CN106406962A - Wind power generation controller failed remote upgrade recovery method based on ARM - Google Patents

Wind power generation controller failed remote upgrade recovery method based on ARM Download PDF

Info

Publication number
CN106406962A
CN106406962A CN201610862157.4A CN201610862157A CN106406962A CN 106406962 A CN106406962 A CN 106406962A CN 201610862157 A CN201610862157 A CN 201610862157A CN 106406962 A CN106406962 A CN 106406962A
Authority
CN
China
Prior art keywords
upgrade
bootloader
arm
upgrading
app1
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610862157.4A
Other languages
Chinese (zh)
Inventor
黄晓军
刘显波
邵勤丰
王秉旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN ORIENT ELECTRIC AUTOMATIC CONTROL ENGINEERING Co Ltd
Original Assignee
SICHUAN ORIENT ELECTRIC AUTOMATIC CONTROL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN ORIENT ELECTRIC AUTOMATIC CONTROL ENGINEERING Co Ltd filed Critical SICHUAN ORIENT ELECTRIC AUTOMATIC CONTROL ENGINEERING Co Ltd
Priority to CN201610862157.4A priority Critical patent/CN106406962A/en
Publication of CN106406962A publication Critical patent/CN106406962A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1415Saving, restoring, recovering or retrying at system level
    • G06F11/1433Saving, restoring, recovering or retrying at system level during software upgrading
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates
    • G06F8/654Updates using techniques specially adapted for alterable solid state memories, e.g. for EEPROM or flash memories

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Security & Cryptography (AREA)
  • Quality & Reliability (AREA)
  • Stored Programmes (AREA)

Abstract

The invention discloses a wind power generation controller failed remote upgrade recovery method based on ARM. The wind power generation controller failed remote upgrade recovery method comprises (1) sending an upgrade instruction to an ARM processor, entering a Bootloader after the upgrade instruction is received; (2) sending a jump instruction to the Bootloader and jumping to an upgrade application APP1; (3) controlling the APP1 to receive upgrade data, erasing the FLASH address of the application to be upgraded first, then starting to upgrade the FLASH write-in of data, and finally obtaining the upgraded application APP2; (4) sending an upgrade complete instruction to the APP1, entering the Bootloader, and verifying the size of the APP2, if the verification result is correct, jumping to the APP2 and completing the upgrade; if the verification result is incorrect, waiting for a host computer to send a new upgrade instruction. According to the invention, the problem that after the upgrade process is interrupted, the system cannot hang up the upgrade task again is solved.

