CN108397194A - 无底柱分段崩落法最后中段矿体采矿平稳过渡方法 - Google Patents

无底柱分段崩落法最后中段矿体采矿平稳过渡方法 Download PDF

Info

Publication number
CN108397194A
CN108397194A CN201810155539.2A CN201810155539A CN108397194A CN 108397194 A CN108397194 A CN 108397194A CN 201810155539 A CN201810155539 A CN 201810155539A CN 108397194 A CN108397194 A CN 108397194A
Authority
CN
China
Prior art keywords
stage casing
ore body
mining
last stage
mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810155539.2A
Other languages
English (en)
Inventor
叶会师
郑卫民
鲍万臣
李胜辉
刘汝勇
张庆丰
巩瑞杰
张阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Iron and Steel Group Mining Co Ltd
HBIS Co Ltd
Original Assignee
HBIS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HBIS Co Ltd filed Critical HBIS Co Ltd
Priority to CN201810155539.2A priority Critical patent/CN108397194A/zh
Publication of CN108397194A publication Critical patent/CN108397194A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor

Abstract

本发明公开了一种无底柱分段崩落法最后中段矿体采矿平稳过渡方法,其工艺为:其在原采区斜坡道的最后中段施工,形成贯穿中段运输巷道的开拓巷道;然后进行矿体下盘边界探矿,确定矿体脉外主巷,即可进行矿体采切等工程。本方法主要利用原中段开拓系统,可以保证无底柱分段崩落法最后中段矿体采矿平稳过渡,能够解决无底柱分段崩落法采矿中最后中段转换期出现的矿山生产中断、采矿生产效率低、采矿生产成本增加等问题;与传统生产方法相比,实现了最后中段矿体采矿平稳过渡,缩短了矿山开采时间,降低了采矿生产成本,提高了采矿生产效率。本方法只增加辅助联络道工程,工程量小,大部分是采切工程,具有施工难度低、采矿成本低、效率高等特点。

Description

无底柱分段崩落法最后中段矿体采矿平稳过渡方法
技术领域
本发明涉及一种采矿方法,尤其是一种无底柱分段崩落法最后中段矿体采矿平稳过渡方法。
背景技术
国内外大中型地下矿山采矿方法多为无底柱分段崩落法,该采矿方法一般采用竖井与斜坡道联合的开拓方式,矿山开采顺序从上至下划分几个采矿中段,每个采矿中段再划分多个回采分段,在采矿中段设置有多条独立采场溜井,每条采场溜井分别与本中段各分段水平相通,采场内的采切及回采矿石通过采场溜井放至本中段底部水平,通过采场溜井振动放矿机卸载到矿车内,一般情况本中段底部水平作为运输水平,设有有轨运输系统,承担该中段水平以上其他各分段水平矿石的溜放和运输任务,同时运输水平巷道布设采场动力供应系统、照明设备及电缆,通过有轨架线式电机车将车斗内矿石卸至主溜井,并在底部放矿水平将矿石放到箕斗内,再由提升机提升至地表矿仓,并用汽车将矿石运输至破碎站进行破碎后供给选厂。
但是,随着开采深度的不断下降,中段运输水平不断下移,在地下矿山开采末期最后中段开采过程中,由于运输水平巷道内设有轨道运输系统、供电设备及电缆的限制,最后中段矿体采矿平稳过渡期间存在的主要问题有:
(1)传统的的生产方法:最后中段运输水平矿体开拓、采切、切割、回采等工作需要等中段运输水平以上各分段水平回采结束后,将中段运输水平内的有轨运输、采场动力、照明系统及电缆全部拆除后才可以进行,导致地下矿山生产中断,此期间采场只有少量副产矿石供矿,采场出矿能力急速下降,矿山开采周期延长。
(2)最后中段运输水平矿体与本中段其他分段水平矿体开采之间生产不连续,由于开拓、采切、中深孔钻凿等工程导致生产间断,间断期至少6个月以上,且最后中段运输水平开采期间采矿生产能力低,导致生产效率低、产量低,采矿生产成本增加。
因此,亟需一种能够解决上述最后中段矿体采矿平稳过渡期存在的影响采矿生产连续性问题的新的采矿方法。
发明内容
本发明要解决的技术问题是提供一种无底柱分段崩落法最后中段矿体采矿平稳过渡方法,以提高采矿延续性。
为解决上述技术问题,本发明所采取的技术方案是:其在原采区斜坡道的最后中段施工,形成贯穿中段运输巷道的开拓巷道;然后进行矿体下盘边界探矿,确定矿体脉外主巷,即可进行矿体采切等工程。
本发明所述最后中段矿体划分若干个矿块,在每个矿块中间增加贯通脉外主巷与中段运输巷道的中段运输水平联络道,采用无轨铲运设备通过中段运输水平联络道进行运卸矿石。
本发明所述中段运输水平联络道与中段运输巷道交汇处进行挑顶处理,形成无轨铲运设备的矿石卸载硐室。
所述采准矿量≤矿山年生产计划量时,采用本方法进行采矿。
采用上述技术方案所产生的有益效果在于:本发明主要利用原中段开拓系统,可以保证无底柱分段崩落法最后中段矿体采矿平稳过渡,能够解决无底柱分段崩落法采矿中最后中段转换期出现的矿山生产中断、采矿生产效率低、采矿生产成本增加等问题;与传统生产方法相比,实现了最后中段矿体采矿平稳过渡,缩短了矿山开采时间,降低了采矿生产成本,提高了采矿生产效率。本发明只增加辅助联络道工程,工程量小,大部分是采切工程,具有施工难度低、采矿成本低、效率高等特点。
附图说明
下面结合附图和具体实施方式对本发明作进一步详细的说明。
图1是本发明的矿体结构示意图。
图中:1—中段穿脉、2—矿体、3—脉外主巷、4—中段运输水平联络道、5—矿石卸载硐室、6—中段运输巷道、7—中段开拓巷道、8—原采区斜坡道。
具体实施方式
以某矿山为例,图1所示,在矿山采用无底柱分段崩落法进行开采的过程中,中段高度为60m,分段高度为12m,-120m水平为上中段运输水平,-180m水平为最后中段运输水平。在进行-120m~-180m水平之间矿体回采过程中,涉及到-180m水平最后中段矿体2的开采工作,在-120m~-180m水平中段各分段回采过程中,当采准矿量不超过1年,即采准矿量≤矿山年生产计划量时,开始在原采区斜坡道8进行-180m水平最后中段的开拓巷道7施工,然后进行矿体2下盘边界探矿,确定矿体的脉外主巷3。根据上水平穿脉巷道坐标,上下水平穿脉巷道保持品字型空间关系,从矿体的脉外主巷3开口,采用YT-28气腿式凿岩机钻孔,人工装药、填塞、连线、警戒、爆破,机械通风,铲运设备出渣等循环施工作业完成中段穿脉1工程,穿脉工程1主要作用是为切割井和中深孔钻凿施工提供作业场所,并且作为日后采场生产出矿的运输巷道。
图1所示,-180m水平最后中段的开拓巷道7施工,即在原采区斜坡道8选取合适位置与-180m水平最后中段运输巷道6进行贯穿工作,贯穿后将环形运输系统切割开后变成两条折返运输系统。合理选取贯通位置时,要充分考虑矿体矿量分布比例、运输距离等因素。
图1所示,将-180m水平矿体2划分为若干个矿块,在每个矿块中间增加中段运输水平联络道4;所述中段运输水平联络道4贯通脉外主巷3与中段运输巷道6,作为无轨设备将各进路矿石铲运卸载到电机车车斗内的运输巷道;同时,将中段运输水平联络道4与中段运输水平巷道6交汇处进行挑顶处理形成矿石卸载硐室5以满足无轨设备将铲斗内的矿石卸载到车斗的高度要求。
这样,矿体经采切后,由无轨设备沿中段运输水平联络道输送到卸载硐室5,在卸载硐室5内卸载到原有轨运输系统的电机车车斗内,由原有轨运输系统运输到地表矿仓。本方法不需将中段运输水平内的有轨运输、采场动力、照明系统及电缆全部拆除即可进行,间断期由原来的6个月以上缩短至1个月左右。

Claims (4)

1.一种无底柱分段崩落法最后中段矿体采矿平稳过渡方法,其特征在于:其在原采区斜坡道的最后中段施工,形成贯穿中段运输巷道的开拓巷道;然后进行矿体下盘边界探矿,确定矿体脉外主巷,即可进行矿体采切等工程。
2.根据权利要求1所述的无底柱分段崩落法最后中段矿体采矿平稳过渡方法,其特征在于:所述最后中段矿体划分若干个矿块,在每个矿块中间增加贯通脉外主巷与中段运输巷道的中段运输水平联络道,采用无轨铲运设备通过中段运输水平联络道进行运卸矿石。
3.根据权利要求2所述的无底柱分段崩落法最后中段矿体采矿平稳过渡方法,其特征在于:所述中段运输水平联络道与中段运输巷道交汇处进行挑顶处理,形成无轨铲运设备的矿石卸载硐室。
4.根据权利要求1、2或3所述的无底柱分段崩落法最后中段矿体采矿平稳过渡方法,其特征在于:所述采准矿量≤矿山年生产计划量时,采用本方法进行采矿。
CN201810155539.2A 2018-02-23 2018-02-23 无底柱分段崩落法最后中段矿体采矿平稳过渡方法 Pending CN108397194A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810155539.2A CN108397194A (zh) 2018-02-23 2018-02-23 无底柱分段崩落法最后中段矿体采矿平稳过渡方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810155539.2A CN108397194A (zh) 2018-02-23 2018-02-23 无底柱分段崩落法最后中段矿体采矿平稳过渡方法

Publications (1)

Publication Number Publication Date
CN108397194A true CN108397194A (zh) 2018-08-14

Family

ID=63096768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810155539.2A Pending CN108397194A (zh) 2018-02-23 2018-02-23 无底柱分段崩落法最后中段矿体采矿平稳过渡方法

Country Status (1)

Country Link
CN (1) CN108397194A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706331A (zh) * 2020-07-07 2020-09-25 酒泉钢铁(集团)有限责任公司 一种井下脉外沿脉巷施工方法
CN114412465A (zh) * 2022-01-19 2022-04-29 长沙矿山研究院有限责任公司 井底车场储调车线的布置方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643955A (zh) * 2013-12-18 2014-03-19 中国华冶科工集团有限公司 无底柱分段崩落法采矿中段平稳转换方法
CN104358573A (zh) * 2014-09-04 2015-02-18 广东安元矿业勘察设计有限公司 厚大矿体的阶段空场与阶段崩落联合采矿法
CN104533416A (zh) * 2014-12-25 2015-04-22 中冶北方(大连)工程技术有限公司 极厚大矿体大规模机械化无底柱分段崩落采矿方法
CN106246183A (zh) * 2016-07-25 2016-12-21 辽宁科技大学 一种确定无底柱分段崩落法崩落体形态的方法
CN106384173A (zh) * 2016-10-17 2017-02-08 长沙迪迈数码科技股份有限公司 基于目标规划的无底柱分段崩落法采掘计划优化方法
CN106988745A (zh) * 2017-05-12 2017-07-28 核工业北京化工冶金研究院 一种倾斜薄矿脉的分段空场采矿方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643955A (zh) * 2013-12-18 2014-03-19 中国华冶科工集团有限公司 无底柱分段崩落法采矿中段平稳转换方法
CN104358573A (zh) * 2014-09-04 2015-02-18 广东安元矿业勘察设计有限公司 厚大矿体的阶段空场与阶段崩落联合采矿法
CN104533416A (zh) * 2014-12-25 2015-04-22 中冶北方(大连)工程技术有限公司 极厚大矿体大规模机械化无底柱分段崩落采矿方法
CN106246183A (zh) * 2016-07-25 2016-12-21 辽宁科技大学 一种确定无底柱分段崩落法崩落体形态的方法
CN106384173A (zh) * 2016-10-17 2017-02-08 长沙迪迈数码科技股份有限公司 基于目标规划的无底柱分段崩落法采掘计划优化方法
CN106988745A (zh) * 2017-05-12 2017-07-28 核工业北京化工冶金研究院 一种倾斜薄矿脉的分段空场采矿方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111706331A (zh) * 2020-07-07 2020-09-25 酒泉钢铁(集团)有限责任公司 一种井下脉外沿脉巷施工方法
CN111706331B (zh) * 2020-07-07 2022-03-15 酒泉钢铁(集团)有限责任公司 一种井下脉外沿脉巷施工方法
CN114412465A (zh) * 2022-01-19 2022-04-29 长沙矿山研究院有限责任公司 井底车场储调车线的布置方法
CN114412465B (zh) * 2022-01-19 2022-11-22 长沙矿山研究院有限责任公司 井底车场储调车线的布置方法

Similar Documents

Publication Publication Date Title
CN101899976B (zh) 露天煤矿的连续采煤工艺方法
US5782539A (en) Wall-to-wall surface mining process
CN103603665B (zh) 矿山采动范围内上盘侧矿体回采方法
CN108547618A (zh) 一种两步骤采矿方法遗留间柱的回收工艺
CN102704934B (zh) 适于大型地下矿山开采的嗣后充填采矿方法
CN102251773B (zh) 适合于极复杂矿体开采的进路式上向水平分层充填采矿法
CN103628877A (zh) 一种多层缓倾斜薄-中厚矿床充填采矿方法
CN102418526A (zh) 中厚急倾斜含废石夹层磷矿体沿走向高分段分部采矿法
CN108643911A (zh) 一种倾斜或急倾斜薄矿体悬臂式掘进机落矿连续采矿方法
CN109026006A (zh) 开采露天矿边帮压覆矿产的新方法
CN1052525C (zh) 一种露天高台阶采矿方法
CN104358574B (zh) 缓倾斜矿体的横向房柱采矿法
CN110735639B (zh) 一种露天转地下崩落法开采后露天坑回填方法
CN101725350A (zh) 下盘沿脉凿岩穿脉进路出矿式崩落采矿法
CN1811129A (zh) 露天煤矿迈步式搭桥贯通内排运输通路
CN109458181A (zh) 一种金属矿沿走向一次采全高的充填采矿方法
CN108397194A (zh) 无底柱分段崩落法最后中段矿体采矿平稳过渡方法
CN104179505B (zh) 一种磷矿的地下采矿方法
CN101725348A (zh) 预控顶空场崩落嗣后充填采矿方法
CN105626068A (zh) 露天煤矿端帮桥的拆除方法
RU2543765C2 (ru) Способ открытой разработки месторождений полезных ископаемых с созданием отвала большой емкости и высоты в сложных условиях
CN109630116B (zh) 一种倾斜中厚盲矿体开采方法
CN111997614A (zh) 前进式综采工作面绕行薄煤带的方法
CN101469612B (zh) 间隔式金属矿的开采方法
CN106703809A (zh) 一种露天转地下多分枝矿体诱导冒落形成覆盖层的方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180814