Prior art keywords
expansion joint
concrete
stone
thickness
joint
Prior art date
Application number
CN201610581952.6A
Other languages
Chinese (zh)
Other versions
CN106223151A (en
Inventor
宋陈明
李�杰
钱跃东
陈超
陈栋梁
Original Assignee
南通八建集团有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 南通八建集团有限公司 filed Critical 南通八建集团有限公司
Priority to CN201610581952.6A priority Critical patent/CN106223151B/en
Publication of CN106223151A publication Critical patent/CN106223151A/en
Application granted granted Critical
Publication of CN106223151B publication Critical patent/CN106223151B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/02Pavings made of prefabricated single units made of natural stones, e.g. sett stones
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/06Sets of paving elements

Abstract

Mat formation prevention and cure of crack method the invention discloses a kind of wing square stone material of severe cold area large area, including granite face typesetting and expansion joint position determine, substrate concrete construction, the construction of surface layer paving control line, granite face are mated formation, filleting.The present invention is easy for construction, effect is good.Save maintenance cost.

Description

Large area wing square stone material in severe cold area is mated formation prevention and cure of crack method

Technical field

Mat formation prevention and cure of crack method the present invention relates to a kind of wing square stone material of severe cold area large area.

Background technology

The severe cold area winter summer temperature difference reaches to be spent more 100, some square stone material surface layers built up, due to summer in winter huge temperature Difference deformation, by drawing crack, breaks, have impact on the use on square, how to prevent the generation of wing square stone material top-crack, be one Important topic.

The content of the invention

It is an object of the invention to provide a kind of large area wing square stone material paving in severe cold area easy for construction, that effect is good Fill prevention and cure of crack method.

The present invention technical solution be:

A kind of wing square stone material of severe cold area large area is mated formation prevention and cure of crack method, it is characterized in that:Comprise the following steps:

(One)Granite face typesetting, expansion joint position determine

Row's plate of granite face abnormity slabstone is carried out using cad technique, determines the size and stone material of every block of trapezoidal stone material Between gap size, it is ensured that effect of mating formation, at the same in the range of 15~20m adjust substrate concrete expansion joint (E.J.) spacing, 3~4m scopes Interior adjustment substrate concrete contracting seam spacing, it is ensured that the position of substrate concrete expansion joint (E.J.) and contracting seam is opposite with facing expansion joint position Should;Every piece of trapezoidal stone material size is determined according to desk-top publishing figure, factory process is simultaneously numbered, and it is mixed to prevent that scene from using;

(Two)Substrate concrete is constructed

Substrate concrete thickness is 200 ㎜, and using C25 commerical ready-mixed concretes, ground pump conveying, Manual, machinery are vibrated, three The leveling of roll shaft evener, grooving machine joint-cutting;

Construction technology:Check basic unit → surveying setting-out → installation form → concrete pumping → pave → leveling → vibrate drawing Hair → joint-cutting → health;

For substrate concrete construction formwork using the enough channel steels of rigidity, side sets stayed mast insertion hole;The height of steel form For substrate concrete design thickness, template length is 3~5m, and supporting adn fixing device at every meter of template-setup 1, mold plate verticality is used Chock wedge method adjusts, and construction joint indwelling is at expansion joint (E.J.);

According to it is predetermined stretch, contract seam position, in concrete structure base layer construction, upper 25 are first buried according to expansion joint (E.J.) position ㎜ thickness soaked the Korean pine expansion joint plate of pitch, and centre sets Φ 16mm transmission rods, 200 ㎜ of spacing;

When concrete is unhardened, the concrete on rejecting expansion joint plate top, the batten of embedded 20 × 20 ㎜, flattened faces, Expansion joint plate should continuously penetrate through whole substrate concrete, and expansion joint plate is vertical with Lu Zhizheng line, and slotted wall is vertical;

Transmission rod uses Φ 16mm reinforcing bars, 200 ㎜ of spacing, and length is 700 ㎜, the surface of more than half length should apply anti-sticking Layer is tied, end should wear movable cap bag, and set cap material uses Φ 20mm plastic tubes, and end is blocked using asphalt felt sealing, transmission rod Steel bar meter should be sawed-off, must not extrude cut-out, and fracture is answered vertical, light circle, pierced with grinder buffing hair loss, and be processed into 2~3 ㎜ and fall Fillet;

All vertical, horizontal contracting seams are constructed using joint-cutting method, and joint-cutting depth is 6 ㎜, and width is 10 ㎜, is first sawed with thin saw blade Switch to and require depth, reuse 6~8 ㎜ thickness saw blades or overlapping saw blade broadening joint filling groove;

Sprinkle water with the covering such as gunnysack, straw screen or mat wet curing and in time, keep concrete surface to be in dampness all the time, Substrate concrete health initial stage, forbid pedestrian, vehicle pass-through, after design strength 40% is reached, pedestrian can pass through;

(Three)Surface layer paving control line is constructed

According to stone material surface layer CAD typesettings figure every block of trapezoidal stone material and gap size, the center of circle of every section of circle and circular arc, using complete Instrument of standing orients the radial direction control line of each every block of stone material of section, and the broadwise control for setting every block of stone material is surveyed using chord off-set method Line, and by the radial direction of every block of trapezoidal stone material and broadwise control line with line of ink marker bullet on concrete base layer, as every piece of stone material paving Foundation;

(Four)Granite face is mated formation

Granite panel of mating formation is 40 ㎜ thickness fired slab floor file, first brush plain-water slurry one time on C25 concrete base layers, so 20 ㎜ thickness 1 are used afterwards:2.5 cement mortar screedings, panel use 50 thickness 1 with basic unit:2.5 dry cement mortar binder courses, fire Burn plate bottom surface and scrape 5 ㎜ thickness plain-water slurry tack coats;

Granite face stays at substrate concrete expansion joint (E.J.) and expansion joint sets 10 ㎜ wide expansion joints;

Used when surface layer is mated formation and be embedded in expansion joint plate with expansion joint plate equal thickness, the highly batten with binder course uniform thickness of mating formation Place, with paving with dragging, it is ensured that without mortar between expansion joint plate and surface layer, filled up after the completion of mating formation using gap-filling glue;

(Five)Filleting

Expansion joint of mating formation uses PVC cement, first removes the sandstone being mingled with seam, the sand of condensation using grooving machine Slurry etc., reuses pressure water of the pressure more than 0.5Mpa and compressed air thoroughly removes dust and other pollutants in seam, Ensure slotted wall and cleaning inside, drying.Slotted wall is examined can not wipe dust as cementation of fissures standard;

Crack pouring depth is in 15~20 mm, most shallow to cannot be less than 15 mm, first extruding insertion 9~12 mm porous foams of diameter Plastic backings bar, then cementation of fissures cementation of fissures top surface should be flushed with plate face;Joint filling full, uniform, consistency of thickness and must be penetrated through continuously, be filled out Sewing must not lack, cracks and seep water

Stone material surface layer is except expansion joint is with addition to PVC cement filleting, other have the gap not filleting, in gap The debris such as the cement mortar to drop will be cleaned out.

The present invention is easy for construction, effect is good.Save maintenance cost.

With reference to embodiment, the invention will be further described.

Embodiment

A kind of wing square stone material of severe cold area large area is mated formation prevention and cure of crack method, is comprised the following steps:

(One)Granite face typesetting, expansion joint position determine

Row's plate of granite face abnormity slabstone is carried out using cad technique, determines the size and stone material of every block of trapezoidal stone material Between gap size, it is ensured that effect of mating formation, while in 15~20m(Example 10m, 15m, 20m)In the range of adjust substrate concrete it is swollen Stitch spacing, 3~4m(Example 3m, 3.5m, 4m)In the range of adjust substrate concrete contracting seam spacing, it is ensured that substrate concrete expansion joint (E.J.) and contracting The position of seam is corresponding with facing expansion joint position;Every piece of trapezoidal stone material size is determined according to desk-top publishing figure, factory process is simultaneously Numbering, it is mixed to prevent that scene from using;

(Two)Substrate concrete is constructed

Substrate concrete thickness is 200 ㎜, and using C25 commerical ready-mixed concretes, ground pump conveying, Manual, machinery are vibrated, three The leveling of roll shaft evener, grooving machine joint-cutting;

Construction technology:Check basic unit → surveying setting-out → installation form → concrete pumping → pave → leveling → vibrate drawing Hair → joint-cutting → health;

For substrate concrete construction formwork using the enough channel steels of rigidity, side sets stayed mast insertion hole;The height of steel form For substrate concrete design thickness, template length is 3~5m, and supporting adn fixing device at every meter of template-setup 1, mold plate verticality is used Chock wedge method adjusts, and construction joint indwelling is at expansion joint (E.J.);

According to it is predetermined stretch, contract seam position, in concrete structure base layer construction, upper 25 are first buried according to expansion joint (E.J.) position ㎜ or 29mm thickness soaked the Korean pine expansion joint plate of pitch, and centre sets Φ 16mm transmission rods, 200 ㎜ of spacing;

When concrete is unhardened, the concrete on expansion joint plate top, embedded 20 × 20 ㎜ are rejected(Or 22 × 22mm)Wood Bar, flattened faces, expansion joint plate should continuously penetrate through whole substrate concrete, and expansion joint plate is vertical with Lu Zhizheng line, and slotted wall is vertical;

Transmission rod uses Φ 16mm reinforcing bars, 200 ㎜ of spacing, and length is 700 ㎜, the surface of more than half length should apply anti-sticking Layer is tied, end should wear movable cap bag, and set cap material uses Φ 20mm plastic tubes, and end is blocked using asphalt felt sealing, transmission rod Steel bar meter should be sawed-off, must not extrude cut-out, and fracture is answered vertical, light circle, pierced with grinder buffing hair loss, and be processed into 2~3 ㎜ (Example 2mm, 2.5mm, 3mm)Rounded corner;

All vertical, horizontal contracting seams are constructed using joint-cutting method, and joint-cutting depth is 6 ㎜, and width is 10 ㎜, is first sawed with thin saw blade Switch to and require depth, reuse 6~8 ㎜(Example 6mm, 7mm, 8mm)Thick saw blade or overlapping saw blade broadening joint filling groove;

Sprinkle water with the covering such as gunnysack, straw screen or mat wet curing and in time, keep concrete surface to be in dampness all the time, Substrate concrete health initial stage, forbid pedestrian, vehicle pass-through, after design strength 40% is reached, pedestrian can pass through;

(Three)Surface layer paving control line is constructed

According to stone material surface layer CAD typesettings figure every block of trapezoidal stone material and gap size, the center of circle of every section of circle and circular arc, using complete Instrument of standing orients the radial direction control line of each every block of stone material of section, and the broadwise control for setting every block of stone material is surveyed using chord off-set method Line, and by the radial direction of every block of trapezoidal stone material and broadwise control line with line of ink marker bullet on concrete base layer, as every piece of stone material paving Foundation;

(Four)Granite face is mated formation

Granite panel of mating formation is 40 ㎜ thickness fired slab floor file, first brush plain-water slurry one time on C25 concrete base layers, so 20 ㎜ thickness 1 are used afterwards:2.5 cement mortar screedings, panel use 50 thickness 1 with basic unit:2.5 dry cement mortar binder courses, fire Burn plate bottom surface and scrape 5 ㎜ thickness plain-water slurry tack coats;

Granite face stays at substrate concrete expansion joint (E.J.) and expansion joint sets 10 ㎜ wide expansion joints;

Used when surface layer is mated formation and be embedded in expansion joint plate with expansion joint plate equal thickness, the highly batten with binder course uniform thickness of mating formation Place, with paving with dragging, it is ensured that without mortar between expansion joint plate and surface layer, filled up after the completion of mating formation using gap-filling glue;

(Five)Filleting

Expansion joint of mating formation uses PVC cement, first removes the sandstone being mingled with seam, the sand of condensation using grooving machine Slurry etc., reuses pressure water of the pressure more than 0.5Mpa and compressed air thoroughly removes dust and other pollutants in seam, Ensure slotted wall and cleaning inside, drying.Slotted wall is examined can not wipe dust as cementation of fissures standard;

Crack pouring depth is in 15~20 mm(Example 15mm, 18mm, 20mm), most shallow to cannot be less than 15 mm, first extruding is embedded straight 9~12 mm of footpath(Example 9mm, 10mm, 12mm)Sponge plastics backing strip, then cementation of fissures cementation of fissures top surface should be flushed with plate face;Joint filling Full, uniform, consistency of thickness and must continuously it penetrate through, joint sealing material must not lack, cracks and seep water

Stone material surface layer is except expansion joint is with addition to PVC cement filleting, other have the gap not filleting, in gap The debris such as the cement mortar to drop will be cleaned out.

Claims (1)

  1. A kind of prevention and cure of crack method 1. wing square stone material of severe cold area large area is mated formation, it is characterized in that:Comprise the following steps:
    (One)Granite face typesetting, expansion joint position determine
    Row's plate of granite face abnormity slabstone is carried out using cad technique, between the size and the stone material that determine every block of trapezoidal stone material Gap size, it is ensured that effect of mating formation, while substrate concrete expansion joint (E.J.) spacing is adjusted in the range of 15~20m, adjusted in the range of 3~4m Integral basis layer concrete contracting seam spacing, it is ensured that the position of substrate concrete expansion joint (E.J.) and contracting seam is corresponding with facing expansion joint position;Root Every piece of trapezoidal stone material size is determined according to desk-top publishing figure, and factory process is simultaneously numbered, and it is mixed to prevent that scene from using;
    (Two)Substrate concrete is constructed
    Substrate concrete thickness is 200 ㎜, and using C25 commerical ready-mixed concretes, ground pump conveying, Manual, machinery are vibrated, three roll shafts Evener leveling, grooving machine joint-cutting;
    Construction technology:Check basic unit → surveying setting-out → installation form → concrete pumping → pave → leveling → plucking that vibrates → Joint-cutting → health;
    For substrate concrete construction formwork using the enough channel steels of rigidity, side sets stayed mast insertion hole;The height of steel form is base Layer concrete design thickness, template length are 3~5m, supporting adn fixing device at every meter of template-setup 1, mold plate verticality chock Wedge method adjusts, and construction joint indwelling is at expansion joint (E.J.);
    According to it is predetermined stretch, seam position of contracting, in concrete structure base layer construction, upper 25 ㎜ thickness is first buried according to expansion joint (E.J.) position The Korean pine expansion joint plate of pitch was soaked, centre sets Φ 16mm transmission rods, 200 ㎜ of spacing;
    When concrete is unhardened, the concrete on expansion joint plate top, the batten of embedded 20 × 20 ㎜, flattened faces, expansion joint (E.J.) are rejected Plate should continuously penetrate through whole substrate concrete, and expansion joint plate is vertical with Lu Zhizheng line, and slotted wall is vertical;
    Transmission rod uses Φ 16mm reinforcing bars, and 200 ㎜ of spacing, length is 700 ㎜, and the surface of more than half length should apply anti-stick Layer, end should wear movable cap bag, and set cap material uses Φ 20mm plastic tubes, and end is blocked using asphalt felt sealing, transmission rod steel Muscle processing should be sawed-off, must not extrude cut-out, and fracture is answered vertical, light circle, pierced with grinder buffing hair loss, and be processed into 2~3 ㎜ roundings Angle;
    All vertical, horizontal contracting seams are constructed using joint-cutting method, and joint-cutting depth is 6 ㎜, and width is 10 ㎜, is first arrived with thin saw blade sawing It is required that depth, reuses 6~8 ㎜ thickness saw blades or overlapping saw blade broadening joint filling groove;
    Sprinkle water with gunnysack, straw screen or mat covering wet curing and in time, keep concrete surface to be in dampness all the time, basic unit is mixed At solidifying soil health initial stage, forbid pedestrian, vehicle pass-through, after design strength 40% is reached, pedestrian can pass through;
    (Three)Surface layer paving control line is constructed
    According to stone material surface layer CAD typesettings figure every block of trapezoidal stone material and gap size, the center of circle of every section of circle and circular arc, using total powerstation The radial direction control line of each every block of stone material of section is oriented, the broadwise control line for setting every block of stone material is surveyed using chord off-set method, and By the radial direction of every block of trapezoidal stone material and broadwise control line with line of ink marker bullet on concrete base layer, as every piece of stone material paving according to According to;
    (Four)Granite face is mated formation
    Granite panel of mating formation is 40 ㎜ thickness fired slab floor file, and first brush plain-water slurry one time, is then adopted on C25 concrete base layers With 20 ㎜ thickness 1:2.5 cement mortar screedings, panel use 50 thickness 1 with basic unit:2.5 dry cement mortar binder courses, fired slab Scrape 5 ㎜ thickness plain-water slurry tack coats in bottom surface;
    Granite face stays at substrate concrete expansion joint (E.J.) and expansion joint sets 10 ㎜ wide expansion joints;
    When surface layer is mated formation use with expansion joint (E.J.) plate thickness, highly with mat formation combine thickness batten be embedded at expansion joint plate, with paving With dragging, it is ensured that without mortar between expansion joint plate and surface layer, filled up after the completion of mating formation using gap-filling glue;
    (Five)Filleting
    Expansion joint of mating formation uses PVC cement, first removes the sandstone being mingled with seam, the mortar of condensation using grooving machine, then The dust and other pollutants in seam are thoroughly removed using pressure water of the pressure more than 0.5Mpa and compressed air, it is ensured that slotted wall And cleaning inside, drying.Slotted wall is examined can not wipe dust as cementation of fissures standard;
    Crack pouring depth is in 15~20 mm, most shallow to cannot be less than 15 mm, first extruding insertion 9~12 mm sponge plastics of diameter Backing strip, then cementation of fissures cementation of fissures top surface should be flushed with plate face;Joint filling full, uniform, consistency of thickness and must be penetrated through continuously, joint sealing material It must not lack, crack and seep water
    Stone material surface layer is except expansion joint is with addition to PVC cement filleting, other have the gap not filleting, to dropping in gap Cement mortar debris to clean out.
CN201610581952.6A 2016-07-22 2016-07-22 Large area wing square stone material in severe cold area is mated formation prevention and cure of crack method CN106223151B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610581952.6A CN106223151B (en) 2016-07-22 2016-07-22 Large area wing square stone material in severe cold area is mated formation prevention and cure of crack method

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201610581952.6A CN106223151B (en) 2016-07-22 2016-07-22 Large area wing square stone material in severe cold area is mated formation prevention and cure of crack method
CN201810272525.9A CN108486978A (en) 2016-07-22 2016-07-22 The wing square stone material of the good severe cold area large area of effect is mated formation prevention and cure of crack method
CN201810271448.5A CN108396607A (en) 2016-07-22 2016-07-22 The wing square stone material of severe cold area large area easy for construction is mated formation prevention and cure of crack method

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201810272525.9A Division CN108486978A (en) 2016-07-22 2016-07-22 The wing square stone material of the good severe cold area large area of effect is mated formation prevention and cure of crack method
CN201810271448.5A Division CN108396607A (en) 2016-07-22 2016-07-22 The wing square stone material of severe cold area large area easy for construction is mated formation prevention and cure of crack method

Publications (2)

Publication Number Publication Date
CN106223151A CN106223151A (en) 2016-12-14
CN106223151B true CN106223151B (en) 2018-05-15

Family

ID=57531322

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201610581952.6A CN106223151B (en) 2016-07-22 2016-07-22 Large area wing square stone material in severe cold area is mated formation prevention and cure of crack method
CN201810272525.9A CN108486978A (en) 2016-07-22 2016-07-22 The wing square stone material of the good severe cold area large area of effect is mated formation prevention and cure of crack method
CN201810271448.5A CN108396607A (en) 2016-07-22 2016-07-22 The wing square stone material of severe cold area large area easy for construction is mated formation prevention and cure of crack method

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201810272525.9A CN108486978A (en) 2016-07-22 2016-07-22 The wing square stone material of the good severe cold area large area of effect is mated formation prevention and cure of crack method
CN201810271448.5A CN108396607A (en) 2016-07-22 2016-07-22 The wing square stone material of severe cold area large area easy for construction is mated formation prevention and cure of crack method

Country Status (1)

Country Link
CN (3) CN106223151B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0220102A1 (en) * 1985-10-09 1987-04-29 BENDIX France Electrically operated control valve
EP0263001A1 (en) * 1986-09-10 1988-04-06 La Generale Du Granit Method for making grooves and bulgings for constructions, in particular for funeral monuments
CN1410933A (en) * 2001-08-27 2003-04-16 日本世纪洋服株式会社 Equipment for use from ordering goods to cut out in making clothes and producing method thereof
CN101949215A (en) * 2010-11-05 2011-01-19 中国建筑第八工程局有限公司 Mounting construction method of steel structure support seat
CN102828600A (en) * 2012-09-07 2012-12-19 华鼎建筑装饰工程有限公司 Method for laying floor artificial stones
CN102912945A (en) * 2012-11-13 2013-02-06 江苏江中集团有限公司 Roof compound seepage-proofing steam exhausting hole detail treatment technology
CN103590294A (en) * 2013-11-19 2014-02-19 苏州金螳螂园林绿化景观有限公司 Production and paving method of ice crack road surface pacing templates with different widths
CN103615110A (en) * 2013-08-21 2014-03-05 广西建工集团第一建筑工程有限责任公司 Irregular oblique-crossing web-shaped grillage beam hyperbolic roof structure construction method
CN103669788A (en) * 2013-12-20 2014-03-26 广东省第四建筑工程公司 Paving method for polished face brick wall

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101619558B (en) * 2009-07-28 2011-07-20 朱奎 Air entraining vacuum concrete roadway and constructing method thereof
CN202208877U (en) * 2011-07-01 2012-05-02 江苏南通六建建设集团有限公司 Ground pavement expansion joint structure on concrete cushion layer expansion joints
KR20130067957A (en) * 2011-12-15 2013-06-25 주식회사 데코페이브 Permeable block with water storage and process of construction
CN104294729A (en) * 2014-08-25 2015-01-21 四川金锋建设有限公司 Method for constructing concrete pavement
CN105256692A (en) * 2015-09-10 2016-01-20 重庆建工住宅建设有限公司 Color and pervious concrete pavement structure and construction technology therefor
CN105178559A (en) * 2015-10-08 2015-12-23 哈尔滨世纪天诚装饰工程有限公司 Novel construction method for granite ground
CN105781064A (en) * 2016-03-04 2016-07-20 上海宝冶集团有限公司 Floor tile laying construction method based on building information modeling (BIM)

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0220102A1 (en) * 1985-10-09 1987-04-29 BENDIX France Electrically operated control valve
EP0263001A1 (en) * 1986-09-10 1988-04-06 La Generale Du Granit Method for making grooves and bulgings for constructions, in particular for funeral monuments
CN1410933A (en) * 2001-08-27 2003-04-16 日本世纪洋服株式会社 Equipment for use from ordering goods to cut out in making clothes and producing method thereof
CN101949215A (en) * 2010-11-05 2011-01-19 中国建筑第八工程局有限公司 Mounting construction method of steel structure support seat
CN102828600A (en) * 2012-09-07 2012-12-19 华鼎建筑装饰工程有限公司 Method for laying floor artificial stones
CN102912945A (en) * 2012-11-13 2013-02-06 江苏江中集团有限公司 Roof compound seepage-proofing steam exhausting hole detail treatment technology
CN103615110A (en) * 2013-08-21 2014-03-05 广西建工集团第一建筑工程有限责任公司 Irregular oblique-crossing web-shaped grillage beam hyperbolic roof structure construction method
CN103590294A (en) * 2013-11-19 2014-02-19 苏州金螳螂园林绿化景观有限公司 Production and paving method of ice crack road surface pacing templates with different widths
CN103669788A (en) * 2013-12-20 2014-03-26 广东省第四建筑工程公司 Paving method for polished face brick wall

Also Published As

Publication number Publication date
CN106223151A (en) 2016-12-14
CN108396607A (en) 2018-08-14
CN108486978A (en) 2018-09-04

Similar Documents

Publication Publication Date Title
Maniatidis et al. A review of rammed earth construction
US5476340A (en) Method of using internal metal stitching for repairing cracks in concrete
CN103821364B (en) The construction method of reinforced concrete water pond
JP2006502325A (en) Method for manufacturing composite tiles
CN103469815B (en) A kind of reinforced concrete retaining wall slope protection construction method
US5771557A (en) Concrete internal metal stitching
CN201137162Y (en) Bottom board anti-floating anchor rod water proof processing structure
KR100431904B1 (en) Construction method of latex modified concrete for the use of a paving equipment
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN105714621B (en) The flexible protective structure and laying method of a kind of ballastless track structure waterproof shock-absorption
CN103615110B (en) Random oblique netted nine-squares beam Hyperbolic Roof construction method
CN103352407A (en) Construction process of roadbed structure with sand-based water-permeable bricks
CN105401605B (en) Deformation joint structure and its construction method
CN101619558B (en) Air entraining vacuum concrete roadway and constructing method thereof
CN103410332B (en) A kind of concrete hollow block reinforcement wall construction technology
CN102352589B (en) Construction method for road base concrete side mold
CN106192907B (en) Add the construction method of 150m~300m grade high concrete panel rock-fill dams of cement sand and gravel structure sheaf
CN103556831B (en) Huge area is without muscle abrasion-proof concrete method for constructing terrace
CN103850164B (en) The construction method of penetrating induction type drainage pavement of a kind of long-life
CN108755983B (en) Waterproof process
CN105003087A (en) Ground hollow detection and repair method based on infrared imaging
CN104372890A (en) Construction method of bare concrete prefabricated box beam with complicated structure
CN104452591B (en) A kind of construction of cast-in-situ box-beam technique that is applied to science of bridge building
KR100687211B1 (en) Method of paving road using precast concrete panel
WO2004061239A1 (en) Composite shaped block

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant