CN106370154A - Subway station main body structure support system construction process monitoring system - Google Patents

Subway station main body structure support system construction process monitoring system Download PDF

Info

Publication number
CN106370154A
CN106370154A CN201610825309.3A CN201610825309A CN106370154A CN 106370154 A CN106370154 A CN 106370154A CN 201610825309 A CN201610825309 A CN 201610825309A CN 106370154 A CN106370154 A CN 106370154A
Authority
CN
China
Prior art keywords
monitoring system
subway station
computer
outfan
input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610825309.3A
Other languages
Chinese (zh)
Inventor
项炳泉
陈万立
吴志新
杜德平
刘杭杭
汪劲松
刘勇
赵世振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Institute of Architectural Research and Design
Original Assignee
Anhui Institute of Architectural Research and Design
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Institute of Architectural Research and Design filed Critical Anhui Institute of Architectural Research and Design
Priority to CN201610825309.3A priority Critical patent/CN106370154A/en
Publication of CN106370154A publication Critical patent/CN106370154A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B21/00Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
    • G01B21/32Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring the deformation in a solid
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
    • H04N7/181Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast for receiving images from a plurality of remote sources

Landscapes

  • Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a subway station main body structure support system construction process monitoring system and relates to the field of intelligent monitoring. The subway station main body structure support system construction process monitoring system comprises a strain monitoring system, a support deformation monitoring system and an onsite monitoring system, wherein the strain monitoring system comprises multiple strain sensors, the support deformation monitoring system comprises multiple electronic total stations, the output ends of the electronic total stations are connected with the input end of a computer through a shielding line, the onsite monitoring system comprises multiple pick-up heads, the output ends of the pick-up heads are connected with the input end of the computer through a shielding line, and the computer is connected with an RAM, an MRAM, a database and a data analysis module. According to the invention, stress and deformation conditions of a construction formation process and a construction field are monitored in real time through the strain monitoring system, the support deformation monitoring system and the onsite monitoring system, and corresponding adjustment is performed, such that the safety of a construction process and the accuracy of construction formation are guaranteed.

Description

A kind of main structure of subway station mounting system work progress monitoring system
Technical field
The present invention relates to intellectual monitoring field is and in particular to a kind of main structure of subway station mounting system work progress is supervised Examining system.
Background technology
In the work progress of Practical Project, because the design theory that template is made is not mature enough, part when setting up Construction technical staff is often too dependent on traditional construction experience, does not have enough attention to construction environment and construction featuress Deng, so be difficult to hold support system working condition.The especially more special system of those structures, if these are special The stress of structure and deformation can not be grasped in time, be difficult to the key position of structure be taken effective adjustment arrange Apply.
Subway work scale is big, have after cycle length and structural mechanical property in work progress and structure formation significance difference away from, Thus take into full account lot of essential factors in work progress and work progress is monitored being very important.
Content of the invention
(1) technical problem solving
For the deficiencies in the prior art, the invention provides a kind of main structure of subway station mounting system work progress prison Examining system, solves the stress of special construction and deformation can not be unable to asking of monitor in real time by timely grasp, job site Topic.
(2) technical scheme
For realizing object above, the present invention is achieved by the following technical programs:
A kind of main structure of subway station mounting system work progress monitoring system, becomes including strain monitoring system, support Shape monitoring system and site monitoring system, described strain monitoring system includes multiple strain transducers, described strain transducer Outfan is connected with the input of signal processor by data acquisition controller, the outfan of described signal processor and signal The input of transducer connects, and the outfan of described signal adapter is connected with the input of computer by shielding line, described Frame DEFORMATION MONITORING SYSTEM includes multiple total powerstations, and the outfan of described total powerstation is connected with the input of computer by shielding line, Described site monitoring system includes multiple photographic head, and the outfan of described photographic head is passed through shielding line and connected with the input of computer Connect, described computer is connected with ram memorizer, mram memorizer, data base's data analysis module.
Described strain transducer is specially vibrating string type sensor.
Described total powerstation is specially tocon os101 total powerstation.
Described photographic head is specially 360 ° of fish-eye cameras.
The outfan of described computer is connected with the input of printer.
(3) beneficial effect
Embodiments provide a kind of main structure of subway station mounting system work progress monitoring system.Possess with Lower beneficial effect: 1, pass through the multiple total powerstations in the multiple strain sensings and deformation of timbering monitoring system in strain monitoring system Monitor in real time is carried out to the component of job site, the stress making component in work progress is all in a comparatively safe stable shape State, it is ensured that completion of works rear part is not in the larger stress of ratio, can grasp stress, the strain feelings of structure simultaneously in time Condition it is ensured that in work progress component there is no too big deformation it is ensured that structure reaches the effect of expected shaping and prevents from constructing Collapse phenomenon occurs in journey;
2nd, by the multiple photographic head in site monitoring system, job site is carried out with monitor in real time and ensure job site Safety, can understand emergency case simultaneously in time, be conducive to managing job site;
3rd, in data analysis module seven big analysis method: Affinity diagram method, associated diagram method, System Diagram, matrix diagram method, The data monitoring can be preferably analyzed by pdpc method, arrow diagram method and factor analysis;
4th, using ram memorizer, mram memorizer database, the data monitoring is stored, compared and inquired about.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing Have technology description in required use accompanying drawing be briefly described it should be apparent that, drawings in the following description be only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, acceptable Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 principle of the invention block diagram.
Strain monitoring system 1, strain transducer 2, data acquisition controller 3, signal processor 4, signal adapter 5, screen Cover line 6, computer 7, deformation of timbering monitoring system 8, total powerstation 9, site monitoring system 10, photographic head 11, ram memorizer 12, Mram memorizer 13, data base 14, data analysis module 15, printer 16
Specific embodiment
Purpose, technical scheme and advantage for making the embodiment of the present invention are clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described it is clear that described embodiment is The a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment being obtained under the premise of not making creative work, broadly falls into the scope of protection of the invention.
A kind of main structure of subway station mounting system work progress monitoring system, becomes including strain monitoring system 1, support Shape monitoring system 8 and site monitoring system 10, described strain monitoring system 1 includes multiple strain transducers 2, described strain sensing The outfan of device 2 is connected with the input of signal processor 4 by data acquisition controller 3, the output of described signal processor 4 End is connected with the input of signal adapter 5, and the outfan of described signal adapter 5 passes through the input of shielding line 6 and computer 7 Connect, described deformation of timbering monitoring system 8 includes multiple total powerstations 9, the outfan of described total powerstation 9 passes through shielding line 6 and electricity The input of brain 7 connects, and described site monitoring system 10 includes multiple photographic head 11, and the outfan of described photographic head 11 passes through screen The input covering line 6 with computer 7 is connected, and described computer 7 is divided with ram memorizer 12, mram memorizer 13, data base 14 data Analysis module 15 connects, and described strain transducer 2 is specially vibrating string type sensor, and it is complete that described total powerstation 9 is specially tocon os101 Stand instrument, described photographic head 11 is specially 360 ° of fish-eye cameras, the input of the outfan of described computer 7 and printer 16 is even Connect.
Operation principle: using many in the multiple strain sensings 2 and deformation of timbering monitoring system 8 in strain monitoring system 1 Individual total powerstation 9 carries out real-time monitoring to the component of job site, so that the stress of component in work progress is relatively pacified all in one Stable state is it is ensured that completion of works rear part is not in it is ensured that component is not less than too in work progress than larger stress entirely Big deformation is it is ensured that structure reaches the effect of expected shaping and prevents collapse phenomenon in work progress, by existing Multiple photographic head 11 in monitoring system 10 carry out monitor in real time to job site it is ensured that the safety of job site, data In analysis module 15 seven big analysis methods: Affinity diagram method, associated diagram method, System Diagram, matrix diagram method, pdpc method, Arrow Diagram The data monitoring can be preferably analyzed by solution and factor analysis, and is printed by printer 16, profit With ram memorizer 12, mram memorizer 13 database 14, the data monitoring is stored, compared and inquired about.
Above example only in order to technical scheme to be described, is not intended to limit;Although with reference to the foregoing embodiments The present invention has been described in detail, it will be understood by those within the art that: it still can be to aforementioned each enforcement Technical scheme described in example is modified, or carries out equivalent to wherein some technical characteristics;And these modification or Replace, do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (5)

1. a kind of main structure of subway station mounting system work progress monitoring system, becomes including strain monitoring system (1), support Shape monitoring system (8) and site monitoring system (10) it is characterised in that: described strain monitoring system (1) includes multiple strains and passes Sensor (2), the outfan of described strain transducer (2) passes through the input of data acquisition controller (3) and signal processor (4) Connect, the outfan of described signal processor (4) is connected with the input of signal adapter (5), described signal adapter (5) Outfan is connected with the input of computer (7) by shielding line (6), and described deformation of timbering monitoring system (8) includes multiple whole stations Instrument (9), the outfan of described total powerstation (9) is connected with the input of computer (7) by shielding line (6), described field monitoring system System (10) includes multiple photographic head (11), and the outfan of described photographic head (11) passes through the input of shielding line (6) and computer (7) Connect, described computer (7) is with ram memorizer (12), mram memorizer (13), data base (14) data analysis module (15) even Connect.
2. main structure of subway station mounting system work progress monitoring system as claimed in claim 1 is it is characterised in that institute State strain transducer (2) and be specially vibrating string type sensor.
3. main structure of subway station mounting system work progress monitoring system as claimed in claim 1 is it is characterised in that institute State total powerstation (9) and be specially tocon os101 total powerstation.
4. main structure of subway station mounting system work progress monitoring system as claimed in claim 1 is it is characterised in that institute State photographic head (11) and be specially 360 ° of fish-eye cameras.
5. main structure of subway station mounting system work progress monitoring system as claimed in claim 1 is it is characterised in that institute The outfan stating computer (7) is connected with the input of printer (16).
CN201610825309.3A 2016-09-14 2016-09-14 Subway station main body structure support system construction process monitoring system Pending CN106370154A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610825309.3A CN106370154A (en) 2016-09-14 2016-09-14 Subway station main body structure support system construction process monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610825309.3A CN106370154A (en) 2016-09-14 2016-09-14 Subway station main body structure support system construction process monitoring system

