CN106400647A - Draining pipe applied to drainage and reinforcement of existing expressway side slope and construction method of draining pipe - Google Patents

Draining pipe applied to drainage and reinforcement of existing expressway side slope and construction method of draining pipe Download PDF

Info

Publication number
CN106400647A
CN106400647A CN201610841270.4A CN201610841270A CN106400647A CN 106400647 A CN106400647 A CN 106400647A CN 201610841270 A CN201610841270 A CN 201610841270A CN 106400647 A CN106400647 A CN 106400647A
Authority
CN
China
Prior art keywords
drain pipe
draining pipe
pipe
side slope
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610841270.4A
Other languages
Chinese (zh)
Other versions
CN106400647B (en
Inventor
徐令宇
潘冬冬
李永义
陈炜昀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
Original Assignee
Nanjing Tech University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University filed Critical Nanjing Tech University
Priority to CN201610841270.4A priority Critical patent/CN106400647B/en
Publication of CN106400647A publication Critical patent/CN106400647A/en
Application granted granted Critical
Publication of CN106400647B publication Critical patent/CN106400647B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/005Drainage conduits
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a draining pipe applied to drainage and reinforcement of an existing expressway side slope and a construction method of the draining pipe. The head of the draining pipe is in a flat shovel shape; the draining pipe body is provided with rectangular holes and circular holes, wherein the rectangular holes and the circular holes are triangularly distributed along the longitudinal direction and are distributed at an interval in the same rectilinear direction; at least four holes are uniformly distributed along each circle of the circumferential direction of the draining pipe body; the tail of the draining pipe has one arc section provided with no hole, and the rest arc sections are provided with at least three holes which are uniformly distributed. The construction method of the draining pipe comprises the following steps: (1) taking the flat shovel end of each draining pipe as an inserting end; (2) taking the arc section, provided with no hole, of each draining pipe as a bottom surface; (3) obliquely inserting the flat shovel end of each draining pipe at a gradient of 20% into a stable soil layer of the side slope so as to form rectangular or triangular arrangement at the slope surface. According to the draining pipe disclosed by the invention, the front section of the draining pipe is set in a flat shovel shape, so the draining pipe can be beneficially inserted into the side slope, more convenient and quicker construction can be realized, and the aim of rapid drainage and reinforcement of the side slope is fulfilled.

Description

Drain pipe for existing expressway slope draining and reinforcing and its construction method
Technical field
The invention belongs to slope treatment and protection technology field, be related to a kind of for existing expressway slope draining and The drain pipe reinforced and its construction method.
Background technology
At present, the highway mileage open to traffic of China, more than 120,000 kilometers, occupies the first in the world it is contemplated that following 13 is last Mileage open to traffic is up to 160,000 kilometers.The new challenge that so huge freeway net proposes to the maintenance of road.
Continuous heavy showers is one of main inducing of causing expressway slope to cave in, and continuous heavy showers causes embankment underground Water level goes up, and the weight of one side slide mass increases, on the other hand, the intensity decreases of the soil body, and therefore, the safety coefficient fall of side slope Low, cave in thus there occurs.It is different from traditional slope project, expressway slope, after caving in, needs quickly to be repaiied Answer and administer, to be open to traffic as early as possible and to relieve traffic congestion.And solve this problem key challenge is how that side slope is carried out effectively Ground Quick drainage and reinforcing.
The number of patent application that State Intellectual Property Office announced on 2 20th, 2013 is 201220429346.X, name Claim:A kind of utility model patent of the white-out structure reducing slope soil level of ground water and moisture content, this patent proposes following skill Art scheme:Multiple drain pipies are set on the full slope in slope soil surface, multiple drain pipies are according to rectangular array or quincunx array cloth Put, although this patent can play the effect of draining it is impossible to enough rapidly reinforce expressway slope.
The number of patent application that State Intellectual Property Office announced on March 13rd, 2013 is 201210543882.7, name Claim:A kind of system for automatically draining water on side slope and its patent of invention of method, this patent proposes following technical scheme:Including energy storage dress Put, triggering device and drainage arrangement.But these devices need before building side slope, complete energy storage device, triggering device and Building of drainage arrangement, cannot implement this patent to existing expressway slope, thus to existing expressway slope no Method reaches Quick drainage and reinforcing.
Content of the invention
The present invention provides a kind of drain pipe being applied to existing highway Quick drainage and reinforcing and its construction method, existing Following technical scheme is proposed:
A kind of drain pipe for existing expressway slope draining and reinforcing, described drain pipe tube head is flat chisel shape, institute State drain pipe pipe shaft and be provided with the rectangular opening of distribution triangular in shape and circular port and described rectangular opening and circular port in a longitudinal direction Spaced apart in same rectilinear direction, along the circumferential direction every ring is uniformly distributed at least 4 holes, described row to described drain pipe pipe shaft Water pipe pipe tail has the segmental arc not apertured that a central angle is 90 °~130 °, and along the circumferential direction every ring is evenly distributed to remaining segmental arc Few 3 holes.
Further improvement of these options, along the circumferential direction every ring is distributed 6 holes, described draining to described drain pipe pipe shaft Pipe pipe tail has the segmental arc not apertured that a central angle is 120 °, and along the circumferential direction every ring is uniformly distributed 5 holes to remaining segmental arc.
Further improvement of these options, drain pipe external diametrical extent is 40 100mm, and wall thickness range is 2 5mm, rectangle The longitudinal size in hole is 20-60mm, and the scope of the diameter of lateral dimension and circular port is 2 5mm, adjacent rectangular opening and circle Longitudinal center's spacing between shape hole is the longitudinal size of rectangular opening.
Further improvement of these options, described drain pipe is a kind of steel pipe, and steel grade selects Q235, in drain pipe Outer surface is zinc-plated.
A kind of construction method for existing expressway slope draining and the drain pipe of reinforcing described in such scheme is:
(1) using the flat chisel end of described drain pipe as insertion end;
(2) segmental arc being 90 °~130 ° using described drain pipe central angle is as bottom surface;
(3) enter in stability of slope soil layer with 2% gradient oblique cutting, on domatic and with rectangle or triangular arrangement.
The beneficial effect that the present invention obtains:
(1) leading portion of drain pipe is set to flat chisel shape, beneficial to inserting in side slope drain pipe, construction is got up convenient fast Victory, pipe shaft arranges multiple osculums, discharges side slope beneficial to by the water in side slope by drain pipe, by the described drainage pipe end center of circle Angle be 90 °~130 ° of segmental arc as bottom surface in order to avoid the water penetration that flows out to the surface of side slope.
(2) rectangular opening being interspersed and circular port are designed on pipe shaft longitudinal direction, comparing is all the row of rectangular opening Water pipe, the drain pipe of the present invention rigidly will be well it is not easy to fracture, and comparing is all the drain pipe of circular port, and drainage effect will be more Smooth.
(3) because the very little of the aperture design of side slope is it is not necessary to by fixing a drainpipe in side slope boring, this ensure that The integrity of side slope, inserts drain pipe, due to the effect of extruding, the more consolidation of the soil around drain pipe, makes side slope firmer, Thus serving the reinforcing to existing side slope.
(4) select steel pipe as drain pipe, surfaces externally and internally is zinc-plated antirust so that the durability of drain pipe is preferable, Neng Goujie About maintenance cost.
(5) operational approach, simply it is only necessary to insert in side slope drain pipe it is not necessary to other hole, increased necessary Simplicity.
Brief description
Fig. 1 is a kind of front view for existing expressway slope draining and the drain pipe of reinforcing of the present invention.
Fig. 2 is a kind of attached view for existing expressway slope draining and the drain pipe of reinforcing of the present invention.
Fig. 3 is a kind of stage casing pipe shaft for existing expressway slope draining and the drain pipe of reinforcing of the present invention Sectional view.
Fig. 4 is a kind of latter end pipe shaft for existing expressway slope draining and the drain pipe of reinforcing of the present invention Sectional view.
Reference:Rectangular opening -1;Circular port -2;Drain pipe tube head -3;Drain pipe pipe shaft -4;Drain pipe pipe tail -5.
Specific embodiment
Technological means, creation characteristic, reached purpose and effect for making the present invention realize are easy to understand, with reference to Specific embodiment, is expanded on further the present invention.
Embodiment 1
A kind of drain pipe for existing expressway slope draining and reinforcing, described drain pipe tube head 3 is flat chisel shape, institute State rectangular opening 1 and circular port 2 and described rectangular opening 1 and the circle that drain pipe pipe shaft 4 is provided with distribution triangular in shape in a longitudinal direction Shape hole 2 is spaced apart in same rectilinear direction, and along the circumferential direction every ring is uniformly distributed 4 holes to described drain pipe pipe shaft 4, described Drain pipe pipe tail 5 has the segmental arc not apertured that a central angle is 130 °, and along the circumferential direction every ring is uniformly distributed 3 to remaining segmental arc Hole.Wherein drain pipe external diameter is 40mm, and wall thickness is 2mm, and the longitudinal size of rectangular opening 1 is 20mm, lateral dimension and circular port 2 Diameter is 2mm, and the longitudinal center's spacing between adjacent rectangular opening 1 and circular port 2 is the longitudinal size of rectangular opening 1.
In the present embodiment, described drain pipe is a kind of steel pipe, and steel grade selects Q235, and drain pipe surfaces externally and internally plates Zinc.
The construction method of above-mentioned drain pipe is:(1) using the flat chisel end of described drain pipe as insertion end;(2) by described row Water pipe pipe tail 5 central angle is 90 ° of segmental arc as bottom surface;(3) enter in stability of slope soil layer with 2% gradient oblique cutting, with square Arrangement, every square metre of side slope inserts 9 drain pipies.
Embodiment 2
A kind of drain pipe for existing expressway slope draining and reinforcing, described drain pipe tube head 3 is flat chisel shape, institute State drain pipe pipe shaft 4 and be provided with rectangular opening 1 and circular port 2 and described rectangular opening 1 and circle along horizontal direction distribution triangular in shape Shape hole 2 is spaced apart in same rectilinear direction, and along the circumferential direction every ring is uniformly distributed 6 holes to described drain pipe pipe shaft 4, described Drain pipe pipe tail 5 has the segmental arc not apertured that a central angle is 120 °, and along the circumferential direction every ring is uniformly distributed 5 to remaining segmental arc Hole.Wherein drain pipe external diameter is 70mm, and wall thickness is 3mm, and the longitudinal size of rectangular opening 1 is 30mm, lateral dimension and circular port 2 Diameter be 4mm, the longitudinal center's spacing between adjacent rectangular opening 1 and circular port 2 be rectangular opening 1 longitudinal size.
In the present embodiment, described drain pipe is a kind of steel pipe, and steel grade selects Q235, and drain pipe surfaces externally and internally plates Zinc.
The construction method of above-mentioned drain pipe is:(1) using the flat chisel end of described drain pipe as insertion end;(2) by described row Water pipe pipe tail 5 central angle is 120 ° of segmental arc as bottom surface;(3) enter in stability of slope soil layer with 2% gradient oblique cutting, with triangle Arrangement, every square metre of side slope inserts 4 drain pipies.
Embodiment 3
A kind of drain pipe for existing expressway slope draining and reinforcing, described drain pipe tube head 3 is flat chisel shape, institute State rectangular opening 1 and circular port 2 and described rectangular opening 1 and the circle that drain pipe pipe shaft 4 is provided with distribution triangular in shape in a longitudinal direction Shape hole 2 is spaced apart in same rectilinear direction, and along the circumferential direction every ring is uniformly distributed 8 holes to described drain pipe pipe shaft 4, described Drain pipe pipe tail 5 has the segmental arc not apertured that a central angle is 90 °, and along the circumferential direction every ring is uniformly distributed 7 holes to remaining segmental arc. Wherein drain pipe external diameter is 100mm, and wall thickness is 5mm, and the longitudinal size of rectangular opening 1 is 40mm, lateral dimension and circular port 2 straight Footpath is 5mm, and the longitudinal center's spacing between adjacent rectangular opening 1 and circular port 2 is the longitudinal size of rectangular opening 1.
In the present embodiment, described drain pipe is a kind of steel pipe, and steel grade selects Q235, and drain pipe surfaces externally and internally plates Zinc.
The construction method of above-mentioned drain pipe is:(1) using the flat chisel end of described drain pipe as insertion end;(2) by described row Water pipe pipe tail 5 central angle is 90 ° of segmental arc as bottom surface;(3) enter in stability of slope soil layer with 2% gradient oblique cutting, every square metre Side slope inserts 1 drain pipe.
In the present embodiment, described drain pipe is a kind of steel pipe, and steel grade selects Q235, and drain pipe surfaces externally and internally plates Zinc.
The construction method of above-mentioned drain pipe is:(1) using the flat chisel end of described drain pipe as insertion end;(2) by described row Water pipe end 5 central angle is 90 ° of segmental arc as bottom surface;(3) enter in stability of slope soil layer with 2% gradient oblique cutting, every square metre Side slope inserts 1 drain pipe.
Based on above-described embodiment, the leading portion 1 of drain pipe is set to flat chisel shape, inserts in side slope beneficial to by drain pipe, construct Get up more convenient, pipe shaft arranges multiple osculums, beneficial to by the water of side slope soil the inside, side slope is discharged by drain pipe, because Very little for aperture design, it is easy to make to penetrate soil layer, makes the soil more consolidation around drain pipe, thus strengthening side slope soil Layer, makes side slope be not easy to cave in.
Will be zinc-plated for drain pipe surfaces externally and internally antirust so that the durability of described drain pipe preferably, can save maintenance cost.
Using flat chisel end as insertion end, insert in side slope beneficial to by drain pipe, construct more convenient, will be described Drainage pipe end central angle be 90 °~130 ° of segmental arc as bottom surface in order to avoid the water penetration flowing out to side slope Surface.
Those of ordinary skill in the art it should be appreciated that above embodiment be intended merely to illustrate the present invention, And be not used as limitation of the invention, the change as long as in the spirit of the present invention, to embodiment described above Change, modification all will fall in scope of the presently claimed invention.

Claims (5)

1. a kind of drain pipe for existing expressway slope draining and reinforcing it is characterised in that:Described drain pipe tube head is Flat chisel shape, described drain pipe pipe shaft is provided with the rectangular opening of distribution triangular in shape and circular port and described rectangular opening in a longitudinal direction Spaced apart in same rectilinear direction with circular port, along the circumferential direction every ring is uniformly distributed at least 4 to described drain pipe pipe shaft Hole, described drain pipe pipe tail has the segmental arc not apertured that a central angle is 90 °~130 °, and along the circumferential direction every ring is equal for remaining segmental arc At least 3 holes of even distribution.
2. a kind of drain pipe for existing expressway slope draining and reinforcing according to claim 1, its feature exists In:Along the circumferential direction every ring is distributed 6 holes to described drain pipe pipe shaft, and described drain pipe pipe tail has the segmental arc that a central angle is 120 ° Not apertured, along the circumferential direction every ring is uniformly distributed 5 holes to remaining segmental arc.
3. a kind of drain pipe for existing expressway slope draining and reinforcing according to claim 1, its feature exists In:Drain pipe external diametrical extent is 40 100mm, and wall thickness range is 2 5mm, and the longitudinal size of rectangular opening is 20-60mm, horizontal chi The scope of the very little diameter with circular port is 2 5mm, and the longitudinal center's spacing between adjacent rectangular opening and circular port is equal to square The longitudinal size in shape hole.
4. a kind of drain pipe for existing expressway slope draining and reinforcing according to claim 1, its feature exists In:Described drain pipe is a kind of steel pipe, and steel grade selects Q235, and drain pipe surfaces externally and internally is zinc-plated.
5. any one according to claim 1-4 is used for the drain pipe of existing expressway slope draining and reinforcing, and it is special Levy and be:Its construction method is:
(1) using the flat chisel end of described drain pipe as insertion end;
(2) segmental arc being 90 °~130 ° using described drain pipe central angle is as bottom surface;
(3) enter in stability of slope soil layer with 2% gradient oblique cutting, on domatic and with rectangle or triangular arrangement.
CN201610841270.4A 2016-09-21 2016-09-21 The drainpipe and its construction method for draining and reinforcing for existing expressway slope Active CN106400647B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610841270.4A CN106400647B (en) 2016-09-21 2016-09-21 The drainpipe and its construction method for draining and reinforcing for existing expressway slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610841270.4A CN106400647B (en) 2016-09-21 2016-09-21 The drainpipe and its construction method for draining and reinforcing for existing expressway slope

Publications (2)

Publication Number Publication Date
CN106400647A true CN106400647A (en) 2017-02-15
CN106400647B CN106400647B (en) 2019-06-14

Family

ID=57996939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610841270.4A Active CN106400647B (en) 2016-09-21 2016-09-21 The drainpipe and its construction method for draining and reinforcing for existing expressway slope

Country Status (1)

Country Link
CN (1) CN106400647B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142923A (en) * 2017-05-25 2017-09-08 湖南科鑫电力设计有限公司 Drainpipe and the method that side slope downslide is handled using the drainpipe

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2033019U (en) * 1988-07-02 1989-02-22 合肥工业大学 Strip water-filted pipe
CN2377348Y (en) * 1999-04-19 2000-05-10 山西省榆次市水泥制管厂 Large bore water filtering tube
CN2392060Y (en) * 1998-12-02 2000-08-16 兰州鼎泰塑料有限公司 Plastic double wall corrugated tube with holes
JP2009052377A (en) * 2007-08-01 2009-03-12 Hidemasa Ota Collapse prevention method of construction of bank
CN202969284U (en) * 2012-11-29 2013-06-05 海南大学 Water discharging soil nail and side slope water discharging system
CN203569547U (en) * 2013-10-30 2014-04-30 柏发忠 Seepage-drainage pipe
CN204139159U (en) * 2014-10-09 2015-02-04 宿迁华夏建设(集团)工程有限公司 Side slope deep layer gutter
CN204826144U (en) * 2015-08-12 2015-12-02 常德七星泰塑业有限公司 Infiltration drain pipe
CN205444395U (en) * 2015-12-30 2016-08-10 广东中科华冉智网新材料科技有限公司 Be equipped with drain pipe in hole of permeating water on pipe wall
CN205557323U (en) * 2016-04-25 2016-09-07 山东畅通路桥股份有限公司 Hinge joint drainage structures

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2033019U (en) * 1988-07-02 1989-02-22 合肥工业大学 Strip water-filted pipe
CN2392060Y (en) * 1998-12-02 2000-08-16 兰州鼎泰塑料有限公司 Plastic double wall corrugated tube with holes
CN2377348Y (en) * 1999-04-19 2000-05-10 山西省榆次市水泥制管厂 Large bore water filtering tube
JP2009052377A (en) * 2007-08-01 2009-03-12 Hidemasa Ota Collapse prevention method of construction of bank
CN202969284U (en) * 2012-11-29 2013-06-05 海南大学 Water discharging soil nail and side slope water discharging system
CN203569547U (en) * 2013-10-30 2014-04-30 柏发忠 Seepage-drainage pipe
CN204139159U (en) * 2014-10-09 2015-02-04 宿迁华夏建设(集团)工程有限公司 Side slope deep layer gutter
CN204826144U (en) * 2015-08-12 2015-12-02 常德七星泰塑业有限公司 Infiltration drain pipe
CN205444395U (en) * 2015-12-30 2016-08-10 广东中科华冉智网新材料科技有限公司 Be equipped with drain pipe in hole of permeating water on pipe wall
CN205557323U (en) * 2016-04-25 2016-09-07 山东畅通路桥股份有限公司 Hinge joint drainage structures

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142923A (en) * 2017-05-25 2017-09-08 湖南科鑫电力设计有限公司 Drainpipe and the method that side slope downslide is handled using the drainpipe

Also Published As

Publication number Publication date
CN106400647B (en) 2019-06-14

Similar Documents

Publication Publication Date Title
CN204401635U (en) There is the slope retaining net of thorn-like pole
CN103590836B (en) Method for processing tunnel collapse caused by shallow-buried excavation
CN106759274B (en) A kind of semi-hollow stake and its construction method with draining AsA -GSH cycle
CN104674802B (en) Prestressing force rubble anchorage pile and landslide control construction method thereof
CN109356046A (en) Grid steel construction keeps off stone walling and construction method
CN104563147B (en) Composite structure pile foundation applied to karst area and construction method of composite structure pile foundation
CN203498721U (en) Three-dimensional drainage roadbed structure preventing damage by water of road in cold region
CN202672097U (en) Protecting slope building block capable of being locked and protecting slope baffling wall
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN108343035A (en) River construction method is worn under shallow tunnel
CN106400647A (en) Draining pipe applied to drainage and reinforcement of existing expressway side slope and construction method of draining pipe
CN204825931U (en) Protective structure is administered to side slope
CN208039273U (en) A kind of mountain area high ferro slope surface supporting and retaining system safeguard structure
CN203668942U (en) Pile protective self-hanging thin plate in supporting structure of deep foundation pit
CN205576950U (en) Prestressing force combined method highway high slope supporting construction
KR102179660B1 (en) Slope reinforcing apparatus
CN207659954U (en) A kind of novel cut slope faces upward inclined osculum
CN208167783U (en) Gear mud wall composite structure
CN101122129B (en) Indented surface water discharging pile with sand lining
CN107217608B (en) Town road edge water seepage mechanism and its construction method
CN105275001A (en) Novel replaceable hard and rigid combined double-layer curved-grain net-shaped pervious pipe for slope
CN202672070U (en) Novel narrow body reinforced concrete guardrail
RU2452815C2 (en) Multi-root soil anchor
KR101081564B1 (en) Using flexible pipes leaking vertical green terraced retaining wall
CN103999592A (en) Method for avoiding vegetation degradation of acid mine waste rock yard

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant