CN106410727B - Conducting wire fixed platform stent - Google Patents

Conducting wire fixed platform stent Download PDF

Info

Publication number
CN106410727B
CN106410727B CN201610412544.8A CN201610412544A CN106410727B CN 106410727 B CN106410727 B CN 106410727B CN 201610412544 A CN201610412544 A CN 201610412544A CN 106410727 B CN106410727 B CN 106410727B
Authority
CN
China
Prior art keywords
auxiliary supports
conducting wire
auxiliary
wire fixed
sliding rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610412544.8A
Other languages
Chinese (zh)
Other versions
CN106410727A (en
Inventor
万新
方翠
游复生
苏春发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd.
Original Assignee
Guangzhou electric power design institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou electric power design institute filed Critical Guangzhou electric power design institute
Priority to CN201610412544.8A priority Critical patent/CN106410727B/en
Publication of CN106410727A publication Critical patent/CN106410727A/en
Application granted granted Critical
Publication of CN106410727B publication Critical patent/CN106410727B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/20Spatial arrangements or dispositions of lines or cables on poles, posts or towers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms

Abstract

The invention discloses a kind of conducting wire fixed platform stents, the bracket institution being connect including platform body, with the platform body and the auxiliary support apparatus being slidably fixed on the bracket institution, the bracket institution is equipped with conducting wire fixed mechanism, the auxiliary support apparatus includes at least one auxiliary supports, the conducting wire fixed mechanism includes being used to support the insulating fixing piece of conducting wire, and the auxiliary supports are matched with the insulating fixing piece.When needing to carry out the installation or maintenance of electrical equipment on terminal tower, the auxiliary supports can be slided and be pushed out of the bracket institution part, and extension keeps safe distance with insulating fixing piece, it is installed on the extension of auxiliary supports or service work in order to which staff stands, thus convenience and the safety of work are greatly improved, meet the code requirement of operating maintenance, while also improve working efficiency, reduce construction cost and risk.

Description

Conducting wire fixed platform stent
Technical field
The present invention relates to terminal tower cable fixture technical field, more particularly, to a kind of conducting wire fixed platform stent.
Background technology
Cable termination tower is used widely in city power transmission and transformation field, is mainly used for aerial condutor transmission of electricity being converted into Cable power transmission.Current terminal tower common on the market there are one it is larger the shortcomings that:Not for fixing the flat of conducting wire on tower body Platform, can cause in this way conducting wire guided to from above under when, more violent swing is easily generated by wind effect, causes conducting wire The place connection that lower part is connect with arrester is unstable, so as to be highly susceptible to fatigue rupture over time.
In order to solve the above problem existing for conventional terminal tower, also occur being designed with fixed conducting wire platform branch on the market Frame, through operating experience for many years and Force Calculation, fixed conducting wire platform support installation site is the arrester of cable termination tower platform And it is more suitable at about 3~5 meters of end top, if apart from excessive, it may be to reducing wind function and effect unobvious;If away from From too small, construction when, would become hard to carry out the crooked radian of conducting wire between fixed conducting wire platform support and arrester, and increase is applied Work difficulty.But another shortcoming is produced again while fixed conducting wire platform support is increased:Utilize conducting wire stage+module Excessive with the difficulty of maintenance supporting insulator, work is inconvenience, and safety is poor.Due to the supporting insulator of usual 110kV It is about 1.5 meters, even about 2.0 meters of 220kV so that the place of installation and maintenance supporting insulator and outside fixation conducting wire seems It is very not convenient.Usually there was only two methods:One is hanging root rope fixed personnel by the undermost conducting wire cross-arm of steel tower, pacified Dress and maintenance, are equivalent to and personnel are suspended in mid air, and such method safety risk is big, and in power construction, safety supervision department is mostly not Agree to such method;Secondly first to fix supporting insulator outboard wire, after supporting insulator is mounted on fixed conducting wire again On platform support, during such mode construction and installation, since supporting insulator is heavier, installation personnel task difficulty is big, and such side Method is not used to later stage maintenance, can not particularly check the quality state of supporting insulator and fixed conducting wire connection status.
Invention content
Based on this, the present invention provides a kind of conducting wire fixed platform stent, the defects of being to overcome the prior art, improves terminal Tower is installed reduces construction cost with the convenience of service work and safety, raising working efficiency.
The object of the present invention is achieved like this:
A kind of conducting wire fixed platform stent, the bracket institution being connect including platform body, with the platform body and can slide The dynamic auxiliary support apparatus being fixed on the bracket institution, the bracket institution are equipped with conducting wire fixed mechanism, the auxiliary branch Support arrangement includes at least one auxiliary supports, and the conducting wire fixed mechanism includes being used to support the insulating fixing piece of conducting wire, institute Auxiliary supports are stated to match with the insulating fixing piece.
Further, the bracket institution includes first support component and second support component, and the auxiliary supports include The first auxiliary supports and the second auxiliary supports of interlaced arrangement, the first support component and the second support component are equal The first sliding rail and the second sliding rail including rack body and being connect with the rack body, first auxiliary supports with First sliding rail is connected, and second auxiliary supports are connected with second sliding rail.
Further, first sliding rail and second sliding rail include sliding rail connector and with the sliding rail connector The sliding track body of connection, the sliding track body are equipped with sliding slot, and first auxiliary supports and second auxiliary supports are equal Including clamping portion, the clamping portion coordinates snapping with the sliding slot.
Further, location locking mechanism is further included, first auxiliary supports pass through the location locking mechanism and institute It states first support component and/or the second support component is fixed, second auxiliary supports pass through the positioning and locking machine Structure is fixed with the first support component and/or the second support component.
Further, the bracket institution further includes oblique connecting rod, and the oblique connecting rod is equipped with the positioning Retaining mechanism, first auxiliary supports and second auxiliary supports by the location locking mechanism with it is described tiltedly It is fixed to connecting rod.
Further, further include haulage gear, the haulage gear include the pedestal being set on the oblique connecting rod, The rotating member that is rotatably fixed on the pedestal, the handle being connect with the rotating member and on loaded on the rotating member Traction piece, one end of the traction piece are fixed with the rotating member, the other end of the traction piece and first Auxiliary support Part or second auxiliary supports are fixed.
Further, the traction piece and the connecting pin of first auxiliary supports or second auxiliary supports are the back of the body One end from direction of travel.
Further, the length of first auxiliary supports is set as L1, the length of the bracket institution is set as Z;Wherein:L1 Length be the higher value in Z and Z/2+1.5m the two.
Further, the length of second auxiliary supports is set as L2, the width of the platform body is set as X, the branch The width of frame mechanism is set as Y;Wherein:L2Length be X and the higher value in Y+1.5 meters of the two.
Further, protection mechanism is further included, the protection mechanism is rotatably fixed on the auxiliary support apparatus.
The beneficial effects of the present invention are:
Above-mentioned conducting wire fixed platform stent on the platform body by installing the bracket institution and in the branch It is slided on frame mechanism and the auxiliary supports is set, and ensure that the auxiliary supports coordinate with the insulating fixing piece.When need When carrying out the installation or maintenance of electrical equipment on terminal tower, the auxiliary supports can be slided and be pushed out of the timbering machine A structure part, and extension keeps safe distance with insulating fixing piece, in order to which staff stands in auxiliary supports It is installed on extension or service work, thus greatly improves convenience and the safety of work, meet operation inspection The code requirement repaiied, while working efficiency is also improved, reduce construction cost and risk.
Description of the drawings
Fig. 1 is the structure diagram of the conducting wire fixed platform stent described in the embodiment of the present invention;
Fig. 2 is the working state schematic representation of the first auxiliary supports described in the embodiment of the present invention;
Fig. 3 is the working state schematic representation of the second auxiliary supports described in the embodiment of the present invention;
Fig. 4 is the structure diagram of the first sliding rail described in the embodiment of the present invention;
Fig. 5 is the structure diagram of the second sliding rail described in the embodiment of the present invention.
Reference sign:
100th, platform body, 200, bracket institution, 220, conducting wire fixed mechanism, 222, insulating fixing piece, 240, first Frame component, 260, second support component, 300, auxiliary support apparatus, 320, auxiliary supports, the 340, first auxiliary supports, 350th, rack body, the 352, first sliding rail, the 354, second sliding rail, the 360, second auxiliary supports, 370, sliding rail connector, 372, Sliding track body, 374, sliding slot, 376, clamping portion, 400, location locking mechanism, 500, oblique connecting rod, 600, haulage gear, 700th, protection mechanism.
Specific embodiment
The embodiment of the present invention is described in detail below:
As shown in Figure 1, a kind of conducting wire fixed platform stent, connect including platform body 100, with the platform body 100 Bracket institution 200 and the auxiliary support apparatus 300 that is slidably fixed on the bracket institution 200, the bracket institution 200 are equipped with conducting wire fixed mechanism 220, and the auxiliary support apparatus 300 includes at least one auxiliary supports 320, the conducting wire Fixed mechanism 220 includes being used to support the insulating fixing piece 222 of conducting wire, the auxiliary supports 320 and the insulating fixing piece 222 match.
Above-mentioned conducting wire fixed platform stent on the platform body 100 by installing the bracket institution 200, Yi Ji It is slided on the bracket institution 200 and the auxiliary supports 320 is set, and ensure the auxiliary supports 320 and the insulation Fixing piece 222 coordinates.It, can be by the auxiliary supports when needing to carry out the installation or maintenance of electrical equipment on terminal tower 320 slips are pushed out of 200 part of bracket institution, and extension keeps safe distance with insulating fixing piece 222, so as to It stands and is installed on auxiliary supports 320 or service work in staff, thus greatly improve the facility of work Property and safety, meet the code requirement of operating maintenance, while also improve working efficiency, reduce construction cost and risk.
Wherein, it is illustrated by taking 110KV terminal towers as an example in the present embodiment;The platform body 100 is terminal tower A tower body structure part, the bracket institution 200 are the rectangular frame that tower body both sides are fixed on by the locking connector such as bolt, Rectangular frame is made of the angle steel or channel steel of high intensity and lightweight, to improve functional reliability and safety.The conducting wire is consolidated Determine mechanism 220 and include circumferentially fixed in multiple supporting insulators on rectangular frame, its quantity is 6 in the present embodiment, The respectively installation two of the front and rear side of middle rectangular frame, left and right sides respectively installs one, is used to support the conducting wire fixed under being drawn from above, avoids The safety of tower body electrical equipment is influenced because vacantly being generated excessive swing by wind effect.In addition, the auxiliary supports 320 are preferably Similar to the structure of ladder, i.e., more cross bars being installed on including two montants and equidistant interval among two montants.Specifically , above-mentioned auxiliary supports 320 are auxiliary including the first auxiliary supports 340 and longitudinally disposed second laterally set along tower body Support element 360 is helped, i.e., described bracket institution 200 includes first support component 240 and second support component 260, the auxiliary branch Support member 320 includes the first auxiliary supports 340 and the second auxiliary supports 360 of interlaced arrangement, the first support component 240 Include rack body 350 and the first sliding rail 352 being connect with the rack body 350 with the second support component 260 With the second sliding rail 354, first auxiliary supports 340 are connected with first sliding rail 352, second Auxiliary support Part 360 is connected with second sliding rail 354.
The first support component 240 and the second support component 260 are divided into the arranged on left and right sides of tower body part, excellent The quantity of first auxiliary supports 340 of choosing is two, is slideably positioned on the rectangular frame of arranged on left and right sides respectively, with It is installed or is overhauled convenient for the supporting insulator to both sides, second auxiliary supports 360, which slide laterally, is set to rectangle On frame, and it is freely slidable through entire platform support.It needs to carry out the branch on left side brackets component it is possible thereby to realize and work as When supportting the repair or installation of insulator, the second auxiliary supports 360 are slidably to carrying out on first support component 240 assisting to apply Work, when needing to carry out the repair or installation of the supporting insulator on the bracket component of right side, the second auxiliary supports 360 can be slided again It moves to assistance construction is carried out on second support component 260, so not only reduces the component count of platform support, make structure simpler It is clean compact, while construction cost can be reduced again.In addition, the slip of auxiliary supports 320 is realized by sliding rail, it can be further Manpower is saved, improves the convenience of operation.