Publications (1)

Publication Number Publication Date
CN106370154A true CN106370154A (en) 2017-02-01

Family

ID=57896756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610825309.3A Pending CN106370154A (en) 2016-09-14 2016-09-14 Subway station main body structure support system construction process monitoring system

Country Status (1)

Country Link
CN (1) CN106370154A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004020533A (en) * 2002-06-20 2004-01-22 Shimizu Corp Control device for mobile object and control method thereof
KR20090090576A (en) * 2008-02-21 2009-08-26 연세대학교 산학협력단 Structural health monitoring system
CN101806663A (en) * 2010-03-17 2010-08-18 东南大学 Health monitoring method of cable system based on mixed monitoring in presence of support seat settlement
CN202688979U (en) * 2012-06-26 2013-01-23 南京工业大学 Integrated monitoring system for foundation pit under construction
CN104457716A (en) * 2014-11-28 2015-03-25 中铁建生态环境设计研究有限公司 Measurement and control method for bridge construction
CN205300520U (en) * 2015-12-07 2016-06-08 中国石油天然气股份有限公司 Tunnel engineering deformation monitoring system
CN205537773U (en) * 2016-04-15 2016-08-31 天津大学 Construction and health monitoring system suitable for a discontinuous supporting string dome
CN206095201U (en) * 2016-09-14 2017-04-12 安徽省建筑科学研究设计院 Subway station main part structural support system construction process monitoring system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004020533A (en) * 2002-06-20 2004-01-22 Shimizu Corp Control device for mobile object and control method thereof
KR20090090576A (en) * 2008-02-21 2009-08-26 연세대학교 산학협력단 Structural health monitoring system
CN101806663A (en) * 2010-03-17 2010-08-18 东南大学 Health monitoring method of cable system based on mixed monitoring in presence of support seat settlement
CN202688979U (en) * 2012-06-26 2013-01-23 南京工业大学 Integrated monitoring system for foundation pit under construction
CN104457716A (en) * 2014-11-28 2015-03-25 中铁建生态环境设计研究有限公司 Measurement and control method for bridge construction
CN205300520U (en) * 2015-12-07 2016-06-08 中国石油天然气股份有限公司 Tunnel engineering deformation monitoring system
CN205537773U (en) * 2016-04-15 2016-08-31 天津大学 Construction and health monitoring system suitable for a discontinuous supporting string dome
CN206095201U (en) * 2016-09-14 2017-04-12 安徽省建筑科学研究设计院 Subway station main part structural support system construction process monitoring system

Similar Documents

Publication Publication Date Title
CN203515972U (en) Clamping force monitoring system for bolt connection of wind generating set
CN106878418A (en) A kind of glass curtain wall intelligent sensor node and method
CN109678060A (en) Intelligent monitoring method and system for disorder of hoisting steel wire rope of tower crane
CN106910410A (en) A kind of equipment of simulated altitude pendant thing strike
CN206095201U (en) Subway station main part structural support system construction process monitoring system
CN106370154A (en) Subway station main body structure support system construction process monitoring system
CN203164745U (en) Building engineering safety construction informatization monitoring system
CN205332998U (en) A health monitoring system for building structure
CN203882342U (en) Back brake operation order safe execution system
CN110132344A (en) A kind of communication monitoring system for transmission tower
CN203338613U (en) Substation automation monitoring terminal operation training system
CN102322791A (en) Automatic test system for model test displacement data and test method thereof
CN202420761U (en) Detection device of stress sensor
CN203101077U (en) Intelligent repair system for equipment
CN202897708U (en) Monitoring device of traction machine used for elevator
CN205405622U (en) Personnel management attendance machine
CN113095461A (en) Pull-up counter based on machine vision
CN209216331U (en) A kind of fired power generating unit debugging system
CN203908531U (en) Photovoltaic calendering glass on-line automatic thickness measuring apparatus
CN206074276U (en) Brake experiment intelligent management system
CN207731494U (en) A kind of learning diagnosis system based on brain wave analysis
CN110322772A (en) A kind of laboratory bridge monitoring teaching demonstration system based on BIM
CN206249333U (en) A kind of data collecting system in shunt workshop
CN107655645A (en) A kind of testing stand data management system and its method of work
CN204808641U (en) Car intelligent trouble checking system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170201

RJ01 Rejection of invention patent application after publication