CN103352705A - 盾构机刀盘系统推力的计算方法 - Google Patents

盾构机刀盘系统推力的计算方法 Download PDF

Info

Publication number
CN103352705A
CN103352705A CN2013102843835A CN201310284383A CN103352705A CN 103352705 A CN103352705 A CN 103352705A CN 2013102843835 A CN2013102843835 A CN 2013102843835A CN 201310284383 A CN201310284383 A CN 201310284383A CN 103352705 A CN103352705 A CN 103352705A
Authority
CN
China
Prior art keywords
geology
cutterhead
cutter head
thrust
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102843835A
Other languages
English (en)
Inventor
张茜
亢一澜
蔡宗熙
候振德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN2013102843835A priority Critical patent/CN103352705A/zh
Publication of CN103352705A publication Critical patent/CN103352705A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种盾构机刀盘系统推力的计算方法,该方法分为以下四个步骤:(1)计算刀盘闭合部分与地质间的掘进挤压力F1;(2)计算刀盘闭合部分由覆土埋深引起的静土压力F2;(3)计算刀盘开口部分的密封舱压力F3;(4)根据F1、F2、F3之和计算刀盘系统推力F。本发明的特点是,当盾构在岩土混合地质中掘进时,可根据工程沿线详细的地质分层信息和每一层岩体或土体的性质参数,预先计算相应的刀盘系统推力,计算结果更接近实际施工情况。与目前已有的计算方法相比,可显著提高计算精度,从而为盾构掘进过程中操作人员调整载荷参数提供更为科学的参考依据。

