CN106372854B - A kind of project security management system based on BIM - Google Patents

A kind of project security management system based on BIM Download PDF

Info

Publication number
CN106372854B
CN106372854B CN201610779336.1A CN201610779336A CN106372854B CN 106372854 B CN106372854 B CN 106372854B CN 201610779336 A CN201610779336 A CN 201610779336A CN 106372854 B CN106372854 B CN 106372854B
Authority
CN
China
Prior art keywords
project
personnel
module
management
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610779336.1A
Other languages
Chinese (zh)
Other versions
CN106372854A (en
Inventor
王能林
楼跃清
潘寒
汪小东
陆杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau First Construction Engineering Co Ltd
Original Assignee
China Construction Third Bureau First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau First Construction Engineering Co Ltd filed Critical China Construction Third Bureau First Construction Engineering Co Ltd
Priority to CN201610779336.1A priority Critical patent/CN106372854B/en
Publication of CN106372854A publication Critical patent/CN106372854A/en
Application granted granted Critical
Publication of CN106372854B publication Critical patent/CN106372854B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal operating condition and not elsewhere provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal operating condition and not elsewhere provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/04Alarms for ensuring the safety of persons responsive to non-activity, e.g. of elderly persons
    • G08B21/0438Sensor means for detecting
    • G08B21/0453Sensor means for detecting worn on the body to detect health condition by physiological monitoring, e.g. electrocardiogram, temperature, breathing

Abstract

The project security management system based on BIM that the invention discloses a kind of comprising following content:Orientation voice is told somebody what one's real intentions are management module;Quality information is collected and inspection of quality module;Safe early warning and construction note module;Personnel health's state detection module;Field Force's trend monitoring module;Site machinery monitoring of tools module.A kind of project security management method based on BIM provided by the invention, improves project quality safety management efficiency, improves communication efficiency, improve safety management promptness, it is ensured that the overall process trackability of quality management.

Description

A kind of project security management system based on BIM
Technical field
The present invention relates to project management techniques more particularly to a kind of project security management systems based on BIM.
Background technology
Currently, construction projects are numerous, and personnel's machinery is complicated during project construction, and management difficulty is big, and project Field Force's peopleware and awareness of safety are irregular, inevitably go wrong in project management process, in project management In the process, due to mainly being signed a bill by papery in project management, site inspection and various regular meetings carry out project management, overall For the efficiency of management it is low, information, which is transmitted, to be had delay and omits, and relevant information is there are the interference of a large amount of human factors, Project management is influenced very big.
Invention content
The technical problem to be solved in the present invention is to provide a kind of project based on BIM for the defects in the prior art Safety management system.
The technical solution adopted by the present invention to solve the technical problems is:A kind of project security management system based on BIM, Including:Safety cap, the safety cap include the button of taking pictures being arranged on safety cap, camera, rhythm of the heart chip, raise one's voice Device, positioning chip and WiFi module;
It is characterised in that it includes:
Management system, for the information of each module and the meta-synthetic management of data in project security management system;
Orientation voice is told somebody what one's real intentions are management module, for according to demand, selected in management module in BIM models a certain work post or The some region of Field Force of person is oriented communication, carries out targetedly voice and tells somebody what one's real intentions are;
Quality information is collected and inspection of quality module, for shared, the administrative staff by the visual angle based on BIM and positioning Long-range inspection and the same visual angle of site operation personnel and administrative staff when carrying out inspection of quality by management module are linked up;Also Construction quality situation for recording each link in project work progress in the course of receiving by photo of taking pictures, the photo BIM model corresponding position of the real time link in management module, the overall process data accumulation as Project quality management;
Safe early warning and construction note module, for detecting every Field Force using the gyroscope being arranged in safety cap Walking form, and by related real-time data synchronization to management module, when certain construction personnel has larger topple in time Being sent to neighbouring construction personnel and office asks alarm to rescue signal;Positioning chip and camera in safety cap can record the work Make the track route before personnel's generation accident and the environment on periphery, the investigation foundation as accident;It is additionally operable to staff Location information matched with BIM models, when construction personnel, which goes to, faces side openings position, automatically give related personnel's safety cap Pre-warning signal is sent out, the generation of safety accident is avoided;
Personnel health's state detection module, for by being arranged whether just heart rate detection sensing chip is used for site personnel Really match and wear a safety helmet, and project management red line is set in management module, detects that safety cap enters project construction field management It, in the construction process can be real by heart rate detection result if occurring correctly not sending out alarm immediately with wearing a safety helmet when red line When monitoring site personnel health status, send out alarm in time more than safety value;
Field Force's trend monitoring module passes through for uploading in management module personnel's track positioning information in real time The positioning of personnel track can each working face of real time inspection number of work, secondly by dividing project work red line and working face Red line can provide foundation, by tracking personal curve movement with real-time statistics site operation personnel amount for labour's clearing The labour state of construction personnel can be monitored, the common track route of next integration project personnel in the project implementation is rationally pacified The setting of row's project related roads;
Site machinery monitoring of tools module is positioned by the associated machines to project scene and is set to site machinery Received shipment row monitors and capacity is managed;By location-based monitoring, colliding to management will occur in plant room at the scene Personnel send orientation early warning, avoid collision.
The beneficial effect comprise that:
1, present invention reduces construction organization difficulty, labor service information is automatically integrating, and can check project field management people at any time Member and labor service personnel's working condition.
2, the present invention improves the safety of project construction, and danger early warning more automates, and much sooner, avoids correlation The generation of accident.
3, the present invention realizes the trackability of quality information, facilitates inquiry of the later stage to information.
4, the present invention improves the efficiency of remote communication, shared by vision, facilitates and is remotely linked up.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, is not used to limit The fixed present invention.
As shown in Figure 1, a kind of project security management system based on BIM, including:Safety cap, the safety cap include setting Set button of taking pictures, camera, rhythm of the heart chip, loud speaker, positioning chip and WiFi module on safety cap;
The system comprises the following modules:
Management module, for the information of each module and the meta-synthetic management of data in project security management system;
Orientation voice is told somebody what one's real intentions are management module, for according to demand, selected in management module in BIM models a certain work post or The some region of Field Force of person is oriented communication, carries out targetedly voice and tells somebody what one's real intentions are;
Quality information is collected and inspection of quality module, for shared, the administrative staff by the visual angle based on BIM and positioning Long-range inspection and the same visual angle of site operation personnel and administrative staff when carrying out inspection of quality by management module are linked up;Also Construction quality situation for recording each link in project work progress in the course of receiving by photo of taking pictures, the photo BIM model corresponding position of the real time link in management module, the overall process data accumulation as Project quality management;
Safe early warning and construction note module, for detecting every Field Force using the gyroscope being arranged in safety cap Walking form, and by related real-time data synchronization to management module, when certain construction personnel has larger topple in time Being sent to neighbouring construction personnel and office asks alarm to rescue signal;Positioning chip and camera in safety cap can record the work Make the track route before personnel's generation accident and the environment on periphery, the investigation foundation as accident;It is additionally operable to staff Location information matched with BIM models, when construction personnel, which goes to, faces side openings position, automatically give related personnel's safety cap Pre-warning signal is sent out, the generation of safety accident is avoided;
Personnel health's state detection module, for by being arranged whether just heart rate detection sensing chip is used for site personnel Really match and wear a safety helmet, and project management red line is set in management module, detects that safety cap enters project construction field management It, in the construction process can be real by heart rate detection result if occurring correctly not sending out alarm immediately with wearing a safety helmet when red line When monitoring site personnel health status, send out alarm in time more than safety value;
Field Force's trend monitoring module passes through for uploading in management module personnel's track positioning information in real time The positioning of personnel track can each working face of real time inspection number of work, secondly by dividing project work red line and working face Red line can provide foundation, by tracking personal curve movement with real-time statistics site operation personnel amount for labour's clearing The labour state of construction personnel can be monitored, the common track route of next integration project personnel in the project implementation is rationally pacified The setting of row's project related roads;
Site machinery monitoring of tools module is positioned by the associated machines to project scene and is set to site machinery Received shipment row monitors and capacity is managed;By location-based monitoring, colliding to management will occur in plant room at the scene Personnel send orientation early warning, avoid collision.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (1)

1. a kind of project security management system based on BIM, including:Safety cap, the safety cap include being arranged on safety cap Button of taking pictures, camera, rhythm of the heart chip, loud speaker, positioning chip and WiFi module;
It is characterised in that it includes:
Management module, for the information of each module and the meta-synthetic management of data in project security management system;
Orientation voice is told somebody what one's real intentions are management module, for according to demand, selected in management module in BIM models a certain work post or certain The Field Force in one region is oriented communication, carries out targetedly voice and tells somebody what one's real intentions are;
Quality information is collected and inspection of quality module, and for shared by the visual angle based on BIM and positioning, administrative staff pass through Long-range inspection and the same visual angle of site operation personnel and administrative staff when management module carries out inspection of quality are linked up;It is additionally operable to The construction quality situation of each link in project work progress is recorded in the course of receiving by photo of taking pictures, the photo is real-time It is linked at the corresponding position of BIM models in management module, the overall process data accumulation as Project quality management;
Safe early warning and construction note module, the row for detecting every Field Force using the gyroscope being arranged in safety cap Form is walked, and by related real-time data synchronization to management module, when certain construction personnel has larger topple in time to attached Nearly construction personnel and office send rescue alarm signal;Positioning chip and camera in safety cap can record the constructor The environment of track route and periphery before member's generation accident, the investigation foundation as accident;It is additionally operable to determine construction personnel Position information is matched with BIM models, automatically pre- to related personnel's safety cap hair when construction personnel, which goes to, faces side openings position Alert signal, avoids the generation of safety accident;
Personnel health's state detection module, for passing through whether setting rhythm of the heart chip is correctly worn for site personnel Safety cap, and project management red line is set in management module, when detecting that safety cap enters project construction field management red line, If occurring correctly not sending out alarm immediately with wearing a safety helmet, can be monitored in real time by heart rate detection result in the construction process existing The health status of field personnel, alarm is sent out more than safety value in time;
Field Force's trend monitoring module passes through personnel for uploading in management module personnel's track positioning information in real time Track positioning can each working face of real time inspection number of work, secondly by divide project work red line and work it is flushing Line can provide foundation with real-time statistics site operation personnel amount for labour's clearing, can by the curve movement for tracking personal To monitor the labour state of construction personnel, the common track route of next integration project personnel in the project implementation, reasonable arrangement The setting of project related roads;
Site machinery monitoring of tools module is positioned by the associated machines to project scene and is transported to site machinery equipment Row monitoring and capacity are managed;By location-based monitoring, colliding to administrative staff will occur in plant room at the scene Orientation early warning is sent, is avoided collision.
CN201610779336.1A 2016-08-30 2016-08-30 A kind of project security management system based on BIM Active CN106372854B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610779336.1A CN106372854B (en) 2016-08-30 2016-08-30 A kind of project security management system based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610779336.1A CN106372854B (en) 2016-08-30 2016-08-30 A kind of project security management system based on BIM

Publications (2)

Publication Number Publication Date
CN106372854A CN106372854A (en) 2017-02-01
CN106372854B true CN106372854B (en) 2018-07-13

Family

ID=57898635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610779336.1A Active CN106372854B (en) 2016-08-30 2016-08-30 A kind of project security management system based on BIM

Country Status (1)