Description

The wind power generation controller remote upgrade recoverable method of failure based on ARM
Technical field
The present invention relates to wind turbine power generation technology, more particularly, to a kind of wind power generation controller remote upgrade mistake based on ARM Lose recoverable method.
Background technology
In order to rationally and effectively utilize wind energy, the blower fan of wind energy turbine set is scattered in the abundant area of each wind resource in wind energy turbine set Domain, the distance between each wind power generating set farther out, even if in the case that weather is fine, completes patrolling and examining also extremely of whole wind field Need less to drive more than a few hours, how easily the control system of wind power generating set to be carried out software upgrading be one very heavy The problem wanted.The primary control program remote upgrade technology of existing domestic controller is occurring in the case that escalation process is interrupted, far Journey upgrade function will be unable to hang up again, only goes to carry out manually upgrading on the spot to scene, not only wastes time and energy, also result in cost Increase.
The prior art that China Patent No. is " 200810045426.3 " and " 201310155776. 6 " is separately had to disclose respectively The remote upgrade method of wind power generating set, but above-mentioned prior art cannot be hung up after all there is remote upgrade failure and again rise The problem of level.For this reason, in the urgent need to recoverable technology after a kind of failure of wind power generation controller remote upgrade.
Content of the invention
It is an object of the invention to overcoming the above-mentioned problems in the prior art, providing and a kind of being sent out based on the wind-force of ARM The electric controller remote upgrade recoverable method of failure, the present invention solves that after being interrupted in program escalation process, system cannot Hang up the problem of upgrading task again, so that remote upgrade operation is more stable.
For achieving the above object, the technical solution used in the present invention is as follows:
A kind of based on ARM wind power generation controller remote upgrade failure recoverable method it is characterised in that:Walk including following Suddenly:
(1)Host computer sends upgrade command to arm processor, and arm processor enters Bootloader after receiving upgrade command;
(2)Host computer sends jump instruction to Bootloader, jumps to ROMPaq APP1;
(3)Control APP1 to receive upgrading data, after receiving success, first wipe the FLASH address of program to be upgraded, then start to upgrade The FLASH write of data, finally obtains program APP2 after upgrading;
(4)Host computer is sent completely upgrade command to APP1, and arm processor enters Bootloader, right in Bootloader The size of APP2 is verified, if check results are correct, jumps to APP2, upgrading completes;If check results are incorrect, Wait host computer to send new upgrade command in Bootloader, and repeat the above steps are until upgrading completes.
Described step(3)In, after the completion of upgrading data write, whether first detection upgrading data is complete, if completely, then enters Enter step(4).
Described step(3)In, the size of write upgrading data after the completion of upgrading data write.
Using it is an advantage of the current invention that:
In the present invention, ROMPaq APP1 is written to FLASH, then no matter because power down or other reason are all without to ROMPaq APP1 impacts.In addition, APP1 starts the erasing of program FLASH address to be upgraded again in the present invention after having received upgrading data With the FLASH write of upgrading data, and write the size of upgrading data after the completion of upgrading data write again so that controller Even if because the write operation that power down or other reason lead to does not complete the safety that yet will not jeopardize blower fan in escalation process.This The size of APP2 being because detecting write in Bootloader and the size whether being stored in data of upgrading in FLASH Cause, if unanimously just APP2 can be entered, if inconsistent, continue the upgrade command waiting host computer to send in Bootloader.Institute So that the present invention solves controller power down, serial ports disconnecting, host computer closing during system remote upgrade and rise After situations such as level computer is restarted cannot remote upgrade again problem.To the complexity reducing the upgrading of wind field master control system, plus The reliability of strong remote update system, fan operation safety, the maintenance cost reducing wind field all makes great sense, so that Obtain remote upgrade operation more stable.
Brief description
Fig. 1 is the logic chart of the present invention.
Specific embodiment
A kind of wind power generation controller remote upgrade recoverable method of failure based on ARM, comprises the steps:
(1)Host computer to arm processor send upgrade command, after arm processor receives upgrade command, arm processor restart into Enter Bootloader.
(2)Host computer sends jump instruction to Bootloader at the appointed time, jumps to ROMPaq APP1.Its In, if host computer does not send jump instruction to Bootloader at the appointed time then it represents that not needing to upgrade, automatically jump to The normal operating conditions of wind power generation controller.
(3)Host computer first sends upgrading data to APP1, controls APP1 to receive, after APP1 receives success, host computer to APP1 sends the instruction of the FLASH address wiping program to be upgraded, and APP1 treats the FLASH of ROMPaq after receiving erasing instruction Address is wiped, and behind erasing FLASH address, host computer sends write instruction to APP1 again, and the FLASH starting upgrading data writes Enter, program APP2 after APP1 completes the FLASH write of upgrading data, after being upgraded.Wherein, complete in upgrading data write The size of upgrading data must be write afterwards.
In this step, after the completion of upgrading data write, to host computer, host computer sends inspection to APP1 feedback write result again Survey instruction, whether complete for detection upgrading data, if upgrading data write is detected is complete, enter step(4)If, inspection The upgrading data measuring write is imperfect, then host computer resends upgrading data.
(4)Host computer is sent completely upgrade command to APP1, and arm processor reboots into Bootloader, In Bootloader, the size of program APP2 after upgrading is verified, to guarantee the data integrity of APP2, if verification knot Fruit is correct, and that is, the size of APP2 and the in the same size of data of upgrading, then jump to APP2, represents that upgrading completes, wind-power electricity generation control Device normal work processed;If check results are incorrect, that is, the cause not of uniform size of the size of APP2 and upgrading data, then exist Wait host computer to send new upgrade command in Bootloader, and repeat the above steps are until upgrading completes.
The present invention adopts above-mentioned steps, solves and controller power down, serial ports connection during system remote upgrade Interrupt, host computer close and upgrading computer situations such as restart after cannot remote upgrade again problem.To minimizing wind field master control The complexity of system upgrade, strengthens the reliability of remote update system, fan operation safety, reduces the maintenance cost of wind field all Make great sense, so that remote upgrade operation is more stable.

Claims (3)

1. a kind of based on ARM wind power generation controller remote upgrade failure recoverable method it is characterised in that:Including as follows Step:
(1)Host computer sends upgrade command to arm processor, and arm processor enters Bootloader after receiving upgrade command;
(2)Host computer sends jump instruction to Bootloader, jumps to ROMPaq APP1;
(3)Control APP1 to receive upgrading data, after receiving success, first wipe the FLASH address of program to be upgraded, then start to upgrade The FLASH write of data, finally obtains program APP2 after upgrading;
(4)Host computer is sent completely upgrade command to APP1, and arm processor enters Bootloader, right in Bootloader The size of APP2 is verified, if check results are correct, jumps to APP2, upgrading completes;If check results are incorrect, Wait host computer to send new upgrade command in Bootloader, and repeat the above steps are until upgrading completes.
2. the wind power generation controller remote upgrade recoverable method of failure based on ARM as claimed in claim 1, its feature It is:Described step(3)In, after the completion of upgrading data write, whether first detection upgrading data is complete, if completely, enters back into Step(4).
3. the wind power generation controller remote upgrade recoverable method of failure based on ARM as claimed in claim 1, its feature It is:Described step(3)In, the size of write upgrading data after the completion of upgrading data write.
CN201610862157.4A 2016-09-29 2016-09-29 Wind power generation controller failed remote upgrade recovery method based on ARM Pending CN106406962A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610862157.4A CN106406962A (en) 2016-09-29 2016-09-29 Wind power generation controller failed remote upgrade recovery method based on ARM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610862157.4A CN106406962A (en) 2016-09-29 2016-09-29 Wind power generation controller failed remote upgrade recovery method based on ARM

Publications (1)

Publication Number Publication Date
CN106406962A true CN106406962A (en) 2017-02-15

Family

ID=59228287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610862157.4A Pending CN106406962A (en) 2016-09-29 2016-09-29 Wind power generation controller failed remote upgrade recovery method based on ARM

Country Status (1)

Country Link
CN (1) CN106406962A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109142844A (en) * 2018-09-13 2019-01-04 卡斯柯信号有限公司 A kind of combined-voltage intelligent comprehensive collector
CN110164394A (en) * 2019-06-04 2019-08-23 深圳市华星光电技术有限公司 Sequence controller and timing control panel
CN110597532A (en) * 2019-08-06 2019-12-20 厦门科灿信息技术有限公司 Data acquisition module, firmware upgrading method thereof and storage medium
CN111782246A (en) * 2020-07-03 2020-10-16 常州东晟合众节能科技有限公司 Embedded program upgrading method of multi-node equipment based on bus
CN113446151A (en) * 2021-06-17 2021-09-28 东方电气风电有限公司 Remote upgrade control system and method for wind generating set

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101303592A (en) * 2008-06-30 2008-11-12 电子科技大学 Novel method of wind generating set remote maintenance
CN103226334A (en) * 2013-04-28 2013-07-31 东方电气集团东方汽轮机有限公司 Hardware safety chain control method in upgrade process of control system of wind generating set
CN103761117A (en) * 2013-12-24 2014-04-30 广东鼎燊科技有限公司 Induction cooker upgrading method
CN104090796A (en) * 2014-07-08 2014-10-08 成都万维图新信息技术有限公司 Embedded device program updating method and system
CN105589767A (en) * 2015-12-21 2016-05-18 北京时代民芯科技有限公司 System power failure protection realizing method for NAND FLASH

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101303592A (en) * 2008-06-30 2008-11-12 电子科技大学 Novel method of wind generating set remote maintenance
CN103226334A (en) * 2013-04-28 2013-07-31 东方电气集团东方汽轮机有限公司 Hardware safety chain control method in upgrade process of control system of wind generating set
CN103761117A (en) * 2013-12-24 2014-04-30 广东鼎燊科技有限公司 Induction cooker upgrading method
CN104090796A (en) * 2014-07-08 2014-10-08 成都万维图新信息技术有限公司 Embedded device program updating method and system
CN105589767A (en) * 2015-12-21 2016-05-18 北京时代民芯科技有限公司 System power failure protection realizing method for NAND FLASH

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109142844A (en) * 2018-09-13 2019-01-04 卡斯柯信号有限公司 A kind of combined-voltage intelligent comprehensive collector
CN109142844B (en) * 2018-09-13 2024-04-26 卡斯柯信号有限公司 Intelligent comprehensive collector for AC/DC voltage
CN110164394A (en) * 2019-06-04 2019-08-23 深圳市华星光电技术有限公司 Sequence controller and timing control panel
CN110164394B (en) * 2019-06-04 2021-08-06 Tcl华星光电技术有限公司 Time sequence controller and time sequence control board
CN110597532A (en) * 2019-08-06 2019-12-20 厦门科灿信息技术有限公司 Data acquisition module, firmware upgrading method thereof and storage medium
CN111782246A (en) * 2020-07-03 2020-10-16 常州东晟合众节能科技有限公司 Embedded program upgrading method of multi-node equipment based on bus
CN113446151A (en) * 2021-06-17 2021-09-28 东方电气风电有限公司 Remote upgrade control system and method for wind generating set

Similar Documents

Publication Publication Date Title
CN106406962A (en) Wind power generation controller failed remote upgrade recovery method based on ARM
CN106227572A (en) A kind of frequency converter control system programme upgrade method
US8997090B2 (en) Installing an operating system in a host system
US9983791B2 (en) System management controller and method of configuration file backup and recovery
CN103150188B (en) The compatible video card fast initializing method of the x86 of non-x 86 instruction set computer
US11698741B2 (en) Updating operating system images of inactive compute instances
CN105183515A (en) Cloud deck firmware updating method and device
CN103377094A (en) Abnormity monitoring method and abnormity monitoring device
CN102184111B (en) The equipment of operating system online upgrading method and tape operation system
CN104199694A (en) Automatic operating system installation and recovery method based on PXE
CN109002310A (en) firmware upgrade method
CN105677398A (en) Universal embedded computer software on-line upgrading method
CN105760191A (en) Embedded system equipment programming mass production method
US9594899B2 (en) Apparatus and method for managing operation of a mobile device
CN110780942A (en) System starting method and device, node equipment and computer readable storage medium
CN112433769A (en) BMC starting method and device, computer equipment and storage medium
CN104978223A (en) Method for implementing upgrade of device firmware in Web manner
CN111338698A (en) Method and system for accurately booting server by BIOS (basic input output System)
CN110995724A (en) Remote upgrading method for whole vehicle controller of new energy bus
CN113741934A (en) Inverter program upgrading method
CN106843022A (en) A kind of method for improving embedded control system output reliability
CN104102505A (en) Computer power-on method
CN103177213B (en) A kind of software vulnerability restorative procedure and system
CN104346239A (en) Method and device for recovering anomaly of application program in embedded system
CN110502267A (en) Update method, device, equipment and the storage medium of appliance applications

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215