CN106436523A - New-structure grass planting brick produced by recycled aggregates - Google Patents
New-structure grass planting brick produced by recycled aggregates Download PDFInfo
- Publication number
- CN106436523A CN106436523A CN201610944513.7A CN201610944513A CN106436523A CN 106436523 A CN106436523 A CN 106436523A CN 201610944513 A CN201610944513 A CN 201610944513A CN 106436523 A CN106436523 A CN 106436523A
- Authority
- CN
- China
- Prior art keywords
- grass
- planting
- brick
- brick body
- cuboid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C9/00—Special pavings; Pavings for special parts of roads or airfields
- E01C9/004—Pavings specially adapted for allowing vegetation
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/04—Pavings made of prefabricated single units made of bricks
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)
- Cultivation Of Plants (AREA)
- Road Paving Structures (AREA)
Abstract
本发明公开一种利用再生骨料生产的新结构植草砖,植草砖由再生骨料制作,主体为长方体砖体,砖面为正方形,正中间挖有一个圆形植草孔,在砖体的四角下方设有四个长6cm的短柱,短柱与上部砖体之间设有倒角,以增强稳定性。此外,四个短柱的存在使得砖体下部架空,从而使泥土联通,若一个植草孔中的草枯萎,周围植草孔中的草可向其蔓延。本发明特征在于:植草砖底部垫层采用特干硬性透水混凝土材料制成,在一定程度上改善了原有硬化路面逢雨必涝,旱涝急转的问题,最大限度地实现雨水在城市区域的积存、调蓄、渗透、净化和利用。砖体全部采用再生骨料,环保且成本低廉,符合绿色建筑的环保理念。
The invention discloses a grass-planting brick with a new structure produced by using recycled aggregate. The grass-planting brick is made of recycled aggregate. There are four short columns with a length of 6cm below, and chamfers are provided between the short columns and the upper brick body to enhance stability. In addition, the existence of four short columns makes the lower part of the brick body elevated, so that the soil is connected. If the grass in one grass planting hole withers, the grass in the surrounding grass planting holes can spread to it. The present invention is characterized in that: the cushion layer at the bottom of the grass-planting brick is made of extra-dry hard permeable concrete material, which improves the problem that the original hardened road surface will be waterlogged every time it rains, and the problem of sudden turn of drought and flood, and realizes the rainwater in the urban area to the greatest extent. Accumulation, regulation and storage, infiltration, purification and utilization. The brick body is all made of recycled aggregate, which is environmentally friendly and low in cost, and conforms to the environmental protection concept of green buildings.
Description
技术领域technical field
本发明涉及建筑材料领域和植草砖技术领域,特别是涉及一种利用再生骨料生产的新结构植草砖。The invention relates to the field of building materials and the technical field of grass-planting bricks, in particular to a new-structure grass-planting brick produced by using recycled aggregates.
背景技术Background technique
植草砖是由混凝土、河沙、颜料等优质材料经过高压砖机振压而成。植草砖具有很强的抗压性,铺设在地面上有很好的稳固性,绿化面积广,能经受行人、车辆的辗压而不容易被损坏,它既可以方便人们出行,又可以增加城市的绿化面积,从而改善空气。植草砖将植草区域变为可承重表面,适用于停车场、人行道、出入通道、消防通道、高尔夫球道、屋顶花园和斜坡,固坡护堤,应用十分广泛。但现有的植草砖结构单一,且普遍存在砖面不稳的问题,行走时脚感不舒适。因此开发新型的植草砖具有非常实际且深远的意义。Grass planting bricks are made of high-quality materials such as concrete, river sand, and pigments, which are vibrated by a high-pressure brick machine. Grass planting bricks have strong compression resistance, good stability when laid on the ground, wide green area, and can withstand the rolling of pedestrians and vehicles without being easily damaged. It can not only facilitate people's travel, but also increase urban Green area, thereby improving the air. Grass planting bricks turn the grass planting area into a load-bearing surface, suitable for parking lots, sidewalks, access passages, fire exits, golf courses, roof gardens and slopes, slope reinforcement and embankment, and are widely used. However, the existing grass-planting bricks have a single structure and generally have the problem of unstable brick surfaces, and the feet feel uncomfortable when walking. Therefore the development of new grass-planting bricks has very practical and far-reaching significance.
当今城市建设处处是硬化路面,逢雨必涝,旱涝急转。因此建设海绵城市,提升城市排水系统迫在眉睫,要优先考虑把有限的雨水留下来,优先考虑更多利用自然力量排水,建设自然存积、自然渗透、自然净化的海绵城市。本发明可同时减少城市地面硬化,增加雨水下渗面积,降低城市内涝风险,下雨时吸水、蓄水、渗水、净水,需要时将蓄存的水“释放”并加以利用。Today's urban construction is full of hardened roads, which will be flooded every time it rains, and droughts and floods will turn sharply. Therefore, it is imminent to build a sponge city and improve the urban drainage system. Priority should be given to retaining limited rainwater and more use of natural forces to drain water, so as to build a sponge city with natural storage, natural infiltration, and natural purification. The invention can simultaneously reduce urban ground hardening, increase rainwater infiltration area, reduce urban waterlogging risk, absorb water, store water, seep water, purify water when it rains, and "release" the stored water and make use of it when necessary.
再生骨料是由建筑垃圾通过资源化再生利用生产得到的。生产和利用建筑垃圾再生骨料对于节约资源、保护环境和实现建筑业的可持续发展具有重要意义。Recycled aggregate is produced from construction waste through resource recycling. The production and utilization of recycled aggregate from construction waste is of great significance for saving resources, protecting the environment and realizing the sustainable development of the construction industry.
发明内容Contents of the invention
本发明的目的在于提供一种环保、稳固、美观的新结构植草砖。本发明材料选用建筑垃圾再生骨料,符合建筑业的可持续发展原则,节能环保,降低成本。本发明主体构件由工厂主体化生产,制作方便,工序简单。经计算,砖体宽度和厚度都有一定的安全性和稳定性,可以满足车辆和行人的通过。The purpose of the present invention is to provide an environmentally friendly, stable and beautiful grass-planting brick with a new structure. The materials of the invention are recycled aggregates from construction waste, which conforms to the sustainable development principle of the construction industry, saves energy and protects the environment, and reduces costs. The main component of the present invention is produced by the main body of the factory, which is convenient to manufacture and simple in process. After calculation, the width and thickness of the brick body have certain safety and stability, which can satisfy the passage of vehicles and pedestrians.
为实现上述要求,本发明采取如下技术解决方案:In order to realize the above-mentioned requirements, the present invention takes the following technical solutions:
本发明的结构简单且新颖,一种利用再生骨料生产的新结构植草砖,包括上部长方体砖体、短柱、倾斜三棱柱倒角、圆形植草孔、特干硬性再生骨料透水垫层。长方体砖体下端设四个短柱,短柱内侧与长方体砖体相连处为倾斜三棱柱倒角。长方体砖体中心设圆形植草孔,圆形植草孔竖直贯通长方体砖体。圆形植草孔用于种植草皮,短柱间填充泥土。长方体砖体拼接,短柱下方为特干硬性再生骨料透水垫层。The structure of the present invention is simple and novel, a new structure grass-planting brick produced by using recycled aggregates, including upper cuboid brick body, short column, inclined triangular prism chamfer, circular grass-planting hole, extra-dry hard recycled aggregate permeable cushion . Four short columns are arranged at the lower end of the rectangular parallelepiped brick body, and the inner side of the short column connects with the rectangular parallelepiped brick body is an inclined triangular prism chamfer. A circular grass planting hole is arranged in the center of the rectangular parallelepiped brick body, and the circular grass planting hole vertically runs through the rectangular parallelepiped brick body. The circular grass hole is used for planting turf, and the short posts are filled with soil. The cuboid bricks are spliced, and the bottom of the short column is a permeable cushion made of extra-dry hard recycled aggregate.
长方体砖体采用C15强度等级的再生混凝土。上部的长方体砖体为长方体,长200mm,宽200mm,高60mm。圆形植草孔半径为40mm,圆心与整体形心重合。短柱为相同形状的长方体,长50mm,宽50mm,高60mm,并附着于上部砖体的四个角。倾斜三棱柱倒角形状为三棱柱,其底面为两边10mm的直角三角形,高与柱平齐。长方体砖体砖面设有防滑层,层面上有多个凸点。特干硬性再生骨料垫层采用特干硬性透水混凝土材料。在特干硬性再生骨料垫层与长方体砖体之间还设有稳定层,由透水混凝土制成,其成分为胶结剂、碎石、水泥。植草砖整体上下左右对称。The cuboid brick body is made of recycled concrete of C15 strength grade. The upper cuboid brick body is cuboid, 200mm long, 200mm wide, and 60mm high. The radius of the circular grass planting hole is 40mm, and the center of the circle coincides with the overall centroid. The short columns are cuboids of the same shape, 50mm long, 50mm wide, and 60mm high, and are attached to the four corners of the upper brick body. The chamfered shape of the inclined triangular prism is a triangular prism, the bottom surface of which is a right triangle with 10mm on both sides, and the height is flush with the column. The brick surface of the cuboid brick body is provided with an anti-slip layer, and there are multiple bumps on the surface. Extra-dry hard recycled aggregate cushion adopts extra-dry hard permeable concrete material. There is also a stable layer between the extra-dry hard recycled aggregate cushion and the cuboid brick body, which is made of permeable concrete, and its components are cement, crushed stone, and cement. The grass planting bricks are symmetrical up and down as a whole.
作为优选,短柱经抗折与抗压强度的计算确定其尺寸。Preferably, the size of the short column is determined by calculating the flexural and compressive strength.
作为优选,长方体砖体砖面设有防滑层,层面上有多个凸点,以增大摩擦,保证行人和车辆安全。Preferably, an anti-slip layer is provided on the surface of the cuboid brick body, and there are a plurality of bumps on the surface to increase friction and ensure the safety of pedestrians and vehicles.
作为优选,砖面与短柱之间连接设倾斜三棱柱倒角,使得四个短柱更加牢固,不易弯折。Preferably, an inclined triangular prism chamfer is provided between the brick surface and the short columns, so that the four short columns are more firm and less prone to bending.
作为优选,砖体下部稳定层采用透水混凝土,透水混凝土层的存在产生很多积极效益,当集中降雨时能减轻城市排水设施的负担,防止河流泛滥和水体污染。能使雨水迅速深入地下,还原地下水,保持土壤湿度。调节城市空间的温度和湿度,改善城市热循环,反向蒸腾;高温季节,有效降温3~5℃,缓解热岛效应。As a preference, the lower stable layer of the brick body is made of permeable concrete. The existence of the permeable concrete layer produces many positive benefits. When the rainfall is concentrated, it can reduce the burden of urban drainage facilities and prevent river flooding and water pollution. It can make rainwater go deep into the ground quickly, restore groundwater and maintain soil moisture. Adjust the temperature and humidity of the urban space, improve the urban thermal cycle, and reverse transpiration; in high temperature seasons, it can effectively reduce the temperature by 3~5°C and alleviate the heat island effect.
撒土时泥土表面与上部砖体底面之间留有空隙,目的是使每个单元的植被能够相互贯通,有利于植被的均匀生长。When spreading the soil, there is a gap between the soil surface and the bottom surface of the upper brick body, so that the vegetation of each unit can penetrate each other, which is conducive to the uniform growth of vegetation.
本发明具有以下优点:The present invention has the following advantages:
1.本发明结构简单实用,工厂模式化制作方便快捷,安装与拆卸效率都很高,铺装方便,外形美观。1. The structure of the present invention is simple and practical, the factory pattern production is convenient and fast, the installation and disassembly efficiency is high, the paving is convenient, and the appearance is beautiful.
2.四个短柱的设计增强了植草砖的抓地力,从而提高了整体的稳定性,当植草砖承受移动荷载时不易水平移动。不容易倾覆导致蚀空底部。2. The design of four short columns enhances the grip of the grass-planting bricks, thereby improving the overall stability, and it is not easy to move horizontally when the grass-planting bricks are subjected to moving loads. It is not easy to overturn and cause an eclipse bottom.
3.柱体与砖体连接牢固,不易弯折。在运输和保存过程中不易损坏。3. The column body and the brick body are firmly connected and not easy to bend. It is not easy to be damaged during transportation and storage.
4.四个短柱的设计使得砖面下部架空,为草提供了水平生长的空间,若一个植草孔中的草死亡,周围的植草孔中的草可以蔓延并补充缺失草的植草孔。从而避免了频繁复种,使整体保持一个完整且美观的状态。4. The design of four short columns makes the lower part of the brick surface elevated, providing a space for grass to grow horizontally. If the grass in one grass planting hole dies, the grass in the surrounding grass planting holes can spread and supplement the grass planting hole that lacks grass. This avoids frequent replanting and keeps the whole in a complete and beautiful state.
5.砖体采用再生骨料,节能环保,成本低廉,具有一定的社会效益和经济效益。5. The brick body adopts recycled aggregate, which is energy-saving, environmentally friendly, low-cost, and has certain social and economic benefits.
6.砖体下部的稳定层是透水混凝土层,配合上部泥土层,使雨水能够得到最大限度的下渗,并且在干旱时能释放一定的水分至路面,像海绵一样调节着路面的干湿,既避免了洪涝,又有效的收集了雨水。6. The stable layer at the lower part of the brick body is a permeable concrete layer, combined with the upper soil layer, the rainwater can be infiltrated to the maximum extent, and can release a certain amount of water to the road surface when it is dry, regulating the dryness and wetness of the road surface like a sponge. It not only avoids flooding, but also effectively collects rainwater.
附图说明Description of drawings
图1是植草砖单体图。Fig. 1 is a single figure of a grass planting brick.
图2是植草砖安装图。Fig. 2 is the installation drawing of grass planting brick.
图3是植草砖铺砌正视图。Fig. 3 is a front view of grass planting brick paving.
图4是植草砖铺砌三维图。Fig. 4 is a three-dimensional diagram of grass planting brick paving.
具体实施方式detailed description
如图1-4,一种利用再生骨料生产的新结构植草砖,包括上部长方体砖体(1)、四个短柱(2)、八个倾斜三棱柱倒角(3)、圆形植草孔(4)、特干硬性再生骨料透水垫层(5)。长方体砖体(1)下端设四个短柱(2),短柱(2)内侧与长方体砖体(1)相连处为倾斜三棱柱倒角(3)。长方体砖体(1)中心设圆形植草孔(4),圆形植草孔(4)竖直贯通长方体砖体(1)。圆形植草孔(4)用于种植草皮,短柱(2)间填充泥土。长方体砖体(1)拼接,短柱(2)下方为特干硬性再生骨料透水垫层(5)。As shown in Figure 1-4, a new structure of grass planting bricks produced using recycled aggregates, including the upper cuboid brick body (1), four short columns (2), eight inclined triangular prism chamfers (3), circular grass planting bricks holes (4), extra-dry rigid recycled aggregate permeable cushion (5). The lower end of the cuboid brick body (1) is provided with four short columns (2), and the inner side of the short columns (2) connected with the cuboid brick body (1) is an inclined triangular prism chamfer (3). A circular grass planting hole (4) is arranged in the center of the rectangular parallelepiped brick body (1), and the circular grass planting hole (4) vertically passes through the rectangular parallelepiped brick body (1). The circular grass planting holes (4) are used for planting turf, and the short columns (2) are filled with soil. The cuboid brick body (1) is spliced, and the bottom of the short column (2) is a permeable cushion (5) of extra-dry rigid recycled aggregate.
长方体砖体(1)采用C15强度等级的再生混凝土。上部的长方体砖体(1)为长方体,长200mm,宽200mm,高60mm。圆形植草孔(4)半径为40mm,圆心与整体形心重合。短柱(2)为相同形状的长方体,长50mm,宽50mm,高60mm,并附着于上部砖体的四个角。倾斜三棱柱倒角(3)形状为三棱柱,其底面为两边10mm的直角三角形,高与柱平齐。长方体砖体(1)砖面设有防滑层,层面上有多个凸点。特干硬性再生骨料垫层(5)采用特干硬性透水混凝土材料。在特干硬性再生骨料垫层(5)与长方体砖体(1)之间还设有稳定层,由透水混凝土制成,其成分为胶结剂、碎石、水泥。植草砖整体上下左右对称。Cuboid brick body (1) adopts recycled concrete with C15 strength grade. The cuboid brick body (1) on the top is a cuboid with a length of 200mm, a width of 200mm and a height of 60mm. The circular grass planting hole (4) has a radius of 40mm, and the center of circle coincides with the overall centroid. The short column (2) is a cuboid of the same shape, with a length of 50mm, a width of 50mm, and a height of 60mm, and is attached to the four corners of the upper brick body. The chamfering of the inclined triangular prism (3) is triangular prism in shape, its bottom surface is a right triangle with 10mm on both sides, and its height is flush with the column. Cuboid brick body (1) The brick surface is provided with an anti-skid layer, and there are multiple bumps on the surface. The extra-dry hard recycled aggregate cushion (5) is made of extra-dry hard permeable concrete. A stabilizing layer is also provided between the extra-dry hard recycled aggregate cushion (5) and the cuboid brick body (1), which is made of permeable concrete, and its components are cement, gravel and cement. The grass planting bricks are symmetrical up and down as a whole.
作为优选,短柱经抗折与抗压强度的计算确定其尺寸。Preferably, the size of the short column is determined by calculating the flexural and compressive strength.
作为优选,长方体砖体(1)砖面设有防滑层,层面上有多个凸点,以增大摩擦,保证行人和车辆安全。Preferably, the cuboid brick body (1) is provided with an anti-slip layer on the brick surface, and there are a plurality of bumps on the surface to increase friction and ensure the safety of pedestrians and vehicles.
作为优选,砖面与短柱之间连接设倾斜三棱柱倒角(3),使得四个短柱更加牢固,不易弯折。Preferably, an inclined triangular prism chamfer (3) is provided between the brick surface and the short columns, so that the four short columns are more firm and less likely to be bent.
作为优选,砖体下部稳定层采用透水混凝土,透水混凝土层的存在产生很多积极效益,当集中降雨时能减轻城市排水设施的负担,防止河流泛滥和水体污染。能使雨水迅速深入地下,还原地下水,保持土壤湿度。调节城市空间的温度和湿度,改善城市热循环,反向蒸腾;高温季节,有效降温3~5℃,缓解热岛效应。As a preference, the lower stable layer of the brick body is made of permeable concrete. The existence of the permeable concrete layer produces many positive benefits. When the rainfall is concentrated, it can reduce the burden of urban drainage facilities and prevent river flooding and water pollution. It can make rainwater go deep into the ground quickly, restore groundwater and maintain soil moisture. Adjust the temperature and humidity of the urban space, improve the urban thermal cycle, and reverse transpiration; in high temperature seasons, it can effectively reduce the temperature by 3~5°C and alleviate the heat island effect.
实施例1Example 1
1.路基的开挖:根据设计的要求,路床开挖,清理土方,并达到设计标高;1. Excavation of the roadbed: According to the design requirements, the road bed is excavated, the earthwork is cleaned, and the design elevation is reached;
检查纵坡、横坡及边线,是否符合设计要求。Check whether the longitudinal slope, transverse slope and sideline meet the design requirements.
2.碾压及夯实地基土:利用机械落锤产生的能量对地基进行夯击使其密实,提高土的强度和减小压缩量,泥土的密实度应达到85%以上,使地基平稳,有利于在上面铺植草砖。 2. Rolling and compacting the foundation soil: Use the energy generated by the mechanical drop hammer to tamp the foundation to make it compact, improve the strength of the soil and reduce the amount of compression. The compactness of the soil should reach more than 85%, so that the foundation is stable and effective It is beneficial to lay grass bricks on it.
3.垫层的制作:铺设150mm垫层,垫层材料选用特干硬性再生骨料配制而成的混凝土,混合拌匀,摊平碾压至密实。 3. Cushion production: lay a 150mm cushion, and the cushion material is concrete prepared from extra-dry hard recycled aggregates, mix well, spread and roll until dense.
4.稳定层的制作:稳定层采用现浇透水混凝土层,其组成成分为专用胶结剂、碎石、水。将混合料均匀摊铺在工作面上,用括尺找准平整度和控制一定的泛水度,然后人工捣实,浇筑成型。4. The production of the stable layer: the stable layer adopts the cast-in-place permeable concrete layer, and its components are special cement, gravel, and water. Spread the mixture evenly on the working surface, use a bracket to find out the flatness and control a certain degree of flooding, and then manually tamp it and pour it into shape.
5.植草砖的铺设:如图二、图三、图四所示,人工铺装植草砖,根据所需面积大小确定植草砖铺设数量以及需要裁剪的尺寸,若植草砖区域内有窨井盖则对砖体进行相应的裁剪和修整。将选配好的板块清洗干净,铺砖时,应抹垫水泥湿浆,或撤1-2mm厚干水泥洒水湿润,将地面砖按控制线铺贴平整密实。5. Laying of grass-planting bricks: As shown in Figure 2, Figure 3, and Figure 4, artificially pave grass-planting bricks, determine the number of grass-planting bricks and the size to be cut according to the required area, if there is a manhole cover in the grass-planting brick area Cut and trim the bricks accordingly. Clean the selected plates. When laying bricks, wet cement slurry should be applied, or 1-2mm thick dry cement should be removed and sprinkled with water to moisten the floor tiles according to the control line. Lay flat and dense.
6.撒土:在植草格的凹植槽内撒上种植土并用扫帚均匀扫入植草格孔内,土层高度以低于植草格平面5-10mm为基准。这样做使得草有一定的蔓延空间可以补充附近枯萎的植草孔中的草。6. Soil spreading: Sprinkle the planting soil in the concave planting groove of the grass-planting grid and sweep it evenly into the hole of the grass-planting grid with a broom. The height of the soil layer is based on 5-10mm below the plane of the grass-planting grid. Doing this gives the grass some room to spread to replenish the grass in nearby dead grass holes.
7.嵌缝:铺完地面砖二天后,将缝口清洁干净,用水湿润,用1:1水砂按设计要求抹缝,嵌实压光。嵌缝的目的是使砖面平整,砖与砖之间不留空隙,从而提高整体的稳定性和美观程度。7. Caulking: Two days after laying the floor tiles, clean the seams, moisten them with water, wipe the seams with 1:1 water sand according to the design requirements, and compact and calender them. The purpose of caulking is to make the brick surface smooth and leave no gaps between bricks, thereby improving the overall stability and aesthetics.
8.植草:在植草孔中铺草皮、播草子。铺草皮时需将草皮压实于种植土上。8. Grass planting: Spread turf and sow grass seeds in the grass planting holes. When laying turf, the turf needs to be compacted on the planting soil.
9.养护:铺贴完后,用棉纱将地面擦拭干净。浇水养护待草成活后即可使用。9. Maintenance: After paving, wipe the ground with cotton yarn. Watering maintenance can be used after the grass survives.
本发明提供的一种利用再生骨料生产的新结构植草砖,解决了现有植草砖的两个问题:一是砖面不稳易倾斜;二是植草孔独立布置,一旦枯萎影响美观。此结构由再生骨料制作,主体为长方体砖体,砖面为正方形,正中间挖有一个圆形植草孔,在砖体的四角下方设有四个长6cm的短柱,短柱与上部砖体之间设有倒角,每个短柱设有两个倒角共八个倒角,以增强稳定性。四个短柱的设计目的为增强植草砖整体的抓地力,提高稳定性,当人与车压过时不易倾覆,此外,四个短柱的存在使得砖体下部架空,从而使泥土联通,若一个植草孔中的草枯萎,周围植草孔中的草可向其蔓延。本发明特征在于:植草砖底部垫层采用特干硬性透水混凝土材料制成,在一定程度上改善了原有硬化路面逢雨必涝,旱涝急转的问题,最大限度地实现雨水在城市区域的积存、调蓄、渗透、净化和利用,符合当下建设海绵城市的大趋势。砖体全部采用再生骨料,环保且成本低廉,符合绿色建筑,可持续发展的环保理念,具有良好的发展前景。The invention provides a new-structure grass-planting brick produced by using recycled aggregates, which solves two problems of the existing grass-planting bricks: one is that the surface of the grass-planting brick is unstable and easy to tilt; This structure is made of recycled aggregate. The main body is a cuboid brick body. The brick surface is square. There are chamfers between the bodies, and each short column has two chamfers, a total of eight chamfers, to enhance stability. The purpose of the design of the four short columns is to enhance the overall grip of the grass planting bricks and improve the stability. When people and vehicles pass by, it is not easy to overturn. In addition, the existence of the four short columns makes the lower part of the brick body overhead, so that the soil is connected. If a The grass in the grass planting hole is withered, and the grass in the surrounding grass planting holes can spread to it. The present invention is characterized in that: the cushion layer at the bottom of the grass-planting brick is made of extra-dry hard permeable concrete material, which improves the problem that the original hardened road surface will be waterlogged every time it rains, and the problem of sudden turn of drought and flood, and realizes the rainwater in the urban area to the greatest extent. The accumulation, storage, infiltration, purification and utilization of water are in line with the current general trend of building sponge cities. The brick body is all made of recycled aggregate, which is environmentally friendly and low in cost. It conforms to the environmental protection concept of green building and sustainable development, and has a good development prospect.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610944513.7A CN106436523A (en) | 2016-10-26 | 2016-10-26 | New-structure grass planting brick produced by recycled aggregates |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610944513.7A CN106436523A (en) | 2016-10-26 | 2016-10-26 | New-structure grass planting brick produced by recycled aggregates |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106436523A true CN106436523A (en) | 2017-02-22 |
Family
ID=58177565
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610944513.7A Pending CN106436523A (en) | 2016-10-26 | 2016-10-26 | New-structure grass planting brick produced by recycled aggregates |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106436523A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107165019A (en) * | 2017-07-07 | 2017-09-15 | 贵州师范大学 | One kind crosses water Water penetrable grass planting brick and preparation method thereof |
| CN107419632A (en) * | 2017-05-31 | 2017-12-01 | 甘肃精达节能环保科技有限责任公司 | A kind of water storage type grass-planting brick |
| CN107856168A (en) * | 2017-07-19 | 2018-03-30 | 深圳市华威环保建材有限公司 | A kind of regeneration aggregate ecological permeable bricks and its production technology |
| CN111593628A (en) * | 2020-06-20 | 2020-08-28 | 李雄伟 | Multifunctional self-fastening water-permeable environment-friendly greening brick |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0516957A1 (en) * | 1991-06-07 | 1992-12-09 | Eugen Prestele | Grating |
| CN201037220Y (en) * | 2006-08-12 | 2008-03-19 | 张国一 | Brick-plastic combined sod culture grid |
| CN201162218Y (en) * | 2008-02-13 | 2008-12-10 | 储裕龙 | Grass planting bricks |
| CN201236306Y (en) * | 2008-07-10 | 2009-05-13 | 李炳杰 | Grass planting bricks for greening of parking yard |
| CN201593148U (en) * | 2009-05-21 | 2010-09-29 | 李炳杰 | Multifunctional grass-planting brick |
| CN204753297U (en) * | 2015-04-23 | 2015-11-11 | 上海市园林工程有限公司 | Ecological grass planting brick parking area |
-
2016
- 2016-10-26 CN CN201610944513.7A patent/CN106436523A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0516957A1 (en) * | 1991-06-07 | 1992-12-09 | Eugen Prestele | Grating |
| CN201037220Y (en) * | 2006-08-12 | 2008-03-19 | 张国一 | Brick-plastic combined sod culture grid |
| CN201162218Y (en) * | 2008-02-13 | 2008-12-10 | 储裕龙 | Grass planting bricks |
| CN201236306Y (en) * | 2008-07-10 | 2009-05-13 | 李炳杰 | Grass planting bricks for greening of parking yard |
| CN201593148U (en) * | 2009-05-21 | 2010-09-29 | 李炳杰 | Multifunctional grass-planting brick |
| CN204753297U (en) * | 2015-04-23 | 2015-11-11 | 上海市园林工程有限公司 | Ecological grass planting brick parking area |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107419632A (en) * | 2017-05-31 | 2017-12-01 | 甘肃精达节能环保科技有限责任公司 | A kind of water storage type grass-planting brick |
| CN107165019A (en) * | 2017-07-07 | 2017-09-15 | 贵州师范大学 | One kind crosses water Water penetrable grass planting brick and preparation method thereof |
| CN107856168A (en) * | 2017-07-19 | 2018-03-30 | 深圳市华威环保建材有限公司 | A kind of regeneration aggregate ecological permeable bricks and its production technology |
| CN111593628A (en) * | 2020-06-20 | 2020-08-28 | 李雄伟 | Multifunctional self-fastening water-permeable environment-friendly greening brick |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102587243B (en) | Urban road water permeability cement concrete pavement structure and construction process thereof | |
| CN104878678A (en) | Construction method for water-permeable and water-retaining water-permeable pavement structure | |
| CN104313967B (en) | Row's water-seepage type is mated formation combining structure | |
| CN203295913U (en) | Novel ecological permeable road structure | |
| CN105040554A (en) | Garden path structure and paving construction technology thereof | |
| CN106869143A (en) | For environmental combination bank protection and the construction method of the punishment of road runoff pollution | |
| CN106758638A (en) | A kind of city sponge brick and its construction technology | |
| CN108532406A (en) | Can rapid construction high-bearing capacity pervious surface and laying method | |
| CN106436523A (en) | New-structure grass planting brick produced by recycled aggregates | |
| CN204125814U (en) | A kind of garden path structure | |
| CN108532407A (en) | One kind is anti-blocking to ooze aggregate size selection method in water-permeable brick and anti-blocking surface layer soon | |
| CN207159737U (en) | The prefabricated permeable parking bit architecture of outdoor grass planting | |
| CN205839510U (en) | A kind of permeable pavement structure | |
| CN104594155A (en) | Permeable pavement laying method | |
| CN105421647B (en) | A kind of step building block of Collection utilization rainwater | |
| CN204570428U (en) | The permeable road structure in a kind of environmental protection gardens | |
| CN107724201A (en) | Novel water permeable brick structure and paving method | |
| CN206289485U (en) | A kind of new construction grass-planting brick of utilization regeneration aggregate production | |
| CN103590302A (en) | Prefabricated cushion-layer-free permeable ecological grassing terrace | |
| CN207958908U (en) | A kind of permeable cement concrete road structure | |
| CN111549603A (en) | Pavement considering water load coupling and construction method thereof | |
| CN206721596U (en) | A kind of pavement structure of permeable road | |
| CN105155387A (en) | Garden road structure | |
| CN105220596A (en) | A kind of brick construction of seepage pavement method | |
| CN215758834U (en) | Ecological bank protection of river bank |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170222 |