Such as Fig. 2, shown in Fig. 3, wherein the length of first auxiliary supports 340 is set as L1, the bracket institution 200 Length is set as Z;Wherein:L1Length be the higher value in Z and Z/2+1.5m the two.Z is the length of rectangular frame, and " 1.5m " has Body refers to be installed on the length of the supporting insulator for being used to support cable conductor on rectangular frame, and Z/2 is auxiliary supports 320 In use, the spacing between the first sliding rail 352 and the second sliding rail 354, L1It, can be with by the higher value being chosen in two values Ensuring the both ends of first auxiliary supports 340 can fix with rectangular frame simultaneously, so as to improve the stability of its installation And use reliability.The length of second auxiliary supports 360 is set as L2, the width of the platform body 100 is set as X, institute The width for stating bracket institution 200 is set as Y;Wherein:L2Length be X and the higher value in Y+1.5 meters of the two.Wherein described platform Ontology 100 be preferably square frame, X be its length of side, Y be rectangular frame width, L2It is larger in two values by choosing Value, it can be ensured that the both ends of second auxiliary supports 360 can be fixed with rectangular frame simultaneously, so as to improve its installation Stability and use reliability.In addition, the distance between second sliding rail 354 and the rack body 350 are more than described the The distance between one sliding rail 352 and the rack body 350, and first sliding rail 352 be arranged in second sliding rail 354 with In spacing between rack body 350, it is possible thereby to ensure that first sliding rail 352 and second sliding rail 354 staggeredly cloth It puts and avoids interfering collision when relatively moving, it is ensured that sliding rail works normally.
In a further embodiment, above-mentioned conducting wire fixed platform stent further includes location locking mechanism 400, and described first is auxiliary Support element 340 is helped to pass through the location locking mechanism 400 and the first support component 240 and/or the second support component 260 fix, second auxiliary supports 360 by the location locking mechanism 400 and the first support component 240 and/ Or the second support component 260 is fixed.The positioning and locking component is the elongated screw rod of high intensity, with being set to described the Pilot hole thread fitting on one bracket component 240 and the second support component 260, so as to first auxiliary supports 340 and second auxiliary supports 360 play the role of locking positioning, auxiliary supports is avoided arbitrarily to slide, it is ensured that work Securely and reliably.
In addition, the bracket institution 200 further includes oblique connecting rod 500, the oblique connecting rod 500 is equipped with institute Location locking mechanism 400 is stated, first auxiliary supports 340 and second auxiliary supports 360 pass through the positioning Retaining mechanism 400 is fixed with the oblique connecting rod 500.The oblique connecting rod 500 is set to the middle part of rectangular frame Hollow part, when above-mentioned auxiliary supports 320, which stretch out bracket component, is in use state, additionally it is possible to ensure to extend away from the one of end End is fixed on by screw rod on oblique connecting rod 500, it is ensured that staff stands will not cause Auxiliary support in projecting end The overturning of part 320 avoids endangering the personal safety of staff.
Further, above-mentioned conducting wire fixed platform stent further includes protection mechanism 700, and the protection mechanism 700 is rotatably solid Due to the auxiliary support apparatus 300.Protection mechanism 700 includes connecting by axis pin, rotates and be fixed on branch in the present embodiment Plate in frame structure, when auxiliary support apparatus 300 is in use state, staff can manually set plate turning vertical It is placed on supporting structure, and mutually splicing is fixed forms annular shield mechanism 700, when work can play staff protection Effect avoids the harm that high-altitude is dropped from occurring, it is ensured that the personal safety of staff.
Such as Fig. 4, shown in Fig. 5, in addition, first sliding rail 352 and second sliding rail 354 include sliding rail connector 370 and the sliding track body 372 that is connect with the sliding rail connector 370, the sliding track body 372 is equipped with sliding slot 374, and described the One auxiliary supports 340 and second auxiliary supports 360 include clamping portion 376, the clamping portion 376 and the sliding slot 374 cooperation snappings.The sliding track body 372 is clod wash inner bead channel steel in the present embodiment, with semi-enclosed cunning Slot 374, the clamping portion 376 are the channel steel that section is U-shaped, and the shape of the channel steel and the sliding slot 374 matches, Ke Yiti Thus the compactedness of high assembling structure ensures that first auxiliary supports 340 or second auxiliary supports 360 are moving Stability when dynamic avoids generating and collides or shake, influences service life.
Above-mentioned conducting wire fixed platform stent further includes haulage gear in the present embodiment, and the haulage gear includes being set to Pedestal on the oblique connecting rod 500, is connect the rotating member that is rotatably fixed on the pedestal with the rotating member Handle and around loaded on the traction piece on the rotating member, one end of the traction piece is fixed with the rotating member, the traction piece The other end fixed with first auxiliary supports 340 or second auxiliary supports 360.The haulage gear is preferably Hand wheel component, wheel seat are fixed on oblique connecting rod 500, and guide wheel is rotatably dispose on wheel seat, and one end and the guide wheel of cable are consolidated Fixed, the other end is connect with the end of first auxiliary supports 340 or second auxiliary supports 360, when needing to move It during above-mentioned auxiliary supports 320, can be realized by shaking handwheel, and time saving and energy saving, easy to operate, reliable operation.In addition, Preferred working condition is arranged in parallel for the section of stretching out of auxiliary supports 320 with insulated support and length is identical (concordant), is Reach above-mentioned purpose, label can be made on cable or on auxiliary supports 320, worker personnel are sentenced by observing label The disconnected number of turns for shaking handwheel, it is possible to the more accurate length realized control auxiliary supports 320 and stretched out, it is not only easy to operate, It is and intuitive and reliable.
Further, the connection of the traction piece and first auxiliary supports 340 or second auxiliary supports 360 It holds as away from one end of direction of travel.When cable is fixed on end of travel, when pulling cable, point lifted upwards can be generated Power can generate the influence for being unfavorable for pulling auxiliary supports 320 so that operation is more laborious, and efficiency is low.And cable is fixed on Away from one end of direction of travel, property that can realize makes auxiliary supports 320 realize mobile power is thrust rather than pulling force, So that it is guaranteed that the power that cable is acted on auxiliary supports 320 is completely used for drawing, the efficiency of operation is improved.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Embodiment described above only expresses the several embodiments of the present invention, and description is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that those of ordinary skill in the art are come It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Range.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (9)

  1. A kind of 1. conducting wire fixed platform stent, which is characterized in that the timbering machine being connect including platform body, with the platform body Structure and the auxiliary support apparatus being slidably fixed on the bracket institution, the bracket institution are equipped with conducting wire fixed mechanism, institute It states auxiliary support apparatus and includes at least one auxiliary supports, the insulation that the conducting wire fixed mechanism includes being used to support conducting wire is consolidated Determine part, the auxiliary supports are matched with the insulating fixing piece;The auxiliary supports first including interlaced arrangement are auxiliary Helping support element and the second auxiliary supports, the bracket institution includes first support component and second support component, and described first Bracket component and the second support component include rack body and the first sliding rail being connect with the rack body and the Two sliding rails, first sliding rail and second sliding rail include sliding rail connector and the cunning being connect with the sliding rail connector Rail ontology, the sliding track body are equipped with sliding slot, and first auxiliary supports and second auxiliary supports include clamping Portion, the clamping portion coordinate snapping with the sliding slot.
  2. 2. conducting wire fixed platform stent according to claim 1, which is characterized in that first auxiliary supports with it is described First sliding rail is connected, and second auxiliary supports are connected with second sliding rail.
  3. 3. conducting wire fixed platform stent according to claim 1, which is characterized in that location locking mechanism is further included, it is described First auxiliary supports are consolidated by the location locking mechanism and the first support component and/or the second support component Fixed, second auxiliary supports pass through the location locking mechanism and the first support component and/or the second support Component is fixed.
  4. 4. conducting wire fixed platform stent according to claim 3, which is characterized in that oblique connecting rod is further included, it is described Oblique connecting rod is equipped with the location locking mechanism, and first auxiliary supports and second auxiliary supports are logical The location locking mechanism is crossed to fix with the oblique connecting rod.
  5. 5. conducting wire fixed platform stent according to claim 4, which is characterized in that further include haulage gear, the traction Mechanism include be set on the oblique connecting rod pedestal, be rotatably fixed on the pedestal rotating member, with it is described Rotating member connection handle and around loaded on the traction piece on the rotating member, one end of the traction piece is consolidated with the rotating member Fixed, the other end of the traction piece is fixed with first auxiliary supports or second auxiliary supports.
  6. 6. conducting wire fixed platform stent according to claim 5, which is characterized in that the traction piece and the described first auxiliary The connecting pin of support element or second auxiliary supports is away from one end of direction of travel.
  7. 7. conducting wire fixed platform stent according to claim 1, which is characterized in that the length of first auxiliary supports It is set as L1, the length of the bracket institution is set as Z;
    Wherein:L1Length be the higher value in Z and Z/2+1.5m the two.
  8. 8. conducting wire fixed platform stent according to claim 1, which is characterized in that the length of second auxiliary supports It is set as L2, the width of the platform body is set as X, and the width of the bracket institution is set as Y;
    Wherein:L2Length be X and the higher value in Y+1.5 meters of the two.
  9. 9. conducting wire fixed platform stent according to claim 1, which is characterized in that further include protection mechanism, the protection Mechanism is rotatably fixed on the auxiliary support apparatus.
CN201610412544.8A 2016-06-12 2016-06-12 Conducting wire fixed platform stent Active CN106410727B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610412544.8A CN106410727B (en) 2016-06-12 2016-06-12 Conducting wire fixed platform stent

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610412544.8A CN106410727B (en) 2016-06-12 2016-06-12 Conducting wire fixed platform stent

Publications (2)

Publication Number Publication Date
CN106410727A CN106410727A (en) 2017-02-15
CN106410727B true CN106410727B (en) 2018-06-29

Family

ID=58005661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610412544.8A Active CN106410727B (en) 2016-06-12 2016-06-12 Conducting wire fixed platform stent

Country Status (1)

Country Link
CN (1) CN106410727B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110289569A (en) * 2019-07-30 2019-09-27 国网上海市电力公司 A kind of GIS terminal mounting device for training

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201157157Y (en) * 2008-02-20 2008-12-03 中铁十局集团有限公司 Operation chair for line rod
CN103236659A (en) * 2013-05-03 2013-08-07 国家电网公司 Near-pole maintenance hanging rack for power transmission line

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013162734A (en) * 2012-02-09 2013-08-19 Chugoku Electric Power Co Inc:The Jumper sleeve cover and method of connecting ground line to electric wire

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201157157Y (en) * 2008-02-20 2008-12-03 中铁十局集团有限公司 Operation chair for line rod
CN103236659A (en) * 2013-05-03 2013-08-07 国家电网公司 Near-pole maintenance hanging rack for power transmission line

Also Published As

Publication number Publication date
CN106410727A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN102420401B (en) Triangular insulating hanging fulcrum bar
CN102623926B (en) Distant equipotential tackle and method for realizing charged equipotential access by using same
CN105322463B (en) UHV transmission line strain insulator-string insulation outlet stretches flat ladder
CN102136693B (en) Method and device for realizing long-distance equal electric potential access of winch hanging basket guide rail
CN107069562B (en) Replacing insulator under electrified method and load transfer device
CN102664358B (en) Live replacement method for static contact of 220 kV flexible busbar
CN209626915U (en) One kind directly drawing following formula double back cable terminal pole
CN106410727B (en) Conducting wire fixed platform stent
CN104752996B (en) Method for live replacement of tension duplex whole-string insulators of 330kV power transmission line
CN103746316B (en) A kind of device and method of electrified replacing linear angle tower insulator string
CN201345512Y (en) 220KV double-circuit overhead tower-sharing circuit high-voltage strong-electric-field special tool
CN103500966B (en) 66kv disconnecting switch is to pipe bus charged disconnecting lead-in wire method
CN103944104A (en) Telescopic live bird nest dismantling sliding plate and live bird nest dismantling method
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential
CN202721387U (en) Special tool for changing split conductor spacer
CN218732775U (en) Ground potential cable jacking mechanism for insulator replacement operation
CN204376311U (en) The heavy electric power cable high-altitude of lifting formula is handed over across unfolding device
CN202534979U (en) Stay wire-free insulating pole holding apparatus
CN203690799U (en) Device for replacing suspension angle tower insulator string in live state
CN205159906U (en) Insulation of special high tension transmission line strain insulator -string is qualified for next round of competitions flexible flat terracedly
CN106129912A (en) A kind of drainage plate electric transmission line hot-line defect elimination power tool
CN103199474B (en) Method for 500KV large cross-section wire hot-line installation of phase to phase spacers
CN102255261A (en) Shifting device for two-circuit hot-line work of transmission line
CN205104688U (en) High -voltage line wire support
CN202572183U (en) Large-current telescopic high-altitude cable connecting clamp

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210610

Address after: 510030 Room 202, Mei Hua Road, Yuexiu District, Guangzhou, Guangdong, 202

Patentee after: GUANGZHOU ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd.

Address before: 510610 8th floor, Guangzhou Electric Power Design Institute, Tianhe beilinhe West Road, Tianhe District, Guangzhou City, Guangdong Province

Patentee before: GUANGZHOU ELECTRIC POWER DESIGN INSTITUTE

TR01 Transfer of patent right