CN203164745U - Building engineering safety construction informatization monitoring system - Google Patents

Building engineering safety construction informatization monitoring system Download PDF

Info

Publication number
CN203164745U
CN203164745U CN 201320181344 CN201320181344U CN203164745U CN 203164745 U CN203164745 U CN 203164745U CN 201320181344 CN201320181344 CN 201320181344 CN 201320181344 U CN201320181344 U CN 201320181344U CN 203164745 U CN203164745 U CN 203164745U
Authority
CN
China
Prior art keywords
unit
construction
monitoring
data
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320181344
Other languages
Chinese (zh)
Inventor
王艳
王茂川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU DECHANGLONG INFORMATION TECHNOLOGY CO LTD
Original Assignee
HANGZHOU DECHANGLONG INFORMATION TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU DECHANGLONG INFORMATION TECHNOLOGY CO LTD filed Critical HANGZHOU DECHANGLONG INFORMATION TECHNOLOGY CO LTD
Priority to CN 201320181344 priority Critical patent/CN203164745U/en
Application granted granted Critical
Publication of CN203164745U publication Critical patent/CN203164745U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a building engineering safety construction informatization monitoring system. The system is characterized by comprising an image pick-up unit, a data acquisition unit, a data processing unit, a data server and a remote monitoring computer. With the system, acquired data about construction buildings can be managed, audited and backed up through a monitoring and management platform so that unified management on safety of multiple construction buildings can be realized. A monitoring unit can obtain monitoring data in real time and can print and display the monitoring data. According to the utility model, electronic data about construction buildings can be acquired and processed in real time, and the monitoring level of building engineering safety construction informatization is greatly improved.

Description

The information-based supervisory systems of a kind of construction work safe construction
Technical field
The utility model relates to construction work safety technique field, particularly the information-based supervisory systems of a kind of construction work safe construction.
Background technology
Because unfavorable factors such as the building engineering construction environment has in the open, high-altitude, work post intersection, and construction work generally is huger, need the parameter kind of monitoring more, as stress, strain, displacement, sedimentation, interstitial hydraulic pressure, soil pressure, ambient temperature and humidity etc., traditional manual measurement parameter can not satisfy the demand of heavy construction.
Existing building engineering construction phase monitoring has two big classes: a kind of is the wired measuring system, each measurement point connects by cable to data center in this system, therefore this series products wiring is complicated, the later maintenance difficulty is big, the overlay area, monitoring point has certain limitation, and because general engineering construction monitoring point all distributes more scatteredly, the signal amplitude after the conversion is less, be not suitable for long Distance Transmission and concentrate and gather, and be difficult to realize unified management to a plurality of construction building; Another kind is the personal monitoring, and the personnel that namely monitor patrol and examine each monitoring point the fixed cycle, and the collection in worksite data of monitoring point is handled measuring point data by the mode of manual entry then.The real-time of this monitoring mode monitoring is relatively poor, and human factor can cause the accuracy of Monitoring Data and reliability to reduce.
The utility model content
For this reason, the utility model proposes the information-based supervisory systems of a kind of construction work safe construction, can eliminate fully because the restriction of prior art and one or more problems that defective causes.
The utility model additional advantage, purpose and characteristic, a part will be illustrated in the following description, and another part will be significantly for those of ordinary skill in the art by the investigation to following explanation or acquire from enforcement of the present utility model.Can realize and obtain the utility model purpose and advantage by the structure of in the instructions of literal and claims and accompanying drawing, pointing out especially.
The utility model provides a kind of construction work safe construction information-based supervisory systems, it is characterized in that, described system comprises: image unit, data acquisition unit, data processing unit, data server and remote monitoring computing machine, wherein, described image unit is connected with described data processing unit with data acquisition unit, described data processing unit is connected with data server in the monitoring management platform by GPRS, and described data processing unit also is connected by the remote monitoring computing machine of Internet of Things with the monitoring unit, and described data server is connected with described remote monitoring computing machine by the Internet.
Preferably, described image unit is the camera that is installed on the construction building.
Preferably, described data acquisition unit is smoke density sensor, gas concentration sensor, temperature sensor and ground sensor.
Preferably, described ground sensor is tiltmeter, stress ga(u)ge, strainmeter or limnimeter.
Preferably, described data processing unit is PDA.
Preferably, described remote monitoring computing machine is connected with display unit with printer.
Preferably, described display unit is LCD.
Preferably, described monitoring management platform also comprises warning device, and described warning device is connected with described data server.
The utility model can manage, examine and back up the data of the construction building that collects by the monitoring management platform, thereby has realized the unified management to a plurality of construction building safety; Monitor the acquisition Monitoring Data that unit can be real-time, and can realize printing and demonstration to Monitoring Data.The utility model has been realized the electronic data collection of construction building and real-time are handled, and has improved the informationalized supervision level of construction work safe construction greatly.
Description of drawings
Fig. 1 is according to structural representation the utility model embodiment, the information-based supervisory systems of construction work safe construction.
Embodiment
With reference to the accompanying drawings the utility model is described more fully, exemplary embodiment of the present utility model wherein is described.
Fig. 1 is according to structural representation the utility model embodiment, the information-based supervisory systems of construction work safe construction.
As shown in Figure 1, the information-based supervisory systems of construction work safe construction provided by the utility model comprises: image unit, data acquisition unit, data processing unit, data server and remote monitoring computing machine, wherein, described image unit is connected with described data processing unit with data acquisition unit, described data processing unit is connected with data server in the monitoring management platform by GPRS, and described data processing unit also is connected by the remote monitoring computing machine of Internet of Things with the monitoring unit, and described data server is connected with described remote monitoring computing machine by the Internet.
Described data processing unit is handled the data of being sent by described image unit and data acquisition unit, data after will handling then send to the data server that is positioned at the monitoring management platform, and the data after will handling send to the remote monitoring computing machine of monitoring unit.
Described image unit is camera, and this camera is installed on the buildings of construction, so that the buildings of construction is taken.
Described data acquisition unit is various kinds of sensors, and it can include but not limited to: smoke density sensor, gas concentration sensor, temperature sensor, ground sensor etc.
After the data that collected by image unit and data acquisition unit are handled by data processing unit, the data server that sends in the monitoring management platform backs up, according to a preferred embodiment of the present utility model, described monitoring management platform also comprises warning device, described warning device is connected with described data server, when data monitored surpassed certain threshold value, this warning device sent warning to the related personnel.The utility model can manage, examine and back up the data of the construction building that collects by the monitoring management platform, thereby has realized the unified management to a plurality of construction building.
The remote monitoring computing machine of monitoring unit is by the data in the data server of the Internet in can the access monitoring management platform.In addition, according to a preferred embodiment of the present utility model, described monitoring unit also comprises printer and display unit, and described remote monitoring computing machine is connected with display unit with printer, printer can print the data that monitor, and display unit shows the data that photographed by camera.Described display unit can be LCD.
Ground sensor in the utility model can be: tiltmeter, stress ga(u)ge, strainmeter or limnimeter.
Each included parts of the information-based supervisory systems of construction work safe construction provided by the utility model are realized by hardware, specifically, image unit wherein is camera, data acquisition unit is sensor, described camera and sensor all are hardware devices, data processing unit can be realized by PDA, PDA obviously also is hardware, remote monitoring computing machine and data server can be realized that all printer, LCD and warning device also all are common hardware devices by the common main frame in this area.
Above content only is preferred embodiment of the present utility model, for those of ordinary skill in the art, according to thought of the present utility model, the part that all can change in specific embodiments and applications, this description should not be construed as restriction of the present utility model.

Claims (8)

1. the information-based supervisory systems of a construction work safe construction, it is characterized in that, described system comprises: image unit, data acquisition unit, data processing unit, data server and remote monitoring computing machine, wherein, described image unit is connected with described data processing unit with data acquisition unit, described data processing unit is connected with data server in the monitoring management platform by GPRS, and described data processing unit also is connected by the remote monitoring computing machine of Internet of Things with the monitoring unit, and described data server is connected with described remote monitoring computing machine by the Internet.
2. the information-based supervisory systems of construction work safe construction according to claim 1 is characterized in that described image unit is the camera that is installed on the construction building.
3. the information-based supervisory systems of construction work safe construction according to claim 1 is characterized in that described data acquisition unit is smoke density sensor, gas concentration sensor, temperature sensor and ground sensor.
4. the information-based supervisory systems of construction work safe construction according to claim 3 is characterized in that described ground sensor is tiltmeter, stress ga(u)ge, strainmeter or limnimeter.
5. the information-based supervisory systems of construction work safe construction according to claim 1 is characterized in that described data processing unit is PDA.
6. the information-based supervisory systems of construction work safe construction according to claim 1 is characterized in that described remote monitoring computing machine is connected with display unit with printer.
7. the information-based supervisory systems of construction work safe construction according to claim 6 is characterized in that described display unit is LCD.
8. the information-based supervisory systems of construction work safe construction according to claim 1 is characterized in that described monitoring management platform also comprises warning device, and described warning device is connected with described data server.
CN 201320181344 2013-04-11 2013-04-11 Building engineering safety construction informatization monitoring system Expired - Fee Related CN203164745U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320181344 CN203164745U (en) 2013-04-11 2013-04-11 Building engineering safety construction informatization monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320181344 CN203164745U (en) 2013-04-11 2013-04-11 Building engineering safety construction informatization monitoring system

