CN110322772A - A kind of laboratory bridge monitoring teaching demonstration system based on BIM - Google Patents
A kind of laboratory bridge monitoring teaching demonstration system based on BIM Download PDFInfo
- Publication number
- CN110322772A CN110322772A CN201910610478.9A CN201910610478A CN110322772A CN 110322772 A CN110322772 A CN 110322772A CN 201910610478 A CN201910610478 A CN 201910610478A CN 110322772 A CN110322772 A CN 110322772A
- Authority
- CN
- China
- Prior art keywords
- data
- monitoring
- module
- sensor
- laboratory
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/26—Visual data mining; Browsing structured data
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/10—Constructive solid geometry [CSG] using solid primitives, e.g. cylinders, cubes
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B25/00—Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
- G09B25/04—Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes of buildings
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Databases & Information Systems (AREA)
- Geometry (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Computer Graphics (AREA)
- Software Systems (AREA)
- Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of laboratory bridge monitoring teaching demonstration system based on BIM, comprising: data acquisition module, data transmission module, data processing module, the monitoring data management module checked for providing monitoring data corresponding to sensor pel and for providing threedimensional model of the laboratory cable-stayed bridge in Revit and realizing that monitoring data exceed the model demonstration module of normal value being highlighted.The present invention provides a kind of laboratory bridge monitoring teaching demonstration system based on BIM technology, the purpose is to by combining BIM technology to realize bridge machinery information visuallization in laboratory conditions, enhance student in learning process for the cognitive ability and the ability of practice of large bridge monitoring, overcome the difficulty that cannot participate in learning by doing into Practical Project during undergraduate course, abundant undergraduate course mode lays the foundation for culture high-quality talents.
Description
Technical field
The present invention relates to detection performance technology fields, specifically, more particularly to a kind of laboratory bridge prison based on BIM
Survey teaching demonstration system.
Background technique
Currently, visualization technique is to convert abstract data to using image procossing and graphics to be readily appreciated by
The technology of image or figure.Visual concept starts from visualization in scientific computing, and staff not only needs with figure or image
This visual in image mode goes description data, while being also required to understand the variation tendency of data to which the tendency to data carries out
Prediction, as the intersection between different subjects is more and more and the fast development of computer technology, visualization have been not only
Refer to visualization in scientific computing, but also the visualization including engineering field data.From 20th century, as the high speed of science and technology is sent out
Exhibition, various new materials, new process are continued to bring out in civil engineering industry, so that engineering structure is constantly to complication, enlargement hair
Exhibition, while but also the health monitoring systems of structure inevitably develop to complication, enlargement.Monitoring data are in health monitoring system
There is highly important status in system, be the scientific basis to structural stress state, degree of injury and life appraisal, after structure
Continuous maintenance and maintenance has highly important directive significance.But it with the enlargement of monitoring system, complicates, different type sensing
The magnanimity monitoring data of device acquisition can be transferred to the data acquisition subsystem in monitoring system in real time, cause staff to prison
Understanding, analysis and the processing of measurement information generate difficult.Therefore, the visualization for improving monitoring data is horizontal, reduces the understanding of data
Difficulty is necessary.
The full name in English of BIM is Building Information Modeling, and concept is by Charles earliest
In 70 generation of 19th century of Eastman et al., is put forward for the first time, and is the direct embodiment that informationization technology is applied to construction industry.By the hair of many years
There has also been more complete definition for the definition of exhibition BIM technology.BIM technology entered China in 2002, and domestic scholars also expand greatly
Quantifier elimination.Guangxi University of Science & Technology Deng Langni professor team has carried out about BIM technology in design phase, construction stage and O&M
The research of the Life cycle application in stage is difficult to realize fine-grained management to solve the problems, such as that CAD tradition arranges brick technology, utilizes
BIM kernel software Revit is platform, establishes race's file of brick, realizes the rapid and automation of simulation row's brick, reduce engineering at
This, by the integrated use to BIM kernel software, realizes that the visual simulating based on BIM model is answered to improve user experience
With.To improve the safety management problem in work progress, based on BIM model, using Pathfinder software realization to fire
The research of calamity simulation and safe early warning.Using secondary exploitation technology, the construction risk source safety management based on Revit is realized,
Reduce construction site safety accident generation and by BIM technology apply with to the research in engineering quality control.In the design phase,
Scholars utilize the function of Revit software collision detection more, carry out collision detection to the BIM model of full profession, discovery is set ahead of time
Blind area in meter reduces design alteration, improves the coordination between different majors.BIM the construction stage application more
It is mature, it can be achieved that construction site preferred arrangement, visualization construction tell somebody what one's real intentions are, progress simulation and quality examination etc., can be very good auxiliary
Help work progress, reduction is done over again, and is increased economic efficiency.In the O&M stage, many scholars, which combine RFID technique with BIM, to be answered
For by dynamic information integration into BIM model, being provided for building identification, indoor positioning, personnel escape etc. good in operation management
It is good to support.But since the problems such as operation management demand is indefinite and management is uncoordinated with technical level, leads to the O&M stage
BIM research is also in the primary stage, needs the intersection between multi-specialized.
To sum up, although BIM technology is more complete in the research of construction stage, in the research of design phase and O&M stage
There are also very long roads to need, and the problems in collection is how to carry out the interaction between different model informations and the friendship between subject
Fork research.
Summary of the invention
According to technical problem set forth above, and provide a kind of laboratory bridge monitoring teaching demonstration system based on BIM.
The present invention mainly utilizes a kind of laboratory bridge monitoring teaching demonstration system based on BIM characterized by comprising data are adopted
Collect module, data transmission module, data processing module, provide the monitoring number of monitoring data corresponding to sensor pel checked
According to management module and for providing threedimensional model of the laboratory cable-stayed bridge in Revit and realizing monitoring data beyond normal value
The model demonstration module being highlighted.
Further, the data acquisition module is arranged on the suspension cable of cable-stayed bridge, is acquired by tension sensor oblique
The strain information of drag-line, and by the wireless transmission unit real-time Transmission in the data transmission module to setting at computer end
The data processing module, the monitoring data management module and the model demonstration module at end.
Further, the monitoring data management module includes: that sensor node operation unit, monitoring data check list
Member, monitoring curve check unit and export data as the monitoring data lead-out unit of Excel formatted file.
Further, the monitoring data pass through the multiple pulling force being arranged on the cable-stayed bridge of laboratory on every skew cables and pass
Sensor, by establishing informational table of nodes in the database, the informational table of nodes is sensor number, sensor father node
The data type of number and sensor name, the sensor number and sensor father node number is INT, the biography
The data type of sensor title is NVARCHAR.
Further, the system automatically reads the information of the informational table of nodes, and according to node and father node
Sensor name is bundled in Treeview control by sequence by recurrence method, is checked in unit in the monitoring data, is realized
Different sensors node data is checked.
Further, when click-sensor node, the system connects the database automatically, inquires and reads selected
The corresponding monitoring data of sensor, and extract in memory, it is realized and is visualized by Data Grid View control;The monitoring
Curve checks that unit by MSChart, shows corresponding monitoring data curve graph when user selects corresponding sensor node;
The monitoring data lead-out unit.
Further, the model demonstration module preset threshold value of warning, the threshold value of warning by targeted destruction shape
Suspension cable strain value under limiting damage state critical condition calculated separately according to relevant calculation theory under state and in cyclic loading
Suspension cable strain value when the lower generation fatigue rupture of effect is critical, finally takes the smaller value of the two as threshold value of warning;The mould
For type demonstration module in turn by the secondary development of Revit, implementation model is highlighted function.
Further, after detecting that data imported into the system, each sensing data of acquisition can be with institute
It states threshold value of warning to compare, the system safety when strain data is less than the threshold value of warning, when strain data is greater than described pre-
When alert threshold value, then carry out being highlighted early warning in the three-dimensional model.
Compared with the prior art, the invention has the following advantages that
The present invention provides a kind of laboratory bridge monitoring teaching demonstration system based on BIM technology, and the purpose is to pass through knot
It closes BIM technology and realizes bridge machinery information visuallization in laboratory conditions, enhance student in learning process for large size
The cognitive ability and the ability of practice of bridge monitoring, learning by doing cannot be participated in during undergraduate course into Practical Project by overcoming
Difficulty, enrich undergraduate course mode, for culture high-quality talents lay the foundation.Simultaneously the present invention for impart knowledge to students provide one it is good
Good Practice Platform, student can be completed by the system in bridge monitoring technology from sensor arrangement to Information Collecting & Processing and
The whole process of visualization display has greatly tempered the ability of practice of starting of student, and it is real during giving lessons to solve teacher
Example says the problem of solving problem less, can effectively improve the effect of giving lessons of civil engineering.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to do simply to introduce, it should be apparent that, the accompanying drawings in the following description is this hair
Bright some embodiments for those of ordinary skill in the art without any creative labor, can be with
It obtains other drawings based on these drawings.
Fig. 1 is overall flow schematic diagram of the present invention.
Fig. 2 is this system sensor layout schematic diagram.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention
Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only
The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people
The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work
It encloses.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, "
Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way
Data be interchangeable under appropriate circumstances, so as to the embodiment of the present invention described herein can in addition to illustrating herein or
Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover
Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to
Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product
Or other step or units that equipment is intrinsic.
It as shown in Figs. 1-2, is a kind of laboratory bridge monitoring teaching demonstration system based on BIM of the present invention, comprising: data
Acquisition module, data processing module, provides the monitoring of monitoring data corresponding to sensor pel checked at data transmission module
Data management module and for providing threedimensional model of the laboratory cable-stayed bridge in Revit and realizing monitoring data beyond normal
The model demonstration module of value being highlighted.It can be understood as in other embodiments, the tutoring system can be with
Include such as audio-frequency module etc..As long as can be realized the acquisition process and acquisition to data.
As a preferred embodiment, the data acquisition module is arranged on the suspension cable of cable-stayed bridge, pass through drawing
Force snesor acquires the strain information of suspension cable, and extremely by the wireless transmission unit real-time Transmission in the data transmission module
The data processing module, the monitoring data management module and the model demonstration module of terminal are set.
In the present embodiment, the monitoring data management module includes: that sensor node operation unit, monitoring data are looked into
See that unit, monitoring curve check unit and export data as the monitoring data lead-out unit of Excel formatted file.It can manage
Solution can mainly expire in other embodiments, the detection data management module can also include other processing units
Collected data can be handled and be managed by foot.
As a preferred embodiment, the monitoring data are by being arranged on the cable-stayed bridge of laboratory every skew cables
On multiple tension sensors, by establishing informational table of nodes in the database, the informational table of nodes is that sensor is compiled
Number, sensor father node number and sensor name, the sensor number and the sensor father node number data
Type is INT, and the data type of the sensor name is NVARCHAR.
In the present embodiment, the system automatically reads the information of the informational table of nodes, and saves according to node and father
Sensor name is bundled in Treeview control by the sequence of point by recurrence method, is checked in unit in the monitoring data,
Different sensors node data is checked in realization.When click-sensor node, the system connects the database automatically,
It inquires and reads the corresponding monitoring data of selected sensor, and extract in memory, realized by Data Grid View control
Visualization;
Preferably, unit is checked by MSChart, when user selects phase as monitoring curve described in preferred embodiment
Corresponding monitoring data curve graph is shown when the sensor node answered;The monitoring data lead-out unit.
As a preferred embodiment, the model demonstration module presets threshold value of warning, the threshold value of warning leads to
It crosses and suspension cable under limiting damage state critical condition is calculated separately according to relevant calculation theory under targeted destruction form strains
Value and occur under Cyclic Load fatigue rupture it is critical when suspension cable strain value, the smaller value both finally taken is as pre-
Alert threshold value;For the model demonstration module in turn by the secondary development of Revit, implementation model is highlighted function.
In the present embodiment, after detecting that data imported into the system, each sensing data meeting of acquisition
It is compared with the threshold value of warning, the system safety when strain data is less than the threshold value of warning, when strain data is greater than institute
When stating threshold value of warning, then carry out being highlighted early warning in the three-dimensional model.
By the above-mentioned means, the monitoring data of laboratory bridge, the system can be obtained in real time by data acquisition module
It is mainly realized by arranging optical fiber tension sensor acquisition strain information on bridge to the real-time monitoring of bridge, is then passed through
The monitoring index data of acquisition and the threshold value of setting are carried out numerical value comparison by System Programming, to realize warning function.Program meeting
Automatically every data is compared with the threshold value in database, if exceeding threshold value, can be carried out in the three-dimensional model highlighted aobvious
Show.Initial data is the basis of monitoring structural health conditions, by the record to initial data and is analyzed to realize to structural reliability
Assessment, when carrying out safety investigation, initial data is also important reference frame, which can allow user to original prison
Measured data is checked, can be called the curve graph of each measuring point and be carried out file unloading to data.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
In the above embodiment of the invention, it all emphasizes particularly on different fields to the description of each embodiment, does not have in some embodiment
The part of detailed description, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others
Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei
A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or
Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual
Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of unit or module
It connects, can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
On unit.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially
The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words
It embodies, which is stored in a storage medium, including some instructions are used so that a computer
Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or
Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code
Medium.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to
So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into
Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution
The range of scheme.
Claims (3)
1. a kind of laboratory bridge monitoring teaching demonstration system based on BIM characterized by comprising
Data acquisition module, data processing module, provides looking into for monitoring data corresponding to sensor pel at data transmission module
The monitoring data management module seen and for providing threedimensional model of the laboratory cable-stayed bridge in Revit and realizing monitoring data
The model demonstration module being highlighted beyond normal value;
The data acquisition module is arranged on the suspension cable of cable-stayed bridge, is believed by the strain that tension sensor acquires suspension cable
Breath, and pass through the wireless transmission unit real-time Transmission in the data transmission module to the data that terminal is set
Processing module, the monitoring data management module and the model demonstration module.
2. a kind of laboratory bridge monitoring teaching demonstration system based on BIM according to claim 1, feature also exist
In:
The monitoring data management module includes: that sensor node operation unit, monitoring data check that unit, monitoring curve are checked
Unit and the monitoring data lead-out unit for exporting data as Excel formatted file;
The monitoring data pass through the multiple tension sensors being arranged on the cable-stayed bridge of laboratory on every skew cables, by institute
It states and establishes informational table of nodes in database, the informational table of nodes is sensor number, sensor father node number and sensing
The data type of device title, the sensor number and sensor father node number is INT, the number of the sensor name
It is NVARCHAR according to type;
The system automatically reads the information of the informational table of nodes, and according to the sequence of node and father node by sensor name
It is bundled in Treeview control by recurrence method, is checked in unit in the monitoring data, realized to different sensors node
Data are checked;
When click-sensor node, the system connects the database automatically, inquires and to read selected sensor corresponding
Monitoring data, and extract in memory, it is realized and is visualized by Data Grid View control;
The monitoring curve checks unit by MSChart, and when user selects corresponding sensor node, display is corresponding supervises
Measured data curve graph;The monitoring data lead-out unit.
3. a kind of laboratory bridge monitoring teaching demonstration system based on BIM according to claim 1, feature also exist
In:
The model demonstration module presets threshold value of warning, the threshold value of warning by under targeted destruction form according to correlometer
Theory is calculated to calculate separately the suspension cable strain value under limiting damage state critical condition and fatigue occurs under Cyclic Load
Suspension cable strain value when destroying critical finally takes the smaller value of the two as threshold value of warning;The model demonstration module is in turn
By the secondary development of Revit, implementation model is highlighted function;
After detecting that data imported into the system, each sensing data of acquisition can carry out pair with the threshold value of warning
Than the system safety when strain data is less than the threshold value of warning, when strain data is greater than the threshold value of warning, then in three-dimensional
It carries out being highlighted early warning in model.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910610478.9A CN110322772A (en) | 2019-07-03 | 2019-07-03 | A kind of laboratory bridge monitoring teaching demonstration system based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910610478.9A CN110322772A (en) | 2019-07-03 | 2019-07-03 | A kind of laboratory bridge monitoring teaching demonstration system based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110322772A true CN110322772A (en) | 2019-10-11 |
Family
ID=68121432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910610478.9A Pending CN110322772A (en) | 2019-07-03 | 2019-07-03 | A kind of laboratory bridge monitoring teaching demonstration system based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110322772A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111209614A (en) * | 2019-10-21 | 2020-05-29 | 广州市第一市政工程有限公司 | BIM technology-based one-key identification method for high beam plate |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102980782A (en) * | 2012-06-13 | 2013-03-20 | 南京大学 | Heterogeneous sensor network and method for bridge and major infrastructure structure safety monitoring and early warning |
CN104899384A (en) * | 2015-06-12 | 2015-09-09 | 卢伟 | Structural health monitoring visualization system based on Revit |
CN106097819A (en) * | 2016-07-31 | 2016-11-09 | 重庆交通大学 | Bridge for experimental teaching emulates detection method and system |
CN107059638A (en) * | 2017-05-16 | 2017-08-18 | 余郁 | A kind of cable-stayed bridge based on BIM is unworthy of weight construction method |
CN206470979U (en) * | 2016-07-31 | 2017-09-05 | 重庆交通大学 | Type variable bridge model status monitoring tutoring system |
CN107966228A (en) * | 2016-10-19 | 2018-04-27 | 南京智行信息科技有限公司 | A kind of intelligent wireless cable force monitoring system and monitoring method |
CN108022056A (en) * | 2017-12-28 | 2018-05-11 | 哈尔滨工业大学深圳研究生院 | A kind of structure dynamic response safety monitoring system and method based on BIM |
CN108106663A (en) * | 2017-12-07 | 2018-06-01 | 云南航天工程物探检测股份有限公司 | Online Visual Creating and management bridge monitoring platform |
CN109594483A (en) * | 2018-12-04 | 2019-04-09 | 中铁九局集团第二工程有限公司 | A kind of bridge real time on-line monitoring control rotation swivel construction method based on BIM |
-
2019
- 2019-07-03 CN CN201910610478.9A patent/CN110322772A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102980782A (en) * | 2012-06-13 | 2013-03-20 | 南京大学 | Heterogeneous sensor network and method for bridge and major infrastructure structure safety monitoring and early warning |
CN104899384A (en) * | 2015-06-12 | 2015-09-09 | 卢伟 | Structural health monitoring visualization system based on Revit |
CN106097819A (en) * | 2016-07-31 | 2016-11-09 | 重庆交通大学 | Bridge for experimental teaching emulates detection method and system |
CN206470979U (en) * | 2016-07-31 | 2017-09-05 | 重庆交通大学 | Type variable bridge model status monitoring tutoring system |
CN107966228A (en) * | 2016-10-19 | 2018-04-27 | 南京智行信息科技有限公司 | A kind of intelligent wireless cable force monitoring system and monitoring method |
CN107059638A (en) * | 2017-05-16 | 2017-08-18 | 余郁 | A kind of cable-stayed bridge based on BIM is unworthy of weight construction method |
CN108106663A (en) * | 2017-12-07 | 2018-06-01 | 云南航天工程物探检测股份有限公司 | Online Visual Creating and management bridge monitoring platform |
CN108022056A (en) * | 2017-12-28 | 2018-05-11 | 哈尔滨工业大学深圳研究生院 | A kind of structure dynamic response safety monitoring system and method based on BIM |
CN109594483A (en) * | 2018-12-04 | 2019-04-09 | 中铁九局集团第二工程有限公司 | A kind of bridge real time on-line monitoring control rotation swivel construction method based on BIM |
Non-Patent Citations (2)
Title |
---|
孙涛等: "基于BIM的桥梁运营期健康监测系统研究应用", 《施工技术与测量技术》 * |
马晋超: "基于BIM的桥梁结构健康监测信息可视化管理及预警研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111209614A (en) * | 2019-10-21 | 2020-05-29 | 广州市第一市政工程有限公司 | BIM technology-based one-key identification method for high beam plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Hou et al. | Literature review of digital twins applications in construction workforce safety | |
Lai et al. | Designing a shape–performance integrated digital twin based on multiple models and dynamic data: a boom crane example | |
CN106227977A (en) | A kind of method of steel structure net rack hydraulic pressure lift time-varying finite element analysis based on BIM | |
CN113806978A (en) | Bridge structure digital twin body and method based on BIM-FEM | |
CN106780116A (en) | The construction method of power emergency drilling method, device and its scenario models, device | |
CN108764601A (en) | A kind of monitoring structural health conditions abnormal data diagnostic method based on computer vision and depth learning technology | |
Liu et al. | Digital Twin‐based Safety Evaluation of Prestressed Steel Structure | |
Lin et al. | Automating closed-loop structural safety management for bridge construction through multisource data integration | |
CN110516820A (en) | A kind of steel structure bridge informationization operational system and processing method based on BIM | |
CN101075226A (en) | Multi-role distributed cooperat simulating system | |
CN109460939A (en) | A kind of Municipal Engineering Construction safety control system and method based on 3DGIS+BIM technology | |
CN110379036A (en) | Intelligent substation patrol recognition methods, system, device and storage medium | |
CN106294969A (en) | A kind of method of steel structure net rack hydraulic pressure lift precision controlling based on BIM | |
CN113919618A (en) | Underground building construction management method based on BIM technology | |
CN109584668A (en) | A kind of rock tunnel(ling) machine training platform based on virtual reality and big data | |
Li et al. | A low-complexity method for authoring an interactive virtual maintenance training system of hydroelectric generating equipment | |
Rosso et al. | Review on deep learning in structural health monitoring | |
CN108647860A (en) | Power equipment state monitoring based on OpenStack and assessment cloud platform | |
CN206470979U (en) | Type variable bridge model status monitoring tutoring system | |
Wang | A theoretical analysis method of spatial analytic geometry and mathematics under digital twins | |
CN110322772A (en) | A kind of laboratory bridge monitoring teaching demonstration system based on BIM | |
KR20140021389A (en) | Apparatus and method for separable simulation by model design and execution | |
CN109918791A (en) | A kind of nuclear plant digital master control room operator human reliability analysis method | |
Wang | Design of damage identification algorithm for mechanical structures based on convolutional neural network | |
CN116341064B (en) | Modeling system and method of intelligent substation cloud system based on 3DMax modeling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191011 |