CN106355379A - Product test method - Google Patents

Product test method Download PDF

Info

Publication number
CN106355379A
CN106355379A CN201610739786.8A CN201610739786A CN106355379A CN 106355379 A CN106355379 A CN 106355379A CN 201610739786 A CN201610739786 A CN 201610739786A CN 106355379 A CN106355379 A CN 106355379A
Authority
CN
China
Prior art keywords
test
project
data
sub
management server
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610739786.8A
Other languages
Chinese (zh)
Inventor
肖孝余
黄兴艺
高洪军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Loncin Motor Co Ltd
Loncin General Dynamics Co Ltd
Original Assignee
Loncin General Dynamics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Loncin General Dynamics Co Ltd filed Critical Loncin General Dynamics Co Ltd
Priority to CN201610739786.8A priority Critical patent/CN106355379A/en
Publication of CN106355379A publication Critical patent/CN106355379A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Abstract

The invention provides a product test method. The method comprises the following steps: the management server distribute current test tasks and the test staff carry out the test in sequence in accordance with the subitems under the task; the test staff determine the test result after completion of each subitem. If the test result is qualified, the test staff proceed to the test of next subitem and upload the test data of the subitem that has been completed to the management server; if the test result is not qualified, the test task is suspended, and the test staff upload the test data to the management server and proceed to the test of next subitem, or the test staff terminate the test task and upload the test data to the management server; the management serve processes the test data and store the data by classification. With the method, the tested product can be tested accurately. The test is flexible and the method can effectively prevent waste of labor and material resources.

Description

Product test method
Technical field
The present invention relates to industrial products field tests, more particularly, to a kind of product test method.
Background technology
Based on any product is required for substantial amounts of experiment in R&D process, the electromotor of such as vehicle, work The test of the products such as the car load for final products;In prior art, for product test all as follows: test job After personnel receive test assignment, according to test assignment, all items of product are tested, then carry out data statisticss, root again Data analysiss test performance according to statistics;This mode has following defects that after the completion of all test events of test product again Carry out data statisticss, the data volume of statistics is big, easily goes wrong, causes final properties of product analysis result inaccurate;And Once and particular or several of test product exist abnormal or unqualified, then continue to carry out test to product and will make Become the waste of human and material resources, if this is because test product has all disposably been surveyed, then by test prepared equipment, Consumptive material etc. is all consumed, and obtained test result is unqualified, then retest if necessary, then need again to prepare entirely The consumptive material in portion, equipment etc., rearrange.
It is, therefore, desirable to provide a kind of new product test method, test product accurately can be tested, and be tested Flexibly, can effectively prevent the waste of human and material resources resource, and beneficial to processing to the data in test process, prevent Occur error in data, can retroactive effect strong.
Content of the invention
In view of this, it is an object of the invention to provide a kind of product test method, test product accurately can be surveyed Examination, and test flexibly, can effectively prevent the waste of human and material resources resource, and be beneficial to the data in test process is entered Row process, prevent error in data, can retroactive effect strong.
A kind of product test method that the present invention provides, comprising:
S1., to issuing current test assignment, test job personnel are according to sub-project each in test assignment for management server Testing sequence executes test successively;
S2. often complete a sub-project, test result judged:
As test result is qualified, test job personnel enter the test of next sub-project and upload currently to management server The test data of the sub-project completing;
As test result is unqualified, then:
Underproof for current test data test assignment is hung up, test job personnel are by the test data of current sub-project It is uploaded to management server, and enter into the test of next sub-project;
Or termination test assignment, test job test job personnel by the test data of current sub-project be uploaded to management clothes Business device;
S3. management servers process test data and carry out classification storage;By said method, in test process, one The underproof state of test result in denier, carries out task suspension according to actual state or terminates test, thus having more Strong motility, and can effectively prevent traditional approach from occurring continuing executing with survey when test result is inaccurate in test process The waste of the human and material resources that trial business brings;And divided reset test data, the i.e. survey of every sub-project in test process Examination data is upload process all after the completion of this sub-project, improves disposal ability and the processing speed of test data, prevents from counting According to error, and the classification of test data storage, facilitate subsequent calls.
Further, described test data includes test result data and test process data, this data structure, on the one hand Performance evaluation to test product is beneficial to by test result data, on the other hand, by test process data and test result Data collective effect, is analyzed beneficial to test process, beneficial to the test of next same test project, has strong reviewing Power.
Further, in step s3, after management server receives test data, the process to test data includes:
S31. for unqualified result data, management server generates quality writ, and quality writ is fed back to higher level Management server, test result data and test process data are respectively stored into quality database and cross number of passes by management server According in storehouse;Wherein, quality writ includes sub-project, the process data of current sub-project test and the unqualified knot currently tested Fruit data;
S32. for pass result data, the test result data receiving and test process data are divided by management server It is not stored in qualified data base and process database, by this data processing method, for each in test process The test data of sub-project can be processed in time, particularly with can making in time of the underproof sub-project of test result data Instruct measure accordingly, that is, in retriggered test assignment or termination test assignment, beneficial to saving test resource.
Further, also include after step s4. upper management server receives quality writ, according to the test of current production Condition and customer demand judge whether currently unqualified sub-project is retested, and such as need to again this sub-project be carried out Test, upper management server sends instruction to management server, and management server retriggered test assignment is simultaneously issued to survey Examination staff;
As higher level's management server judge currently unqualified sub-project need not be retested, upper management server to Send instructions under management server, management server is made termination test instruction and is issued to test job personnel, by this method, Corresponding treatment measures can be made in time, save test resource, processing mode is more flexible.
Further, in test assignment, such as sub-project test has condition stub, when the test result of this sub-project does not conform to During lattice, the test assignment of this sub-project is hung up, and enters in the test of next sub-project;
As not having condition stub in sub-project, when the test result of this sub-project is unqualified, terminate test assignment;Logical Cross this mode, arrange beneficial to occurring in test process accurately making during certain sub-project test structure defect of data processing accordingly Applying, beneficial to being smoothed out in test process, and accurately judging to be able to carry out end of test, thus being beneficial to economize on resources.
Beneficial effects of the present invention: the product test method of the present invention, in test process, once test result occurs not Qualified state, carries out task suspension according to actual state or terminates test, thus having higher motility, Er Qieneng Enough effectively prevent traditional approach occur continuing executing with when test result is inaccurate in test process the manpower that test assignment is brought, The waste of material resources;And in test process divided reset test data, that is, the test data of every sub-project is all in this subitem It is upload process after the completion of mesh, improve disposal ability and the processing speed of test data, prevent corrupt data, and test number According to classification storage, facilitate subsequent calls.
Brief description
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the flow chart of the present invention.
Specific embodiment
Fig. 1 is the flow chart of the present invention;As illustrated, a kind of product test method that the present invention provides, comprising:
S1., to issuing current test assignment, test job personnel are according to sub-project each in test assignment for management server Testing sequence executes test successively;
S2. often complete a sub-project, test result judged:
As test result is qualified, test job personnel enter the test of next sub-project and upload currently to management server The test data of the sub-project completing;That is, often having executed a sub-project test, if test result is qualified, instead Feedback test data is to management server, and during execution sub-project, also judges whether current sub-project is last Sub-project, if it is, after feedback test data, that is, terminate test, if it is not, proceeding next sub-project;
As test result is unqualified, then:
Underproof for current test data test assignment is hung up, test job personnel are by the test data of current sub-project It is uploaded to management server, and enter into the test of next sub-project;
Or termination test assignment, test job test job personnel by the test data of current sub-project be uploaded to management clothes Business device;
S3. management servers process test data and carry out classification storage;By said method, in test process, one The underproof state of test result in denier, carries out task suspension according to actual state or terminates test, thus having more Strong motility, and can effectively prevent traditional approach from occurring continuing executing with survey when test result is inaccurate in test process The waste of the human and material resources that trial business brings;And divided reset test data, the i.e. survey of every sub-project in test process Examination data is upload process all after the completion of this sub-project, improves disposal ability and the processing speed of test data, prevents from counting According to error, and the classification of test data storage, facilitate subsequent calls.
Wherein, test assignment is hung up and is referred to that the test sub-project currently completing is unqualified in time, temporarily ignores, and continues Carry out the test of next sub-project, the hang-up of test assignment or the termination of test assignment are judged according to following manner:
In test assignment, such as sub-project test has condition stub, when the test result of this sub-project is unqualified, should The test assignment of sub-project is hung up, and enters in the test of next sub-project;Condition stub refers to timely certain sub-project test and does not conform to Lattice, continue executing with next sub-project, such as: test product is badly in need of by client and is defined the time of delivery, even if some sub-projects Test result data unqualified, but do not affect client using and admit the test result data of this sub-project current;Also than Although the test result data as certain or a few sub-project is unqualified, in current test condition difficult to reach test Qualified, and survey test result data with set result data difference in current test strip part in set point;? Other requirements of client in above-mentioned factor or in actual production test all can make task suspension;If currently testing sub-project It is last sub-project, after completing the test of last sub-project, even if test result is unqualified, no longer by test assignment Hang up, in management server, while the storage that management server is classified, superior manages direct feedback test data Server feedback quality report;
As not having condition stub in sub-project, when the test result of this sub-project is unqualified, terminate test assignment;Cause It is in the case of not having condition stub, once certain sub-project test result data is unqualified, continuing executing with other tests does not have Necessity, results even in the waste of resource, thus terminating test assignment, in this way, occurs certain beneficial in test process Corresponding treatment measures are accurately made during sub-project test structure defect of data, beneficial to being smoothed out in test process, and Accurately judge to be able to carry out end of test, thus being beneficial to economize on resources
In the present embodiment, described test data includes test result data and test process data, this data structure, and one Aspect is beneficial to the performance evaluation to test product by test result data, on the other hand, by test process data and test Result data collective effect, is analyzed beneficial to test process, beneficial to the test of next same test project, have strong can Retroactive effect.
In the present embodiment, in step s3, after management server receives test data, the process to test data includes:
S31. for unqualified result data, management server generates quality writ, and quality writ is fed back to higher level Management server, test result data and test process data are respectively stored into quality database and cross number of passes by management server According in storehouse;Wherein, quality writ includes sub-project, the process data of current sub-project test and the unqualified knot currently tested Fruit data;
S32. for pass result data, the test result data receiving and test process data are divided by management server It is not stored in qualified data base and process database, by this data processing method, for each in test process The test data of sub-project can be processed in time, particularly with can making in time of the underproof sub-project of test result data Instruct measure accordingly, that is, in retriggered test assignment or termination test assignment, beneficial to saving test resource.
In the present embodiment, also include after step s4. upper management server receives quality writ, according to current production Test condition and customer demand judge whether currently unqualified sub-project is retested, such as need to be again to this sub-project Tested, upper management server sends instruction to management server, management server retriggered test assignment simultaneously issues To test job personnel;
As higher level's management server judge currently unqualified sub-project need not be retested, upper management server to Send instructions under management server, management server make termination test instruction be issued to test job personnel, retest including Again the first sub-project from test assignment is tested successively, or from currently having completed the underproof son of single test result data Project starts to retest, and by this method, can make corresponding treatment measures in time, save test resource, process side Formula is more flexible.
Finally illustrate, above example only in order to technical scheme to be described and unrestricted, although with reference to relatively Good embodiment has been described in detail to the present invention, it will be understood by those within the art that, can be to the skill of the present invention Art scheme is modified or equivalent, the objective without deviating from technical solution of the present invention and scope, and it all should be covered at this In the middle of the right of invention.

Claims (5)

1. a kind of product test method it is characterised in that: include:
S1., to issuing current test assignment, test job personnel are according to the test of sub-project each in test assignment for management server Order executes test successively;
S2. often complete a sub-project, test result judged:
As test result is qualified, test job personnel enter the test of next sub-project and currently complete to management server upload Sub-project test data;
As test result is unqualified, then:
Underproof for current test data test assignment is hung up, the test data of current sub-project is uploaded by test job personnel To management server, and enter into the test of next sub-project;
Or termination test assignment, the test data of current sub-project is uploaded to management service by test job test job personnel Device;
S3. management servers process test data and carry out classification storage.
2. according to claim 1 product test method it is characterised in that: described test data include test result data and Test process data.
3. according to claim 2 product test method it is characterised in that: in step s3, management server receives test After data, the process to test data includes:
S31. for unqualified result data, management server generates quality writ, and quality writ is fed back to upper management Server, test result data and test process data are respectively stored into quality database and process database by management server In;Wherein, quality writ includes sub-project, the process data of current sub-project test and the unqualified number of results currently tested According to;
S32. for pass result data, the test result data receiving and test process data are deposited by management server respectively It is stored in qualified data base and process database.
4. according to claim 3 product test method it is characterised in that: also include step s4. upper management server and connect After receiving quality writ, the test condition according to current production and customer demand judge whether currently unqualified sub-project is entered Row retests, and such as need to again this sub-project be tested, upper management server sends instruction to management server, management Server retriggered test assignment is simultaneously issued to test job personnel;
As higher level's management server judges that currently unqualified sub-project need not be retested, upper management server is to management Send instructions under server, management server is made termination test instruction and is issued to test job personnel.
5. according to claim 1 product test method it is characterised in that: in test assignment, such as sub-project test has Condition stub, when the test result of this sub-project is unqualified, the test assignment of this sub-project is hung up, and enters into next subitem In range estimation examination;
As not having condition stub in sub-project, when the test result of this sub-project is unqualified, terminate test assignment.
CN201610739786.8A 2016-08-26 2016-08-26 Product test method Pending CN106355379A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610739786.8A CN106355379A (en) 2016-08-26 2016-08-26 Product test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610739786.8A CN106355379A (en) 2016-08-26 2016-08-26 Product test method

Publications (1)

Publication Number Publication Date
CN106355379A true CN106355379A (en) 2017-01-25

Family

ID=57855215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610739786.8A Pending CN106355379A (en) 2016-08-26 2016-08-26 Product test method

Country Status (1)

Country Link
CN (1) CN106355379A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107784448A (en) * 2017-11-07 2018-03-09 中国银行股份有限公司 Task management method and system under a kind of waterfall model
CN109754093A (en) * 2018-12-13 2019-05-14 四川天邑康和通信股份有限公司 A kind of smooth cat maintenance system and management method
CN111786854A (en) * 2020-06-30 2020-10-16 曙光信息产业(北京)有限公司 Network card testing method and device, electronic equipment and readable storage medium
CN113406477A (en) * 2021-06-18 2021-09-17 广州市诺的电子有限公司 PCBA test method, system, computer equipment and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101853438A (en) * 2010-05-06 2010-10-06 华立仪表集团股份有限公司 Management system for product test information of electric energy meter
CN103164311A (en) * 2011-12-16 2013-06-19 环旭电子股份有限公司 Method for automatically testing communication function of object to be tested

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101853438A (en) * 2010-05-06 2010-10-06 华立仪表集团股份有限公司 Management system for product test information of electric energy meter
CN103164311A (en) * 2011-12-16 2013-06-19 环旭电子股份有限公司 Method for automatically testing communication function of object to be tested

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107784448A (en) * 2017-11-07 2018-03-09 中国银行股份有限公司 Task management method and system under a kind of waterfall model
CN109754093A (en) * 2018-12-13 2019-05-14 四川天邑康和通信股份有限公司 A kind of smooth cat maintenance system and management method
CN109754093B (en) * 2018-12-13 2021-04-09 四川天邑康和通信股份有限公司 Optical modem maintenance system and management method
CN111786854A (en) * 2020-06-30 2020-10-16 曙光信息产业(北京)有限公司 Network card testing method and device, electronic equipment and readable storage medium
CN111786854B (en) * 2020-06-30 2022-08-16 曙光信息产业(北京)有限公司 Network card testing method and device, electronic equipment and readable storage medium
CN113406477A (en) * 2021-06-18 2021-09-17 广州市诺的电子有限公司 PCBA test method, system, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
CN106355379A (en) Product test method
CN106850330B (en) Intelligent cloud desktop performance test system and method
CN103279063B (en) It is applicable to the detection error-preventing method of electronic part production line
CN107861876A (en) Method of testing, device, computer equipment and readable storage medium storing program for executing
CN109115383A (en) The Prediction method for fatigue life of cold extrusion Strengthening Hole
CN108108296A (en) A kind of cloud test method, server and client
CN110568339A (en) Instrument automatic testing system and method based on Internet of things
CN105808412A (en) Process resource real-time monitoring method
CN109085485A (en) Semiconductor product test macro and method
CN109309022A (en) A kind of defect sampling observation method
CN109324978A (en) A kind of software testing management system of multi-person synergy
CN110069409A (en) A kind of Evaluation of Software Quality and system
CN110033160A (en) A kind of performance appraisal system and method
CN105550088A (en) Automated testing method and automated testing system
CN105159806A (en) Terminal compatibility test system and operating method therefor
CN109409728B (en) Integrity detection method and system for configurable bill of material
CN101694634A (en) Device allocation method in automatic test system
CN106940673A (en) One kind monitoring item interval adjustment method and system
CN108196992B (en) Automatic performance testing method and device
CN106227658A (en) The management method of a kind of test case, system and device
CN104572466A (en) Automatic testing method and device
CN105675992B (en) Auto-Test System and its test method
CN105628564A (en) Rice uniformity testing method and system and electronic equipment
CN108459867A (en) A kind of cloud terminal staging method
CN106067100A (en) The ameliorative way of a kind of product quality and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170125

RJ01 Rejection of invention patent application after publication