage is by full-time surveyor to the earthwork
Construction carry out technology repetition measurement, forbid to occur backbreaking, disorderly dig phenomenon.
Pour cushion cap or ground beam, the foundation ditch or groove of cushion cap or grade beam excavate and check of foundation subsoil after, construction bearing platform and grade beam
Foot mat, bed course side extend out 100mm than cushion cap and grade beam sideline;
Loose tool line is put, after blinding concrete intensity reaches 1.5Mpa, upper people's surveying setting-out, prefabricated moulding bed plate is ejected with ink fountain and installs
Line, installation control line, cushion cap or grade beam axis;
Prefabricated moulding bed plate is installed, the erection method of precast concrete is specially to be cut by live length arrangement sheet material, short slab using portable
Cutting mill is cut, and Ban Xiakou and joint laying cement mortar seat slurry, highly more than 0.6m or length is more than 3.0m and set in lower floor
Fourth plate, and the upper and lower fissure of displacement, fourth plate termination are blocked using concrete, and concrete prefabricated board both sides are fixed using bar dowel head and prevented
Displacement, seam paste grid Cracking-proof belt, as seen in figs. 5-6;The height of prefabricated moulding bed plate is lower 2cm than depth of beam;
Cushion cap or the backfill of ground beam sides are smooth;With 2 between prefabricated moulding bed plate and side slope:8 dirt are filled, compaction in layers,
Check of foundation subsoil pours blinding layer.
When pouring cushion cap bed course, positioning hole is reserved on cushion cap bedding plane, position of the positioning hole along prefabricated moulding bed plate is uniformly divided
Cloth, and be two row.
The work technique is applied to the construction at the position such as foundation beam, cushion cap, catch pit in architectural engineering, and requires basis
The height at the positions such as beam, cushion cap, catch pit is less than or equal to be not more than 1.2m.
Claims (5)
1. a kind of construction technology that foundation platform is made by precast concrete, it is characterised in that comprise the following steps:Batch production adds
Work precast concrete, surveying setting-out, earth excavation, pour cushion cap or ground beam, put loose tool line, prefabricated moulding bed plate is installed, cushion cap or
Ground beam sides backfill is smooth, and check of foundation subsoil pours blinding layer;
Precast concrete is processed in batch production, that is, processes prefabricated moulding bed plate;
Earth excavation, more than mechanical earth excavation to cushion cap bottom 200 ㎜ are artificial clear native, smooth;Foundation ditch finishing soil after excavation
Bar dowel head is stamped on face, as bed course position and thickness control point;
Pour cushion cap or ground beam, the foundation ditch or groove of cushion cap or grade beam excavate and check of foundation subsoil after, construction bearing platform and grade beam heelpiece
Layer, bed course side extends out 100mm than cushion cap and grade beam sideline;
Loose tool line is put, after blinding concrete intensity reaches 1.5Mpa, upper people's surveying setting-out, prefabricated moulding bed plate is ejected with ink fountain and installs
Line, installation control line, cushion cap or grade beam axis;
Prefabricated moulding bed plate is installed, specially arranged sheet material by live length, short slab is cut using portable cutting machine, under plate mouth with connect
Cement mortar seat slurry is laid at head, highly more than 0.6m or length is more than 3.0m and sets fourth plate, and the upper and lower fissure of displacement, fourth in lower floor
Plate termination is blocked using concrete, and concrete prefabricated board both sides are fixed using bar dowel head and prevent from shifting, and seam is pasted grid and prevented
Split band;The height of prefabricated moulding bed plate is lower 2cm than depth of beam;
(7)Cushion cap or the backfill of ground beam sides are smooth;With 2 between prefabricated moulding bed plate and side slope:8 dirt are filled, compaction in layers,
(8)Check of foundation subsoil pours blinding layer.
2. a kind of construction technology that foundation platform is made by precast concrete according to claim 1, it is characterised in that pour
During cushion cap bed course, positioning hole is reserved on cushion cap bedding plane, position of the positioning hole along prefabricated moulding bed plate is uniformly distributed, and is two
Row.
A kind of 3. construction technology that foundation platform is made by precast concrete according to claim 1, it is characterised in that institute
It is 3 × 0.6 × 0.09m to state precast concrete material size.
A kind of 4. construction technology that foundation platform is made by precast concrete according to claim 1, it is characterised in that work
Technique is applied to the construction at the position such as foundation beam, cushion cap, catch pit in architectural engineering.
A kind of 5. construction technology that foundation platform is made by precast concrete according to claim 4, it is characterised in that institute
The height for stating the positions such as foundation beam, cushion cap, catch pit is less than or equal to 1.2m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710612988.0A CN107653894A (en) | 2017-07-25 | 2017-07-25 | A kind of construction technology that foundation platform is made by precast concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710612988.0A CN107653894A (en) | 2017-07-25 | 2017-07-25 | A kind of construction technology that foundation platform is made by precast concrete |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107653894A true CN107653894A (en) | 2018-02-02 |
Family
ID=61127921
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710612988.0A Pending CN107653894A (en) | 2017-07-25 | 2017-07-25 | A kind of construction technology that foundation platform is made by precast concrete |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107653894A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109113067A (en) * | 2018-09-20 | 2019-01-01 | 上海宝冶建筑工程有限公司 | A kind of portable prefabricated board brick fetal membrane installation method |
CN109252676A (en) * | 2018-11-02 | 2019-01-22 | 广东省水利水电第三工程局有限公司 | A kind of production technology and its safe construction method of basement cushion cap |
CN109267749A (en) * | 2018-11-02 | 2019-01-25 | 广东省水利水电第三工程局有限公司 | A kind of concrete prefabricated template construction technique applied to thick mud layer |
CN113417308A (en) * | 2021-07-01 | 2021-09-21 | 中铁一局集团(广州)建设工程有限公司 | Prefabricated wallboard bearing platform tire membrane construction process |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11172709A (en) * | 1997-12-09 | 1999-06-29 | Ohbayashi Corp | Method for constructing reinforced concrete basement |
CN102071698A (en) * | 2010-12-24 | 2011-05-25 | 浙江中南建设集团有限公司 | Construction method of beddings of foundation downward overturn beam and pile cap |
CN105369826A (en) * | 2015-12-08 | 2016-03-02 | 中国一冶集团有限公司 | Basement bearing platform side mold construction method |
-
2017
- 2017-07-25 CN CN201710612988.0A patent/CN107653894A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11172709A (en) * | 1997-12-09 | 1999-06-29 | Ohbayashi Corp | Method for constructing reinforced concrete basement |
CN102071698A (en) * | 2010-12-24 | 2011-05-25 | 浙江中南建设集团有限公司 | Construction method of beddings of foundation downward overturn beam and pile cap |
CN105369826A (en) * | 2015-12-08 | 2016-03-02 | 中国一冶集团有限公司 | Basement bearing platform side mold construction method |
Non-Patent Citations (1)
Title |
---|
徐伟平等: "混凝土预制板在基础胎模中的应用", 《工程技术(全文版)》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109113067A (en) * | 2018-09-20 | 2019-01-01 | 上海宝冶建筑工程有限公司 | A kind of portable prefabricated board brick fetal membrane installation method |
CN109252676A (en) * | 2018-11-02 | 2019-01-22 | 广东省水利水电第三工程局有限公司 | A kind of production technology and its safe construction method of basement cushion cap |
CN109267749A (en) * | 2018-11-02 | 2019-01-25 | 广东省水利水电第三工程局有限公司 | A kind of concrete prefabricated template construction technique applied to thick mud layer |
CN113417308A (en) * | 2021-07-01 | 2021-09-21 | 中铁一局集团(广州)建设工程有限公司 | Prefabricated wallboard bearing platform tire membrane construction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107653894A (en) | A kind of construction technology that foundation platform is made by precast concrete | |
CN102444142B (en) | Pile group column replacement expanded basement and construction method of same | |
CN106192907B (en) | Add the construction method of 150m~300m grade high concrete panel rock-fill dams of cement sand and gravel structure sheaf | |
CN105780992B (en) | A kind of orthogonal spatial Rc Open-web Sandwich Plates floor construction engineering method | |
CN102505709A (en) | Concrete-formwork-precast foundation construction method | |
CN108086113A (en) | A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area | |
CN109648696A (en) | Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method | |
CN103469806A (en) | Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die | |
CN106812219A (en) | Filling wall top stuff up a crack construction method | |
CN111997066A (en) | Manufacturing and construction method of assembled prestressed anchor cable frame beam for slope reinforcement | |
CN108330902B (en) | Construction method for cast-in-situ lower cross beam of high-pile wharf | |
CN103215950B (en) | Pile foundation extension construction method in backfilling area | |
CN210117716U (en) | Trapezoidal foundation ditch lateral wall concrete typical forms of elevartor shaft | |
CN105951842B (en) | Reversed beam styrofoam fetal membrane construction method under raft plate | |
CN211949044U (en) | Infilled wall masonry structure | |
CN112411597A (en) | Construction method of side formwork of underground bearing platform | |
CN210507502U (en) | Prefabricated assembled concrete slab bed structure | |
CN206667459U (en) | A kind of pre-splicing Standard formula building of prefabrication type reinforced concrete shear wall | |
CN110777854A (en) | High-rise building basement roof structure, waterproof coiled material and construction method for protecting layer to survive in one step | |
CN108130889B (en) | Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer | |
KR100853125B1 (en) | Frame type concrete block and method of construction using for PP mat and frame type concrete block | |
CN104929012A (en) | Construction method for basalt brick road and tile road of skid pad | |
CN110409282A (en) | It is a kind of based on permanent post-tensioned prestressing UHPC set decking without the rib prestressed Self-curing combination beam of abdomen and construction method | |
CN106436517A (en) | Construction method of soft soil anti-collapse concrete road surface | |
CN211922683U (en) | Concrete rigid foundation adopting large-particle-size coarse aggregate and free of stirring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180202 |