CN106395640A CN201611013070.6A CN201611013070A CN106395640A CN 106395640 A CN106395640 A CN 106395640A CN 201611013070 A CN201611013070 A CN 201611013070A CN 106395640 A CN106395640 A CN 106395640A
Authority
CN
China
Prior art keywords
transformer
support
rail
installation
bracket according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611013070.6A
Other languages
English (en)
Other versions
CN106395640B (zh
Inventor
吴军
陈连君
华亮亮
张军
韩慧
于泽龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongliao Electric Co Of State Grid Eastern Inner Mongolia Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Tongliao Electric Co Of State Grid Eastern Inner Mongolia Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongliao Electric Co Of State Grid Eastern Inner Mongolia Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Tongliao Electric Co Of State Grid Eastern Inner Mongolia Electric Power Co Ltd
Priority to CN201611013070.6A priority Critical patent/CN106395640B/zh
Publication of CN106395640A publication Critical patent/CN106395640A/zh
Application granted granted Critical
Publication of CN106395640B publication Critical patent/CN106395640B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

本发明涉及一种电力设备,即一种变压器装卸支架,包括由立柱(2)和横梁构成的立体支架(1),其特征是:所述支架(1)上面沿两侧设有纵向滑道(4),纵向滑道(4)上面设有纵向滑车(5),纵向滑车(5)设有横向滑道(6),横向滑道(6)上配装横向滑车(7),横向滑车(7)上面装有卷扬机(8)。有益效果是:能快速完成变压器的安装和拆卸,占用空间小、无触电风险、起吊速度快、安全可靠、结构简单、操作方便,可望替代吊车和倒链成为变台建设和维护的首选设备。

Description

变压器装卸支架
技术领域
本发明涉及一种电力设备,即一种变压器装卸支架。
背景技术
配电变压器的安装及拆卸是电力设施维护的重要作业,目前,这项作业主要靠两种工具,一种是吊车,另一种是人工倒链。吊车受作业空间限制和与安全距离限制,有时不能使用。人工倒链需在变台近位绑扎起吊横梁,存在触电风险,而且起吊速度很低,效率低下,作业时间过长。
发明内容
本发明的目的是提供一种占用空间小、无触电风险、起吊速度快、安全可靠、结构简单、操作方便的变压器装卸支架。
上述目的是由以下技术方案实现的:研制一种变压器装卸支架,包括由立柱和横梁构成的立体支架,其特点是:所述支架上面沿两侧设有纵向滑道,纵向滑道上面设有纵向滑车,纵向滑车设有横向滑道,横向滑道上配装横向滑车,横向滑车上面装有卷扬机。
所述支架的中部两侧设有可拆卸的支撑梁上面配装有两条钢轨,钢轨为可随时装卸的组合部件,钢轨的长度大于支架的长度。
所述钢轨放在支撑梁的上面,一端备有可以与支撑梁相固连的锁卡。
所述立柱的下端设有吊索,吊索的下端设置托板,托板的下面设有滚轮。
所述支架的立柱下部设有调高套管。
所述支柱下端装有地轮。
所述地轮是万向轮。
本发明的有益效果是:能快速完成变压器的安装和拆卸,占用空间小、无触电风险、起吊速度快、安全可靠、结构简单、操作方便,可望替代吊车和倒链成为变台建设和维护的首选设备。
附图说明
图1是一种实施例的主视图;
图2是这种实施例的俯视图;
图3是这种实施例的一种工作状态的主视图;
图4是这种实施例的一种工作状态的俯视图。
图中可见:支架1,立柱2,横梁3,纵向滑道4,纵向滑车5,横向滑道6,横向滑车7,卷扬机8,吊索9,变压器10,钢轨11,支撑梁12,调高套管13,托板14,滚轮15,地轮16,锁卡17。
具体实施方式
如图1、图2所示,这种变压器装卸支架1,包括由立柱2和横梁3构成的立体支架1,这里的立体支架1是构成立方体的框架,包括长方体框架。也可以是下大上小的梯形或椎体框架。其特点是:所述支架上面沿两侧设有纵向滑道4,纵向滑道4上面设有纵向滑车5,纵向滑车5设有横向滑道6,横向滑道6上配装横向滑车7,横向滑车7上面装有卷扬机8。显然,卷扬机8可以沿纵向滑道4和横向滑道6改变位置,到达纵向滑道下面的任何位置。
用这种支架安装变压器时,先把支架1安装在适当的位置,卷扬机8沿纵向滑道4和横向滑道6调整位置,运输变压器的车辆最好能够进入支架1下方,把变压器10与卷扬机8相对。再用吊索9束缚变压器10,开动卷扬机8,即可把变压器10吊起,达到所需要的高度即可安装到变台上。
在上述基础上,可以进一步改进:所述支架1的中部两侧设有可拆卸的支撑梁12,上面配装有两条钢轨11。钢轨11是可随时装卸的组合部件,可以随时安装或卸下,可以在支撑梁12上滑动而改变位置,两支钢轨11的距离可以改变。钢轨11的长度要大于支架1的长度,钢轨11一端最好备有可以与支撑梁12相固连的锁卡17。锁卡17的形式很多,图中仅列举一种U型螺栓式的锁卡17,可以通过连板和螺母把钢轨和支撑梁固定连接。
在作业开始时,为了便于运送变压器的车辆要进入支架1,应抽下钢轨11。当变压器10吊起,运送车辆驶离之后,可以如图1、图2所示,把两支钢轨11放到支撑梁12上面。当变压器10起吊高于变台以后,就可以如图3、图4所示,把两支钢轨11滑动到变压器10的下面,最好把钢轨的一端向变台方向拉出,使之接近变台。同时利用锁卡17把钢轨远离变台的一端固定在支撑梁12上。这样,就可以把变压器10沿钢轨11推到变台上面。
在拆卸变压器时,反向参照上述做法,就可以顺利的完成拆卸作业。
为了进一步优化设备的性能,可以在吊索9的下端设置托板14,托板14的下面设有滚轮15。吊装变压器10的时候,托板14置于变压器之下,可使吊装更加平稳,减轻吊索对变压器壳体的磨损。在变压器10落到钢轨上面时,滚轮15与钢轨接触,滑动非常省力。
为了适应不同高度的需求,支架1的立柱2下部最好设有调高套管13,可以调整支架的高度。支柱12下端最好装有地轮16,地轮16最好是万向轮,以便于移动。
上述卷扬机的动力可以是电动,也可以是汽油机或柴油机,也可以采用液压装置进行起吊。

Claims (7)

1.一种变压器装卸支架,包括由立柱(2)和横梁构成的立体支架(1),其特征是:所述支架(1)上面沿两侧设有纵向滑道(4),纵向滑道(4)上面设有纵向滑车(5),纵向滑车(5)设有横向滑道(6),横向滑道(6)上配装横向滑车(7),横向滑车(7)上面装有卷扬机(8)。
2.根据权利要求1所述的变压器装卸支架,其特征是:所述支架(1)的中部两侧设有可拆卸的支撑梁(12),上面配装有两条钢轨(11),钢轨(11)为可随时装卸的组合部件,钢轨(11)的长度大于支架(1)的长度。
3.根据权利要求2所述的变压器装卸支架,其特征是:所述钢轨(11)放在支撑梁(12)的上面,一端备有可以与支撑梁(12)相固连的锁卡(17)。
4.根据权利要求1所述的变压器装卸支架,其特征是:所述卷扬机(8)设有吊索(9),吊索(9)的下端设置托板(14),托板(14)的下面设有滚轮(15)。
5.根据权利要求1或2所述的变压器装卸支架,其特征是:所述支架的立柱(2)下部设有调高套管(13)。
6.根据权利要求1所述的变压器装卸支架,其特征是:所述立柱(2)的下端装有地轮(16)。
7.根据权利要求6所述的变压器装卸支架,其特征是:所述地轮(16)是万向轮。
CN201611013070.6A 2016-11-17 2016-11-17 变压器装卸支架 Expired - Fee Related CN106395640B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611013070.6A CN106395640B (zh) 2016-11-17 2016-11-17 变压器装卸支架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611013070.6A CN106395640B (zh) 2016-11-17 2016-11-17 变压器装卸支架

Publications (2)

Publication Number Publication Date
CN106395640A true CN106395640A (zh) 2017-02-15
CN106395640B CN106395640B (zh) 2018-04-10

Family

ID=58068912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611013070.6A Expired - Fee Related CN106395640B (zh) 2016-11-17 2016-11-17 变压器装卸支架

Country Status (1)

Country Link
CN (1) CN106395640B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106927370A (zh) * 2017-03-24 2017-07-07 安徽江淮汽车集团股份有限公司 一种吊具转挂总成
CN107068376A (zh) * 2017-04-26 2017-08-18 山东电力设备有限公司 一种用于变压器上铁轭安装的支撑装置
CN108551107A (zh) * 2018-06-12 2018-09-18 国网辽宁省电力有限公司朝阳供电公司 标准配电变台整体安装方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5593050A (en) * 1992-11-11 1997-01-14 Liebherr-Werk Nenzing Ges.M.B.H. Bridge crane
CN202107454U (zh) * 2011-05-27 2012-01-11 山西东华机械有限公司 井下行车
EP2435352B1 (de) * 2009-08-06 2013-03-20 Demag Cranes & Components GmbH Laufkran mit laufkatze und seilwinde
CN203333167U (zh) * 2013-05-31 2013-12-11 成都世唯科技有限公司 钻井二层平台机械手
CN103508359A (zh) * 2012-06-29 2014-01-15 成都长迪传感技术有限公司 一种传感器成型模具安装的移动式吊架加强结构
CN203439947U (zh) * 2013-07-12 2014-02-19 岳阳安泰起重设备有限公司 凹形葫芦双梁桥吊
CN203998700U (zh) * 2014-07-24 2014-12-10 王秀兰 带有双吊装装置的搬运车
CN204751997U (zh) * 2015-07-06 2015-11-11 深圳市创思泰科技有限公司 龙门式悬臂吊装置
CN204823870U (zh) * 2015-08-03 2015-12-02 河南省三马起重机械有限公司 一种桥式起重机及小车
CN206203695U (zh) * 2016-11-17 2017-05-31 国家电网公司 变压器装卸支架

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5593050A (en) * 1992-11-11 1997-01-14 Liebherr-Werk Nenzing Ges.M.B.H. Bridge crane
EP2435352B1 (de) * 2009-08-06 2013-03-20 Demag Cranes & Components GmbH Laufkran mit laufkatze und seilwinde
CN202107454U (zh) * 2011-05-27 2012-01-11 山西东华机械有限公司 井下行车
CN103508359A (zh) * 2012-06-29 2014-01-15 成都长迪传感技术有限公司 一种传感器成型模具安装的移动式吊架加强结构
CN203333167U (zh) * 2013-05-31 2013-12-11 成都世唯科技有限公司 钻井二层平台机械手
CN203439947U (zh) * 2013-07-12 2014-02-19 岳阳安泰起重设备有限公司 凹形葫芦双梁桥吊
CN203998700U (zh) * 2014-07-24 2014-12-10 王秀兰 带有双吊装装置的搬运车
CN204751997U (zh) * 2015-07-06 2015-11-11 深圳市创思泰科技有限公司 龙门式悬臂吊装置
CN204823870U (zh) * 2015-08-03 2015-12-02 河南省三马起重机械有限公司 一种桥式起重机及小车
CN206203695U (zh) * 2016-11-17 2017-05-31 国家电网公司 变压器装卸支架

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106927370A (zh) * 2017-03-24 2017-07-07 安徽江淮汽车集团股份有限公司 一种吊具转挂总成
CN106927370B (zh) * 2017-03-24 2018-04-13 安徽江淮汽车集团股份有限公司 一种吊具转挂总成
CN107068376A (zh) * 2017-04-26 2017-08-18 山东电力设备有限公司 一种用于变压器上铁轭安装的支撑装置
CN108551107A (zh) * 2018-06-12 2018-09-18 国网辽宁省电力有限公司朝阳供电公司 标准配电变台整体安装方法
CN108551107B (zh) * 2018-06-12 2023-05-30 国网辽宁省电力有限公司朝阳供电公司 标准配电变台整体安装方法

Also Published As

Publication number Publication date
CN106395640B (zh) 2018-04-10

Similar Documents

Publication Publication Date Title
CN102996062B (zh) 检修升降平台及其使用方法
CN106395640B (zh) 变压器装卸支架
CN104444865A (zh) 一种升降吊装设备
CN212503731U (zh) 一种锅炉安装吊运装置
CN203247031U (zh) 遮板运输吊装装置
CN104671112A (zh) 轨枕码垛机
CN2761563Y (zh) 超高、捆绑、自升式风力发电机专用塔吊
CN202358850U (zh) 轻型升降式悬臂起重机
CN107758579A (zh) 一种多功能高空作业平台
CN206188298U (zh) 一种变压器吊装设备
CN206203695U (zh) 变压器装卸支架
CN202545121U (zh) 自带吊车的风力发电机组
CN108100912A (zh) 一种多功能小型龙门式起重机
CN103663183A (zh) 快速自安装塔式起重机
CN204661163U (zh) 一种多功能变压器套管吊装用支架
CN201577351U (zh) 温室桁架履带式升降安装设备
CN203602264U (zh) 快速自安装塔式起重机
RU2577720C1 (ru) Кран стреловой самоходный
CN109384162B (zh) 一种龙门式构件运输车及构件运输方法
CN208196091U (zh) 一种矿用自卸车举升油缸转运变位工装
CN206915629U (zh) 一种电缆盖板放置装置
CN105151999A (zh) 便携式铁芯翻转机构
CN201737611U (zh) 电力电容塔吊装装置
CN204251234U (zh) 用于风力发电机检修、维护的多功能高空作业起重机
CN209306848U (zh) 一种超高层建筑大型设备吊运装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410

Termination date: 20201117