Publications (1)

Publication Number Publication Date
CN203164745U true CN203164745U (en) 2013-08-28

Family

ID=49025917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320181344 Expired - Fee Related CN203164745U (en) 2013-04-11 2013-04-11 Building engineering safety construction informatization monitoring system

Country Status (1)

Country Link
CN (1) CN203164745U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105427546A (en) * 2015-12-31 2016-03-23 国网浙江奉化市供电公司 Electric power facility construction monitoring method and electric power facility construction monitoring device
CN107748959A (en) * 2017-10-25 2018-03-02 东华理工大学 A kind of construction management information service system
CN108632333A (en) * 2017-09-18 2018-10-09 淄博职业学院 Construction site real time data acquisition, storage, uploading system and application method
CN108632332A (en) * 2017-09-18 2018-10-09 淄博职业学院 A kind of construction engineering quality security information high in the clouds data collecting system and application method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105427546A (en) * 2015-12-31 2016-03-23 国网浙江奉化市供电公司 Electric power facility construction monitoring method and electric power facility construction monitoring device
CN108632333A (en) * 2017-09-18 2018-10-09 淄博职业学院 Construction site real time data acquisition, storage, uploading system and application method
CN108632332A (en) * 2017-09-18 2018-10-09 淄博职业学院 A kind of construction engineering quality security information high in the clouds data collecting system and application method
CN107748959A (en) * 2017-10-25 2018-03-02 东华理工大学 A kind of construction management information service system

Similar Documents

Publication Publication Date Title
CN205388766U (en) Building engineering safety construction informatization monitoring system
CN203164745U (en) Building engineering safety construction informatization monitoring system
CN102280005A (en) Early warning system for fire prevention of forest based on infrared thermal imaging technology and method
CN103115667B (en) A kind of sensor-based vibration monitoring device
CN105136101A (en) Real-time bridge state parameter monitoring and alarm system
CN106979799A (en) The safe auxiliary monitoring system of grid equipment
CN107202569A (en) One kind detection, monitoring railway communication steel tower system
CN105403250A (en) Electric disaster prevention and early warning system
CN107860425A (en) A kind of bridge structural health monitoring and early warning system and method
CN109387242A (en) The real-time monitoring system and its method of building state
CN205317685U (en) Product surface quality detecting system
CN104326360B (en) High pedestal jib crane holographic measuring method
CN204594499U (en) A kind of structural healthy monitoring system
CN111668927A (en) Substation intelligent inspection system based on ubiquitous power Internet of things and control method thereof
CN101794146B (en) Management system used for tower type crane
CN207033011U (en) Electric force pole tower based on GPRS
CN112558568A (en) Raw rubber automatic production line information visualization system based on DCS data acquisition
CN204832852U (en) Structure slope monitoring devices based on thing networking
CN203855261U (en) Real-time monitoring system for elevator running
CN203241816U (en) Ethernet-based monitoring system of natural gas compressor
CN108892040A (en) Crane Internet of Things net dynamic safety monitoring and managing method and system
CN205405176U (en) Building site management system
CN204166364U (en) The cable shaft running safety monitoring system of the communication technology Network Based
CN204082446U (en) Based on the offshore wind farm unit comprehensive monitoring system of 6LoWPAN radio sensing network
CN210246807U (en) BIM-based road tunnel real-time monitoring system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130828

Termination date: 20150411

EXPY Termination of patent right or utility model