CN108345318A - 一种节段梁悬臂拼装墩顶块安装测量方法 - Google Patents

一种节段梁悬臂拼装墩顶块安装测量方法 Download PDF

Info

Publication number
CN108345318A
CN108345318A CN201810121315.XA CN201810121315A CN108345318A CN 108345318 A CN108345318 A CN 108345318A CN 201810121315 A CN201810121315 A CN 201810121315A CN 108345318 A CN108345318 A CN 108345318A
Authority
CN
China
Prior art keywords
pier top
measurement method
coordinate system
top block
beam sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810121315.XA
Other languages
English (en)
Inventor
胡古月
胡风明
李响
尉洪利
李明
罗家宇
秦佳
黄永亮
王霏
王一霏
胡平
洪矿
孙启炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, No 2 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201810121315.XA priority Critical patent/CN108345318A/zh
Publication of CN108345318A publication Critical patent/CN108345318A/zh
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05DSYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
    • G05D3/00Control of position or direction
    • G05D3/12Control of position or direction using feedback
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/02Means for marking measuring points
    • G01C15/06Surveyors' staffs; Movable markers
    • G01C15/08Plumbing or registering staffs or markers over ground marks
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels

Abstract

本发明涉及一种节段梁悬臂拼装墩顶块安装测量方法,属于桥梁施工技术领域。它主要包括:线形测试点设置、垫石高程检测、桥轴线放样、坐标转换和轴系互换测设等步骤。本发明的有益之处是:可以进一步提高节段梁悬臂拼装墩顶块的定位精度,平面高程定位精度均可达到±2mm以内,现场拼装桥梁线型顺畅,错台、高差均低于规范要求,节约大量施工成本。拼装工效大幅提高,调梁简易、方便、精确。同时实现多跨拼装同步进行,减少了施工协调难度,缩短了拼装工期。

Description

一种节段梁悬臂拼装墩顶块安装测量方法
技术领域
本发明涉及一种节段梁悬臂拼装墩顶块安装测量方法,属于桥梁施工技术领域。
背景技术
目前国内所有节段梁最为显著的通病就是节段梁成桥线型控制不佳,由于节段梁先预制后拼装的工艺,因此拼装过程是一个不可逆的过程。
T构悬臂拼装,墩顶块作为所有节段的起始点,其安装精度,直接决定了一个T构悬拼的整体线形,非常关键。但目前国内对墩顶块的安装精度重视程度不足、工艺落后、措施欠缺,主要表现在:
1、测量监控系统一直采用最为传统的“6点法”,数据量大、不易分析;
2、测量方法传统、方法单一,效率低、精度低;
3、由于平曲线的变化,大地坐标系给出的数据不能直观反应墩顶块的实际状态,给调梁带来一定的麻烦。
墩顶块安装精度的保证是短线法悬臂拼装节段梁的最为根本的要求,若它的精度不能保证,实际现场拼装线型将难以控制,极易发生超规范的错台和轴线偏位。
发明内容
本发明所要解决的技术问题是:克服传统测量监控技术手段单一、精度差、效率低的问题,提高测量工效,使调梁变得简易、方便、精确。
为了解决上述技术问题,本发明是通过以下技术方案实现的:一种节段梁悬臂拼装墩顶块安装测量方法,包括以下步骤:
步骤1,线形测试点设置:在每个节段的前、后两端分别设置3个线形测试点,即每个测试断面设置中线及左右3个测点,形成3条控制线。
步骤2,垫石高程检测:在墩身施工完毕后,对临时支座标高和永久支座垫石标高进行测量,检测墩身有无超高,对超高部分进行凿除或垫石调整,并打磨平整,打磨完成后重复步骤2,直至墩身符合施工要求,继续进行下一步。
步骤3,桥轴线放样:放样桥轴线,用黑线将其弹放于墩顶上,并做好标记。
步骤4,坐标转换:运用坐标转换公式转换坐标系,并运用CAD直接画图进行复核,两种方法双复核无误后,方可投入使用。
步骤5,轴系互换测设:调整腹板X轴的值,控制梁段平面旋转,从而控制梁段水平方向偏位。
作为优选,所述3条控制线分别是连接位于节段顶面中心线上BH、FH两点确定的节段平面线形,称为水平控制线,连接位于腹板顶部BL、FL和BR、FR的两条线确定节段立面线形和接缝横坡,均称为高程控制线。
作为优选,运用坐标转换公式转换坐标系是利用坐标转换公式将大地坐标系转化为空间笛卡尔坐标系,坐标转换公式如下:
作为优选,运用CAD直接画图进行复核是使用CAD 中的UCS命令对坐标转换的结果进行复核。
作为优选,轴系互换测设是将传统的横桥向控制水平方向,进行轴系互换,改为纵桥向控制轴线偏角,调整腹板X轴的值,控制梁段平面旋转,从而控制梁段水平方向偏位。
与现有技术相比,本发明的有益之处是:可以进一步提高节段梁悬臂拼装墩顶块的定位精度,平面高程定位精度均可达到±2mm以内,现场拼装桥梁线型顺畅,错台、高差均低于规范要求,节约大量施工成本。拼装工效大幅提高,调梁简易、方便、精确。同时实现多跨拼装同步进行,减少了施工协调难度,缩短了拼装工期。
附图说明
下面结合附图对本发明进一步说明。
图1是本发明工艺流程图;
图2是本发明控制点及控制线布设示意图;
图3是本发明支座垫石测点及控制线示意图;
图4是本发明CAD转换流程图;
图5是本发明最终控制点主控参数示意图。
图中:1、临时支座;2、永久支座;3、桥轴线;4、标高控制点;5、轴线控制点
具体实施方式
下面结合附图及具体实施方式对本发明进行详细描述:
如图1至图5所示,本发明涉及一种节段梁悬臂拼装墩顶块安装测量方法,其特征在于包括以下步骤:
步骤1,线形测试点设置:在每个节段的前、后两端分别设置3个线形测试点,即每个测试断面设置中线及左右3个测点,形成3条控制线。
步骤2,垫石高程检测:在墩身施工完毕后,对临时支座1的标高控制点4和永久支座2的标高控制点4进行测量,检测墩身有无超高,对超高部分进行凿除或垫石调整,并打磨平整,打磨完成后重复步骤2,直至墩身符合施工要求,继续进行下一步。
步骤3,桥轴线放样:放样桥轴线3,用黑线将其弹放于墩顶上,并做好标记。
步骤4,坐标转换:运用坐标转换公式转换坐标系,并运用CAD直接画图进行复核,两种方法双复核无误后,方可投入使用。
步骤5,轴系互换测设:调整腹板X轴的值,控制梁段平面旋转,从而控制梁段水平方向偏位。
如图2所示:上述步骤1中的3条控制线分别是连接位于节段顶面中心线上BH、FH两点确定的节段平面线形,称为水平控制线,连接位于腹板顶部BL、FL和BR、FR的两条线确定节段立面线形和接缝横坡,均称为高程控制线。
上述步骤4中运用坐标转换公式转换坐标系是利用坐标转换公式将大地坐标系转化为空间笛卡尔坐标系,坐标转换公式如下:
上述步骤4中运用CAD直接画图进行复核是使用CAD 中的UCS命令对坐标转换的结果进行复核,然后使用Autolisp语言输出至Excel表。
上述步骤5中轴系互换测设是将传统的横桥向控制水平方向,进行轴系互换,改为纵桥向控制轴线偏角,调整腹板X轴的值,控制梁段平面旋转,从而控制梁段水平方向偏位。
总之,以上仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明专利的涵盖范围。

Claims (5)

1.一种节段梁悬臂拼装墩顶块安装测量方法,其特征在于,包括以下步骤:
步骤1,线形测试点设置:在每个节段的前、后两端分别设置3个线形测试点,即每个测试断面设置中线及左右3个测点,形成3条控制线;
步骤2,垫石高程检测:在墩身施工完毕后,对临时支座上的标高控制点和永久支座上的标高控制点进行测量,检测墩身有无超高,对超高部分进行凿除或垫石调整,并打磨平整,打磨完成后重复步骤2,直至墩身符合施工要求,继续进行下一步;
步骤3,桥轴线放样:放样桥轴线,用黑线将其弹放于墩顶上,并做好标记;
步骤4,坐标转换:运用坐标转换公式转换坐标系,并运用CAD直接画图进行复核,两种方法双复核无误后,方可投入使用;
步骤5,轴系互换测设:调整腹板X轴的值,控制梁段平面旋转,从而控制梁段水平方向偏位。
2.根据权利要求1所述的一种节段梁悬臂拼装墩顶块安装测量方法,其特征在于:所述的3条控制线分别是连接位于节段顶面中心线上BH-FH两点确定的节段平面线形,称为水平控制线,连接位于腹板顶部BL-FL和BR-FR的两条线确定节段立面线形和接缝横坡,均称为高程控制线。
3.根据权利要求1所述的节段梁悬臂拼装墩顶块安装测量方法,其特征在于:所述运用坐标转换公式转换坐标系是利用坐标转换公式将大地坐标系转化为空间笛卡尔坐标系,坐标转换公式如下:
设待转换点为P,大地坐标为:,笛卡尔坐标系原点O,大地坐标系:,笛卡尔坐 标:,工程坐标系X轴大地方位角
P点转换后笛卡尔坐标为
4.根据权利要求1所述的节段梁悬臂拼装墩顶块安装测量方法,其特征在于:所述运用CAD直接画图进行复核是使用CAD 中的UCS命令对坐标转换的结果进行复核。
5.根据权利要求1所述的节段梁悬臂拼装墩顶块安装测量方法,其特征在于:所述轴系互换测设是将传统的横桥向控制水平方向,进行轴系互换,改为纵桥向控制轴线偏角,调整腹板X轴的值,控制梁段平面旋转,从而控制梁段水平方向偏位。
CN201810121315.XA 2018-02-07 2018-02-07 一种节段梁悬臂拼装墩顶块安装测量方法 Withdrawn CN108345318A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810121315.XA CN108345318A (zh) 2018-02-07 2018-02-07 一种节段梁悬臂拼装墩顶块安装测量方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810121315.XA CN108345318A (zh) 2018-02-07 2018-02-07 一种节段梁悬臂拼装墩顶块安装测量方法

Publications (1)

Publication Number Publication Date
CN108345318A true CN108345318A (zh) 2018-07-31

Family

ID=62960046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810121315.XA Withdrawn CN108345318A (zh) 2018-02-07 2018-02-07 一种节段梁悬臂拼装墩顶块安装测量方法

Country Status (1)

Country Link
CN (1) CN108345318A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109750603A (zh) * 2019-01-26 2019-05-14 中铁三局集团广东建设工程有限公司 结合节段梁结构短线法施工的几何监测系统及监测方法
CN111197276A (zh) * 2020-01-14 2020-05-26 温州永昌建设有限公司 一种修筑道路的模板支撑方法和装置
CN111664832A (zh) * 2020-06-22 2020-09-15 中铁二院工程集团有限责任公司 一种重力异常显著地区桥梁施工独立高程系统的建立方法
CN111827126A (zh) * 2020-08-07 2020-10-27 中铁大桥局集团第二工程有限公司 一种斜拉桥钢梁架设期间放样铁路挡渣墙边线的方法
CN112146575A (zh) * 2020-09-15 2020-12-29 中铁第五勘察设计院集团有限公司 架桥机落梁偏位监测系统及方法
CN112227213A (zh) * 2020-10-16 2021-01-15 中国矿业大学 一种装配式盖梁与立柱预制拼装导向定位方法、导向架
CN113073555A (zh) * 2021-03-19 2021-07-06 中铁大桥局集团第四工程有限公司 一种墩顶块定位系统及其施工方法
CN116136403A (zh) * 2023-04-14 2023-05-19 中交一航局第一工程有限公司 一种大型预制墩台海上安装的施工测量方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050102198A (ko) * 2004-04-21 2005-10-26 한국전력공사 철탑 주각재 설치용 자
CN102433841A (zh) * 2011-12-28 2012-05-02 中铁二局股份有限公司 一种异型曲线钢箱梁安装方法
CN103614968A (zh) * 2013-12-05 2014-03-05 中铁大桥局股份有限公司 连续梁柔性墩抵抗水平力的系统及方法
CN104748732A (zh) * 2015-03-26 2015-07-01 广州瀚阳工程咨询有限公司 一种节段预制桥梁架设现场测量方法
CN104831632A (zh) * 2015-04-24 2015-08-12 正坚建设有限公司 一种桥梁索塔上横梁与下横梁施工方法
CN105057512A (zh) * 2015-07-28 2015-11-18 中交一公局第二工程有限公司 制作节段梁钢筋的胎架装置
CN106436579A (zh) * 2016-08-25 2017-02-22 中铁二十三局集团轨道交通工程有限公司 异形截面节段梁短线台位匹配法线形控制方法及装置
CN106758828A (zh) * 2016-12-02 2017-05-31 腾达建设集团股份有限公司 固定式非对称桥梁悬臂拼装设备的应用方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050102198A (ko) * 2004-04-21 2005-10-26 한국전력공사 철탑 주각재 설치용 자
CN102433841A (zh) * 2011-12-28 2012-05-02 中铁二局股份有限公司 一种异型曲线钢箱梁安装方法
CN103614968A (zh) * 2013-12-05 2014-03-05 中铁大桥局股份有限公司 连续梁柔性墩抵抗水平力的系统及方法
CN104748732A (zh) * 2015-03-26 2015-07-01 广州瀚阳工程咨询有限公司 一种节段预制桥梁架设现场测量方法
CN104831632A (zh) * 2015-04-24 2015-08-12 正坚建设有限公司 一种桥梁索塔上横梁与下横梁施工方法
CN105057512A (zh) * 2015-07-28 2015-11-18 中交一公局第二工程有限公司 制作节段梁钢筋的胎架装置
CN106436579A (zh) * 2016-08-25 2017-02-22 中铁二十三局集团轨道交通工程有限公司 异形截面节段梁短线台位匹配法线形控制方法及装置
CN106758828A (zh) * 2016-12-02 2017-05-31 腾达建设集团股份有限公司 固定式非对称桥梁悬臂拼装设备的应用方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘彧: "节段预制拼装简支箱梁拼装施工技术分析", 《交通建设》 *
肖黎等: "乐清湾大桥基于空间笛卡尔坐标系的"短线法"墩顶块精确定位测设技术", 《公路》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109750603A (zh) * 2019-01-26 2019-05-14 中铁三局集团广东建设工程有限公司 结合节段梁结构短线法施工的几何监测系统及监测方法
CN111197276A (zh) * 2020-01-14 2020-05-26 温州永昌建设有限公司 一种修筑道路的模板支撑方法和装置
CN111664832A (zh) * 2020-06-22 2020-09-15 中铁二院工程集团有限责任公司 一种重力异常显著地区桥梁施工独立高程系统的建立方法
CN111827126A (zh) * 2020-08-07 2020-10-27 中铁大桥局集团第二工程有限公司 一种斜拉桥钢梁架设期间放样铁路挡渣墙边线的方法
CN112146575A (zh) * 2020-09-15 2020-12-29 中铁第五勘察设计院集团有限公司 架桥机落梁偏位监测系统及方法
CN112146575B (zh) * 2020-09-15 2021-11-09 中铁第五勘察设计院集团有限公司 架桥机落梁偏位监测系统及方法
CN112227213A (zh) * 2020-10-16 2021-01-15 中国矿业大学 一种装配式盖梁与立柱预制拼装导向定位方法、导向架
CN113073555A (zh) * 2021-03-19 2021-07-06 中铁大桥局集团第四工程有限公司 一种墩顶块定位系统及其施工方法
CN116136403A (zh) * 2023-04-14 2023-05-19 中交一航局第一工程有限公司 一种大型预制墩台海上安装的施工测量方法

Similar Documents

Publication Publication Date Title
CN108345318A (zh) 一种节段梁悬臂拼装墩顶块安装测量方法
CN103084806B (zh) 一种大型曲线钢箱梁制作方法
CN103711080B (zh) 利用坐标对比法确定钢管拱桥拱肋之间定位的方法
CN108363860A (zh) 一种基于bim技术的三维异形桥梁模板拼装测设方法
CN106638318B (zh) 斜拉桥梁端锚固点的定位方法及索导管安装方法
CN103425054B (zh) 一种基于数字化的电力隧道施工控制方法
CN107255442B (zh) 基于激光跟踪技术的大尺寸水轮发电机定子安装测量方法
CN104748732B (zh) 一种节段预制桥梁架设现场测量方法
CN110886186A (zh) 基于bim技术的复杂空间曲面异形钢箱梁制作与安装施工方法
CN108871268A (zh) 一种基于激光点云的隧道超欠挖数值计算方法
CN108595766B (zh) 基于catia软件的梁格系桥梁结构建模方法
CN113221221A (zh) 一种基于bim技术的预制梁上预应力管道定位方法
Zhou et al. Accurate virtual trial assembly method of prefabricated steel components using terrestrial laser scanning
CN111709078A (zh) 基于bim技术的走廊可视化建模方法
CN109898399A (zh) 一种装配式景观桥及其拼装方法
CN108507452B (zh) 一种客运专线接触网支柱侧面限界的测定方法
CN103453884B (zh) 基于分区的完整地物测绘作业方法
Ying et al. Applying BIM and 3D laser scanning technology on virtual pre-assembly for complex steel structure in construction
CN108625296A (zh) 一种用于节段预制桥梁安装线形控制方法
CN103195012B (zh) 一种生态河道模型的地形制作台架
CN106759349B (zh) 一种导管架基础精定位及临时锁定系统
Qi et al. Research On Control Of Precast Alignment Of Short-line Method Precast Segmental Concrete Bridges Based On The Theory Of Four-point Distance
CN109781064A (zh) 一种轨道的高程的测量方法及系统
CN203961321U (zh) 一种网架节点定位调节装置
CN113160403B (zh) 一种高精度公路信息模型的建模方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180731