CN106354950A - 一种钢结构预拼装方法及系统 - Google Patents
一种钢结构预拼装方法及系统 Download PDFInfo
- Publication number
- CN106354950A CN106354950A CN201610786163.6A CN201610786163A CN106354950A CN 106354950 A CN106354950 A CN 106354950A CN 201610786163 A CN201610786163 A CN 201610786163A CN 106354950 A CN106354950 A CN 106354950A
- Authority
- CN
- China
- Prior art keywords
- value
- workpiece
- model
- deviation
- real
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 38
- 238000000034 method Methods 0.000 title claims abstract description 38
- 239000010959 steel Substances 0.000 title claims abstract description 38
- 238000013461 design Methods 0.000 claims abstract description 48
- 238000005259 measurement Methods 0.000 claims abstract description 23
- 238000005516 engineering process Methods 0.000 claims abstract description 18
- 239000000523 sample Substances 0.000 claims abstract description 15
- 238000001514 detection method Methods 0.000 claims description 44
- 230000008569 process Effects 0.000 claims description 16
- 238000012360 testing method Methods 0.000 claims description 6
- 238000012545 processing Methods 0.000 claims description 3
- 238000004141 dimensional analysis Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 13
- 238000004519 manufacturing process Methods 0.000 abstract description 11
- 238000007689 inspection Methods 0.000 abstract description 6
- 230000008901 benefit Effects 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 238000012937 correction Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 230000008676 import Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000001186 cumulative effect Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
- 239000010979 ruby Substances 0.000 description 1
- 229910001750 ruby Inorganic materials 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T19/00—Manipulating 3D models or images for computer graphics
- G06T19/20—Editing of 3D images, e.g. changing shapes or colours, aligning objects or positioning parts
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Software Systems (AREA)
- Computer Graphics (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
Abstract
本发明公开了一种钢结构预拼装方法及系统,在钢结构预拼装时,使用三维测量技术测量工件真实值,并实时与设计模型比对,修正设计值模型得到真实值模型,再将真实值模型进行预拼装,省去工厂实地拼装过程。在钢结构截面处,架设传感器,布置校准设备,使用探针探触钢箱梁截面,与设计模型比对,得到制造误差值。并可在软件中实现虚拟拼装,将测量所得的真实值模型在软件中实时拼装,直观得到能否拼接的结论。本技术实现了钢结构的虚拟拼装检测,为施工检测提供了更为可靠的保障,节省了场地、人工费和时间。
Description
技术领域
本发明属于钢箱梁施工技术领域,具体涉及一种钢结构预拼装方法及系统。
背景技术
自上世纪80年代末开始,钢结构在建设领域得到广泛应用。随着经济的发展钢铁工业技术和产能的提升,高层建筑、体育场馆、机场航站楼等建筑物逐渐增多,钢结构进入了快速发展期。然而国内大多数钢结构加工企业中,普遍采用钢尺、拉线、放样吊线和检验模板等传统方法来检验钢构件是否符合设计的要求。对于复杂的钢构件还要通过实物预拼装,检验构件的空间位置,减小累积误差。如今的钢结构造型已经变得十分复杂,如高层建筑的避难层桁架构件、雨棚网壳结构和顶冠造型;又如各种场馆的空间大跨度立体桁架构件和巨型的高架桥梁,给钢构件的检验增添了许多难度。采用现有的检测手段不但需要大片的预拼装场地,检测过程繁琐,测量时间长,检测费用高,而且检测精度低,已经无法满足现在钢结构加工制造技术的需求。
以高架桥的建设为例,高架桥跨度大,为保证高架桥的强度、刚度和稳定性,主体结构全部采用焊制型钢、装配组焊、预应力张拉等措施。为了保证高架桥的强度和刚度,针对其跨度大,安全要求严格等特点,对主体钢结构运用预应力张拉的技术焊制型钢进行装配组焊。高架桥采用顶压弯来控制焊接变形。
传统的分段吊装法的主要特点:结构安装定位和拼装质量易于保证,无需采用参数很大的起重设备;但是拼装胎架用量大,高空作业较多,安全保障难度大,安全措施费用高:
(1)节段制作工艺复杂、周期长
传统工艺通过梁段在胎架拼接的方式制作控制焊接误差,每个梁段制作过程中,胎架的制作、梁段拼装及拆除耗时巨大;
(2)节段制作过程中胎架占用场地大,经济性差
浪费人力、物力、财力等资源,梁段尺寸大,两个胎架上梁段同时施工占据了工厂厂棚大部分空间,耗费资源多,不利于节段制作过程中其他工序的进行。
(3)梁段间误差难以控制
采用现场预制拼装的方式确保了在同一梁段中,各个节段焊接的误差。然而,梁段间也存在误差,难以通过传统工艺进行控制,施工现场的调整耗时长、施工机械、工期浪费严重。
(4)精度控制措施复杂
不同结构的立体拼装特殊,建筑结构上下、左右以及前后完全拼装就位存在很大的工作难度,导致要保证构件组装连接后测量总装偏差的精度也具有很大难度。
发明内容
本发明针对现有技术的不足,本发明旨在提供一种钢结构预拼装方法及系统,能省去工厂实地拼装过程,将真实构件尺寸与设计模型比对,得到制造误差值,并可在软件中实现虚拟拼装,直接由软件得到能否拼接的结论。
为了实现上述目的,本发明提供了一种钢结构预拼装方法,包括如下步骤:
(1)使用BIM技术依据设计图纸建立工件的设计值三维模型;
(2)利用三维检测设备对工件进行实测,得到工件的真实值并输入处理器;
(3)处理器调取设计值三维模型,将工件各部位的真实值与设计值进行对比,得到真实值与设计值的偏差;
(4)处理器依据真实值对设计值三维模型进行修正,得到工件的真实值三维模型;
(5)处理器将真实值三维模型进行模拟拼装,输出模拟拼装结果。
进一步地,步骤(2)~(4)中,实测过程与对比过程同步进行,并且在对比过程中,实时对设计值三维模型进行修正,得到真实值三维模型。
进一步地,在步骤(3)还包括如下步骤:
判断真实值与设计值的偏差是否在合格范围内;若工件所有部位的偏差均在合格范围内,则往下进行步骤(4);若某部位的偏差不在合格范围内,表示工件不合格,对不合格部位进行修正或更换该工件以后,重新执行步骤(2)。
进一步地,在步骤(3)中,若某一时刻检测到某部位的偏差不合格,且该偏差不可修正,则停止检测,直接更换该工件。
进一步地,在步骤(3)中,若某一时刻检测到某部位的偏差不合格,但该偏差可修正,则继续检测,直至检测完毕,或直至检测到不可修正的不合格偏差。
为了实现上述目的,本发明还提供了一种钢结构预拼装系统,包括:三维检测设备、处理器、BIM模型存储器、显示器;三维检测设备的输出端连接处理器,BIM模型存储器的输入、输出端均连接处理器,显示器的输入端连接处理器;三维检测设备的输入端包括探针,探针用于与工件表面接触测量以获取工件参数的真实值;三维检测设备将探针获取的真实值上传至处理器;BIM模型存储器中存有基于BIM技术建立的包含工件参数的设计值的三维模型;处理器用于将真实值与设计值对比得出偏差,并将该偏差实时输出至显示设备,以及根据实际值修正设计值的三维模型得到真实值的三维模型,并将真实值的三维模型预拼装结果输出至显示设备。
本发明实现了钢结构的虚拟拼装检测,为施工检测提供了更为可靠的保障,节省了场地、人工费和时间。
附图说明
图1是本发明系统架构及工作流程示意图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。此外,下面所描述的本发明各个实施方式中所涉及到的技术特征只要彼此之间未构成冲突就可以相互组合。
本发明提供了一种钢结构预拼装系统,包括:三维检测设备、处理器、BIM模型存储器、显示器;三维检测设备的输出端连接处理器,BIM模型存储器的输入、输出端均连接处理器,显示器的输入端连接处理器;三维检测设备的输入端包括探针,探针用于与工件表面接触测量以获取工件参数的真实值;三维检测设备将探针获取的真实值上传至处理器;BIM模型存储器中存有基于BIM技术建立的包含工件参数的设计值的三维模型;处理器用于将真实值与设计值对比得出偏差,并将该偏差实时输出至显示设备,以及根据实际值修正设计值的三维模型得到真实值的三维模型,并将真实值的三维模型预拼装结果输出至显示设备。
本发明还提供了一种钢结构预拼装方法,包括如下步骤:
(1)使用BIM技术依据设计图纸建立工件的设计值三维模型;
(2)利用三维检测设备对工件进行实测,得到工件的真实值并输入处理器;
(3)处理器调取设计值三维模型,将工件各部位的真实值与设计值进行对比,得到真实值与设计值的偏差;
(4)处理器依据真实值对设计值三维模型进行修正,得到工件的真实值三维模型;
(5)处理器将真实值三维模型进行模拟拼装,输出模拟拼装结果。
在本发明的优选实施例中,步骤(2)~(4)中,实测过程与对比过程同步进行,并且在对比过程中,实时对设计值三维模型进行修正,得到真实值三维模型,保证测量工作的连续性,避免因不连续的测量导致的测量误差。
作为进一步的优化,在步骤(3)还包括如下步骤:
判断真实值与设计值的偏差是否在合格范围内;若工件所有部位的偏差均在合格范围内,则往下进行步骤(4);若某部位的偏差不在合格范围内,表示工件不合格,对不合格部位进行修正或更换该工件以后,重新从步骤(2)开始执行。为了节约检测时间,可以一次性检测完整个工件,得出工件上所有不合格的部位,然后再集中进行修正使工件合格,修正以后重新从步骤(2)开始执行,以确保修正成功。
在某些情况下,有些不合格的偏差是不可修正的,例如某工件长度设计值为1m,允许偏差为±0.01m,测得的真实值为0.98m,则无法去修正该工件的长度,该工件只能报废,只能重新更换以后,再从步骤(2)重新开始测量。如果测得的真实值为1.02m,则可以通过打磨或切割等方式修正到1±0.1m范围内,因此如果偏差大于﹢0.01,则视为可以修正的偏差。
在步骤(3)中,若某一时刻检测到某部位的偏差不合格,且该偏差不可修正,则直接停止检测,直接更换该工件,可以大大节约检测时间而不必等到将该工件所有参数测量完毕才去更换。但是,在步骤(3)中,若某一时刻检测到某部位的偏差不合格,但该偏差可修正,则可以继续检测,直至检测完毕,或直至检测到不可修正的不合格偏差,从而节约检测时间。
步骤(5)中输出的拼装结果包括但不限于拼装偏差、拼装后的总成的各个参数,以及是否能完成拼装等。例如:对于需要拼装成方框的四个杆,如果虚拟拼装无法拼装成方框,则输出结果为无法拼装,如果能够拼成方框,则显示拼装结果及拼装后的总成的参数,例如方框的整体高度、方框的整体平面度、边框平行度和垂直度等,根据这些参数可以进一步判断拼装总成是否合格。可以人为判断,也可以将合格标准预置到BIM模型或检测软件中,由处理器自动调用比对。
在其他实施例中(未图示),在步骤(2)中只测量工件的拼装截面的真实值,同时只对设计值三维模型的拼装截面进行修正,对较大的工件,可以大大节约检测时间。
本发明是先在软件中使用BIM技术建立工件的设计值三维模型(即该工件的BIM模型),并按照三维检测设备的坐标系来建立该BIM模型的坐标系,然后将三维检测设备检测到的工件上的每个点在三维检测设备中的坐标直接导入到BIM模型中,从而可以直接在BIM模型中与该点的设计值坐标进行对比计算,得到两点的偏差值。如果是平面度的检测,则可以在工件的平面上检测多个点,输入到BIM模型中模拟出由这几个检测点确定的真实值平面,然后计算这个真实值平面的平面度与该平面的设计值平面的平面度进行对比,得出平面度的偏差。测量时选取的点越多,该真实值越精确。
总的说来,本发明是将多个需要拼装在一起的工件分别测出其真实值,并利用测到的真实值修正各工件的设计值三维模型,然后将修正得到的各个工件的真实值三维模型进行模拟拼装。根据各构件之间的空间关联性,在对构件接口的特征点进行坐标采集的基础上进行坐标间的转换,并在软件中进行数字建模,从而达到精度分析的一种方法。其原理可以归结于如下两点:
1)对单个已经加工完毕构件建立坐标系,通过接触测量得出探针与工件接触点的坐标,即工件上该点的坐标,将该点定义为特征点,通过检测获取多个不同的特征点,输入到BIM模型即可以根据特征点的坐标来模拟真实工件的曲面、平面,并求出曲率、长度、平面度等参数的真实值。
2)由于两个工件的对接处一定会形成两个拼装面(可以是平面、台阶面、曲面、异形面),将多个相关构件及其设计值模型一起建立统一的整体坐标系,将单个构件的特征点单独的坐标转化为统一的整体坐标系下的坐标,从而将两个拼装面转化到同一个坐标系中进行计算对比,分析两拼装面的间隙、错边情况。
基于上述方法、系统及其原理,对于场地、吊装设备、时间周期等方面有限制、有时不具备整体预拼装的条件的工程,尤其是大跨度桥梁的建造,能取得良好的工期效益和经济效益。
如图1所示,为基于上述系统和方法的一个具体应用案例,在该案例中,三维测量技术的设备包括连接设备、检测设备和校准设备。连接设备起连接设备的作用,将检测设备、显示设备和校准设备连接起来;检测设备起检测作用,对被测物体进行检查测量,传感器和反射器界定范围,探针探触测量;校准设备起校准作用,设备在出厂前,会在实验室进行多次校准,根据偏差情况生成报告,然后再根据报告误差范围,生成配置文件,这个配置文件会跟随设备一起出厂,以后的所有校准都依据配置文件,凡是校准与配置文件不符的部分,都会增加补偿,以保证测量精度,用户在使用时也会考虑到探针处红宝石球的磨损情况,定期进行校准。
基于上述设备,以高架桥为例,预拼装方法包括以下步骤:
(1)连接设备将检测设备、显示设备(显示设备和处理器都集中在笔记本电脑内)和校准设备连接起来;
(2)使用检测设备中的传感器、相机、探针、光笔校正检测设备的最大测量范围,将高架桥的工程构件放在该测量范围内进行检测;
(3)根据上述高架桥工程构件摆放的空间位置,使用检测设备中的光笔、探针和校准锥进行空间测量精度校准(参考设备出厂时的配置文件补偿校准及用户的四个方位校准);
(4)将已建好的高架桥工程构件的设计值三维模型导入检测软件中,使用检测设备中的探针在被测物体上探触检测;
(5)探测数据实时传输到显示设备中,并与设计值三维模型进行数据比对,直观显示高架桥的真实构件尺寸值与设计值的偏差;
(6)如果偏差在合格范围内,在检测软件中(检测软件也可以安装在笔记本电脑内,由处理器直接调用),导入真实构件尺寸值的模型,进行虚拟拼装,显示拼装结果及拼装偏差;
(7)生成检测报告,给出预拼装结论。
上述高架桥的模拟拼装方法,相比于现有技术中传统的实地拼装,具有以下优点:
(1)应用计算机三维模拟仿真预拼装测量技术,录入检测数据即可得出结果和指导数据,操作简单、耗时短;
(2)可应用于桥梁工程钢结构构件整体部位制作全过程,具有代表性和指导性;
(3)由计算机智能处理数据,测量结果可靠、精确度高;
(4)一次开发可重复利用,类似桥梁工程钢结构拼装或者其他钢结构预拼装工程都可以使用,无资源浪费;
(5)可以提高钢结构工程领域生产力,推广意义大。
综上,本发明提出的一种钢结构预拼装三维测量技术及其工作方法具有技术可靠、成本节约、施工可控的特点:
(1)节省场地租赁、机械费用、人工费用;
(2)节约工期,保证产品质量及合格率,提高生产效率;
(3)项目应用BIM技术后,项目管理人员对BIM技术都有了一定的了解,可以对接下来的项目应用BIM技术。
(4)钢结构件制作过程中节省胎架上拼接节段的过程,减少预拼接过程中工程拼装指令等信息请求。
本领域的技术人员容易理解,以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (6)
1.一种钢结构预拼装方法,其特征在于,包括如下步骤:
(1)使用BIM技术依据设计图纸建立工件的设计值三维模型;
(2)利用三维检测设备对工件进行实测,得到工件的真实值并输入处理器;
(3)处理器调取设计值三维模型,将工件各部位的真实值与设计值进行对比,得到真实值与设计值的偏差;
(4)处理器依据真实值对设计值三维模型进行修正,得到工件的真实值三维模型;
(5)处理器将真实值三维模型进行模拟拼装,输出模拟拼装结果。
2.如权利要求1所述的一种钢结构预拼装方法,其特征在于,步骤(2)~(4)中,实测过程与对比过程同步进行,并且在对比过程中,实时对设计值三维模型进行修正,得到真实值三维模型。
3.如权利要求2所述的一种钢结构预拼装方法,其特征在于,在步骤(3)还包括如下步骤:
判断真实值与设计值的偏差是否在合格范围内;若工件所有部位的偏差均在合格范围内,则往下进行步骤(4);若某部位的偏差不在合格范围内,表示工件不合格,对不合格部位进行修正或更换该工件以后,重新执行步骤(2)。
4.如权利要求3所述的一种钢结构预拼装方法,其特征在于,在步骤(3)中,若某一时刻检测到某部位的偏差不合格,且该偏差不可修正,则停止检测,直接更换该工件。
5.一种如权利要求4所述的一种钢结构预拼装方法,其特征在于,在步骤(3)中,若某一时刻检测到某部位的偏差不合格,但该偏差可修正,则继续检测,直至检测完毕,或直至检测到不可修正的不合格偏差。
6.一种钢结构预拼装系统,其特征在于,包括:三维检测设备、处理器、BIM模型存储器、显示器;三维检测设备的输出端连接处理器,BIM模型存储器的输入、输出端均连接处理器,显示器的输入端连接处理器;
三维检测设备的输入端包括探针,探针用于与工件表面接触测量以获取工件参数的真实值;三维检测设备将探针获取的真实值上传至处理器;
BIM模型存储器中存有基于BIM技术建立的包含工件参数的设计值的三维模型;
处理器用于将真实值与设计值对比得出偏差,并将该偏差实时输出至显示设备,以及根据实际值修正设计值的三维模型得到真实值的三维模型,并将真实值的三维模型预拼装结果输出至显示设备。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610786163.6A CN106354950B (zh) | 2016-08-31 | 2016-08-31 | 一种钢结构预拼装方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610786163.6A CN106354950B (zh) | 2016-08-31 | 2016-08-31 | 一种钢结构预拼装方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106354950A true CN106354950A (zh) | 2017-01-25 |
CN106354950B CN106354950B (zh) | 2020-02-21 |
Family
ID=57856276
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610786163.6A Active CN106354950B (zh) | 2016-08-31 | 2016-08-31 | 一种钢结构预拼装方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106354950B (zh) |
Cited By (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106886659A (zh) * | 2017-03-21 | 2017-06-23 | 湖南联智监测科技有限公司 | 基于三维激光扫描和云平台的钢结构桥梁虚拟预拼和检测方法 |
CN106934729A (zh) * | 2017-03-09 | 2017-07-07 | 河北省建筑科学研究院 | 建筑检测鉴定方法及装置 |
CN106971031A (zh) * | 2017-03-15 | 2017-07-21 | 上海森松制药设备工程有限公司 | 一种模块组装适配度检测系统及方法 |
CN107092739A (zh) * | 2017-04-12 | 2017-08-25 | 四川云图瑞科技有限公司 | 利用模型对预制构件现场拼装时的施工管理方法 |
CN107220798A (zh) * | 2017-04-24 | 2017-09-29 | 郑州铁路职业技术学院 | 一种基于bim的建筑施工监管方法 |
CN107273607A (zh) * | 2017-06-13 | 2017-10-20 | 北京工业大学 | 一种基于bim的钢结构厂房预拼装方法 |
CN107341847A (zh) * | 2017-07-07 | 2017-11-10 | 四川云图瑞科技有限公司 | 一种基于bim技术的钢结构拼装构件三维模型数据处理方法 |
CN108592789A (zh) * | 2018-03-29 | 2018-09-28 | 浙江精工钢结构集团有限公司 | 一种基于bim和机器视觉技术的钢结构工厂预拼装方法 |
CN109099872A (zh) * | 2018-08-01 | 2018-12-28 | 中钢集团新型材料(浙江)有限公司 | 一种石墨构件的预组装系统及方法 |
CN109117558A (zh) * | 2018-08-14 | 2019-01-01 | 湖南金海集团有限公司 | 一种钢结构桥梁数字模拟预拼装施工方法 |
CN109296205A (zh) * | 2018-11-30 | 2019-02-01 | 中国二十冶集团有限公司 | 一种多级多角度钢结构屋面的施工方法 |
CN109356018A (zh) * | 2018-09-05 | 2019-02-19 | 重庆建工住宅建设有限公司 | 一种钢结构箱梁模拟方法 |
CN109441127A (zh) * | 2018-12-05 | 2019-03-08 | 中铁二局第三工程有限公司 | 一种大跨悬挑钢结构虚拟仿真现场安装施工方法 |
CN109488028A (zh) * | 2018-10-15 | 2019-03-19 | 筑梦高科建筑有限公司 | 一种基于bim技术的建筑施工预拼装方法 |
CN109740218A (zh) * | 2018-12-25 | 2019-05-10 | 三箭建设工程集团有限公司 | 一种基于bim的钢结构整体吊装系统 |
CN109931867A (zh) * | 2019-04-11 | 2019-06-25 | 中民筑友科技投资有限公司 | 一种灌浆套筒安装质量检测方法、系统及装置 |
CN110039548A (zh) * | 2019-05-31 | 2019-07-23 | 中国铁建重工集团股份有限公司 | 一种拼装机控制方法、装置及设备 |
CN110059428A (zh) * | 2018-06-26 | 2019-07-26 | 北京工业大学 | 一种基于bim模型的车辐式索桁架结构数字模拟预拼装方法 |
CN110055901A (zh) * | 2019-05-16 | 2019-07-26 | 中铁十五局集团第五工程有限公司 | 一种基于bim技术实现顶推钢管拱肋合龙精度的控制方法 |
CN110124298A (zh) * | 2018-02-09 | 2019-08-16 | 上海宝冶集团有限公司 | 用于雪橇竞赛项目的制冷管道支架的分段拼装方法 |
CN110258803A (zh) * | 2019-06-21 | 2019-09-20 | 南通大学 | 一种基于bim技术的穹顶钢结构安装施工方法 |
CN110390179A (zh) * | 2019-08-22 | 2019-10-29 | 惠州市新一代工业互联网创新研究院 | 一种钢构矫正力数学模型构建方法 |
CN110414170A (zh) * | 2019-08-05 | 2019-11-05 | 重庆建工第三建设有限责任公司 | 一种基于bim技术的建筑施工预拼装方法及系统 |
CN110502867A (zh) * | 2019-08-30 | 2019-11-26 | 华北理工大学 | 一种轻钢框架复合墙结构设计系统 |
CN110700583A (zh) * | 2019-05-28 | 2020-01-17 | 北京构力科技有限公司 | 一种基于三维bim技术的铝模板预拼装系统及方法 |
CN110714416A (zh) * | 2019-10-25 | 2020-01-21 | 中国一冶集团有限公司 | 一种基于bim的大悬臂梁桥梁体临时固结施工结构和方法 |
CN111188272A (zh) * | 2019-12-12 | 2020-05-22 | 中冶天工集团有限公司 | 一种多胎架组装钢箱梁施工辅助装置及其施工方法 |
CN111276058A (zh) * | 2020-02-11 | 2020-06-12 | 京东方科技集团股份有限公司 | 拼接显示面板及拼接显示装置 |
CN111397497A (zh) * | 2020-03-23 | 2020-07-10 | 南京大学(苏州)高新技术研究院 | 机床装配精度检测方法及系统 |
CN112035916A (zh) * | 2020-08-07 | 2020-12-04 | 卓辉(福建)建设工程有限公司 | 一种基于bim技术的建筑施工预拼装方法 |
CN113111423A (zh) * | 2021-04-21 | 2021-07-13 | 重庆华兴工程咨询有限公司 | 基于bim的钢结构虚拟拼装方法、系统、装置及存储介质 |
CN114086467A (zh) * | 2021-11-24 | 2022-02-25 | 中铁四局集团第五工程有限公司 | 一种钢混组合梁桥面板预制安装施工方法 |
CN114925422A (zh) * | 2022-05-11 | 2022-08-19 | 金恪建筑装饰工程有限公司 | 一种基于数据孪生技术的bim建筑数据处理方法、系统及存储介质 |
CN115045560A (zh) * | 2022-06-23 | 2022-09-13 | 中建钢构工程有限公司 | 异形高耸钢结构的预拼装方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101458731A (zh) * | 2008-12-21 | 2009-06-17 | 中铁宝桥股份有限公司 | 钢结构组件计算机模拟拼装方法 |
CN103336856A (zh) * | 2013-05-31 | 2013-10-02 | 中建钢构有限公司 | 一种基于可视化模型的钢结构虚拟预拼装方法 |
CN103870657A (zh) * | 2014-03-27 | 2014-06-18 | 中冶建筑研究总院有限公司 | 一种钢结构预拼装计算机模拟实现方法 |
CN104268331A (zh) * | 2014-09-19 | 2015-01-07 | 北京卫星制造厂 | 一种基于现场可视化的天线塔体结构虚拟装配方法 |
-
2016
- 2016-08-31 CN CN201610786163.6A patent/CN106354950B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101458731A (zh) * | 2008-12-21 | 2009-06-17 | 中铁宝桥股份有限公司 | 钢结构组件计算机模拟拼装方法 |
CN103336856A (zh) * | 2013-05-31 | 2013-10-02 | 中建钢构有限公司 | 一种基于可视化模型的钢结构虚拟预拼装方法 |
CN103870657A (zh) * | 2014-03-27 | 2014-06-18 | 中冶建筑研究总院有限公司 | 一种钢结构预拼装计算机模拟实现方法 |
CN104268331A (zh) * | 2014-09-19 | 2015-01-07 | 北京卫星制造厂 | 一种基于现场可视化的天线塔体结构虚拟装配方法 |
Non-Patent Citations (3)
Title |
---|
KANGLONG LI,ET AL: ""The Analysis and Application of BIM Technology in Design of Steel Structure Joints"", 《4TH INTERNATIONAL CONFERENCE ON SENSORS, MEASUREMENT AND INTELLIGENT MATERIALS (ICSMIM 2015)》 * |
吴蔚: ""BIM效益评价方法及应用研究"", 《万方学位论文》 * |
李亚东: ""数字模拟预拼装在大型钢结构工程中的应用"", 《施工技术》 * |
Cited By (41)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106934729A (zh) * | 2017-03-09 | 2017-07-07 | 河北省建筑科学研究院 | 建筑检测鉴定方法及装置 |
CN106971031A (zh) * | 2017-03-15 | 2017-07-21 | 上海森松制药设备工程有限公司 | 一种模块组装适配度检测系统及方法 |
CN106886659A (zh) * | 2017-03-21 | 2017-06-23 | 湖南联智监测科技有限公司 | 基于三维激光扫描和云平台的钢结构桥梁虚拟预拼和检测方法 |
CN107092739A (zh) * | 2017-04-12 | 2017-08-25 | 四川云图瑞科技有限公司 | 利用模型对预制构件现场拼装时的施工管理方法 |
CN107220798A (zh) * | 2017-04-24 | 2017-09-29 | 郑州铁路职业技术学院 | 一种基于bim的建筑施工监管方法 |
CN107273607A (zh) * | 2017-06-13 | 2017-10-20 | 北京工业大学 | 一种基于bim的钢结构厂房预拼装方法 |
CN107341847A (zh) * | 2017-07-07 | 2017-11-10 | 四川云图瑞科技有限公司 | 一种基于bim技术的钢结构拼装构件三维模型数据处理方法 |
CN110124298A (zh) * | 2018-02-09 | 2019-08-16 | 上海宝冶集团有限公司 | 用于雪橇竞赛项目的制冷管道支架的分段拼装方法 |
CN108592789A (zh) * | 2018-03-29 | 2018-09-28 | 浙江精工钢结构集团有限公司 | 一种基于bim和机器视觉技术的钢结构工厂预拼装方法 |
CN110059428A (zh) * | 2018-06-26 | 2019-07-26 | 北京工业大学 | 一种基于bim模型的车辐式索桁架结构数字模拟预拼装方法 |
CN109099872A (zh) * | 2018-08-01 | 2018-12-28 | 中钢集团新型材料(浙江)有限公司 | 一种石墨构件的预组装系统及方法 |
CN109099872B (zh) * | 2018-08-01 | 2023-12-26 | 赛迈科先进材料股份有限公司 | 一种石墨构件的预组装系统及方法 |
CN109117558A (zh) * | 2018-08-14 | 2019-01-01 | 湖南金海集团有限公司 | 一种钢结构桥梁数字模拟预拼装施工方法 |
CN109356018A (zh) * | 2018-09-05 | 2019-02-19 | 重庆建工住宅建设有限公司 | 一种钢结构箱梁模拟方法 |
CN109488028A (zh) * | 2018-10-15 | 2019-03-19 | 筑梦高科建筑有限公司 | 一种基于bim技术的建筑施工预拼装方法 |
CN109296205A (zh) * | 2018-11-30 | 2019-02-01 | 中国二十冶集团有限公司 | 一种多级多角度钢结构屋面的施工方法 |
CN109441127A (zh) * | 2018-12-05 | 2019-03-08 | 中铁二局第三工程有限公司 | 一种大跨悬挑钢结构虚拟仿真现场安装施工方法 |
CN109740218A (zh) * | 2018-12-25 | 2019-05-10 | 三箭建设工程集团有限公司 | 一种基于bim的钢结构整体吊装系统 |
CN109740218B (zh) * | 2018-12-25 | 2023-03-24 | 三箭建设工程集团有限公司 | 一种基于bim的钢结构整体吊装系统 |
CN109931867B (zh) * | 2019-04-11 | 2021-04-27 | 中民筑友科技投资有限公司 | 一种灌浆套筒安装质量检测方法、系统及装置 |
CN109931867A (zh) * | 2019-04-11 | 2019-06-25 | 中民筑友科技投资有限公司 | 一种灌浆套筒安装质量检测方法、系统及装置 |
CN110055901A (zh) * | 2019-05-16 | 2019-07-26 | 中铁十五局集团第五工程有限公司 | 一种基于bim技术实现顶推钢管拱肋合龙精度的控制方法 |
CN110700583A (zh) * | 2019-05-28 | 2020-01-17 | 北京构力科技有限公司 | 一种基于三维bim技术的铝模板预拼装系统及方法 |
CN110039548A (zh) * | 2019-05-31 | 2019-07-23 | 中国铁建重工集团股份有限公司 | 一种拼装机控制方法、装置及设备 |
CN110039548B (zh) * | 2019-05-31 | 2021-07-09 | 中国铁建重工集团股份有限公司 | 一种拼装机控制方法、装置及设备 |
CN110258803A (zh) * | 2019-06-21 | 2019-09-20 | 南通大学 | 一种基于bim技术的穹顶钢结构安装施工方法 |
CN110414170A (zh) * | 2019-08-05 | 2019-11-05 | 重庆建工第三建设有限责任公司 | 一种基于bim技术的建筑施工预拼装方法及系统 |
CN110390179A (zh) * | 2019-08-22 | 2019-10-29 | 惠州市新一代工业互联网创新研究院 | 一种钢构矫正力数学模型构建方法 |
CN110502867A (zh) * | 2019-08-30 | 2019-11-26 | 华北理工大学 | 一种轻钢框架复合墙结构设计系统 |
CN110714416A (zh) * | 2019-10-25 | 2020-01-21 | 中国一冶集团有限公司 | 一种基于bim的大悬臂梁桥梁体临时固结施工结构和方法 |
CN111188272A (zh) * | 2019-12-12 | 2020-05-22 | 中冶天工集团有限公司 | 一种多胎架组装钢箱梁施工辅助装置及其施工方法 |
CN111276058B (zh) * | 2020-02-11 | 2022-10-11 | 京东方科技集团股份有限公司 | 拼接显示面板及拼接显示装置 |
CN111276058A (zh) * | 2020-02-11 | 2020-06-12 | 京东方科技集团股份有限公司 | 拼接显示面板及拼接显示装置 |
US11783738B2 (en) | 2020-02-11 | 2023-10-10 | BOE MLED Technology Co., Ltd. | Spliced display panel and spliced display apparatus |
CN111397497A (zh) * | 2020-03-23 | 2020-07-10 | 南京大学(苏州)高新技术研究院 | 机床装配精度检测方法及系统 |
CN111397497B (zh) * | 2020-03-23 | 2021-12-10 | 南京大学(苏州)高新技术研究院 | 机床装配精度检测方法及系统 |
CN112035916A (zh) * | 2020-08-07 | 2020-12-04 | 卓辉(福建)建设工程有限公司 | 一种基于bim技术的建筑施工预拼装方法 |
CN113111423A (zh) * | 2021-04-21 | 2021-07-13 | 重庆华兴工程咨询有限公司 | 基于bim的钢结构虚拟拼装方法、系统、装置及存储介质 |
CN114086467A (zh) * | 2021-11-24 | 2022-02-25 | 中铁四局集团第五工程有限公司 | 一种钢混组合梁桥面板预制安装施工方法 |
CN114925422A (zh) * | 2022-05-11 | 2022-08-19 | 金恪建筑装饰工程有限公司 | 一种基于数据孪生技术的bim建筑数据处理方法、系统及存储介质 |
CN115045560A (zh) * | 2022-06-23 | 2022-09-13 | 中建钢构工程有限公司 | 异形高耸钢结构的预拼装方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106354950B (zh) | 2020-02-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106354950B (zh) | 一种钢结构预拼装方法及系统 | |
CN109405817B (zh) | 一种圆形立柱垂直度检测方法 | |
CN111324923B (zh) | 桥梁顶推结构实时监控方法、装置及系统 | |
CN111811420B (zh) | 隧道三维轮廓整体绝对变形监测方法及系统 | |
CN109117558A (zh) | 一种钢结构桥梁数字模拟预拼装施工方法 | |
CN108824816B (zh) | 一种高空大跨网架滑移定位安装及监测方法 | |
CN101907439A (zh) | 建筑钢结构制作仿真测量检测方法 | |
CN112016147A (zh) | 一种基于Revit平台的钢桁梁预拼装精度检测方法 | |
CN107273607A (zh) | 一种基于bim的钢结构厂房预拼装方法 | |
CN101882180A (zh) | 建筑钢结构件计算机仿真模拟预拼装方法 | |
CN107341847A (zh) | 一种基于bim技术的钢结构拼装构件三维模型数据处理方法 | |
CN103336856A (zh) | 一种基于可视化模型的钢结构虚拟预拼装方法 | |
CN108345318A (zh) | 一种节段梁悬臂拼装墩顶块安装测量方法 | |
CN112525091A (zh) | 一种钢箱桁拱桥安装定位及监测一体化的施工方法 | |
CN111677294A (zh) | 基于数字孪生技术的钢结构智能安装方法 | |
CN115618472A (zh) | 基于bim模型的工程结构数字化预拼装方法、系统及应用 | |
CN212294344U (zh) | 斜拉桥索梁锚固结构 | |
CN105382491A (zh) | 弧形钢管柱的加工制作及检验方法 | |
CN113513173A (zh) | 一种大型异型钢结构累积连续预拼装施工方法 | |
CN104594508A (zh) | 多维空间钢结构安装节点定位施工方法 | |
Zhou et al. | Virtual pre-assembly for large steel structures based on BIM, PLP algorithm, and 3D measurement | |
CN106403858B (zh) | 一种超高空大悬挑钢平台端部挠度监测方法 | |
CN117972865A (zh) | 一种钢桁梁线形优化方法、装置、存储介质、设备及程序产品 | |
CN101255767A (zh) | 异形构件的虚拟四面体顶点测量定位方法 | |
CN111979913A (zh) | 斜拉桥索梁锚固结构及锚管角度的控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |