CN106381796A CN201611043311.1A CN201611043311A CN106381796A CN 106381796 A CN106381796 A CN 106381796A CN 201611043311 A CN201611043311 A CN 201611043311A CN 106381796 A CN106381796 A CN 106381796A
Authority
CN
China
Prior art keywords
permeable
brick
road surface
water
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611043311.1A
Other languages
Chinese (zh)
Other versions
CN106381796B (en
Inventor
张磊蕾
王武祥
陈晋栋
廖礼平
王爱军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU DEZHI HEAVY INDUSTRY Co.,Ltd.
Original Assignee
China Building Materials Academy CBMA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Building Materials Academy CBMA filed Critical China Building Materials Academy CBMA
Priority to CN201611043311.1A priority Critical patent/CN106381796B/en
Publication of CN106381796A publication Critical patent/CN106381796A/en
Application granted granted Critical
Publication of CN106381796B publication Critical patent/CN106381796B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00241Physical properties of the materials not provided for elsewhere in C04B2111/00
    • C04B2111/00284Materials permeable to liquids
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/00612Uses not provided for elsewhere in C04B2111/00 as one or more layers of a layered structure
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/00474Uses not provided for elsewhere in C04B2111/00
    • C04B2111/0075Uses not provided for elsewhere in C04B2111/00 for road construction
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a concrete water-permeable road surface as well as a paving method thereof and a maintenance and restoration method thereof, relates to the field of road construction, and particularly relates to a road surface with a water-permeable requirement, which is applicable to an urban municipal-administration footway, a garden-landscape pathway, a non-heavy-load road-surface plaza and the like, a paving method thereof and a maintenance and restoration method thereof. The invention provides a concrete water-permeable road surface which is good in water permeability, is stable and firm to pave and mount, and can be repeatedly restored, a paving method thereof and a maintenance and restoration method thereof. A road-surface brick comprises a rectangular brick body; four corners of the brick body are provided with circular-arc grooves respectively, so that the four circular-arc grooves form a circular hole used for placing a water-permeable filling body when four brick bodies are spliced. Two side surfaces of the brick body are both provided with convex blocks and grooves; the two side surfaces each are provided with two grooves. Three side surfaces of the brick body are all provided with convex blocks and grooves; one side surface is provided with two grooves. By using the concrete water-permeable road surface as well as the paving method thereof and the maintenance and restoration method thereof, the key problems of a water-permeable concrete road-surface brick in technical and application aspects are solved; the application of the water-permeable concrete road-surface brick to the road construction in China is promoted.

Description

A kind of concrete permeable road surface, its laying method and its maintenance restorative procedure
Technical field
The present invention relates to field of road construction is and in particular to a kind of municipal footpath being applied to city, garden landscape are little There is road surface, its laying method and its maintenance restorative procedure of permeable requirement in footpath and non-Supporting Load Pavement square etc..
Background technology
During urbanization Fast Construction, because city development intensity is too high, substantial amounts of hard is mated formation as granite, Dali The fluid-tight material such as stone, glazed tile, cement and Colophonium changes original natural, ecological background and hydrological characteristics, destroys certainly So " spongy body ".Bring serious problems to urban environment:The rainfall of 70%-80% is formed arranges outside runoff, the only rain of 20%-30% Water energy enough permeates the ground, and leads to the adverse consequencess of " meet rain must flood, i.e. drought after rain ", also bring Ecology deteriorate, water resource tight Lack, water environment pollution, water security lack a series of problems, such as ensure.
For this situation, the General Office of the State Council prints and distributes《With regard to advancing the instruction of sponge urban construction》(Below Referred to as《Instruction》), deploy propulsion sponge urban construction work.On March 18th, 2016 firmly the portion of building printed and distributed with regard to《Sponge Urban subject planning works out temporary provisions》Notice,《Notify》Various places are required to combine actual, promptly the special rule in establishment sponge city Draw.Sponge urban construction has been brought into schedule, extremely payes attention to.
It is the important of sponge urban road construction using the covering between porous pavement solution rainwater and subsoil water and release One of approach.After road utilizes water-permeable brick laying, on the one hand can increase city porous, vapor permeation area, adjust urban climate, Reduce surface temperature, be conducive to alleviating city " heat island phenomenon ".Meanwhile, rain, snow precipitation can be made full use of, increase earth's surface relatively Humidity, supplements the groundwater resources of city increasingly depleted, plays " cistern " function of water penetration roadbed.Water-permeable brick is Environmental Effect Benefit and social benefit the environment protection ecological type pavement material deposited.
At present, conventional water-permeable brick is through life-time service, surface and hole be easy to fall into various dirts form blocking and Can not automatically remove, and then lose permeable effect, ecological effect is poor.
Content of the invention
In view of the shortcomings of the prior art, it is an object of the invention to provide a kind of water permeability is good, stable jail of mating formation Gu, the concrete permeable road surface that can repeatedly repair, its laying method and its maintenance restorative procedure.
The technical scheme is that:Including some pavior bricks and some permeable fill body, described pavior brick includes rectangular tiles Body, the corner of brick body is respectively equipped with arc groove so that during the splicing of four brick body, and four arc grooves form permeable for placing Fill the circular hole of body;
At least one side of brick body is provided with projection and groove, and at least one side is provided with two grooves, adjacent brick body it Between projection be adaptedly located in groove, the groove between adjacent brick body and groove are formed for placing the permeable circular hole filling body.
Two sides of brick body are equipped with projection and groove, and two sides are equipped with two grooves.
Three sides of brick body are equipped with projection and groove, and a side is provided with two grooves.
The section of described projection and groove is in circular arc.
Brick body includes basic unit and is located at surface layer in basic unit,
Described basic unit includes the component of following percentage by weight:Including cement 15%-20%, particle diameter be 5-8mm stone 40%~ 60%th, particle diameter is stone 20%~40% and the additive 2%-4% of 8-10mm;
Described surface layer includes the component of following percentage by weight:Including cement 15%-20%, particle diameter is the quartz sand 40%- of 1-2mm 50%th, particle diameter is stone 30%-40%, pigment 1.2%-1.8% and the additive 2%~4% of 2.5-3.5mm;
The base material comprising said components and surface material are first mixed respectively, then through dither and pressing process compacting Combine to form pervious concrete road pavement brick.
In described basic unit and surface layer, additive therefor includes active mixed material, polymer emulsion and water reducer, described activity The percentage by weight of mixing material is 1.0-2.0%, the percentage by weight of polymer emulsion is 0.8%-2.0%, the weight hundred of water reducer Divide ratio 0.15%-0.25%, described active mixed material, polymer emulsion and water reducer percentage by weight sum are 2%-4%.
Described active mixed material is one or more of silicon ash, ground slag, Kaolin;Described polymer emulsion is third One or more of olefin(e) acid emulsion, butadiene-styrene latex, EVA emulsion.
The described permeable body that fills includes the upper and lower, and described lower floor 2-5mm level joins stone filling, described upper strata 2- 5mm level is filled after joining stone and adhesive mix;Described adhesive is organic polymeric emulsions or waterglass.
A kind of laying method of pervious concrete porous pavement, comprises the following steps:The roadbed having laid is laid Joined the reservoir bed that stone is constituted by level for one layer, described reservoir bed lays one layer of geotextiles, if then laying in geotextiles Dry pervious concrete road pavement brick, and after porous pavement mats formation end, it is filled with circular hole by some permeable bodies that fill.
A kind of maintenance restorative procedure of pervious concrete porous pavement, is less than Pavement Design value in porous pavement permeation rate When, permeable in circular hole is filled by body using powerful vacuum vacuum cleaner and suctions out and cleaned with water, newly filled out with described permeable body weight of filling Full circular hole.
The present invention compared with prior art has advantages below:
(1) the contact point intensity between concrete aggregate is improved by ratio optimization, protect under meeting coefficient of permeability indicator conditions Card water-permeable brick physical and mechanical property and durability, realize the coordination of water-permeable brick intensity and coefficient of permeability;The permeable coagulation of the present invention Dirt road face brick coefficient of permeability >=0.4mm/s, rupture strength reaches >=5.0MPa;Frost resistance (25 times) is qualified.
(2) using the permeable pattern of " permeable from permeable and gap ", pass through block-type from permeable pervious concrete road pavement brick Optimization design, makes two pieces of arbitrary neighborhood both can be mutually twisted fixation, it is to avoid is produced dislocation deformation by external force effect, makes permeable Brick is mated formation and must be stablized firmly;Circular hole can be spliced to form again(I.e. gap hole), in the hole filling in gap is permeable to fill body(I.e. pervious material Material)Can be repaired by cleaning repeatedly and realize permeable for a long time effect and the recovery of water-permeable brick;The coefficient of permeability recovery rate of the present invention ≥80%.
(3) in the hole packing material in gap divides the upper and lower two parts filling, and lower floor joins stone for 2-5mm level and piles up, heap Long-pending space is larger and does not have Binder Materials, can fully ensure that permeable effect;Stone and a small amount of adhesive are joined for 2-5mm level in upper strata, There is certain cohesive force, both can ensure that permeable effect is unaffected, can prevent from cleaning when road surface or walking by surface stone again Take out of, also without prejudice to is suctioned out cleaning by powerful vacuum vacuum cleaner to relatively low cohesive force.
The pervious concrete road pavement brick that the present invention provides has the advantages that good water permeability, good looking appearance, using " from permeable and Gap is permeable " permeable pattern, it is used in combination permeable joint filler it is ensured that the permeable for a long time effect of pervious concrete pavement and repairing Multiple.The present invention solves the key issue in technology and application aspect for the pervious concrete road pavement brick, promotes pervious concrete pavement Application in China's road construction for the brick.
Brief description
Fig. 1 is the structural representation of pavior brick embodiment one in the present invention,
Fig. 2 is the structural representation of pavior brick laying in Fig. 1,
Fig. 3 is the structural representation of pavior brick embodiment two in the present invention,
Fig. 4 is the structural representation of pavior brick laying in Fig. 3,
Fig. 5 is the structural representation of pavior brick embodiment three in the present invention,
Fig. 6 is the structural representation of pavior brick laying in Fig. 5,
Fig. 7 is the sectional view of road surfacing in the present invention;
In figure 1 is brick body, and 11 is arc groove, and 12 is projection, and 13 is groove, and 14 is basic unit, and 15 is surface layer, 2 be permeable fill body, 21 It is upper strata, 22 is lower floor, 3 is circular hole, 4 is reservoir bed, 5 is geotextiles.
Specific embodiment
The present invention as shown in figs. 1-7, including some pavior bricks and some permeable fill body 2, described pavior brick includes rectangular tiles Body 1, the corner of brick body is respectively equipped with arc groove 11 so that when four brick body are spliced, four arc grooves are formed for placing The permeable circular hole 3 filling body;
At least one side of brick body is provided with projection 12 and groove 13, and at least one side is provided with two grooves 13, adjacent Projection between brick body is adaptedly located in groove, and the groove between adjacent brick body and groove are formed for placing the permeable body that fills Circular hole 3.
In work, pervious concrete road pavement brick includes the surface layer on basic unit and basic unit, generally one rectangle brick body, four Turning is in arc-shaped, and at least one side of brick body is provided with projection and groove, and at least one side is provided with two grooves.Laying When, the projection between two neighboring brick body and groove are mutually twisted fixation, thus play the effect of positioning interlocking when mating formation, make Stablizing of water-permeable brick laying is firm;Groove between two neighboring brick body and groove are spliced to form the gap hole of circle, gap hole Inside it is filled with gap seepy material(I.e. permeable fill body).Gap hole not only possesses preferable water permeability, also will not be to permeable road The intensity in face produces impact.
As shown in Figure 3-4, two sides of brick body 1 are equipped with projection and groove, two sides be equipped with two recessed Groove so that sound construction, is easy to place and permeable is filled body.
As seen in figs. 5-6, three sides of brick body 1 are equipped with projection and groove, and a side is provided with two grooves, Convenient connect, sound construction, be easy to place and permeable fill body.
The section of described projection and groove is in circular arc, the interlocking structure firm stable so being formed by projection and groove, Gap hole is formed by groove and groove and not only possesses preferable water permeability, also will not produce obvious shadow to the intensity of porous pavement Ring.
Brick body includes basic unit 14 and is located at surface layer 15 in basic unit, and the basic unit of pavior brick adopts the larger bone of particle diameter Material is formulated, and surface layer is formulated using the less aggregate of particle diameter.
Described basic unit includes the component of following percentage by weight:Including cement 15%-20%, particle diameter is the stone 40% of 5-8mm ~60%, particle diameter is stone 20%~40% and the additive 2%-4% of 8-10mm;
Described surface layer includes the component of following percentage by weight:Including cement 15%-20%, particle diameter is the quartz sand 40%- of 1-2mm 50%th, particle diameter is stone 30%-40%, pigment 1.2%-1.8% and the additive 2%~4% of 2.5-3.5mm;
The base material comprising said components and surface material are first mixed respectively, then through dither and pressing process compacting Combine to form pervious concrete road pavement brick, make the pervious concrete road pavement brick of preparation not only have higher intensity, and profile Attractive in appearance.
, by basic unit and surface layer are carried out respectively with mixtures optimal design, the contact point improving between concrete aggregate is strong for the present invention Degree, ensures water-permeable brick physical and mechanical property and durability under meeting coefficient of permeability indicator conditions, realize water-permeable brick intensity with thoroughly The coordination of water coefficient.
Embodiment one:Described basic unit is formulated using the larger aggregate of particle diameter, by weight percentage, including cement 18%, particle diameter 5-8mm stone 52%, particle diameter 8-10mm stone 27% and additive 3%;In described basic unit, additive therefor includes silicon ash 2.0%th, acrylic emulsion 0.8%, high-efficiency water-reducing agent of poly-carboxylic acid 0.2%.
Described surface layer is formulated using the less aggregate of particle diameter, by weight percentage, including cement 20%, particle diameter 1- 2mm quartz sand 45%, particle diameter 2.5-3.5mm stone 30%, pigment 1.5% and additive 3.5%;Additive therefor bag in described surface layer Include silicon ash 1.7%, acrylic emulsion 1.6%, high-efficiency water-reducing agent of poly-carboxylic acid 0.2%.
Pervious concrete road pavement brick coefficient of permeability >=the 0.4mm/s of the present invention, rupture strength reaches >=5.0MPa;Frost resistance (25 times) are qualified.
Embodiment two:Described basic unit is formulated using the larger aggregate of particle diameter, by weight percentage, including cement 15%, particle diameter 5-8mm stone 43%, particle diameter 8-10mm stone 40% and additive 2%;In described basic unit, additive therefor includes silicon ash 1.0%th, acrylic emulsion 0.8%, high-efficiency water-reducing agent of poly-carboxylic acid 0.2%.
Described surface layer is formulated using the less aggregate of particle diameter, by weight percentage, including cement 15%, particle diameter 1- 2mm quartz sand 40%, particle diameter 2.5-3.5mm stone 40%, pigment 1.5% and additive 3.5%;Additive therefor bag in described surface layer Include silicon ash 2.0%, acrylic emulsion 1.3%, high-efficiency water-reducing agent of poly-carboxylic acid 0.2%.
Pervious concrete road pavement brick coefficient of permeability >=the 0.3mm/s of the present invention, rupture strength reaches >=4.0MPa.
Embodiment three:Described basic unit is formulated using the larger aggregate of particle diameter, by weight percentage, including cement 20%, particle diameter 5-8mm stone 56%, particle diameter 8-10mm stone 20% and additive 4%;In described basic unit, additive therefor includes silicon ash 2.0%th, acrylic emulsion 1.8%, high-efficiency water-reducing agent of poly-carboxylic acid 0.2%.
Described surface layer is formulated using the less aggregate of particle diameter, by weight percentage, including cement 18%, particle diameter 1- 2mm quartz sand 48%, particle diameter 2.5-3.5mm stone 30%, pigment 1.5% and additive 2.5%;Additive therefor bag in described surface layer Include silicon ash 1.5%, acrylic emulsion 0.8%, high-efficiency water-reducing agent of poly-carboxylic acid 0.2%.
Pervious concrete road pavement brick coefficient of permeability >=the 0.35mm/s of the present invention, rupture strength reaches >=4.5MPa.
In described basic unit and surface layer, additive therefor includes active mixed material, polymer emulsion and water reducer, described activity The percentage by weight of mixing material is 1.0-2.0%, the percentage by weight of polymer emulsion is 0.8%-2.0%, the weight hundred of water reducer Divide ratio 0.15%-0.25%, described active mixed material, polymer emulsion and water reducer percentage by weight sum are 2%-4%.
Described active mixed material is one or more of silicon ash, ground slag, Kaolin;Described polymer emulsion is third One or more of olefin(e) acid emulsion, butadiene-styrene latex, EVA emulsion.Described polymer emulsion covers and can substantially carry in aggregate surface The adhesion strength of high aggregate contact point.
The described permeable body 2 that fills includes upper strata 21 and lower floor 22, and described lower floor 2-5mm level joins stone filling, described upper strata Join filling after stone and adhesive mix with 2-5mm level;Described adhesive is organic polymeric emulsions or waterglass.
In application, stone filling, remaining top section 2- join with 2-5mm level in the lower floor apart from brick body surface 10-15mm 5mm level is filled after joining stone and adhesive mix;Described adhesive has cohesive force for organic polymeric emulsions or waterglass etc. Material it is ensured that the aggregate of gap in the hole is not cleaned out or is kicked out of by pedestrian.Waterglass is sodium silicate aqueous solution, colourless, There is certain viscosity.
A kind of laying method of pervious concrete porous pavement, comprises the following steps:The roadbed having laid is laid Joined the reservoir bed 4 that stone is constituted by level for one layer, one layer of geotextiles 5 are laid on described reservoir bed, rainwater passes through permeable geotextiles Continue to permeate downwards, the impurity in water can be filtered down by geotextiles, play the effect filtering rainwater.Then in geotextiles The some pervious concrete road pavement bricks of upper laying, and after porous pavement mats formation end, be filled with justifying by some permeable bodies that fill Hole(Gap filling seepy material is used to fill the gap hole between adjacent water-permeable brick).
A kind of maintenance restorative procedure of pervious concrete porous pavement, is less than Pavement Design value in porous pavement permeation rate When, permeable in circular hole is filled by body using powerful vacuum vacuum cleaner and suctions out and cleaned with water, newly filled out with described permeable body weight of filling Full circular hole.
In application, the material of gap in the hole will be sucked out through repeatedly rinsing, and if being not added with adhesive, is to hold very much Easily cleaning is sucked out by vacuum, but easily swept away, so top section has added adhesive, simply when such cleaning Form the material of one layer of viscosity in stone surface, strengthen the cohesive force between stone, it is to avoid sweep away during cleaning.It is to lean between stone Point contact, the space of entirety or particle packing formation, plus a small amount of adhesive is little to permeable influential effect.
, using " permeable from permeable and gap " permeable pattern, pervious concrete road pavement brick making is convenient and swift, phase for the present invention Adjacent brick body interlocks solid and reliable, good water permeability, be used in combination permeable joint filler it can be ensured that pervious concrete pavement saturating for a long time Water effect and reparation.

Claims (10)

1. a kind of concrete permeable road surface it is characterised in that include some pavior bricks and some permeable fill body, described pavior brick bag Include rectangle brick body, the corner of brick body is respectively equipped with arc groove so that when four brick body are spliced, four arc grooves form and are used for Place the permeable circular hole filling body;
At least one side of brick body is provided with projection and groove, and at least one side is provided with two grooves, adjacent brick body it Between projection be adaptedly located in groove, the groove between adjacent brick body and groove are formed for placing the permeable circular hole filling body.
2. a kind of concrete permeable road surface according to claim 1 is it is characterised in that two sides of brick body are all provided with There are projection and groove, two sides are equipped with two grooves.
3. a kind of concrete permeable road surface according to claim 1 is it is characterised in that three sides of brick body are all provided with There are projection and groove, a side is provided with two grooves.
4. a kind of concrete permeable road surface according to claim 1 is it is characterised in that the section of described projection and groove is in Circular arc.
5. a kind of concrete permeable road surface according to claim 1 is it is characterised in that brick body includes basic unit and sets Surface layer in basic unit,
Described basic unit includes the component of following percentage by weight:Including cement 15%-20%, particle diameter be 5-8mm stone 40%~ 60%th, particle diameter is stone 20%~40% and the additive 2%-4% of 8-10mm;
Described surface layer includes the component of following percentage by weight:Including cement 15%-20%, particle diameter is the quartz sand 40%- of 1-2mm 50%th, particle diameter is stone 30%-40%, pigment 1.2%-1.8% and the additive 2%~4% of 2.5-3.5mm;
The base material comprising said components and surface material are first mixed respectively, then through dither and pressing process compacting Combine to form pervious concrete road pavement brick.
6. a kind of concrete permeable road surface according to claim 5 is it is characterised in that used in described basic unit and surface layer add Plus agent includes active mixed material, polymer emulsion and water reducer, the percentage by weight of described active mixed material is 1.0-2.0%, gathers The percentage by weight of compound emulsion is 0.8%-2.0%, the percentage by weight 0.15%-0.25% of water reducer, described active mixed material, Polymer emulsion and water reducer percentage by weight sum are 2%-4%.
7. a kind of concrete permeable road surface according to claim 6 it is characterised in that described active mixed material be silicon ash, One or more of ground slag, Kaolin;Described polymer emulsion is acrylic emulsion, butadiene-styrene latex, in EVA emulsion One or more.
8. according to a kind of arbitrary described concrete permeable road surface of claim 1-7 it is characterised in that the described permeable body that fills includes The upper and lower, described lower floor 2-5mm level joins stone filling, after described upper strata 2-5mm level joins stone and adhesive mix Filling;Described adhesive is organic polymeric emulsions or waterglass.
9. a kind of laying method on the concrete permeable road surface described in claim 1 is it is characterised in that comprise the following steps:? On the roadbed having laid, the reservoir bed that stone is constituted is joined in one layer of laying by level, lays one layer of geotextiles on described reservoir bed, Then some pervious concrete road pavement bricks are laid on geotextiles, and after porous pavement mats formation end, permeable filled by some Body is filled with circular hole.
10. a kind of maintenance restorative procedure on the concrete permeable road surface described in claim 1 is it is characterised in that in porous pavement When permeation rate is less than Pavement Design value, permeable in circular hole is filled by body using powerful vacuum vacuum cleaner and suctions out and cleaned with water, Newly fill up circular hole with described permeable body weight of filling again.
CN201611043311.1A 2016-11-22 2016-11-22 A kind of concrete permeable road surface, its laying method and its maintenance restorative procedure Active CN106381796B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611043311.1A CN106381796B (en) 2016-11-22 2016-11-22 A kind of concrete permeable road surface, its laying method and its maintenance restorative procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611043311.1A CN106381796B (en) 2016-11-22 2016-11-22 A kind of concrete permeable road surface, its laying method and its maintenance restorative procedure

Publications (2)

Publication Number Publication Date
CN106381796A true CN106381796A (en) 2017-02-08
CN106381796B CN106381796B (en) 2019-08-02

Family

ID=57959268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611043311.1A Active CN106381796B (en) 2016-11-22 2016-11-22 A kind of concrete permeable road surface, its laying method and its maintenance restorative procedure

Country Status (1)

Country Link
CN (1) CN106381796B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403174A (en) * 2018-11-30 2019-03-01 厦门固泽环保科技有限公司 A kind of chain self-luminous water-permeable brick
CN109437738A (en) * 2018-11-26 2019-03-08 中国十七冶集团有限公司 A kind of preparation method of Double-layer water silt particle base water-permeable brick
CN111809472A (en) * 2020-07-15 2020-10-23 孙亚 Different-terrain self-adaptive rapid installation road
CN112062524A (en) * 2020-10-16 2020-12-11 福州大学 Recycled concrete permeable pavement brick and preparation method thereof
CN112431083A (en) * 2020-12-02 2021-03-02 中国建筑第五工程局有限公司 Permeable pavement layer
CN113106821A (en) * 2021-04-21 2021-07-13 交通运输部公路科学研究所 Hoisting and positioning device and method for assembly type cement concrete pavement slab

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0328639A1 (en) * 1987-07-22 1989-08-23 HAYASHI, Isao Frame for laying wooden bricks
JPH08338002A (en) * 1995-06-14 1996-12-24 Shinko Yogyo Kk Tile
CN202466348U (en) * 2011-12-31 2012-10-03 潍坊特钢集团新型建材有限公司 Steelmaking waste slag floor tile
CN204417961U (en) * 2014-12-16 2015-06-24 越艳 Regeneration concrete lawn brick
CN105401504A (en) * 2015-12-11 2016-03-16 盐城市荣立新型建材有限公司 Concrete pavement brick capable of achieving gap water permeation and self water permeation
CN206189241U (en) * 2016-11-22 2017-05-24 中国建筑材料科学研究总院 Concrete permeable pavement

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0328639A1 (en) * 1987-07-22 1989-08-23 HAYASHI, Isao Frame for laying wooden bricks
JPH08338002A (en) * 1995-06-14 1996-12-24 Shinko Yogyo Kk Tile
CN202466348U (en) * 2011-12-31 2012-10-03 潍坊特钢集团新型建材有限公司 Steelmaking waste slag floor tile
CN204417961U (en) * 2014-12-16 2015-06-24 越艳 Regeneration concrete lawn brick
CN105401504A (en) * 2015-12-11 2016-03-16 盐城市荣立新型建材有限公司 Concrete pavement brick capable of achieving gap water permeation and self water permeation
CN206189241U (en) * 2016-11-22 2017-05-24 中国建筑材料科学研究总院 Concrete permeable pavement

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109437738A (en) * 2018-11-26 2019-03-08 中国十七冶集团有限公司 A kind of preparation method of Double-layer water silt particle base water-permeable brick
CN109403174A (en) * 2018-11-30 2019-03-01 厦门固泽环保科技有限公司 A kind of chain self-luminous water-permeable brick
CN111809472A (en) * 2020-07-15 2020-10-23 孙亚 Different-terrain self-adaptive rapid installation road
CN112062524A (en) * 2020-10-16 2020-12-11 福州大学 Recycled concrete permeable pavement brick and preparation method thereof
CN112431083A (en) * 2020-12-02 2021-03-02 中国建筑第五工程局有限公司 Permeable pavement layer
CN112431083B (en) * 2020-12-02 2024-05-28 中国建筑第五工程局有限公司 Permeable pavement layer
CN113106821A (en) * 2021-04-21 2021-07-13 交通运输部公路科学研究所 Hoisting and positioning device and method for assembly type cement concrete pavement slab

Also Published As

Publication number Publication date
CN106381796B (en) 2019-08-02

Similar Documents

Publication Publication Date Title
CN106381796B (en) A kind of concrete permeable road surface, its laying method and its maintenance restorative procedure
CN105887609B (en) A kind of construction method on sponge urban ecology diafiltration ground
CN103669145B (en) A kind of paving method of permeable pavement structure
CN104878678A (en) Construction method for water-permeable and water-retaining water-permeable pavement structure
CN105040554A (en) Garden path structure and paving construction technology thereof
CN107034767A (en) A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
CN106758638A (en) A kind of city sponge brick and its construction technology
CN206189241U (en) Concrete permeable pavement
US20160090737A1 (en) Layered architectural pervious concrete
CN103669147A (en) Pavement method of permeable ground and permeable pavement structure paved through pavement method
CN103669167B (en) A kind of permeable pavement structure
CN207685618U (en) A kind of Old cement concrete transform asphalt pavement structure as
KR100718292B1 (en) Pavement method
CN105401504A (en) Concrete pavement brick capable of achieving gap water permeation and self water permeation
CN205557229U (en) Build sediment and slag and mix sponge brick that permeates water
CN213772779U (en) Concrete road surface structure permeates water
CN106677003A (en) Pervious concrete structure and preparation method thereof
CN106436523A (en) New-structure grass planting brick produced by recycled aggregates
CN205501754U (en) Ecological ceramic tile
CN207793792U (en) A kind of road surface permeable pavement structure
CN206828912U (en) A kind of full pervious concrete pavement structure of regeneration aggregate
CN206721596U (en) A kind of pavement structure of permeable road
CN104878672A (en) Stone-planted cement concrete bridge deck paving structure and method
CN107974892A (en) A kind of environment protection pavement and its construction method
CN106996063A (en) A kind of pavement structure of permeable road

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200624

Address after: 213000, No. 8, West Avenue, Wujin District, Changzhou, Jiangsu (green building industry agglomeration demonstration area of Changzhou District, Wujin city), Research Institute, room 323

Patentee after: JIANGSU DEZHI HEAVY INDUSTRY Co.,Ltd.

Address before: 100024 No. 1, East Lane, Chaoyang District, Beijing, Guanzhuang

Patentee before: CHINA BUILDING MATERIALS ACADEMY

TR01 Transfer of patent right