CN110322772A - A kind of laboratory bridge monitoring teaching demonstration system based on BIM - Google Patents

A kind of laboratory bridge monitoring teaching demonstration system based on BIM Download PDF

Info

Publication number
CN110322772A
CN110322772A CN201910610478.9A CN201910610478A CN110322772A CN 110322772 A CN110322772 A CN 110322772A CN 201910610478 A CN201910610478 A CN 201910610478A CN 110322772 A CN110322772 A CN 110322772A
Authority
CN
China
Prior art keywords
data
monitoring
module
sensor
laboratory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910610478.9A
Other languages
Chinese (zh)
Inventor
李晓飞
尹赫男
杨刚
赵瑞
国海楠
刘辉
李亚文
赵东彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Maritime University
Original Assignee
Dalian Maritime University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Maritime University filed Critical Dalian Maritime University
Priority to CN201910610478.9A priority Critical patent/CN110322772A/en
Publication of CN110322772A publication Critical patent/CN110322772A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/26Visual data mining; Browsing structured data
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/10Constructive solid geometry [CSG] using solid primitives, e.g. cylinders, cubes
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B25/00Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
    • G09B25/04Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • Geometry (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Computer Graphics (AREA)
  • Software Systems (AREA)
  • Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of laboratory bridge monitoring teaching demonstration system based on BIM, comprising: data acquisition module, data transmission module, data processing module, the monitoring data management module checked for providing monitoring data corresponding to sensor pel and for providing threedimensional model of the laboratory cable-stayed bridge in Revit and realizing that monitoring data exceed the model demonstration module of normal value being highlighted.The present invention provides a kind of laboratory bridge monitoring teaching demonstration system based on BIM technology, the purpose is to by combining BIM technology to realize bridge machinery information visuallization in laboratory conditions, enhance student in learning process for the cognitive ability and the ability of practice of large bridge monitoring, overcome the difficulty that cannot participate in learning by doing into Practical Project during undergraduate course, abundant undergraduate course mode lays the foundation for culture high-quality talents.

Description

A kind of laboratory bridge monitoring teaching demonstration system based on BIM
Technical field
The present invention relates to detection performance technology fields, specifically, more particularly to a kind of laboratory bridge prison based on BIM Survey teaching demonstration system.
Background technique
Currently, visualization technique is to convert abstract data to using image procossing and graphics to be readily appreciated by The technology of image or figure.Visual concept starts from visualization in scientific computing, and staff not only needs with figure or image This visual in image mode goes description data, while being also required to understand the variation tendency of data to which the tendency to data carries out Prediction, as the intersection between different subjects is more and more and the fast development of computer technology, visualization have been not only Refer to visualization in scientific computing, but also the visualization including engineering field data.From 20th century, as the high speed of science and technology is sent out Exhibition, various new materials, new process are continued to bring out in civil engineering industry, so that engineering structure is constantly to complication, enlargement hair Exhibition, while but also the health monitoring systems of structure inevitably develop to complication, enlargement.Monitoring data are in health monitoring system There is highly important status in system, be the scientific basis to structural stress state, degree of injury and life appraisal, after structure Continuous maintenance and maintenance has highly important directive significance.But it with the enlargement of monitoring system, complicates, different type sensing The magnanimity monitoring data of device acquisition can be transferred to the data acquisition subsystem in monitoring system in real time, cause staff to prison Understanding, analysis and the processing of measurement information generate difficult.Therefore, the visualization for improving monitoring data is horizontal, reduces the understanding of data Difficulty is necessary.
The full name in English of BIM is Building Information Modeling, and concept is by Charles earliest In 70 generation of 19th century of Eastman et al., is put forward for the first time, and is the direct embodiment that informationization technology is applied to construction industry.By the hair of many years There has also been more complete definition for the definition of exhibition BIM technology.BIM technology entered China in 2002, and domestic scholars also expand greatly Quantifier elimination.Guangxi University of Science & Technology Deng Langni professor team has carried out about BIM technology in design phase, construction stage and O&M The research of the Life cycle application in stage is difficult to realize fine-grained management to solve the problems, such as that CAD tradition arranges brick technology, utilizes BIM kernel software Revit is platform, establishes race's file of brick, realizes the rapid and automation of simulation row's brick, reduce engineering at This, by the integrated use to BIM kernel software, realizes that the visual simulating based on BIM model is answered to improve user experience With.To improve the safety management problem in work progress, based on BIM model, using Pathfinder software realization to fire The research of calamity simulation and safe early warning.Using secondary exploitation technology, the construction risk source safety management based on Revit is realized, Reduce construction site safety accident generation and by BIM technology apply with to the research in engineering quality control.In the design phase, Scholars utilize the function of Revit software collision detection more, carry out collision detection to the BIM model of full profession, discovery is set ahead of time Blind area in meter reduces design alteration, improves the coordination between different majors.BIM the construction stage application more It is mature, it can be achieved that construction site preferred arrangement, visualization construction tell somebody what one's real intentions are, progress simulation and quality examination etc., can be very good auxiliary Help work progress, reduction is done over again, and is increased economic efficiency.In the O&M stage, many scholars, which combine RFID technique with BIM, to be answered For by dynamic information integration into BIM model, being provided for building identification, indoor positioning, personnel escape etc. good in operation management It is good to support.But since the problems such as operation management demand is indefinite and management is uncoordinated with technical level, leads to the O&M stage BIM research is also in the primary stage, needs the intersection between multi-specialized.
To sum up, although BIM technology is more complete in the research of construction stage, in the research of design phase and O&M stage There are also very long roads to need, and the problems in collection is how to carry out the interaction between different model informations and the friendship between subject Fork research.
Summary of the invention
According to technical problem set forth above, and provide a kind of laboratory bridge monitoring teaching demonstration system based on BIM. The present invention mainly utilizes a kind of laboratory bridge monitoring teaching demonstration system based on BIM characterized by comprising data are adopted Collect module, data transmission module, data processing module, provide the monitoring number of monitoring data corresponding to sensor pel checked According to management module and for providing threedimensional model of the laboratory cable-stayed bridge in Revit and realizing monitoring data beyond normal value The model demonstration module being highlighted.
Further, the data acquisition module is arranged on the suspension cable of cable-stayed bridge, is acquired by tension sensor oblique The strain information of drag-line, and by the wireless transmission unit real-time Transmission in the data transmission module to setting at computer end The data processing module, the monitoring data management module and the model demonstration module at end.
Further, the monitoring data management module includes: that sensor node operation unit, monitoring data check list Member, monitoring curve check unit and export data as the monitoring data lead-out unit of Excel formatted file.
Further, the monitoring data pass through the multiple pulling force being arranged on the cable-stayed bridge of laboratory on every skew cables and pass Sensor, by establishing informational table of nodes in the database, the informational table of nodes is sensor number, sensor father node The data type of number and sensor name, the sensor number and sensor father node number is INT, the biography The data type of sensor title is NVARCHAR.
Further, the system automatically reads the information of the informational table of nodes, and according to node and father node Sensor name is bundled in Treeview control by sequence by recurrence method, is checked in unit in the monitoring data, is realized Different sensors node data is checked.
Further, when click-sensor node, the system connects the database automatically, inquires and reads selected The corresponding monitoring data of sensor, and extract in memory, it is realized and is visualized by Data Grid View control;The monitoring Curve checks that unit by MSChart, shows corresponding monitoring data curve graph when user selects corresponding sensor node; The monitoring data lead-out unit.
Further, the model demonstration module preset threshold value of warning, the threshold value of warning by targeted destruction shape Suspension cable strain value under limiting damage state critical condition calculated separately according to relevant calculation theory under state and in cyclic loading Suspension cable strain value when the lower generation fatigue rupture of effect is critical, finally takes the smaller value of the two as threshold value of warning;The mould For type demonstration module in turn by the secondary development of Revit, implementation model is highlighted function.
Further, after detecting that data imported into the system, each sensing data of acquisition can be with institute It states threshold value of warning to compare, the system safety when strain data is less than the threshold value of warning, when strain data is greater than described pre- When alert threshold value, then carry out being highlighted early warning in the three-dimensional model.
Compared with the prior art, the invention has the following advantages that
The present invention provides a kind of laboratory bridge monitoring teaching demonstration system based on BIM technology, and the purpose is to pass through knot It closes BIM technology and realizes bridge machinery information visuallization in laboratory conditions, enhance student in learning process for large size The cognitive ability and the ability of practice of bridge monitoring, learning by doing cannot be participated in during undergraduate course into Practical Project by overcoming Difficulty, enrich undergraduate course mode, for culture high-quality talents lay the foundation.Simultaneously the present invention for impart knowledge to students provide one it is good Good Practice Platform, student can be completed by the system in bridge monitoring technology from sensor arrangement to Information Collecting & Processing and The whole process of visualization display has greatly tempered the ability of practice of starting of student, and it is real during giving lessons to solve teacher Example says the problem of solving problem less, can effectively improve the effect of giving lessons of civil engineering.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to do simply to introduce, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without any creative labor, can be with It obtains other drawings based on these drawings.
Fig. 1 is overall flow schematic diagram of the present invention.
Fig. 2 is this system sensor layout schematic diagram.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work It encloses.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way Data be interchangeable under appropriate circumstances, so as to the embodiment of the present invention described herein can in addition to illustrating herein or Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product Or other step or units that equipment is intrinsic.
It as shown in Figs. 1-2, is a kind of laboratory bridge monitoring teaching demonstration system based on BIM of the present invention, comprising: data Acquisition module, data processing module, provides the monitoring of monitoring data corresponding to sensor pel checked at data transmission module Data management module and for providing threedimensional model of the laboratory cable-stayed bridge in Revit and realizing monitoring data beyond normal The model demonstration module of value being highlighted.It can be understood as in other embodiments, the tutoring system can be with Include such as audio-frequency module etc..As long as can be realized the acquisition process and acquisition to data.
As a preferred embodiment, the data acquisition module is arranged on the suspension cable of cable-stayed bridge, pass through drawing Force snesor acquires the strain information of suspension cable, and extremely by the wireless transmission unit real-time Transmission in the data transmission module The data processing module, the monitoring data management module and the model demonstration module of terminal are set.
In the present embodiment, the monitoring data management module includes: that sensor node operation unit, monitoring data are looked into See that unit, monitoring curve check unit and export data as the monitoring data lead-out unit of Excel formatted file.It can manage Solution can mainly expire in other embodiments, the detection data management module can also include other processing units Collected data can be handled and be managed by foot.
As a preferred embodiment, the monitoring data are by being arranged on the cable-stayed bridge of laboratory every skew cables On multiple tension sensors, by establishing informational table of nodes in the database, the informational table of nodes is that sensor is compiled Number, sensor father node number and sensor name, the sensor number and the sensor father node number data Type is INT, and the data type of the sensor name is NVARCHAR.
In the present embodiment, the system automatically reads the information of the informational table of nodes, and saves according to node and father Sensor name is bundled in Treeview control by the sequence of point by recurrence method, is checked in unit in the monitoring data, Different sensors node data is checked in realization.When click-sensor node, the system connects the database automatically, It inquires and reads the corresponding monitoring data of selected sensor, and extract in memory, realized by Data Grid View control Visualization;
Preferably, unit is checked by MSChart, when user selects phase as monitoring curve described in preferred embodiment Corresponding monitoring data curve graph is shown when the sensor node answered;The monitoring data lead-out unit.
As a preferred embodiment, the model demonstration module presets threshold value of warning, the threshold value of warning leads to It crosses and suspension cable under limiting damage state critical condition is calculated separately according to relevant calculation theory under targeted destruction form strains Value and occur under Cyclic Load fatigue rupture it is critical when suspension cable strain value, the smaller value both finally taken is as pre- Alert threshold value;For the model demonstration module in turn by the secondary development of Revit, implementation model is highlighted function.
In the present embodiment, after detecting that data imported into the system, each sensing data meeting of acquisition It is compared with the threshold value of warning, the system safety when strain data is less than the threshold value of warning, when strain data is greater than institute When stating threshold value of warning, then carry out being highlighted early warning in the three-dimensional model.
By the above-mentioned means, the monitoring data of laboratory bridge, the system can be obtained in real time by data acquisition module It is mainly realized by arranging optical fiber tension sensor acquisition strain information on bridge to the real-time monitoring of bridge, is then passed through The monitoring index data of acquisition and the threshold value of setting are carried out numerical value comparison by System Programming, to realize warning function.Program meeting Automatically every data is compared with the threshold value in database, if exceeding threshold value, can be carried out in the three-dimensional model highlighted aobvious Show.Initial data is the basis of monitoring structural health conditions, by the record to initial data and is analyzed to realize to structural reliability Assessment, when carrying out safety investigation, initial data is also important reference frame, which can allow user to original prison Measured data is checked, can be called the curve graph of each measuring point and be carried out file unloading to data.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
In the above embodiment of the invention, it all emphasizes particularly on different fields to the description of each embodiment, does not have in some embodiment The part of detailed description, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of unit or module It connects, can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple On unit.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code Medium.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (3)

1. a kind of laboratory bridge monitoring teaching demonstration system based on BIM characterized by comprising
Data acquisition module, data processing module, provides looking into for monitoring data corresponding to sensor pel at data transmission module The monitoring data management module seen and for providing threedimensional model of the laboratory cable-stayed bridge in Revit and realizing monitoring data The model demonstration module being highlighted beyond normal value;
The data acquisition module is arranged on the suspension cable of cable-stayed bridge, is believed by the strain that tension sensor acquires suspension cable Breath, and pass through the wireless transmission unit real-time Transmission in the data transmission module to the data that terminal is set Processing module, the monitoring data management module and the model demonstration module.
2. a kind of laboratory bridge monitoring teaching demonstration system based on BIM according to claim 1, feature also exist In:
The monitoring data management module includes: that sensor node operation unit, monitoring data check that unit, monitoring curve are checked Unit and the monitoring data lead-out unit for exporting data as Excel formatted file;
The monitoring data pass through the multiple tension sensors being arranged on the cable-stayed bridge of laboratory on every skew cables, by institute It states and establishes informational table of nodes in database, the informational table of nodes is sensor number, sensor father node number and sensing The data type of device title, the sensor number and sensor father node number is INT, the number of the sensor name It is NVARCHAR according to type;
The system automatically reads the information of the informational table of nodes, and according to the sequence of node and father node by sensor name It is bundled in Treeview control by recurrence method, is checked in unit in the monitoring data, realized to different sensors node Data are checked;
When click-sensor node, the system connects the database automatically, inquires and to read selected sensor corresponding Monitoring data, and extract in memory, it is realized and is visualized by Data Grid View control;
The monitoring curve checks unit by MSChart, and when user selects corresponding sensor node, display is corresponding supervises Measured data curve graph;The monitoring data lead-out unit.
3. a kind of laboratory bridge monitoring teaching demonstration system based on BIM according to claim 1, feature also exist In:
The model demonstration module presets threshold value of warning, the threshold value of warning by under targeted destruction form according to correlometer Theory is calculated to calculate separately the suspension cable strain value under limiting damage state critical condition and fatigue occurs under Cyclic Load Suspension cable strain value when destroying critical finally takes the smaller value of the two as threshold value of warning;The model demonstration module is in turn By the secondary development of Revit, implementation model is highlighted function;
After detecting that data imported into the system, each sensing data of acquisition can carry out pair with the threshold value of warning Than the system safety when strain data is less than the threshold value of warning, when strain data is greater than the threshold value of warning, then in three-dimensional It carries out being highlighted early warning in model.
CN201910610478.9A 2019-07-03 2019-07-03 A kind of laboratory bridge monitoring teaching demonstration system based on BIM Pending CN110322772A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910610478.9A CN110322772A (en) 2019-07-03 2019-07-03 A kind of laboratory bridge monitoring teaching demonstration system based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910610478.9A CN110322772A (en) 2019-07-03 2019-07-03 A kind of laboratory bridge monitoring teaching demonstration system based on BIM

Publications (1)

Publication Number Publication Date
CN110322772A true CN110322772A (en) 2019-10-11

Family

ID=68121432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910610478.9A Pending CN110322772A (en) 2019-07-03 2019-07-03 A kind of laboratory bridge monitoring teaching demonstration system based on BIM

Country Status (1)

Country Link
CN (1) CN110322772A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111209614A (en) * 2019-10-21 2020-05-29 广州市第一市政工程有限公司 BIM technology-based one-key identification method for high beam plate

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102980782A (en) * 2012-06-13 2013-03-20 南京大学 Heterogeneous sensor network and method for bridge and major infrastructure structure safety monitoring and early warning
CN104899384A (en) * 2015-06-12 2015-09-09 卢伟 Structural health monitoring visualization system based on Revit
CN106097819A (en) * 2016-07-31 2016-11-09 重庆交通大学 Bridge for experimental teaching emulates detection method and system
CN107059638A (en) * 2017-05-16 2017-08-18 余郁 A kind of cable-stayed bridge based on BIM is unworthy of weight construction method
CN206470979U (en) * 2016-07-31 2017-09-05 重庆交通大学 Type variable bridge model status monitoring tutoring system
CN107966228A (en) * 2016-10-19 2018-04-27 南京智行信息科技有限公司 A kind of intelligent wireless cable force monitoring system and monitoring method
CN108022056A (en) * 2017-12-28 2018-05-11 哈尔滨工业大学深圳研究生院 A kind of structure dynamic response safety monitoring system and method based on BIM
CN108106663A (en) * 2017-12-07 2018-06-01 云南航天工程物探检测股份有限公司 Online Visual Creating and management bridge monitoring platform
CN109594483A (en) * 2018-12-04 2019-04-09 中铁九局集团第二工程有限公司 A kind of bridge real time on-line monitoring control rotation swivel construction method based on BIM

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102980782A (en) * 2012-06-13 2013-03-20 南京大学 Heterogeneous sensor network and method for bridge and major infrastructure structure safety monitoring and early warning
CN104899384A (en) * 2015-06-12 2015-09-09 卢伟 Structural health monitoring visualization system based on Revit
CN106097819A (en) * 2016-07-31 2016-11-09 重庆交通大学 Bridge for experimental teaching emulates detection method and system
CN206470979U (en) * 2016-07-31 2017-09-05 重庆交通大学 Type variable bridge model status monitoring tutoring system
CN107966228A (en) * 2016-10-19 2018-04-27 南京智行信息科技有限公司 A kind of intelligent wireless cable force monitoring system and monitoring method
CN107059638A (en) * 2017-05-16 2017-08-18 余郁 A kind of cable-stayed bridge based on BIM is unworthy of weight construction method
CN108106663A (en) * 2017-12-07 2018-06-01 云南航天工程物探检测股份有限公司 Online Visual Creating and management bridge monitoring platform
CN108022056A (en) * 2017-12-28 2018-05-11 哈尔滨工业大学深圳研究生院 A kind of structure dynamic response safety monitoring system and method based on BIM
CN109594483A (en) * 2018-12-04 2019-04-09 中铁九局集团第二工程有限公司 A kind of bridge real time on-line monitoring control rotation swivel construction method based on BIM

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙涛等: "基于BIM的桥梁运营期健康监测系统研究应用", 《施工技术与测量技术》 *
马晋超: "基于BIM的桥梁结构健康监测信息可视化管理及预警研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111209614A (en) * 2019-10-21 2020-05-29 广州市第一市政工程有限公司 BIM technology-based one-key identification method for high beam plate

Similar Documents

Publication Publication Date Title
Hou et al. Literature review of digital twins applications in construction workforce safety
Lai et al. Designing a shape–performance integrated digital twin based on multiple models and dynamic data: a boom crane example
CN106227977A (en) A kind of method of steel structure net rack hydraulic pressure lift time-varying finite element analysis based on BIM
CN113806978A (en) Bridge structure digital twin body and method based on BIM-FEM
CN106780116A (en) The construction method of power emergency drilling method, device and its scenario models, device
CN108764601A (en) A kind of monitoring structural health conditions abnormal data diagnostic method based on computer vision and depth learning technology
Liu et al. Digital Twin‐based Safety Evaluation of Prestressed Steel Structure
Lin et al. Automating closed-loop structural safety management for bridge construction through multisource data integration
CN110516820A (en) A kind of steel structure bridge informationization operational system and processing method based on BIM
CN101075226A (en) Multi-role distributed cooperat simulating system
CN109460939A (en) A kind of Municipal Engineering Construction safety control system and method based on 3DGIS+BIM technology
CN110379036A (en) Intelligent substation patrol recognition methods, system, device and storage medium
CN106294969A (en) A kind of method of steel structure net rack hydraulic pressure lift precision controlling based on BIM
CN113919618A (en) Underground building construction management method based on BIM technology
CN109584668A (en) A kind of rock tunnel(ling) machine training platform based on virtual reality and big data
Li et al. A low-complexity method for authoring an interactive virtual maintenance training system of hydroelectric generating equipment
Rosso et al. Review on deep learning in structural health monitoring
CN108647860A (en) Power equipment state monitoring based on OpenStack and assessment cloud platform
CN206470979U (en) Type variable bridge model status monitoring tutoring system
Wang A theoretical analysis method of spatial analytic geometry and mathematics under digital twins
CN110322772A (en) A kind of laboratory bridge monitoring teaching demonstration system based on BIM
KR20140021389A (en) Apparatus and method for separable simulation by model design and execution
CN109918791A (en) A kind of nuclear plant digital master control room operator human reliability analysis method
Wang Design of damage identification algorithm for mechanical structures based on convolutional neural network
CN116341064B (en) Modeling system and method of intelligent substation cloud system based on 3DMax modeling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191011