Description

盾构机刀盘系统推力的计算方法
技术领域
本发明属于盾构机械施工技术,具体涉及一种盾构机在掘进时刀盘系统推力的计算方法。
背景技术
盾构施工法作为一种暗挖隧道方法,以其对周围环境扰动小等优点被广泛应用于城市地下交通、各类输运管道等大型隧道工程建设中。盾构刀盘系统推力是贯穿装备运行始终的重要参数,而且该推力与施工地质条件、装备掘进速度、装备结构特征等均密切相关。因此盾构掘进过程中刀盘系统推力的确定是其设计及施工环节的核心技术之一。目前采用的刀盘系统推力确定方法,是将待掘进地质简化为某些特定情况,如单一均匀地质以及掘进面分为上下两层地质的简单情况。然而,许多实际隧道工程掘进面地质的情况是十分复杂的,不仅包含很多地质层,并且可能既包含岩层又包含土层,称为岩土混合地质(如附图所示)。不同地质层之间的物性参数相差很大,计算刀盘系统推力时需要逐一考虑每一层地质的影响。所以这种计算方法难以满足复杂工况下对刀盘推力的准确计算,为此提出一种新的计算方法,以解决类似于岩土混合类复杂地质工程掘进施工中亟待解决的难题。
发明内容
本发明的目的是,提出一种盾构机在岩土混合地质中掘进时刀盘系统推力的计算方法,为盾构施工提供科学有效的参数控制依据。
本发明的计算方法分为以下四个步骤:
(1)计算刀盘闭合部分与地质间的掘进挤压力F1
(2)计算刀盘闭合部分由覆土埋深引起的静土压力F2
(3)计算刀盘开口部分的密封舱压力F3
(4)根据F1、F2、F3之和计算刀盘系统推力F;
具体计算式为:
F 1 = Σ i = 1 n ( 1 - η ) E i h i δ 1 - μ i 2
F 2 = Σ i = 1 n [ 2 ( 1 - η ) x i K 0 i γ i h i ( H - y i ) ]
F3=πR2ηpm
F=F1+F2+F3
式中:n为掘进面地质分层数;η为刀盘开口率;δ为刀盘每转切入深度;Ei为第i层地质的弹性模量;μi为第i层地质的泊松比;hi为第i层地质的厚度;K0i为第i层地质的静土压系数;γi为第i层地质的容重;xi为第i层地质中心的宽度;yi为第i层地质的中心与掘进面中心的高度差,当第i层地质处于掘进面上半部分时yi值取正,处于掘进面下半部分时yi值取负;H为地表至装备中轴线处的埋深;R为刀盘半径;pm为密封舱平均土压力。
本发明的特点以及产生的积极效果是,当盾构在岩土混合地质中掘进时,可根据工程沿线详细的地质分层信息和每一层岩体或土体的性质参数,预先计算相应的刀盘系统推力。计算结果更接近实际施工情况,与目前已有的简化为单一均匀地质或掘进面分上下两层地质的近似计算方法相比,可显著提高计算精度,从而为盾构掘进过程中操作人员调整载荷参数提供更为科学的参考依据。
附图说明
所示附图为掘进面上岩土混合地质分布参数示意图。
具体实施方式
以下通过具体实施例对本发明的计算过程作进一步的说明,需要说明的是本实施例是叙述性的,而不是限定性的,不以此限定本发明的保护范围。
盾构在岩土混合地质中掘进时刀盘系统推力的计算方法,分为以下四个步骤:
(1)计算刀盘闭合部分与地质间的掘进挤压力F1
F 1 = Σ i = 1 n ( 1 - η ) E i h i δ 1 - μ i 2
式中:n为掘进面地质分层数;η为刀盘开口率;δ为刀盘每转切入深度(m/r);Ei(kPa)为第i层地质的弹性模量;μi为第i层地质的泊松比;hi(m)为第i层地质的厚度。
(2)计算刀盘闭合部分由覆土埋深引起的静土压力F2
F 2 = Σ i = 1 n [ 2 ( 1 - η ) x i K 0 i γ i h i ( H - y i ) ]
式中:K0i为第i层地质的静土压系数;γi(kN/m3)为第i层地质的容重;xi(m)为第i层地质中心的宽度;yi(m)为第i层地质的中心与掘进面中心的高度差,当第i层地质处于掘进面上半部分时yi值取正,处于掘进面下半部分时yi值取负;H(m)为地表至装备中轴线处的埋深。
(3)计算刀盘开口部分的密封舱压力F3
F3=πR2ηpm
式中:R为刀盘半径(m);pm(kPa)为密封舱平均土压力。
(4)根据F1、F2、F3之和计算刀盘系统推力F;
F=F1+F2+F3
以某地铁工程作为实施例。该工程所使用的盾构机结构参数如下:刀盘半径R=3.2m,刀盘开口率η=44%。以该工程掘进到第200环时的地质条件与操作状态为例,给出计算盾构掘进到该环时所需刀盘系统推力的详细步骤,其他各环均可按照相同的方法进行计算。
计算中所涉及的地质参数均取自地质报告,该工程第200环处的地质参数如下:掘进面自上而下共分n=3层。
第1层为粉质粘土:弹性模量E1=5.2MPa,泊松比μ1=0.3,静止土压力系数K01=0.43,容重γ1=19.7kN/m3,地质层厚度h1=3.2m,高度差y1=1.6m,宽度x1=2.8m。
第2层为砾质粘土:E2=5.0MPa,μ2=0.32,K02=0.47,γ2=17.0kN/m3,h2=2.6m,y2=-1.3m,x2=2.9m。
第3层为全风化花岗岩:E3=30.0MPa,μ3=0.26,K03=0.39,γ3=18.8kN/m3,h3=0.6m,y3=-2.9m,x3=1.4m。
计算中所涉及的操作参数均由盾构机自动记录,该工程掘进至第200环处时的操作参数如下,刀盘每转切入深度δ=0.035m/r,密封舱平均土压力pm=150kPa,地表至装备中轴线处埋深H=12.4m。
第一步计算刀盘闭合部分与地质间的掘进挤压力F1
F 1 = Σ i = 1 n ( 1 - η ) E i h i δ 1 - μ i 2 , 得到F1=1020.8kN
第二步计算刀盘闭合部分由覆土埋深引起的静土压力F2
F 2 = Σ i = 1 n [ 2 ( 1 - η ) x i K 0 i γ i h i ( H - y i ) ] , 得到F2=1948.0kN
第三步计算刀盘开口部分的密封舱压力F3
由F3=πR2ηpm,得到F3=2122.1kN
第四步计算刀盘系统推力F:
由F=F1+F2+F3,得到F=5090.9kN。
至此,已计算出该地铁工程掘进至第200环处时,盾构掘进所需的刀盘系统推力值。其余各环均可按照相同方法确定。由此可预先获得盾构在整个工程标段中的刀盘系统推力设定与调控方案,为盾构施工提供科学有效的数据依据。

Claims (1)

1.盾构机刀盘系统推力的计算方法,其特征是该计算方法分为以下四个步骤:
(1)计算刀盘闭合部分与地质间的掘进挤压力F1
F 1 = Σ i = 1 n ( 1 - η ) E i h i δ 1 - μ i 2
(2)计算刀盘闭合部分由覆土埋深引起的静土压力F2
F 2 = Σ i = 1 n [ 2 ( 1 - η ) x i K 0 i γ i h i ( H - y i ) ]
(3)计算刀盘开口部分的密封舱压力F3
F3=πR2ηpm
(4)根据F1、F2、F3之和计算刀盘系统推力F;
F=F1+F2+F3
式中:n为掘进面地质分层数;η为刀盘开口率;δ为刀盘每转切入深度;Ei为第i层地质的弹性模量;μi为第i层地质的泊松比;hi为第i层地质的厚度;K0i为第i层地质的静土压系数;γi为第i层地质的容重;xi为第i层地质中心的宽度;yi为第i层地质的中心与掘进面中心的高度差,当第i层地质处于掘进面上半部分时yi值取正,处于掘进面下半部分时yi值取负;H为地表至装备中轴线处的埋深;R为刀盘半径;pm为密封舱平均土压力。
CN2013102843835A 2013-07-08 2013-07-08 盾构机刀盘系统推力的计算方法 Pending CN103352705A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102843835A CN103352705A (zh) 2013-07-08 2013-07-08 盾构机刀盘系统推力的计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102843835A CN103352705A (zh) 2013-07-08 2013-07-08 盾构机刀盘系统推力的计算方法

Publications (1)

Publication Number Publication Date
CN103352705A true CN103352705A (zh) 2013-10-16

Family

ID=49309110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102843835A Pending CN103352705A (zh) 2013-07-08 2013-07-08 盾构机刀盘系统推力的计算方法

Country Status (1)

Country Link
CN (1) CN103352705A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103899328A (zh) * 2014-03-10 2014-07-02 天津大学 曲面型土压平衡盾构刀盘正面扭矩的计算方法
CN103899326A (zh) * 2014-03-10 2014-07-02 天津大学 盾构刀盘不同安装半径处刀具数量的确定方法
CN104732059A (zh) * 2015-01-12 2015-06-24 天津大学 硬岩tbm装备掘进过程中总推力的计算方法
CN108446418A (zh) * 2018-01-16 2018-08-24 天津大学 一种基于量纲分析的盾构掘进总推力计算方法
WO2019128123A1 (zh) * 2017-12-29 2019-07-04 天津大学 复合盾构在岩土混合地质中掘进总推力的计算方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3411839B2 (ja) * 1998-11-27 2003-06-03 三菱重工業株式会社 カッタヘッドの制御装置とその制御方法及びトンネル掘削機
CN102278961A (zh) * 2011-03-21 2011-12-14 天津大学 掘进机盘形滚刀磨损量预估计算方法
CN102562079A (zh) * 2012-01-17 2012-07-11 天津大学 盾构掘进中沿深度方向调向时俯仰弯矩的计算方法
JP2013007226A (ja) * 2011-06-27 2013-01-10 Tobishima Corp シールド掘進機における推進ジャッキの推力設定方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3411839B2 (ja) * 1998-11-27 2003-06-03 三菱重工業株式会社 カッタヘッドの制御装置とその制御方法及びトンネル掘削機
CN102278961A (zh) * 2011-03-21 2011-12-14 天津大学 掘进机盘形滚刀磨损量预估计算方法
JP2013007226A (ja) * 2011-06-27 2013-01-10 Tobishima Corp シールド掘進機における推進ジャッキの推力設定方法
CN102562079A (zh) * 2012-01-17 2012-07-11 天津大学 盾构掘进中沿深度方向调向时俯仰弯矩的计算方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张茜: "盾构装备掘进中的力学特征与载荷建模", 《中国博士学位论文全文数据库 工程科技Ⅱ辑》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103899328A (zh) * 2014-03-10 2014-07-02 天津大学 曲面型土压平衡盾构刀盘正面扭矩的计算方法
CN103899326A (zh) * 2014-03-10 2014-07-02 天津大学 盾构刀盘不同安装半径处刀具数量的确定方法
CN103899328B (zh) * 2014-03-10 2015-12-02 天津大学 曲面型土压平衡盾构刀盘正面扭矩的计算方法
CN103899326B (zh) * 2014-03-10 2016-04-06 天津大学 盾构刀盘不同安装半径处刀具数量的确定方法
CN104732059A (zh) * 2015-01-12 2015-06-24 天津大学 硬岩tbm装备掘进过程中总推力的计算方法
CN104732059B (zh) * 2015-01-12 2018-10-26 天津大学 硬岩tbm装备掘进过程中总推力的计算方法
WO2019128123A1 (zh) * 2017-12-29 2019-07-04 天津大学 复合盾构在岩土混合地质中掘进总推力的计算方法
CN108446418A (zh) * 2018-01-16 2018-08-24 天津大学 一种基于量纲分析的盾构掘进总推力计算方法
WO2019140794A1 (zh) * 2018-01-16 2019-07-25 天津大学 一种基于量纲分析的盾构掘进总推力计算方法

Similar Documents

Publication Publication Date Title
Tóth et al. Case studies of TBM tunneling performance in rock–soil interface mixed ground
Wang et al. Modeling and analysis of thrust force for EPB shield tunneling machine
Jain et al. Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps–a case study
CN102262712B (zh) 上下分层地质条件下盾构刀盘正面载荷的计算方法
CN103352705A (zh) 盾构机刀盘系统推力的计算方法
Coulter et al. Effect of jet-grouting on surface settlements above the Aeschertunnel, Switzerland
Bilgin et al. TBM excavation in difficult ground conditions: case studies from Turkey
CN102129499B (zh) 隧道掘进机刀盘驱动载荷计算方法
CN108268709B (zh) 复合盾构在岩土混合地质中掘进总推力的计算方法
CN105653811A (zh) 高压变电站深回填区旋挖钻进中的入岩深度确定方法
Wang et al. Shield tunnel engineering: from theory to practice
Coşar Application of rock mass classification systems for future support design of the Dim Tunnel near Alanya
CN102562079B (zh) 盾构掘进中沿深度方向调向时俯仰弯矩的计算方法
CN113010997A (zh) 一种岩溶发育区桩基冲击成孔施工事故的预警处治方法
CN102289588B (zh) 上下分层地质条件下盾构刀盘俯仰弯矩的计算方法
Kurose et al. Construction of Namikata underground LPG storage cavern in Japan
CN109723450A (zh) 一种复合式tbm隧道掘进施工方法
CN104654948B (zh) 一种边坡与近接隧道协同爆破施工的爆破控制方法
Quick et al. Aicha‐Mauls on the Brenner Base Tunnel–status of the works and results
CN105300444A (zh) 一种峡谷岸坡深埋地下大型溶洞形态特征勘探的方法
Mössmer et al. Brenner Base Tunnel–Tunnelling in the immediate vicinity of existing structures on the Tulfes–Pfons contract
CN104632239B (zh) 分层地质中盾构机推进油缸垂直分区压力配比的确定方法
Kannan et al. Geological assessment of underground storage cavern sites
Cardu et al. Technical–operational comparison between trench-cutters and clam excavators for concrete diaphragm construction in underground works at shallow depths
Ma et al. Advanced geological detection for tunneling in karst area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131016