Country Link
CN (1) CN106372854B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106980705A (en) * 2017-02-22 2017-07-25 中国建筑第八工程局有限公司 Safety protection standard construction method based on BIM technology
CN106934729B (en) * 2017-03-09 2021-03-30 河北省建筑科学研究院有限公司 Building detection and identification method and device
CN108427815A (en) * 2017-08-12 2018-08-21 中民筑友科技投资有限公司 A kind of collision detection method and device in engineering project
CN107748945A (en) * 2017-09-01 2018-03-02 郭亚晋 A kind of wisdom site staff management system
CN109658665A (en) * 2017-10-10 2019-04-19 重庆大学 Personal protection protection against electric shock method for early warning, device, system, storage equipment and terminal
CN108446889A (en) * 2018-02-11 2018-08-24 北京市轨道交通建设管理有限公司 A kind of exchange method of construction site and construction speed platform
CN108732979A (en) * 2018-05-15 2018-11-02 浙江大学 A kind of construction safety managing and control system based on BIM technology
CN109410544A (en) * 2018-10-16 2019-03-01 广州源贸易有限公司 A kind of enterprise security early warning system that early warning effect is good
CN109637078A (en) * 2018-11-16 2019-04-16 万翼科技有限公司 A kind of abnormality monitoring method of intelligent wearable device
CN110557501A (en) * 2019-08-07 2019-12-10 黄莹 risk identification rescue method and system based on coordination of smart watch and smart phone

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103544556A (en) * 2013-09-06 2014-01-29 上海大学 Life-cycle management system and method for tunnels
CN103955174A (en) * 2014-03-31 2014-07-30 湖南大学 Building health monitoring system based on building information model technology

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103544556A (en) * 2013-09-06 2014-01-29 上海大学 Life-cycle management system and method for tunnels
CN103955174A (en) * 2014-03-31 2014-07-30 湖南大学 Building health monitoring system based on building information model technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
BIM和RFID在施工安全管理中的集成应用研究;郭红领 等;《工程管理学报》;20140815;第28卷(第4期);正文第1-2节 *
基于BIM和RFID技术的建设项目安全管理研究;江帆;《中国优秀硕士学位论文全文数据库 工程科技II辑》;20150315(第03期);正文第2.3节 *

Also Published As

Publication number Publication date
CN106372854A (en) 2017-02-01

Similar Documents

Publication Publication Date Title
CN103393412B (en) A kind of care device for old man based on Smart Home
US9466197B2 (en) Emergency services system and method comprising a mesh communications network, a plurality of communication nodes, and a plurality of personal tags
CN103978996B (en) A kind of high speed railway environment information acquisition, assessment and prior-warning device and method
CN103245912B (en) A kind of running of wind generating set state analysis diagnostic method and system
CN104989452B (en) wireless underground miner positioning and construction area environment safety intelligent monitoring system
CN106975191A (en) A kind of fire-fighting system and its rescue mode
CN201765513U (en) Urban safety portrait targeting, tracking and capturing system based on biometric portrait identification technology
RU2472226C2 (en) Apparatus for monitoring location of individuals
CN204856812U (en) Automatic warning robot patroles
CN108259625A (en) A kind of escape and rescue method based on Buildings Modeling and personnel's running fix
CN104021403A (en) Indoor prison person positioning system based on active RFID
CN103366565B (en) Method and system of detecting pedestrian running red light based on Kinect
CN102610035A (en) Financial self-service device and anti-peeping system and anti-peeping method thereof
CN107748945A (en) A kind of wisdom site staff management system
CN101650869A (en) Human body tumbling automatic detecting and alarming device and information processing method thereof
CN103530978A (en) Special population-oriented danger sensing and alarming system
CN102646316B (en) Comprehensive security monitoring method and comprehensive security monitoring system based on sentry
CN106779447A (en) Builder's intelligent management system and method for a kind of RFID of fusion BIM
CN106226804A (en) Nuclear power station real-time monitoring system
CN202697857U (en) Intelligent helmet
US8296063B1 (en) Emergency rescue system and method having video and IMU data synchronization
CN104331942B (en) Miner card-swiping analytic system
CN207395787U (en) Cloud platform intelligent helmet and the security protection managing and control system based on cloud platform intelligent helmet
CN105704427A (en) Intelligent video monitoring system for high-voltage power transmission line
CN105354956B (en) The cloud computing platform and method analyzed based on data mining and big data

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant