CN106384173A - 基于目标规划的无底柱分段崩落法采掘计划优化方法 - Google Patents
基于目标规划的无底柱分段崩落法采掘计划优化方法 Download PDFInfo
- Publication number
- CN106384173A CN106384173A CN201610900963.6A CN201610900963A CN106384173A CN 106384173 A CN106384173 A CN 106384173A CN 201610900963 A CN201610900963 A CN 201610900963A CN 106384173 A CN106384173 A CN 106384173A
- Authority
- CN
- China
- Prior art keywords
- prime
- sigma
- stope
- constraint
- system engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 78
- 238000005065 mining Methods 0.000 title claims abstract description 42
- 238000005457 optimization Methods 0.000 title claims abstract description 23
- 238000013439 planning Methods 0.000 title abstract description 14
- 238000004519 manufacturing process Methods 0.000 claims abstract description 47
- 230000011218 segmentation Effects 0.000 claims abstract description 41
- 238000013178 mathematical model Methods 0.000 claims abstract description 16
- 230000008569 process Effects 0.000 claims abstract description 13
- 238000011161 development Methods 0.000 claims description 41
- 230000018109 developmental process Effects 0.000 claims description 41
- 238000000605 extraction Methods 0.000 claims description 37
- 239000011159 matrix material Substances 0.000 claims description 16
- 230000006870 function Effects 0.000 claims description 10
- 230000002085 persistent effect Effects 0.000 claims description 9
- 238000005520 cutting process Methods 0.000 claims description 4
- 238000012913 prioritisation Methods 0.000 claims description 4
- 238000005553 drilling Methods 0.000 claims description 3
- 230000005641 tunneling Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 6
- 238000012986 modification Methods 0.000 description 6
- 230000004048 modification Effects 0.000 description 6
- 230000008859 change Effects 0.000 description 5
- 238000009412 basement excavation Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 2
- 238000013473 artificial intelligence Methods 0.000 description 2
- 238000005094 computer simulation Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000739 chaotic effect Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000002068 genetic effect Effects 0.000 description 1
- 238000000227 grinding Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000005456 ore beneficiation Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 230000009885 systemic effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Mining
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610900963.6A CN106384173B (zh) | 2016-10-17 | 2016-10-17 | 基于目标规划的无底柱分段崩落法采掘计划优化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610900963.6A CN106384173B (zh) | 2016-10-17 | 2016-10-17 | 基于目标规划的无底柱分段崩落法采掘计划优化方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106384173A true CN106384173A (zh) | 2017-02-08 |
CN106384173B CN106384173B (zh) | 2019-10-29 |
Family
ID=57957880
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610900963.6A Active CN106384173B (zh) | 2016-10-17 | 2016-10-17 | 基于目标规划的无底柱分段崩落法采掘计划优化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106384173B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108397194A (zh) * | 2018-02-23 | 2018-08-14 | 河北钢铁集团矿业有限公司 | 无底柱分段崩落法最后中段矿体采矿平稳过渡方法 |
WO2020215503A1 (zh) * | 2019-04-24 | 2020-10-29 | 山东科技大学 | 一种采掘生产计划编制时空约束模型构建方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101086208A (zh) * | 2007-07-13 | 2007-12-12 | 大连理工大学 | 全断面岩石掘进机刀具布置优化设计方法 |
US20110029475A1 (en) * | 2009-08-03 | 2011-02-03 | Yahoo! Inc. | Taxonomy-driven lumping for sequence mining |
CN103867205A (zh) * | 2014-03-11 | 2014-06-18 | 西安科技大学 | 一种掘进机远程控制系统及方法 |
-
2016
- 2016-10-17 CN CN201610900963.6A patent/CN106384173B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101086208A (zh) * | 2007-07-13 | 2007-12-12 | 大连理工大学 | 全断面岩石掘进机刀具布置优化设计方法 |
US20110029475A1 (en) * | 2009-08-03 | 2011-02-03 | Yahoo! Inc. | Taxonomy-driven lumping for sequence mining |
CN103867205A (zh) * | 2014-03-11 | 2014-06-18 | 西安科技大学 | 一种掘进机远程控制系统及方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108397194A (zh) * | 2018-02-23 | 2018-08-14 | 河北钢铁集团矿业有限公司 | 无底柱分段崩落法最后中段矿体采矿平稳过渡方法 |
WO2020215503A1 (zh) * | 2019-04-24 | 2020-10-29 | 山东科技大学 | 一种采掘生产计划编制时空约束模型构建方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106384173B (zh) | 2019-10-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Alford et al. | Optimisation in underground mining | |
CN107869349B (zh) | 一种缓倾斜中厚矿体的机械化采矿方法 | |
Hustrulid et al. | Underground mining methods: Engineering fundamentals and international case studies | |
Hamrin et al. | Underground mining methods and applications | |
CA3142063A1 (en) | Wall continuous mining and continuous filling water-preserved coal mining method, and water resource migration monitoring and water disaster early warning method | |
Carlyle et al. | Underground planning at stillwater mining company | |
CN104863592B (zh) | 一种大结构分段凿岩阶段出矿嗣后充填采矿法 | |
CN103362519B (zh) | 煤巷安全快速掘进方法 | |
CN105019902B (zh) | 一种脉内斜巷上向分层充填采矿法 | |
CN102086765B (zh) | 一种极薄铜矿体高分段多分层采矿方法 | |
CN110388209A (zh) | 一种急倾斜双层矿体阶段深孔采矿法 | |
CN102251773A (zh) | 适合于极复杂矿体开采的进路式上向水平分层充填采矿法 | |
Mustapaevich et al. | Underground mine mining systems and technological parameters of mine development | |
CN111241620A (zh) | 一种基于隧道工程进度斜率图的工期预测方法及编制方法 | |
CN106384173A (zh) | 基于目标规划的无底柱分段崩落法采掘计划优化方法 | |
CN108005657B (zh) | 一种含夹石急倾斜薄矿脉群/组的开采方法 | |
CN103352705A (zh) | 盾构机刀盘系统推力的计算方法 | |
CN108331580A (zh) | 一种清洁高效的采煤方法 | |
CN113818881B (zh) | 一种应用于缓倾斜矿体胶结充填条带回采的施工方法 | |
CN115163174A (zh) | 一种基于双巷作业模式的连采连充采煤方法 | |
Wieland et al. | Semmering Base Tunnel–Design and construction of the shaft head caverns under difficult conditions: Semmering‐Basistunnel–Planung und Bau der Schachtkopfkavernen unter erschwerten Bedingungen | |
Stace | Iron ore extraction techniques | |
Vásquez et al. | Optimization of mining planning in block/panel caving mines including development activities | |
Kaplunov et al. | Particularities of solving the problem of sustainable development of chromite underground mining at deep horizons by means of combined geotechnology | |
CN103643955A (zh) | 无底柱分段崩落法采矿中段平稳转换方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Optimization Method for Mining Plan of Pillarless Sublevel Caving Method Based on Goal Programming Effective date of registration: 20230323 Granted publication date: 20191029 Pledgee: Agricultural Bank of China Limited Changsha Lushan Sub branch Pledgor: CHANGSHA DIGITAL MINE CO.,LTD. Registration number: Y2023430000010 |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 410205, 10th Floor, Building C1, Lugu Yuyuan (Enterprise Square), Wenxuan Road, High tech Zone, Changsha City, Hunan Province Patentee after: Changsha Dimai Technology Co.,Ltd. Country or region after: China Address before: 410205, 10th Floor, Building C1, Lugu Yuyuan (Enterprise Square), Wenxuan Road, High tech Zone, Changsha City, Hunan Province Patentee before: CHANGSHA DIGITAL MINE CO.,LTD. Country or region before: China |