CN106372854A - Project safety management system based on BIM - Google Patents

Project safety management system based on BIM Download PDF

Info

Publication number
CN106372854A
CN106372854A CN201610779336.1A CN201610779336A CN106372854A CN 106372854 A CN106372854 A CN 106372854A CN 201610779336 A CN201610779336 A CN 201610779336A CN 106372854 A CN106372854 A CN 106372854A
Authority
CN
China
Prior art keywords
project
management
module
personnel
safety helmet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610779336.1A
Other languages
Chinese (zh)
Other versions
CN106372854B (en
Inventor
王能林
楼跃清
潘寒
汪小东
陆杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201610779336.1A priority Critical patent/CN106372854B/en
Publication of CN106372854A publication Critical patent/CN106372854A/en
Application granted granted Critical
Publication of CN106372854B publication Critical patent/CN106372854B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/04Alarms for ensuring the safety of persons responsive to non-activity, e.g. of elderly persons
    • G08B21/0438Sensor means for detecting
    • G08B21/0453Sensor means for detecting worn on the body to detect health condition by physiological monitoring, e.g. electrocardiogram, temperature, breathing

Landscapes

  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Emergency Management (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Cardiology (AREA)
  • Heart & Thoracic Surgery (AREA)
  • Physical Education & Sports Medicine (AREA)
  • Physiology (AREA)
  • Pulmonology (AREA)
  • Gerontology & Geriatric Medicine (AREA)
  • Biophysics (AREA)
  • Data Mining & Analysis (AREA)
  • Primary Health Care (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Alarm Systems (AREA)
  • Emergency Alarm Devices (AREA)

Abstract

The present invention discloses a project safety management system based on BIM. The system comprises: an orientation voice disclosure management module, a quality information collection and quality acceptance module, a safety early warning and construction recording module, a personnel health state detection module, a field staff trend monitoring module and a field mechanical equipment monitoring module. The project safety management system based on the BIM improves the project quality safety management efficiency, improves the communication efficiency, improves the safety management timeliness and ensures the overall process traceability of the quality management.

Description

A kind of project security management system based on bim
Technical field
The present invention relates to project management techniques, more particularly, to a kind of project security management system based on bim.
Background technology
Currently, construction projects are numerous, and during project construction, personnel's machinery is complicated, and management difficulty is big, and project Field Force's peopleware and safety consciousness are uneven, go wrong unavoidably in project management process, in project management During, due to mainly being signed a bill by papery in project management, site inspection and various regular meeting carrying out project management, totally For the efficiency of management low, information transmission exists and postpones and omit, and relevant information has the interference of a large amount of anthropic factors, On project management impact greatly.
Content of the invention
The technical problem to be solved in the present invention is for defect of the prior art, provides a kind of project based on bim Safety management system.
The technical solution adopted for the present invention to solve the technical problems is: a kind of project security management system based on bim, Including safety helmet, button of taking pictures that described safety helmet includes being arranged on safety helmet, photographic head, rhythm of the heart chip, raise one's voice Device, positioning chip and wifi module;
It is characterized in that, comprising:
Management system, for the meta-synthetic management of the information data of each module in project security management system;
Orientation voice is told somebody what one's real intentions are management module, for according to demand, select in management module in bim model a certain work post or certain The Field Force in one region is oriented communication, carries out targetedly voice and tells somebody what one's real intentions are;
Quality information is collected and inspection of quality module, and for being shared by the visual angle based on bim and positioning, management personnel pass through Management module is carried out long-range inspection during inspection of quality and site operation personnel and is linked up with the same visual angle of management personnel;It is additionally operable to By the construction quality situation of each of photo record entry work progress link of taking pictures in the course of receiving, described photo is real-time It is linked at the corresponding position of bim model in management module, as the overall process data accumulation of Project quality management;
Safe early warning and construction note module, for detecting the row of every Field Force using the gyroscope being arranged in safety helmet Walk form, and by related real-time data synchronization in management module, when certain workmen has larger toppling in time to attached Nearly workmen and office send and ask warning to rescue signal;Positioning chip in safety helmet and photographic head can record this work people Member have an accident before track route and periphery environment, as the investigation foundation of accident;It is additionally operable to determining staff Position information is mated with bim model, when workmen goes to and faces side openings position, automatically sends out pre- to related personnel's safety helmet Alert signal, it is to avoid the generation of security incident;
Personnel health's state detection module, for by arranging whether heart rate detection sensing chip correctly joins for site personnel Wear a safety helmet, and project management red line is set in management module, safety helmet is detected and enter project construction field management red line When, if appearance is not correctly worn safety helmet and sent alarm immediately, can be supervised in real time by heart rate detection result in work progress The health status of control Field Force, exceed safety value and send alarm in time;
Field Force's trend monitoring module, for uploading to personnel's track positioning information in management module in real time, by personnel Track positioning can each work surface of real time inspection number of work, secondly by divide project work red line and work flushing Line, can be with real-time statistics site operation personnel amount, and settling accounts for labour force provides foundation, can by the curve movement following the tracks of personal To monitor the work state of workmen, the conventional track route of next integration project personnel in the project implementation, reasonable arrangement The setting of project related roads;
Site machinery monitoring of tools module, is positioned by the associated machines live to project and site machinery equipment is transported Row monitoring and capacity are managed;By location-based monitoring, plant room will appear from collision to management personnel at the scene Send orientation early warning, it is to avoid collision.
The beneficial effect comprise that:
1 present invention reduces construction organization difficulty, and labor service information is automatically integrating, can check at any time project site administrator with And labor service personnel's working condition.
2nd, the present invention improves the safety of project construction, danger early warning more automatization, much sooner, it is to avoid correlation The generation of accident.
3, present invention achieves the trackability of quality information, facilitate the inquiry to information for the later stage.
4th, the present invention improves the efficiency of remote communication, is shared by vision, is conveniently remotely linked up.
Brief description
Below in conjunction with drawings and Examples, the invention will be further described, in accompanying drawing:
Fig. 1 is the structural representation of the embodiment of the present invention;
Specific embodiment
In order that the objects, technical solutions and advantages of the present invention become more apparent, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not used to limit Determine the present invention.
As shown in figure 1, a kind of project security management system based on bim, comprising: safety helmet, described safety helmet includes setting Put button of taking pictures on safety helmet, photographic head, rhythm of the heart chip, speaker, positioning chip and wifi module;
This system includes with lower module:
Management module, for the meta-synthetic management of the information data of each module in project security management system;
Orientation voice is told somebody what one's real intentions are management module, for according to demand, select in management module in bim model a certain work post or certain The Field Force in one region is oriented communication, carries out targetedly voice and tells somebody what one's real intentions are;
Quality information is collected and inspection of quality module, and for being shared by the visual angle based on bim and positioning, management personnel pass through Management module is carried out long-range inspection during inspection of quality and site operation personnel and is linked up with the same visual angle of management personnel;It is additionally operable to By the construction quality situation of each of photo record entry work progress link of taking pictures in the course of receiving, described photo is real-time It is linked at the corresponding position of bim model in management module, as the overall process data accumulation of Project quality management;
Safe early warning and construction note module, for detecting the row of every Field Force using the gyroscope being arranged in safety helmet Walk form, and by related real-time data synchronization in management module, when certain workmen has larger toppling in time to attached Nearly workmen and office send and ask warning to rescue signal;Positioning chip in safety helmet and photographic head can record this work people Member have an accident before track route and periphery environment, as the investigation foundation of accident;It is additionally operable to determining staff Position information is mated with bim model, when workmen goes to and faces side openings position, automatically sends out pre- to related personnel's safety helmet Alert signal, it is to avoid the generation of security incident;
Personnel health's state detection module, for by arranging whether heart rate detection sensing chip correctly joins for site personnel Wear a safety helmet, and project management red line is set in management module, safety helmet is detected and enter project construction field management red line When, if appearance is not correctly worn safety helmet and sent alarm immediately, can be supervised in real time by heart rate detection result in work progress The health status of control Field Force, exceed safety value and send alarm in time;
Field Force's trend monitoring module, for uploading to personnel's track positioning information in management module in real time, by personnel Track positioning can each work surface of real time inspection number of work, secondly by divide project work red line and work flushing Line, can be with real-time statistics site operation personnel amount, and settling accounts for labour force provides foundation, can by the curve movement following the tracks of personal To monitor the work state of workmen, the conventional track route of next integration project personnel in the project implementation, reasonable arrangement The setting of project related roads;
Site machinery monitoring of tools module, is positioned by the associated machines live to project and site machinery equipment is transported Row monitoring and capacity are managed;By location-based monitoring, plant room will appear from collision to management personnel at the scene Send orientation early warning, it is to avoid collision.
It should be appreciated that for those of ordinary skills, can be improved according to the above description or be converted, And all these modifications and variations all should belong to the protection domain of claims of the present invention.

Claims (1)

1. a kind of project security management system based on bim, comprising: safety helmet, described safety helmet includes being arranged on safety helmet Button of taking pictures, photographic head, rhythm of the heart chip, speaker, positioning chip and wifi module;
It is characterized in that, comprising:
Management module, for the meta-synthetic management of the information data of each module in project security management system;
Orientation voice is told somebody what one's real intentions are management module, for according to demand, select in management module in bim model a certain work post or certain The Field Force in one region is oriented communication, carries out targetedly voice and tells somebody what one's real intentions are;
Quality information is collected and inspection of quality module, and for being shared by the visual angle based on bim and positioning, management personnel pass through Management module is carried out long-range inspection during inspection of quality and site operation personnel and is linked up with the same visual angle of management personnel;It is additionally operable to By the construction quality situation of each of photo record entry work progress link of taking pictures in the course of receiving, described photo is real-time It is linked at the corresponding position of bim model in management module, as the overall process data accumulation of Project quality management;
Safe early warning and construction note module, for detecting the row of every Field Force using the gyroscope being arranged in safety helmet Walk form, and by related real-time data synchronization in management module, when certain workmen has larger toppling in time to attached Nearly workmen and office send and ask warning to rescue signal;Positioning chip in safety helmet and photographic head can record this work people Member have an accident before track route and periphery environment, as the investigation foundation of accident;It is additionally operable to determining staff Position information is mated with bim model, when workmen goes to and faces side openings position, automatically sends out pre- to related personnel's safety helmet Alert signal, it is to avoid the generation of security incident;
Personnel health's state detection module, for by arranging whether heart rate detection sensing chip correctly joins for site personnel Wear a safety helmet, and project management red line is set in management module, safety helmet is detected and enter project construction field management red line When, if appearance is not correctly worn safety helmet and sent alarm immediately, can be supervised in real time by heart rate detection result in work progress The health status of control Field Force, exceed safety value and send alarm in time;
Field Force's trend monitoring module, for uploading to personnel's track positioning information in management module in real time, by personnel Track positioning can each work surface of real time inspection number of work, secondly by divide project work red line and work flushing Line, can be with real-time statistics site operation personnel amount, and settling accounts for labour force provides foundation, can by the curve movement following the tracks of personal To monitor the work state of workmen, the conventional track route of next integration project personnel in the project implementation, reasonable arrangement The setting of project related roads;
Site machinery monitoring of tools module, is positioned by the associated machines live to project and site machinery equipment is transported Row monitoring and capacity are managed;By location-based monitoring, plant room will appear from collision to management personnel at the scene Send orientation early warning, it is to avoid collision.
CN201610779336.1A 2016-08-30 2016-08-30 A kind of project security management system based on BIM Active CN106372854B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610779336.1A CN106372854B (en) 2016-08-30 2016-08-30 A kind of project security management system based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610779336.1A CN106372854B (en) 2016-08-30 2016-08-30 A kind of project security management system based on BIM

Publications (2)

Publication Number Publication Date
CN106372854A true CN106372854A (en) 2017-02-01
CN106372854B CN106372854B (en) 2018-07-13

Family

ID=57898635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610779336.1A Active CN106372854B (en) 2016-08-30 2016-08-30 A kind of project security management system based on BIM

Country Status (1)

Country Link
CN (1) CN106372854B (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106934729A (en) * 2017-03-09 2017-07-07 河北省建筑科学研究院 Building Testing and appraisal method and device
CN106980705A (en) * 2017-02-22 2017-07-25 中国建筑第八工程局有限公司 Safety protection standard construction method based on BIM technology
CN107748945A (en) * 2017-09-01 2018-03-02 郭亚晋 A kind of wisdom site staff management system
CN108089510A (en) * 2017-12-22 2018-05-29 深圳市前海公共安全科学研究院有限公司 A kind of construction personnel's behavior intelligent monitoring system and method
CN108268985A (en) * 2016-12-30 2018-07-10 上海大学 Cross-river tunnel engineering construction quality safety tracing system based on BIM
CN108427815A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of collision detection method and device in engineering project
CN108446889A (en) * 2018-02-11 2018-08-24 北京市轨道交通建设管理有限公司 A kind of exchange method of construction site and construction speed platform
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology
CN109410544A (en) * 2018-10-16 2019-03-01 广州源贸易有限公司 A kind of enterprise security early warning system that early warning effect is good
CN109637078A (en) * 2018-11-16 2019-04-16 万翼科技有限公司 A kind of abnormality monitoring method of intelligent wearable device
CN109658665A (en) * 2017-10-10 2019-04-19 重庆大学 Personal protection protection against electric shock method for early warning, device, system, storage equipment and terminal
CN110557501A (en) * 2019-08-07 2019-12-10 黄莹 risk identification rescue method and system based on coordination of smart watch and smart phone
CN111428299A (en) * 2020-03-25 2020-07-17 河南华北水电工程监理有限公司 Engineering whole-course monitoring system
CN111784967A (en) * 2020-07-23 2020-10-16 南通市达欣工程股份有限公司 Building construction safety early warning protection system based on BIM
CN111985736A (en) * 2019-05-21 2020-11-24 中铁北京工程局集团有限公司 Quality supervision system for expressway bridge construction
CN112016884A (en) * 2020-07-30 2020-12-01 河北新金轧材有限公司 Safety management method and system for field production
CN112884444A (en) * 2021-03-10 2021-06-01 苏州思萃融合基建技术研究所有限公司 Intelligent system for managing construction site personnel based on digital twin technology
CN113570327A (en) * 2021-07-06 2021-10-29 廖妹远 Construction supervision intelligent management system and supervision method
CN114360205A (en) * 2022-03-21 2022-04-15 四川新迎顺信息技术股份有限公司 BIM-based danger source early warning method, device, equipment and readable storage medium
CN117114619A (en) * 2023-09-07 2023-11-24 深圳叮当科技技术有限公司 Project security management system based on big data analysis

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103544556A (en) * 2013-09-06 2014-01-29 上海大学 Life-cycle management system and method for tunnels
CN103955174A (en) * 2014-03-31 2014-07-30 湖南大学 Building health monitoring system based on building information model technology

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103544556A (en) * 2013-09-06 2014-01-29 上海大学 Life-cycle management system and method for tunnels
CN103955174A (en) * 2014-03-31 2014-07-30 湖南大学 Building health monitoring system based on building information model technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
江帆: "基于BIM和RFID技术的建设项目安全管理研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *
郭红领 等: "BIM和RFID在施工安全管理中的集成应用研究", 《工程管理学报》 *

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108268985A (en) * 2016-12-30 2018-07-10 上海大学 Cross-river tunnel engineering construction quality safety tracing system based on BIM
CN106980705A (en) * 2017-02-22 2017-07-25 中国建筑第八工程局有限公司 Safety protection standard construction method based on BIM technology
CN106934729A (en) * 2017-03-09 2017-07-07 河北省建筑科学研究院 Building Testing and appraisal method and device
CN106934729B (en) * 2017-03-09 2021-03-30 河北省建筑科学研究院有限公司 Building detection and identification method and device
CN108427815A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of collision detection method and device in engineering project
CN107748945A (en) * 2017-09-01 2018-03-02 郭亚晋 A kind of wisdom site staff management system
CN109658665A (en) * 2017-10-10 2019-04-19 重庆大学 Personal protection protection against electric shock method for early warning, device, system, storage equipment and terminal
CN108089510A (en) * 2017-12-22 2018-05-29 深圳市前海公共安全科学研究院有限公司 A kind of construction personnel's behavior intelligent monitoring system and method
CN108446889A (en) * 2018-02-11 2018-08-24 北京市轨道交通建设管理有限公司 A kind of exchange method of construction site and construction speed platform
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology
CN109410544A (en) * 2018-10-16 2019-03-01 广州源贸易有限公司 A kind of enterprise security early warning system that early warning effect is good
CN109637078A (en) * 2018-11-16 2019-04-16 万翼科技有限公司 A kind of abnormality monitoring method of intelligent wearable device
CN111985736A (en) * 2019-05-21 2020-11-24 中铁北京工程局集团有限公司 Quality supervision system for expressway bridge construction
CN110557501A (en) * 2019-08-07 2019-12-10 黄莹 risk identification rescue method and system based on coordination of smart watch and smart phone
CN111428299A (en) * 2020-03-25 2020-07-17 河南华北水电工程监理有限公司 Engineering whole-course monitoring system
CN111784967A (en) * 2020-07-23 2020-10-16 南通市达欣工程股份有限公司 Building construction safety early warning protection system based on BIM
CN112016884A (en) * 2020-07-30 2020-12-01 河北新金轧材有限公司 Safety management method and system for field production
CN112884444A (en) * 2021-03-10 2021-06-01 苏州思萃融合基建技术研究所有限公司 Intelligent system for managing construction site personnel based on digital twin technology
CN112884444B (en) * 2021-03-10 2023-07-18 苏州思萃融合基建技术研究所有限公司 Intelligent system for managing construction site personnel based on digital twin technology
CN113570327A (en) * 2021-07-06 2021-10-29 廖妹远 Construction supervision intelligent management system and supervision method
CN114360205A (en) * 2022-03-21 2022-04-15 四川新迎顺信息技术股份有限公司 BIM-based danger source early warning method, device, equipment and readable storage medium
CN117114619A (en) * 2023-09-07 2023-11-24 深圳叮当科技技术有限公司 Project security management system based on big data analysis
CN117114619B (en) * 2023-09-07 2024-05-14 深圳叮当科技技术有限公司 Project security management system based on big data analysis

Also Published As

Publication number Publication date
CN106372854B (en) 2018-07-13

Similar Documents

Publication Publication Date Title
CN106372854A (en) Project safety management system based on BIM
CN109240311B (en) Outdoor electric power field construction operation supervision method based on intelligent robot
CN105989682A (en) Safety early warning and monitoring system and monitoring method for construction machinery under power transmission line
CN105563488A (en) Night patrol robot
CN104392582B (en) The Ship Welding long-range monitor and alarm system of personnel based on multi-sensor information fusion
CN109345056A (en) A kind of construction personnel's behavior real time monitoring system
CN109388115A (en) Mining intelligent individual soldier operation and safeguards system, method and intelligent polling method
CN112530144B (en) Method and system for warning violation behaviors of thermal power plant based on neural network
CN103311829B (en) Monitoring system of electric substation
CN113206978A (en) Security intelligent monitoring early warning system and method for oil and gas pipeline station
CN103244186A (en) Identification, tracking and early-warning system based on coal and gas outburst development process
CN113506416A (en) Engineering abnormity early warning method and system based on intelligent visual analysis
CN205819229U (en) A kind of guard system being applicable to Railway Site attendant
CN209199300U (en) A kind of comprehensive monitor system based on intelligent safety helmet
CN115731670A (en) Safety alarm method, device and monitoring system for construction site
CN108388873A (en) A kind of supervisory systems of machine vision, method and client computer, storage medium
CN204515966U (en) A kind of warning system based on Internet of Things and image recognition
CN207352670U (en) A kind of construction personnel deploys to ensure effective monitoring and control of illegal activities safely system
CN106744221B (en) A kind of well-bucket operational safety integrated protection system and its means of defence
CN206144242U (en) Communication tower
CN109459966A (en) A kind of construction safety intelligent management system
CN105988444A (en) Iron tower remote control monitoring system
CN107545610A (en) A kind of workmen deploys to ensure effective monitoring and control of illegal activities safely system
CN115240362A (en) Monitoring alarm system and method of intelligent construction site management and control platform
CN204496658U (en) Crag avalanche monitoring warning device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant