CN107165019A - One kind crosses water Water penetrable grass planting brick and preparation method thereof - Google Patents

One kind crosses water Water penetrable grass planting brick and preparation method thereof Download PDF

Info

Publication number
CN107165019A
CN107165019A CN201710552023.7A CN201710552023A CN107165019A CN 107165019 A CN107165019 A CN 107165019A CN 201710552023 A CN201710552023 A CN 201710552023A CN 107165019 A CN107165019 A CN 107165019A
Authority
CN
China
Prior art keywords
water
grass planting
planting brick
permeable body
penetrable grass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710552023.7A
Other languages
Chinese (zh)
Inventor
吴福飞
董双快
邓洪刚
赵振华
陈荣妃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Education University
Original Assignee
Guizhou Education University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Education University filed Critical Guizhou Education University
Priority to CN201710552023.7A priority Critical patent/CN107165019A/en
Publication of CN107165019A publication Critical patent/CN107165019A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • E01C9/004Pavings specially adapted for allowing vegetation
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/021Pots formed in one piece; Materials used therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/14Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/20Drainage details

Abstract

Water Water penetrable grass planting brick and preparation method thereof is crossed the invention discloses one kind, this, which crosses water Water penetrable grass planting brick, includes Water permeable body, water gallery positioned at Water permeable body bottom and the dress soil body positioned at Water permeable body top, its proportioning includes regenerative bone material by concrete, cement, flyash, water and water reducer, present invention process is simple, low raw-material cost, and intensity can obtain design strength, its structure solves rainwater and imports underground water, forms local groundwater reservoir.Meanwhile, by planting plants, reach purification air and the purpose beautified the environment.

Description

One kind crosses water Water penetrable grass planting brick and preparation method thereof
Technical field
It is especially a kind of to cross water Water penetrable grass planting brick and its making side the present invention relates to technical field of inorganic nonmetallic materials Method.
Background technology
Sponge city has good " elasticity " in terms of reply natural calamity and environmental change, can be played when rainy The functions such as water suction, water purification, infiltration, retaining, it is necessary to when the water stored is discharged and is used again;Accordingly, it is capable to by nature Approach is combined with artificial measures, reaches the purpose of prevention waterlogging, infiltration, purification, retaining;Gui Anxinqu be located at Guiyang City, Guizhou Province and Anshun calmodulin binding domain CaM, is national unique using Ecological Civilization Construction as the national new district of positioning, is that the pilot in sponge city is new Area;In addition, in Gui Anxinqu process of construction, being required to remove a large amount of old concrete structures, and produce in work progress Raw unqualified discarded concrete, this causes the yield of discarded concrete to sharply increase, if the discarded concrete of generation is not added with Rationally to utilize, storing up for it will take substantial amounts of land resource, and local air and groundwater environment are polluted, and this is As the resource that can not be ignored now, society and environmental issue.Therefore, the present invention prepares one kind and crosses water Water penetrable grass planting brick, can The purpose using discarded concrete is reached, the water-permeable brick needed in sponge urban construction can be also provided, while by setting grass planting Part, reaches the purpose of greening environment.
The content of the invention
The technical problems to be solved by the invention are:One kind is provided and crosses water Water penetrable grass planting brick and preparation method thereof, sea is solved Rainwater invasion problem by continuous municipal highway, solves rainwater and imports underground water, form local groundwater reservoir.Meanwhile, pass through plantation Plant, reaches purification air and the purpose beautified the environment, to overcome the deficiencies in the prior art.
What the present invention was realized in:
A kind of preparation method for crossing water Water penetrable grass planting brick, this, which crosses water Water penetrable grass planting brick, includes Water permeable body, positioned at Water permeable body bottom Water gallery and the dress soil body positioned at Water permeable body top, its proportioning include regenerative bone material by concrete, cement, flyash, water and diminishing Agent.
In a kind of foregoing preparation method of water Water penetrable grass planting brick excessively, by weight, this spends matching somebody with somebody for water Water penetrable grass planting brick Composition and division in a proportion is cement:Flyash:Water:Water reducer:Regenerative bone material by concrete=1:0.2~0.3:0.24~0.28:0.01~0.015:235 ~255。
In a kind of foregoing preparation method of water Water penetrable grass planting brick excessively, the making for crossing water Water penetrable grass planting brick includes following step Suddenly:
1) strength grade is used for C20 ~ C50 discarded concrete, is crushed, is sieved, chooses the concrete between 10mm ~ 20mm Regeneration aggregate particle is standby;
2)By cement:Flyash:Water:Water reducer:Regenerative bone material by concrete=1:0.2~0.3:0.24~0.28:0.01~0.015: 235 ~ 255 match ratio mixed concrete;
3)Die trial is made, and by the concreting mixed in die trial, is conserved in 20 DEG C ± 2 DEG C of fog room after 24h Form removal;
4)Water Water penetrable grass planting brick of crossing after the demoulding continues the maintenance extremely regulation age in 20 DEG C ± 2 DEG C of fog room.
In a kind of foregoing preparation method of water Water penetrable grass planting brick excessively, step 4)The maintenance of water Water penetrable grass planting brick is crossed after the demoulding Condition is:20 DEG C ± 2 DEG C of temperature, humidity RH>95%, time 28d.
One kind crosses water Water penetrable grass planting brick, including Water permeable body, it is characterised in that:The Water permeable body is cube structure, in Water permeable body Lower surface sets water gallery, and the arrangement dress soil body is evenly distributed in the upper surface in Water permeable body, and soil is embedded in the dress soil body.
Foregoing one kind is crossed in water Water penetrable grass planting brick, and the Water permeable body uses 300mm × 300mm × 300mm standard sizes Solid cube structure.
Foregoing one kind is crossed in water Water penetrable grass planting brick, and the water gallery is sliding groove structure, the water gallery two ends and Water permeable body Front/rear end insertion, the plane of symmetry of the water gallery is overlapped with the plane of symmetry of Water permeable body.
Foregoing one kind is crossed in water Water penetrable grass planting brick, and the dress soil body is shallow slot and is cube or column structure, dress soil Body quantity is 4 or 9 and is distributed in using uniform method for arranging on Water permeable body upper surface.
By adopting the above-described technical solution, compared with prior art, present invention process is simple, low raw-material cost, and And intensity can obtain design strength, its structure solves rainwater and imports underground water, forms local groundwater reservoir.Meanwhile, pass through plantation Plant, reaches purification air and the purpose beautified the environment.
Brief description of the drawings
Accompanying drawing 1 is the three-view diagram one of the present invention;
Accompanying drawing 2 is the three-view diagram two of the present invention;
Accompanying drawing 3 is the three-view diagram three of the present invention;
Accompanying drawing 4 is the three-view diagram four of the present invention.
Embodiment
Embodiments of the invention one:Cross a height of 300mm × 140mm of length and width × 100mm of water gallery 2, the length and width of Water permeable body 1 A height of 300mm × 300mm × 300mm, fill the soil body 3 a height of 60mm × 60mm of length and width × 150mm, dress the soil body 3 by 4 it is square or Circle composition;The match ratio for crossing water Water penetrable grass planting brick is cement:Flyash:Water:Water reducer:Regenerative bone material by concrete=1:0.2~ 0.3:0.24~0.28:0.01~0.015:235~255.
Comprise the following steps that:
1) strength grade is used for C20 ~ C50 discarded concrete, is crushed, is sieved, chooses the concrete between 10mm ~ 20mm Regeneration aggregate particle is standby.
2)By cement:Flyash:Water:Water reducer:Regenerative bone material by concrete=1:0.2~0.3:0.24~0.28:0.01~ 0.015:235 ~ 255 match ratio mixed concrete.
3)Make square containing 4(As shown in Figure 1)Or it is circular(As shown in Figure 2)The die trial of the soil body is filled, and by mix Good concreting conserves form removal after 24h in die trial in 20 DEG C ± 2 DEG C of fog room.
4)Water Water penetrable grass planting brick of crossing after the demoulding continues the maintenance extremely regulation age in 20 DEG C ± 2 DEG C of fog room.
In fog room(20 DEG C ± 2 DEG C of temperature, humidity RH>95%)Middle maintenance 28d, its compression strength is in 22.6-24.4MPa Between;Grass planting is planted by long-term scene to find, the grass of plantation can be kept for not water January.Therefore available for parking lot, pavement and Square etc., and irrigation times can be reduced.
Embodiments of the invention two:Cross a height of 300mm × 140mm of length and width × 100mm of water gallery, the length, width and height of Water permeable body For 300mm × 300mm × 300mm, a height of 60mm × 60mm of length and width × 150mm of the soil body is filled, the dress soil body is by 9 square or circles Composition;The match ratio for crossing water Water penetrable grass planting brick is cement:Flyash:Water:Water reducer:Regenerative bone material by concrete=1:0.2~0.3: 0.24~0.28:0.01~0.015:235~255.
Comprise the following steps that:
1) strength grade is used for C20 ~ C50 discarded concrete, is crushed, is sieved, chooses the concrete between 10mm ~ 20mm Regeneration aggregate particle is standby.
2)By cement:Flyash:Water:Water reducer:Regenerative bone material by concrete=1:0.2~0.3:0.24~0.28:0.01~ 0.015:235 ~ 255 match ratio mixed concrete.
3)Make square containing 4(As shown in Figure 3)Or it is circular(As shown in Figure 4)The die trial of the soil body is filled, and by mix Good concreting conserves form removal after 24h in die trial in 20 DEG C ± 2 DEG C of fog room.
4)Water Water penetrable grass planting brick of crossing after the demoulding continues the maintenance extremely regulation age in 20 DEG C ± 2 DEG C of fog room.
In fog room(20 DEG C ± 2 DEG C of temperature, humidity RH>95%)Middle maintenance 28d, its compression strength is in 15.2-17.7MPa Between, therefore available for parking lot, pavement and square etc..
It is only the mentality of designing of some embodiments of the present invention above, it is clear that the above embodiment of the present invention, which is only, Illustrate to Chu example of the present invention, and be not the restriction to embodiments of the present invention.For the common of art For technical staff, it can also make other changes in different forms on the basis of the above description.Here need not All embodiments can not be exhaustive.Any modification for being made within the spirit and principles of the invention, equally replace Change and improve, should be included within the protection domain of the claims in the present invention.

Claims (8)

1. a kind of preparation method for crossing water Water penetrable grass planting brick, it is characterised in that:This, which crosses water Water penetrable grass planting brick, includes Water permeable body, is located at The water gallery of Water permeable body bottom and the dress soil body positioned at Water permeable body top, its proportioning include regenerative bone material by concrete, cement, fine coal Ash, water and water reducer.
2. a kind of preparation method for crossing water Water penetrable grass planting brick according to claim 1, it is characterised in that:By weight, The match ratio for crossing water Water penetrable grass planting brick is cement:Flyash:Water:Water reducer:Regenerative bone material by concrete=1:0.2~0.3:0.24 ~0.28:0.01~0.015:235~255.
3. a kind of preparation method for crossing water Water penetrable grass planting brick according to claim 1, it is characterised in that:This crosses the permeable plant of water The making of careless brick comprises the following steps:
1) strength grade is used for C20 ~ C50 discarded concrete, is crushed, is sieved, chooses the concrete between 10mm ~ 20mm Regeneration aggregate particle is standby;
2)By cement:Flyash:Water:Water reducer:Regenerative bone material by concrete=1:0.2~0.3:0.24~0.28:0.01~0.015: 235 ~ 255 match ratio mixed concrete;
3)Die trial is made, and by the concreting mixed in die trial, is conserved in 20 DEG C ± 2 DEG C of fog room after 24h Form removal;
4)Water Water penetrable grass planting brick of crossing after the demoulding continues the maintenance extremely regulation age in 20 DEG C ± 2 DEG C of fog room.
4. a kind of preparation method for crossing water Water penetrable grass planting brick according to claim 3, it is characterised in that:Step 4)After the demoulding Cross water Water penetrable grass planting brick curing condition be:20 DEG C ± 2 DEG C of temperature, humidity RH>95%, time 28d.
5. one kind crosses water Water penetrable grass planting brick, including Water permeable body(1), it is characterised in that:The Water permeable body(1)For cube structure, saturating Water body(1)Lower surface sets water gallery(2), in Water permeable body(1)It is evenly distributed in the upper surface the arrangement dress soil body(3), it is native that soil is embedded in dress Body(3)It is interior.
6. one kind according to claim 5 crosses water Water penetrable grass planting brick, it is characterised in that:The Water permeable body(1)Using 300mm The standard-sized solid cube structures of × 300mm × 300mm.
7. one kind according to claim 5 crosses water Water penetrable grass planting brick, it is characterised in that:The water gallery(2)For chute knot Structure, the water gallery(2)Two ends and Water permeable body(1)Front/rear end insertion, the water gallery(2)The plane of symmetry and Water permeable body(1)Pair Title face is overlapped.
8. one kind according to claim 5 crosses water Water penetrable grass planting brick, it is characterised in that:The dress soil body(3)For shallow slot and For cube or column structure, the dress soil body(3)Quantity is 4 or 9 and is distributed in Water permeable body using uniform method for arranging(1)On On surface.
CN201710552023.7A 2017-07-07 2017-07-07 One kind crosses water Water penetrable grass planting brick and preparation method thereof Pending CN107165019A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710552023.7A CN107165019A (en) 2017-07-07 2017-07-07 One kind crosses water Water penetrable grass planting brick and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710552023.7A CN107165019A (en) 2017-07-07 2017-07-07 One kind crosses water Water penetrable grass planting brick and preparation method thereof

Publications (1)

Publication Number Publication Date
CN107165019A true CN107165019A (en) 2017-09-15

Family

ID=59823357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710552023.7A Pending CN107165019A (en) 2017-07-07 2017-07-07 One kind crosses water Water penetrable grass planting brick and preparation method thereof

Country Status (1)

Country Link
CN (1) CN107165019A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301281A (en) * 2018-03-07 2018-07-20 中国建筑股份有限公司 Prefabricated plant growth pervious concrete road pavement brick and preparation method thereof
CN112474790A (en) * 2020-10-27 2021-03-12 江西农业大学 Water and soil conservation ecological restoration method for rare earth tailings

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06122540A (en) * 1992-10-13 1994-05-06 Alpha- Corp Technol:Kk Water-permeable plate material by cement bonding and its production
KR20030004194A (en) * 2002-11-22 2003-01-14 박승범 Manufacturing Methods of Hybrid Type Concrete Pavement using Recycled and Crushed Aggregates
CN203593930U (en) * 2013-11-11 2014-05-14 金华市国鼎建设有限公司 Park anti-slip tile
CN103981783A (en) * 2014-04-29 2014-08-13 中国建筑股份有限公司 Stone texture imitating permeable concrete prefabricated brick and preparation method thereof
CN103992075A (en) * 2014-04-24 2014-08-20 青岛理工大学 Vegetative medium strength concrete made of construction wastes, and making method thereof
CN105218043A (en) * 2014-06-26 2016-01-06 北科绿能有限公司 Brick-shaped structural product and manufacturing method thereof and manufacturing method of flow channel structure contained in brick-shaped structural product
CN106436523A (en) * 2016-10-26 2017-02-22 南昌大学 New-structure grass planting brick produced by recycled aggregates
CN207031954U (en) * 2017-07-07 2018-02-23 贵州师范大学 One kind crosses water Water penetrable grass planting brick

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06122540A (en) * 1992-10-13 1994-05-06 Alpha- Corp Technol:Kk Water-permeable plate material by cement bonding and its production
KR20030004194A (en) * 2002-11-22 2003-01-14 박승범 Manufacturing Methods of Hybrid Type Concrete Pavement using Recycled and Crushed Aggregates
CN203593930U (en) * 2013-11-11 2014-05-14 金华市国鼎建设有限公司 Park anti-slip tile
CN103992075A (en) * 2014-04-24 2014-08-20 青岛理工大学 Vegetative medium strength concrete made of construction wastes, and making method thereof
CN103981783A (en) * 2014-04-29 2014-08-13 中国建筑股份有限公司 Stone texture imitating permeable concrete prefabricated brick and preparation method thereof
CN105218043A (en) * 2014-06-26 2016-01-06 北科绿能有限公司 Brick-shaped structural product and manufacturing method thereof and manufacturing method of flow channel structure contained in brick-shaped structural product
CN106436523A (en) * 2016-10-26 2017-02-22 南昌大学 New-structure grass planting brick produced by recycled aggregates
CN207031954U (en) * 2017-07-07 2018-02-23 贵州师范大学 One kind crosses water Water penetrable grass planting brick

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
柯旭等: "再生骨料透水混凝土蓄水植草砖", 《四川建材》 *
舒怀珠: "《商品混凝土实用技术读本》", 30 September 2012, 中国建材工业出版社 *
赖拥斌等: "利用废弃混凝土优化制作透水砖的研究", 《中国住宅设施》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108301281A (en) * 2018-03-07 2018-07-20 中国建筑股份有限公司 Prefabricated plant growth pervious concrete road pavement brick and preparation method thereof
CN112474790A (en) * 2020-10-27 2021-03-12 江西农业大学 Water and soil conservation ecological restoration method for rare earth tailings

Similar Documents

Publication Publication Date Title
CN100453740C (en) Impurifying ecological bank-protection combined system
CN107365164B (en) Fine powder waste residue water-permeable sintered pavement brick and preparation method thereof
CN204875416U (en) Porous pavement structure
CN105272071A (en) Sponge concrete brick and application thereof
CN103553471B (en) Method for manufacturing water permeable brick from waste concrete, and pavement method of water permeable brick
CN104402388A (en) Water-permeable water-holding brick and preparation method thereof
CN107858888A (en) A kind of hollow layer-stepping lightweight shell concrete plants raw component and its construction method
KR20190006233A (en) Construction method of water-permeable pavement with excellent properties of stability, economy and conduct ability for pavement and road
CN102425176A (en) Ecological brick for fast restoring vegetation on coal gangue dump slope and manufacture method of ecological brick
KR101815017B1 (en) Manufacturing method of eco-friendly colonnade protective plate using oyster shell and eco-friendly colonnade protective plate and staging process
CN106747199A (en) A kind of grass planting sand brick and preparation method thereof
CN106348694A (en) A permeable brick and preparing method thereof
CN107165019A (en) One kind crosses water Water penetrable grass planting brick and preparation method thereof
CN105174863A (en) Cavernous garden waste mortar
CN104148377A (en) Method for producing greened structure soil from silt
WO2001098231A1 (en) Concrete material for greening
CN207031954U (en) One kind crosses water Water penetrable grass planting brick
CN104631258A (en) High-strength concrete permeable pavement brick
TW201600677A (en) Brick structure and manufacture method for the brick structure
CN109056455A (en) A kind of sponge urban construction permeable side walk slab and method for paving
CN207749380U (en) Vegetation type eco-concrete
CN206752237U (en) Stealthy passageway for fire apparatus
CN109400090A (en) Environment friendly road paves block, preparation method and building waste processing method
CN106320126B (en) One kind cutting dirty road surface water-permeable brick
CN105239532A (en) Ecological concrete building block similar to sponge and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination