Prior art keywords
tunnel
layer
fire prevention
freezing
insulating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611110975.5A
Other languages
Chinese (zh)
Other versions
CN106368722B (en
Inventor
那通兴
马士伟
张国柱
陈俊栋
闵世平
赵阳
徐志鹏
林国庆
江亚男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
China Railway Academy Co Ltd
Original Assignee
Southeast University
China Railway Academy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University, China Railway Academy Co Ltd filed Critical Southeast University
Priority to CN201611110975.5A priority Critical patent/CN106368722B/en
Publication of CN106368722A publication Critical patent/CN106368722A/en
Application granted granted Critical
Publication of CN106368722B publication Critical patent/CN106368722B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F5/00Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a freezing prevention, thermal insulation and fire prevention integrated facility for a tunnel in a cold region. The problems that in the prior art, a thermal insulation layer and a fire prevention layer need to be laid layer by layer, management and maintenance are difficult in the later period, construction cost is high, and construction efficiency is low are solved. The facility comprises a tunnel primary lining, a tunnel waterproof layer and a tunnel secondary lining in sequence from outside to inside, and further comprises a fire prevention and thermal insulation integrated layer which is formed by prefabricated region lattices machined by a factory in a fixedly spliced mode, the prefabricated region lattices are made from sealed air cavities defined by fireproof plates, and partitioning plates made of fireproof plates are arranged inside the sealed air cavities; installing hooks are arranged on the inner surface of the tunnel secondary lining, clamping grooves are formed in the outer side faces of the prefabricated region lattices, and the fire prevention and thermal insulation integrated layer is laid on the inner surface of the tunnel secondary lining in a hung-clamped mode through the installing hooks and the clamping grooves. The freezing prevention, thermal insulation and fire prevention integrated facility is simple in structure and scientific and reasonable in design.

Description

A kind of tunnel in cold area anti-freezing and heat-insulating and the integrated facility of fire prevention
Technical field
The present invention relates to tunnel in cold area technical field, more particularly, to a kind of tunnel in cold area anti-freezing and heat-insulating and fire prevention integration set Apply.
Background technology
China's puna distribution area accounts for the 26.7% of territory total area, and Permafrost Area area accounts for territory total area 22.4%.Build Tunnel Engineering in cold district and be faced with serious freeze injury problem, many tunnels just occur after building up soon Extensive freeze injury, has a strong impact on tunnel traffic safety and structure safety.For preventing tunnel in cold area freeze injury, now it is typically employed in tunnel Two lining inner surfacies lay certain thickness solid warming plate, or using from wall type lining cutting anti-freezing and heat-insulating structure.
Prior art construction costs is high, construction is loaded down with trivial details;Heat-insulation layer outside need specially lays PLASTIC LAMINATED;With tunnel-liner The deformation of structure, sealing cavity occurs leakage problem, causes heat-insulating property to decline and even lost efficacy;The volume of sealing cavity is big, Intracavity gas heat convection is notable, and heat-insulating property is poor.Meanwhile, the heat-insulation layer of existing tunnel and fireprotection layer are individually constructed, operation Various, cost is high, and it is also extremely difficult that maintenance supported by later stage pipe.
Content of the invention
The technical problem to be solved in the present invention is: a kind of tunnel in cold area anti-freezing and heat-insulating and the integrated facility of fire prevention are provided, should It is integrated with fireprotection layer that facility achieves tunneling insulating layer, has insulation, fire prevention, a waterproof and moistureproof excellent performance, durability and suitable Answer surrouding rock deformation ability strong, can factory normalization produce, construction and maintenance are convenient and swift, efficiency high, construction costs and maintaining into This low advantage.
For achieving the above object, the technical solution used in the present invention is as follows:
A kind of tunnel in cold area anti-freezing and heat-insulating and the integrated facility of fire prevention, including lining, tunnel waterproofing layer and tunnel two at the beginning of tunnel Lining, also includes fireproof heat insulating one layer, and described fireproof heat insulating one layer is assembled by the predefined region lattice fixation of factory process, in advance Area processed lattice are enclosed the seal gas cavity setting and are made by PLASTIC LAMINATED, are provided with dividing of PLASTIC LAMINATED making in described seal gas cavity Dividing plate.
Further, described seal gas cavity is provided with tenon structure, and described fireproof heat insulating one Ceng You area lattice pass through Tenon structures to form forms;Described tunnel double-lining is provided with mounting hook, and described area lattice are provided with draw-in groove, described fireproof heat insulating one Body layer is layed in tunnel double-lining by way of hanging tag.
Specifically, described tenon structure includes tenon and the mortise matching with tenon.
Further, described predefined region lattice are formed by fire-proof board processing and fabricating.
Compared with prior art, the method have the advantages that
(1) present configuration is simple, design science is reasonable, be suitable to wide popularization and application.
(2) present invention achieves tunnel in cold area heat-insulation layer is integrated with fireprotection layer, solve tunneling insulating layer construction with The problem that PLASTIC LAMINATED is individually constructed, simplifies working procedure, reduces construction costs and this is formed by pipe;Fireproof heated board interior Sealing gas sub-chamber is separated by portion's framework, forms PLASTIC LAMINATED and the alternate multilayer system of sealing gas so that fireproof heated board Heat-insulating property, waterproof and dampproof performance, durability, suitable for surrounding rock deformability be greatly improved;Fireproof heated board itself has excellent Different fire protecting performance it is not necessary to carry out again lays PLASTIC LAMINATED construction, meanwhile, the multi-layer fireproofing plate of fireproof heated board, can be significantly Improve the fire protecting performance in tunnel;Fireproof heated board can be transported to job site and carried out assembly by factory normalization processing and fabricating, can be big Width improves the efficiency of construction of tunnel in cold area heat-insulation layer and fireprotection layer, meanwhile, efficiently avoid traditional tunnel in cold area layering laying Heat-insulation layer and fireprotection layer and the step installing Os Draconis, simplify working procedure, significantly reduce construction cost, and, rear The replacing that also can carry out fireproof heated board in work easily and fast supported by phase tunneltron, and the pipe improving tunnel in cold area supports efficiency, fall This is formed by low pipe.
Brief description
Fig. 1 is tunnel cross-section figure of the present invention.
Fig. 2 is area of the present invention lattice schematic diagram.
Fig. 3 is tunnel of the present invention ring section partial enlarged drawing.
Fig. 4 is tunnel of the present invention longitudinal profile partial enlarged drawing.
Wherein, reference is corresponding entitled:
At the beginning of 1- tunnel, lining, 2- tunnel waterproofing layer, 3- tunnel double-lining, 4- fireproof heat insulating one layer, 5- predefined region lattice, 6- separate Plate, 7- seal gas cavity, 8- tenon, 9- mortise, 10- mounting hook, 11- draw-in groove, 12- temperature sensor, 13- heating dress Put, 14- controller.
Specific embodiment
The invention will be further described with embodiment for explanation below in conjunction with the accompanying drawings, and the mode of the present invention includes but not only limits In following examples.
Embodiment
As Figure 1-4, a kind of tunnel in cold area anti-freezing and heat-insulating and the integrated facility of fire prevention, including being followed successively by tunnel from outside to inside Lining 1, tunnel waterproofing layer 2 and tunnel double-lining 3 and fireproof heat insulating one layer 4 at the beginning of road.Described fireproof heat insulating one layer 4 is by factory Predefined region lattice 5 fixation of processing is assembled, and predefined region lattice 5 are enclosed seal gas cavity 7 dislocation setting and are made by PLASTIC LAMINATED, It is thusly-formed PLASTIC LAMINATED and airtight air chamber replaces body, realizing also may be used while tunnel in cold area heat-insulation layer is integrated with fireprotection layer Fire protecting performance and the heat-insulating property in tunnel are greatly improved;It is provided with more than one in described seal gas cavity 7 and adopt PLASTIC LAMINATED system The demarcation strip 6 made, described demarcation strip 6 is used for increasing rigidity and the intensity of predefined region lattice 5, simultaneously will be empty in seal gas cavity 7 Edema caused by disorder of QI chamber separates, and the local that can be prevented effectively from fireproof heated board is punctured thus forming cross-ventilation heat exchange to further result in guarantor The situation that warm nature can reduce occurs.Described seal gas cavity 7 adopts dislocation form, its purpose is to ensure predefined region lattice 5 The insulation of seam portion of the assembled fireproof heat insulating one layer 4 being formed is identical with predefined region lattice 5 with fire protecting performance.
Described tunnel double-lining 3 inner surface is provided with mounting hook 10, the described seal gas chamber positioned at predefined region lattice 5 outside The lateral surface of body 7 is provided with the draw-in groove 11 matching with mounting hook 10, and described fireproof heat insulating one layer 4 passes through mounting hook 10 It is laid in the way of hanging tag on tunnel double-lining 3 inner surface with draw-in groove 11, so can achieve that the scene of fireproof heat insulating one layer 4 is fast Speed installs laying.The optimal making material of the predefined region lattice 5 of anti-freezing and heat-insulating and fire prevention one layer 4 can be selected for the property such as glass magnesium fireproof board The excellent fire-proof board of energy.
Described seal gas cavity 7 is provided with tenon structure, and described fireproof heat insulating one layer 4 is passed through convex by predefined region lattice 5 Tenon structure wedging is spliced.Described tenon structure includes tenon 8 and the mortise 9 matching with tenon 8, described positioned at predefined region Tenon 8 on the seal gas cavity 7 in lattice 5 outside and mortise 9 are respectively arranged on the two ends of seal gas cavity 7, described positioned at pre- Tenon 8 on the seal gas cavity 7 of area processed lattice 5 inner side and mortise 9 are respectively arranged on top and the bottom of seal gas cavity 7. Spliced using tenon structure, further increase the scene laying efficiency of fireproof heat insulating one layer 4, decrease screw simultaneously Deng the use of parts, also will not bring because of the shortage of the parts such as screw often occurring in construction while cost-effective The situation such as the duration is slow.In order that the antifreezing heat insulation of fireproof heat insulating one layer 4 is better, enter in fireproof heat insulating one layer 4 During row splicing, the airtight adhesive glue with microdilatancy performance, environment-protecting asepsis can be smeared on tenon structure, spell for blocking area's lattice Faint air flow that may be present between dress seam.
For solving the problems, such as pole cold district or country rock has the freezing damage in tunnel in frost heave area, present invention additionally comprises heating system System, described heating system includes the temperature sensor 12 being laid on tunnel double-lining 3 inner surface, is equidistantly provided at predefined region lattice 5 outside the lateral surface of seal gas cavity 7 on heater 13, and simultaneously with temperature sensor 12 and heater 13 The controller 14 connecting, described controller 14 is located on tunnel double-lining 3 inner surface or is located at the sealing sky in predefined region lattice 5 outside On the lateral surface of air cavity 7.The temperature of temperature sensor 12 real-time monitoring tunnel double-lining 3 wall, and it is sent to controller in real time 14, when controller 14 receive temperature sensor 12 monitor tunnel double-lining 3 wall temperature be less than 0 DEG C when, control start plus Thermal 13 provides heat for tunnel, and preventing and treating freezing damage in tunnel occurs, thus realizing the active anti-freezing and heat-insulating of tunnel in cold area.
The fireproof heat insulating one layer 4 of present invention design is it is achieved that tunnel in cold area heat-insulation layer is integrated with fireprotection layer, and leads to Cross multilamellar PLASTIC LAMINATED and replace with seal gas chamber and fire protecting performance and heat-insulating property are greatly improved.Paving by assembled insulated fire plate If mode, it is to avoid traditional tunnel in cold area layering laying heat-insulation layer and fireprotection layer and the step installing Os Draconis, simplify construction work Sequence, reduces construction cost.Meanwhile, the form of precast assembly is conducive to the Guan Yangyu that the phase is runed in tunnel to change, and improves pipe and supports Efficiency, reduces pipe and forms this.It is suitable to wide popularization and application in extremely frigid zones constructing tunnel.
Above-described embodiment is only one of the preferred embodiment of the present invention, should not be taken to limit the protection model of the present invention Enclose, as long as in the body design thought of the present invention and change or the polishing of having no essential meaning mentally made, it is solved Technical problem still consistent with the present invention, all should be included within protection scope of the present invention.

Claims (4)

1. a kind of tunnel in cold area anti-freezing and heat-insulating and the integrated facility of fire prevention, including lining (1), tunnel waterproofing layer (2) and tunnel at the beginning of tunnel Road two serve as a contrast (3) it is characterised in that: also include fireproof heat insulating one layer (4), described fireproof heat insulating one layer (4) is by factory process Predefined region lattice (5) fixation assembled, predefined region lattice (5) are enclosed the seal gas cavity (7) setting and are made by PLASTIC LAMINATED, institute State the demarcation strip (6) being provided with PLASTIC LAMINATED making in seal gas cavity (7).
2. a kind of tunnel in cold area anti-freezing and heat-insulating according to claim 1 and the integrated facility of fire prevention it is characterised in that: described Seal gas cavity (7) is provided with tenon structure, and described fireproof heat insulating one floor (4) passes through tenon structures to form by area's lattice (5) Form;Described tunnel double-lining (3) is provided with mounting hook (10), and described area lattice (5) is provided with draw-in groove (11), described fireproof heat insulating One layer (4) is layed in tunnel double-lining (3) by way of hanging tag.
3. a kind of tunnel in cold area anti-freezing and heat-insulating according to claim 2 and the integrated facility of fire prevention it is characterised in that: described Tenon structure includes tenon (8) and the mortise (9) matching with tenon (8).
4. a kind of tunnel in cold area anti-freezing and heat-insulating according to claim 1-3 any one and the integrated facility of fire prevention, it is special Levy and be: described predefined region lattice (5) is formed by fire-proof board processing and fabricating.
CN201611110975.5A 2016-12-06 2016-12-06 A kind of tunnel in cold area anti-freezing and heat-insulating and integrated facility of preventing fires Expired - Fee Related CN106368722B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611110975.5A CN106368722B (en) 2016-12-06 2016-12-06 A kind of tunnel in cold area anti-freezing and heat-insulating and integrated facility of preventing fires

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611110975.5A CN106368722B (en) 2016-12-06 2016-12-06 A kind of tunnel in cold area anti-freezing and heat-insulating and integrated facility of preventing fires

Publications (2)

Publication Number Publication Date
CN106368722A true CN106368722A (en) 2017-02-01
CN106368722B CN106368722B (en) 2018-12-07

Family

ID=57891594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611110975.5A Expired - Fee Related CN106368722B (en) 2016-12-06 2016-12-06 A kind of tunnel in cold area anti-freezing and heat-insulating and integrated facility of preventing fires

Country Status (1)

Country Link
CN (1) CN106368722B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988769A (en) * 2017-06-02 2017-07-28 安徽理工大学 A kind of deep High-geotemperature tunnel heat-insulation liner structure and its construction method
CN107587881A (en) * 2017-10-30 2018-01-16 中铁五局集团第五工程有限责任公司 A kind of composite lining structure and construction technology for permafrost tunnel
CN108166999A (en) * 2017-09-18 2018-06-15 招商局重庆交通科研设计院有限公司 A kind of antifreeze fire proof construction of the waterproof of tunnel in cold area
CN110821515A (en) * 2019-09-30 2020-02-21 中铁隧道局集团建设有限公司 Construction method of assembled supporting structure of tunnel in high and cold area
CN110985067A (en) * 2019-11-21 2020-04-10 山东大学 Water-blocking, anti-freezing and heat-insulating integrated facility for cold region tunnel and construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001020691A (en) * 1999-07-06 2001-01-23 Toyo Bussan Kk Tunnel freezing damage prevention device
CN202132058U (en) * 2011-07-27 2012-02-01 长沙理工大学 Flameproof thermal insulation board for tunnel
CN102953738A (en) * 2012-11-08 2013-03-06 福州大学 Method and system for automatical antifreezing and thermal insulating of tunnel lining in high and cold areas
CN203420715U (en) * 2013-08-06 2014-02-05 中交第一公路勘察设计研究院有限公司 Cold region tunnel grid-shaped thermal insulation structure separated from wall
CN103835725A (en) * 2014-03-05 2014-06-04 东南大学 Antifreezing and insulating tunnel in cold region
CN203796286U (en) * 2014-03-20 2014-08-27 中铁七局集团第三工程有限公司 Landslide section tunnel defect processing structure
CN204175314U (en) * 2014-10-20 2015-02-25 长安大学 A kind of tunnel in cold area insulation composite support system
CN204283451U (en) * 2014-11-20 2015-04-22 重庆国翔新材料有限公司 Cold district railway tunnel winterization system
CN104775833A (en) * 2015-04-07 2015-07-15 山西省交通科学研究院 Cold region tunnel anti-freezing insulation system and anti-freezing insulation construction method
CN206220981U (en) * 2016-12-06 2017-06-06 中铁科学研究院有限公司 A kind of tunnel in cold area anti-freezing and heat-insulating and the integrated facility of fire prevention

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001020691A (en) * 1999-07-06 2001-01-23 Toyo Bussan Kk Tunnel freezing damage prevention device
CN202132058U (en) * 2011-07-27 2012-02-01 长沙理工大学 Flameproof thermal insulation board for tunnel
CN102953738A (en) * 2012-11-08 2013-03-06 福州大学 Method and system for automatical antifreezing and thermal insulating of tunnel lining in high and cold areas
CN203420715U (en) * 2013-08-06 2014-02-05 中交第一公路勘察设计研究院有限公司 Cold region tunnel grid-shaped thermal insulation structure separated from wall
CN103835725A (en) * 2014-03-05 2014-06-04 东南大学 Antifreezing and insulating tunnel in cold region
CN203796286U (en) * 2014-03-20 2014-08-27 中铁七局集团第三工程有限公司 Landslide section tunnel defect processing structure
CN204175314U (en) * 2014-10-20 2015-02-25 长安大学 A kind of tunnel in cold area insulation composite support system
CN204283451U (en) * 2014-11-20 2015-04-22 重庆国翔新材料有限公司 Cold district railway tunnel winterization system
CN104775833A (en) * 2015-04-07 2015-07-15 山西省交通科学研究院 Cold region tunnel anti-freezing insulation system and anti-freezing insulation construction method
CN206220981U (en) * 2016-12-06 2017-06-06 中铁科学研究院有限公司 A kind of tunnel in cold area anti-freezing and heat-insulating and the integrated facility of fire prevention

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988769A (en) * 2017-06-02 2017-07-28 安徽理工大学 A kind of deep High-geotemperature tunnel heat-insulation liner structure and its construction method
CN106988769B (en) * 2017-06-02 2023-06-23 安徽理工大学 Deep high-ground-temperature roadway heat insulation lining structure and construction method thereof
CN108166999A (en) * 2017-09-18 2018-06-15 招商局重庆交通科研设计院有限公司 A kind of antifreeze fire proof construction of the waterproof of tunnel in cold area
CN108166999B (en) * 2017-09-18 2023-10-27 招商局重庆交通科研设计院有限公司 Waterproof, antifreezing and fireproof structure of tunnel in cold region
CN107587881A (en) * 2017-10-30 2018-01-16 中铁五局集团第五工程有限责任公司 A kind of composite lining structure and construction technology for permafrost tunnel
CN110821515A (en) * 2019-09-30 2020-02-21 中铁隧道局集团建设有限公司 Construction method of assembled supporting structure of tunnel in high and cold area
CN110821515B (en) * 2019-09-30 2021-04-02 中铁隧道局集团建设有限公司 Construction method of assembled supporting structure of tunnel in high and cold area
CN110985067A (en) * 2019-11-21 2020-04-10 山东大学 Water-blocking, anti-freezing and heat-insulating integrated facility for cold region tunnel and construction method

Also Published As

Publication number Publication date
CN106368722B (en) 2018-12-07

Similar Documents

Publication Publication Date Title
CN106368722A (en) Freezing prevention, thermal insulation and fire prevention integrated facility for tunnel in cold region
CN104775833B (en) A kind of tunnel in cold area anti-freezing and heat-insulating system and anti-freezing and heat-insulating construction method
CN104499609B (en) A kind of external mold plate cast-in-place concrete composite exterior wall outer heat preservation system
KR101224293B1 (en) The construction method for concrete wall using insulation gang form
CN104329103A (en) Cold area tunnel heat-insulating composite support system and supporting method thereof
CN102322276A (en) Tunneling engineering freeze-proofing structure in seasonally frozen ground region
CN103452196A (en) Ultrathin-stone composite insulation plate
CN206220981U (en) A kind of tunnel in cold area anti-freezing and heat-insulating and the integrated facility of fire prevention
CN205013018U (en) Severe cold district tunnel portal section waterproof heat -insulating layer construction structures
CN102505777B (en) Heat preservation system for large-scale horizontal hole composite sandwich heat-preservation wallboard
CN101566073B (en) Dual-source heat-supply water-drainage antifreezing method for construction joint of tunnel in cold area
CN103437440B (en) Building energy conservation heat insulation system and building heat preservation top-down construction method
CN206034902U (en) Compound incubation outer wall -in -place mould
CN110067588B (en) Tunnel cold air system based on phase change cold storage
CN105714943B (en) Exterior-wall heat insulation reinforcement composite plate, heat-preserving wall integral structure and construction method
CN204691792U (en) A kind of tunnel in cold area anti-freezing and heat-insulating system
CN204175314U (en) A kind of tunnel in cold area insulation composite support system
CN110985067A (en) Water-blocking, anti-freezing and heat-insulating integrated facility for cold region tunnel and construction method
CN105544842A (en) Novel composite wall brick
CN202250107U (en) Tunneling anti-freezing structure in seasonally frozen ground district
CN112942248B (en) Anti-cracking construction method for anti-seepage face plate of dam
CN203487651U (en) Ultra-thin stone compound insulation board
CN108149944A (en) A kind of existing building exterior-wall heat insulation integral structure and construction method
CN209397769U (en) Steel construction combined wall
CN210685048U (en) Cast-in-place concrete composite steel wire mesh frame integrated plate heat preservation system with sealing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207

Termination date: 20191206

CF01 Termination of patent right due to non-payment of annual fee