CN106351663A - Retrograde brush expansion process for cut construction - Google Patents

Retrograde brush expansion process for cut construction Download PDF

Info

Publication number
CN106351663A
CN106351663A CN201610864800.7A CN201610864800A CN106351663A CN 106351663 A CN106351663 A CN 106351663A CN 201610864800 A CN201610864800 A CN 201610864800A CN 106351663 A CN106351663 A CN 106351663A
Authority
CN
China
Prior art keywords
fully
brush
digging machine
retrusive
mechanized digging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610864800.7A
Other languages
Chinese (zh)
Inventor
汪林清
侯立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201610864800.7A priority Critical patent/CN106351663A/en
Publication of CN106351663A publication Critical patent/CN106351663A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明提供一种切眼施工后退式刷扩工艺,涉及切眼施工技术领域,1)做好切眼导硐前的准备工作;2)综掘机向前移动进行切眼导硐,并根据需要在巷道内分别设置挑棚支护;3)切眼导硐施工结束后,将切眼导硐形成的小断面扩大成设计断面;4)将皮带运输机的机尾固定在切眼口;5)综掘机进行后退式刷扩,皮带机缓冲床随综掘机刷扩向后移动,皮带机的H架随着综掘机的后退式移动进行拆除向后收缩;6)在综掘机后退式刷扩的同时,在原先两侧的挑棚支护外侧继续分别安装挑棚支护和木垛,对顶板进行加固,综掘机刷扩至出发位置,刷扩结束,成巷结束。本发明工艺流程设计合理,一次成巷,避免返工,大大提高切眼施工效率。

The present invention provides a kind of cutting hole construction retreat type brush expansion technology, relates to the technical field of cutting hole construction, 1) do the preparation work before the hole cutting guide tunnel; It is necessary to set up canopy supports in the roadway; 3) After the construction of the cut-out guide tunnel is completed, the small section formed by the cut-out guide tunnel is enlarged to the design section; 4) The tail of the belt conveyor is fixed on the cut-out opening; 5 ) The fully-mechanized excavator performs a retreat brushing expansion, the buffer bed of the belt conveyor moves backwards with the fully-mechanized excavator brushing, and the H frame of the belt conveyor is removed and shrinks backwards with the retreating movement of the fully-mechanized excavator; 6) At the same time as the retreating brush expansion, the canopy supports and wooden piles were continued to be installed on the outer sides of the original canopy supports on both sides, and the roof was reinforced. The fully mechanized excavator brushed to the starting position. The technological process of the invention is reasonably designed, and the lane is formed at one time, which avoids rework and greatly improves the construction efficiency of eye cutting.

Description

切眼施工后退式刷扩工艺Retrograde Brush Expanding Technology in Cutting Eye Construction

技术领域technical field

本发明涉及切眼施工领域,具体涉及切眼施工后退式刷扩工艺。The invention relates to the field of eye-cutting construction, in particular to a retreat-type brushing technique for eye-cutting construction.

背景技术Background technique

工作面切眼设计断面大,压力集中,支护强度要求高,挑棚木垛多,劳动强度大,传统施工方法为先导硐施工结束,退综掘机刷扩,期间要拆除皮带机、挑棚等,返工多且工期长,切眼施工效率低下。The design section of the working face cutout is large, the pressure is concentrated, the support strength is high, there are many wooden stacks in the canopy, and the labor intensity is high. The traditional construction method is to complete the construction of the pilot tunnel, and the comprehensive excavator will be removed for expansion. During the period, the belt conveyor and the canopy must be removed Etc., there are many reworks and the construction period is long, and the construction efficiency is low.

针对于此,需要做出改进。For this, need to make improvement.

发明内容Contents of the invention

本发明提供了一种能大大提高切眼施工效率的切眼施工后退式刷扩工艺。The invention provides a receding brush-expansion process for eye-cutting construction that can greatly improve the construction efficiency of eye-cutting.

一种切眼施工后退式刷扩工艺,按如下步骤进行:A kind of eye-cutting construction retreat type brush expansion process is carried out according to the following steps:

1)切眼导硐具备条件后,依次安装好皮带运输机、皮带机缓冲床、二运装载装置和综掘机,做好切眼导硐前的准备工作;1) After the eye-cutting guide tunnel is ready, install the belt conveyor, belt conveyor buffer bed, secondary transport loading device and fully mechanized excavator in sequence, and make preparations before the eye-cutting guide tunnel;

2)综掘机向前移动进行切眼导硐,并根据断面宽度和地质条件,在巷道内设置挑棚支护,皮带机缓冲床随综掘机向前移动,并且皮带运输机的H架随着综掘机前进而向前补充;2) The fully mechanized excavator moves forward to cut the hole, and according to the section width and geological conditions, a canopy support is set in the roadway, the buffer bed of the belt conveyor moves forward with the fully mechanized excavator, and the H frame of the belt conveyor follows the Replenish forward with the advance of the comprehensive excavator;

3)切眼导硐施工结束后,将切眼导硐形成的小断面扩大成设计断面;3) After the construction of the cut-out guide tunnel is completed, the small section formed by the cut-out guide tunnel is enlarged to the design section;

4)将皮带运输机的机尾固定在切眼口,拆除二运装载装置,将综掘机的机头原地掉头,开始刷扩施工,一段距离后,再将二运装载装置安装上;4) Fix the tail of the belt conveyor on the cutout, remove the secondary loading device, turn the head of the comprehensive excavator on the spot, and start the brushing and expansion construction. After a certain distance, install the secondary loading device;

5)综掘机进行后退式刷扩,皮带机缓冲床随综掘机刷扩向后移动,皮带机的H架随着综掘机的后退式移动进行拆除向后收缩;5) The fully-mechanized excavator performs backward brush expansion, the buffer bed of the belt conveyor moves backward with the fully-mechanized excavator brushing, and the H frame of the belt conveyor is removed and shrinks backwards with the backward movement of the fully-mechanized excavator;

6)在综掘机后退式刷扩的同时,在原先两侧的挑棚支护外侧继续分别安装挑棚支护和木垛,对顶板进行加固,综掘机刷扩至出发位置,刷扩结束,支护安装结束,成巷结束。6) While the fully-mechanized excavator is retreating and brushing, continue to install the canopy supports and wooden stacks on the outer sides of the original two-sided canopy supports respectively, and reinforce the roof. End, the support installation is over, and the lane formation is over.

进一步的,在步骤5)中综掘机后退式刷扩过程中,要根据顶板的情况设置挑棚和木垛对顶板进行加强支护。Further, in step 5), in the process of back-type brushing and expansion of the fully mechanized excavator, it is necessary to set up canopies and wooden piles to strengthen the support of the roof according to the situation of the roof.

进一步的,在步骤5)中综掘机和二运转载装置之间根据刷扩的大小要设置成一定的夹角。Further, in step 5), a certain included angle should be set between the fully mechanized excavator and the second-run transfer device according to the size of the brush expansion.

进一步的,在所述步骤6)中挑棚支护和木垛随着皮带机缓冲床的移动进行安装。Further, in the step 6), the canopy support and the wood stack are installed along with the movement of the buffer bed of the belt conveyor.

进一步的,所述挑棚支护为先将工字钢用铁丝固定在巷道顶板的铁丝网上,然后使用单体支柱注入乳化液承力伸长顶住工字钢。Further, the canopy support is to first fix the I-beam with iron wires on the wire mesh of the roof of the roadway, and then use the single pillar to inject emulsion to support and elongate to withstand the I-beam.

本发明的优点在于:本发明采用后退式刷扩工艺,即切眼导硐施工结束后,直接把综掘机在原地倒头,皮带机机尾固定在切眼口,缓冲床随综掘机刷扩向前移动进行刷扩,在刷扩的同时分别安装挑棚支护和木垛,对顶板进行加固,综掘机刷扩至出发位置,刷扩结束,支护安装结束,成巷结束,后退式刷扩一次成巷,有效解决了切眼刷扩施工中的工期、安全及返工浪费问题,大大提高了工作效率。The advantage of the present invention is that: the present invention adopts the retreat type brush expansion process, that is, after the construction of the eye-cut guide tunnel is completed, the fully-mechanized excavator is directly turned over in situ, the tail of the belt conveyor is fixed on the eye-cut opening, and the buffer bed is brushed with the fully-mechanized excavator. The expansion moves forward to perform brush expansion. At the same time as the brush expansion, install the canopy support and wooden stacks respectively, and reinforce the roof. The comprehensive excavator brushes to the starting position. The retreat-type brush expansion can form a lane at one time, which effectively solves the problems of construction period, safety and rework waste in the construction of eye-cut brush expansion, and greatly improves work efficiency.

附图说明Description of drawings

图1为本发明实施例中后退式刷扩示意图。Fig. 1 is a schematic diagram of a retreating brush expansion in an embodiment of the present invention.

具体实施方式detailed description

为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

结合附图1,本发明一种切眼施工后退式刷扩工艺,按如下步骤进行:In conjunction with accompanying drawing 1, a kind of eye-cutting construction retreat type brushing technique of the present invention is carried out according to the following steps:

1)切眼导硐具备条件后,依次安装好皮带运输机1、皮带机缓冲床2、二运装载装置3和综掘机4,做好切眼导硐前的准备工作;1) After the eye-cutting guide tunnel is ready, install the belt conveyor 1, the belt conveyor buffer bed 2, the secondary transport loading device 3 and the fully mechanized excavator 4 in sequence, and make preparations before the eye-cutting guide tunnel;

2)综掘机4向前移动进行切眼导硐,并根据断面宽度和地质条件,在巷道内设置挑棚支护5,皮带机缓冲床2随综掘机4向前移动,并且皮带运输机1的H架随着综掘机1前进而向前补充;2) The fully mechanized excavator 4 moves forward to cut the hole, and according to the width of the section and geological conditions, set up the canopy support 5 in the roadway, the belt conveyor buffer bed 2 moves forward with the mechanized excavator 4, and the belt conveyor The H frame of 1 is supplemented forward along with the advancement of fully mechanized excavator 1;

3)切眼导硐施工结束后,将切眼导硐形成的小断面扩大成设计断面;3) After the construction of the cut-out guide tunnel is completed, the small section formed by the cut-out guide tunnel is enlarged to the design section;

4)将皮带运输机1的机尾固定在切眼口6,拆除二运装载装置3,将综掘机4的机头原地掉头,开始刷扩施工,一段距离后,再将二运装载装置3安装上;4) Fix the tail of the belt conveyor 1 on the cutout 6, remove the secondary loading device 3, turn the head of the fully mechanized excavator 4 on the spot, and start the brushing and expansion construction. After a certain distance, install the secondary loading device 3 installed;

5)综掘机4进行后退式刷扩,皮带机缓冲床2随综掘机4刷扩向后移动,皮带机1的H架随着综掘机4的后退式移动拆除向后收缩;5) The fully-mechanized excavator 4 carries out the retreat type brushing expansion, the belt conveyor buffer bed 2 moves backward with the fully-mechanized excavator 4 brushing, and the H frame of the belt conveyor 1 shrinks backward along with the retreating movement of the fully-mechanized excavator 4;

6)在综掘机4后退式刷扩的同时,在原先两侧的挑棚支护5外侧继续分别安装挑棚支护5和木垛(图中未示出),对顶板进行加固(图中未示出),综掘机4刷扩至出发位置,刷扩结束,支护安装结束,成巷结束。6) While the fully mechanized excavator 4 is retreating and brushing, continue to install the canopy support 5 and wooden piles (not shown in the figure) on the outside of the original two sides of the canopy support 5, and reinforce the roof (Fig. Not shown in ), fully mechanized excavator 4 brushes and expands to starting position, and brushes and expands and finishes, and supporting installation finishes, and the lane-forming finishes.

进一步的,在步骤5)中综掘机后退式刷扩过程中,要根据顶板的情况设置挑棚和木垛对顶板进行加强支护,提高安全性;Further, in step 5), in the process of retreating brush expansion of the fully mechanized excavator, a canopy and wooden stacks should be set according to the situation of the roof to strengthen the support of the roof and improve safety;

进一步的,在步骤5)中综掘机4和二运转载装置3之间根据刷扩的大小要设置成一定的夹角。Further, in step 5), a certain included angle should be set between the fully mechanized excavator 4 and the second-rotation conveying device 3 according to the size of the brush expansion.

进一步的,在所述步骤6)中挑棚支护5和木垛随着皮带机缓冲床2的移动进行安装的。Further, in said step 6), the canopy support 5 and the wooden pile are installed along with the movement of the buffer bed 2 of the belt conveyor.

进一步的,所述挑棚支护5为先将工字钢用铁丝固定在巷道顶板的铁丝网上,然后使用单体支柱注入乳化液承力伸长顶住工字钢。Further, the canopy support 5 is to first fix the I-beam with iron wires on the wire mesh of the roof of the roadway, and then use the single pillar to inject the emulsion to bear the force and elongate to withstand the I-beam.

本发明的优点在于:本发明采用后退式刷扩工艺,即切眼导硐施工结束后,直接把综掘机在原地倒头,皮带机机尾固定在切眼口,缓冲床随综掘机刷扩向前移动进行刷扩,在刷扩的同时分别安装挑棚支护和木垛,并同时进行顶板加固,综掘机刷扩至出发位置,刷扩结束,支护安装结束,成巷结束,后退式刷扩一次成巷,有效解决了切眼刷扩施工中的工期、安全及返工浪费问题,大大提高了工作效率。The advantage of the present invention is that: the present invention adopts the retreat type brush expansion process, that is, after the construction of the eye-cut guide tunnel is completed, the fully-mechanized excavator is directly turned over in situ, the tail of the belt conveyor is fixed on the eye-cut opening, and the buffer bed is brushed with the fully-mechanized excavator. The expansion moves forward to perform brushing, and at the same time of brushing, install the canopy support and wooden stacks respectively, and at the same time reinforce the roof. , The retreat type brush expansion once forms a lane, which effectively solves the problems of construction period, safety and rework waste in the construction of eye cutting brush expansion, and greatly improves the work efficiency.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.

以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: it can still be described in the foregoing embodiments Modifications are made to the recorded technical solutions, or equivalent replacements are made to some of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims (5)

1. a kind of incisor canal retrusive brush expands technique it is characterised in that carrying out as follows:
1) cut eye to lead after cave satisfies the requirements, install that belt conveyer, belt feeder be buffer bed successively, two fortune loading attachments and comprehensive pick Machine, carries out and cuts the preparation before eye leads cave;
2) fully-mechanized digging machine moves forward to carry out cutting eye and leads cave, and according to section width and geological conditions, in tunnel, setting marguise props up Shield, belt feeder buffer bed with fully-mechanized digging machine forward movement, and the h frame of belt conveyer is with supplementing before fully-mechanized digging machine and then forward;
3) cut eye lead cave construction terminate after, by cut eye lead cave formation light section be expanded into design section;
4) tail of belt conveyer is fixed on and cuts eye mouth, remove two fortune loading attachments, by the head spot turn of fully-mechanized digging machine, Start brush and expand construction, after a segment distance, then two fortune loading attachments are installed;
5) fully-mechanized digging machine carries out retrusive brush expansion, and buffer bed expansion with fully-mechanized digging machine brush is moved rearwards by belt feeder, and the h frame of belt feeder is with comprehensive The retrusive movement of pick machine is removed to after-contraction;
6) while fully-mechanized digging machine retrusive brush expands, continue to be respectively mounted outside the marguise supporting of original both sides marguise supporting and Grillage, reinforces to top board, and fully-mechanized digging machine brush expands to homeposition, and brush expansion terminates, and supporting is installed and terminated, and becomes lane to terminate.
2. incisor canal retrusive brush according to claim 1 expands technique it is characterised in that in step 5) in after fully-mechanized digging machine During moving back the expansion of formula brush, strengthening supporting to be carried out to top board according to the situation setting marguise of top board and grillage.
3. incisor canal retrusive brush according to claim 1 expands technique it is characterised in that in step 5) in fully-mechanized digging machine and To be arranged at a certain angle between two fortune rehandling facilities according to the size that brush expands.
4. incisor canal retrusive brush according to claim 1 expands technique it is characterised in that in described step 6) in marguise Supporting and grillage are installed with the buffer bed movement of belt feeder.
5. incisor canal retrusive brush according to claim 1 expands technique it is characterised in that described marguise supporting is first will I-steel iron wire is fixed on the wire gauze of back, then withstands work using individual prop injection emulsion load elongation Word steel.
CN201610864800.7A 2016-09-29 2016-09-29 Retrograde brush expansion process for cut construction Pending CN106351663A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610864800.7A CN106351663A (en) 2016-09-29 2016-09-29 Retrograde brush expansion process for cut construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610864800.7A CN106351663A (en) 2016-09-29 2016-09-29 Retrograde brush expansion process for cut construction

Publications (1)

Publication Number Publication Date
CN106351663A true CN106351663A (en) 2017-01-25

Family

ID=57865752

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610864800.7A Pending CN106351663A (en) 2016-09-29 2016-09-29 Retrograde brush expansion process for cut construction

Country Status (1)

Country Link
CN (1) CN106351663A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143338A (en) * 2017-06-28 2017-09-08 陕西煤业化工技术研究院有限责任公司 A kind of coal mine roadway driving and method for protecting support
CN109519187A (en) * 2018-12-17 2019-03-26 山西中煤华晋能源有限责任公司 Cut a tunneling construction process
CN110748352A (en) * 2019-10-17 2020-02-04 山西晋城无烟煤矿业集团有限责任公司 Construction method suitable for rapid hole cutting and enlarging
CN111691886A (en) * 2020-06-23 2020-09-22 国家能源集团宁夏煤业有限责任公司 Construction method for opening cutting hole by fully-mechanized coal mining machine in fully-mechanized coal mining face
CN113482635A (en) * 2021-07-08 2021-10-08 淮北矿业股份有限公司 Parallel construction method for installing and expanding cutting brush based on stack type support reinforced long-span top plate

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101328809A (en) * 2008-06-25 2008-12-24 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Non-bottom pillar deep hole falling-back type mining method
CN102877847A (en) * 2012-09-24 2013-01-16 山西晋城无烟煤矿业集团有限责任公司 Method for tunneling open-off cut expansion opening section of fully mechanized coal mining face
CN103174448A (en) * 2013-04-15 2013-06-26 辽宁天安矿山科技有限公司 In-time supporting method for roadway fully-mechanized excavating operation
CN103195457A (en) * 2013-04-15 2013-07-10 辽宁天安矿山科技有限公司 Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader
CN103899317A (en) * 2012-12-28 2014-07-02 折俊杰 Work surface expanding excavation method
CN104265319A (en) * 2014-09-15 2015-01-07 中国神华能源股份有限公司 Constructing method of construction cutting hole

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101328809A (en) * 2008-06-25 2008-12-24 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Non-bottom pillar deep hole falling-back type mining method
CN102877847A (en) * 2012-09-24 2013-01-16 山西晋城无烟煤矿业集团有限责任公司 Method for tunneling open-off cut expansion opening section of fully mechanized coal mining face
CN103899317A (en) * 2012-12-28 2014-07-02 折俊杰 Work surface expanding excavation method
CN103174448A (en) * 2013-04-15 2013-06-26 辽宁天安矿山科技有限公司 In-time supporting method for roadway fully-mechanized excavating operation
CN103195457A (en) * 2013-04-15 2013-07-10 辽宁天安矿山科技有限公司 Supporting method for roadway fully-mechanized drivage operation without withdrawal of roadheader
CN104265319A (en) * 2014-09-15 2015-01-07 中国神华能源股份有限公司 Constructing method of construction cutting hole

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143338A (en) * 2017-06-28 2017-09-08 陕西煤业化工技术研究院有限责任公司 A kind of coal mine roadway driving and method for protecting support
CN107143338B (en) * 2017-06-28 2018-12-25 陕西煤业化工技术研究院有限责任公司 A kind of coal mine roadway driving and method for protecting support
CN109519187A (en) * 2018-12-17 2019-03-26 山西中煤华晋能源有限责任公司 Cut a tunneling construction process
CN109519187B (en) * 2018-12-17 2020-02-21 中煤华晋集团有限公司 Construction process for cutting and tunneling
CN110748352A (en) * 2019-10-17 2020-02-04 山西晋城无烟煤矿业集团有限责任公司 Construction method suitable for rapid hole cutting and enlarging
CN111691886A (en) * 2020-06-23 2020-09-22 国家能源集团宁夏煤业有限责任公司 Construction method for opening cutting hole by fully-mechanized coal mining machine in fully-mechanized coal mining face
CN111691886B (en) * 2020-06-23 2021-08-31 国家能源集团宁夏煤业有限责任公司 Construction method for opening cutting hole by fully-mechanized coal mining machine in fully-mechanized coal mining face
CN113482635A (en) * 2021-07-08 2021-10-08 淮北矿业股份有限公司 Parallel construction method for installing and expanding cutting brush based on stack type support reinforced long-span top plate
CN113482635B (en) * 2021-07-08 2024-09-03 淮北矿业股份有限公司 Parallel construction method for installing and expanding hole-cutting brushes based on pile-type support reinforced large-span top plate

Similar Documents

Publication Publication Date Title
CN106351663A (en) Retrograde brush expansion process for cut construction
CN103711504B (en) The propulsion method of shield tunnel section and mining tunnel section binding site in subway tunnel
CN105971628A (en) Temporary supporting method for tunneled roadway
CN111852524A (en) A special hydraulic support group for retracting hydraulic support in fully mechanized coal mining face and its retracting method
CN109594988B (en) Excavation construction method for large-section soft rock tunnel
CN108049882B (en) Shield split starting pushing construction method and pushing device for ultra-small starting well
CN104790997A (en) Self-moving advance temporary supporting hydraulic bracket used for fully-mechanized excavation
CN107035380A (en) A kind of mining TBM retrusives method for dismounting
CN107882569A (en) It is a kind of to carry out driving and assembled shield machine and construction simultaneously
CN203756208U (en) Top beam telescopic driving working face temporary timbering support
CN103615254B (en) A kind of method that sharp radius curve articulated shield machine starts
CN105019903B (en) Integrated support for working face of steeply inclined coal seam and mining method thereof
CN108708724B (en) A method for coal mining by cemented filling and recovering Wangveli coal pillars
CN203756207U (en) Support device for fully-mechanized caving face transport crossheading near goaf section support and coal drawing
CN203756209U (en) Longitudinal-girder staggered temporary support for heading face
CN207014451U (en) A kind of pipeline outer wall notcher
CN114233334A (en) Roadway lapping auxiliary device
CN105781559A (en) Ripping construction method for slope inclined shaft duct entering main tunnel
CN108119173B (en) Self-moving type telescopic front canopy and supporting method thereof
CN206681733U (en) Fully-mechanized digging machine cutterhead protective cover
CN216665635U (en) Roadway lapping auxiliary device
CN108691545B (en) A kind of continuous tunneling construction method of bolting with wire mesh adapting to Complex Roof shape
CN103993899B (en) Suspension roof support support
CN206409254U (en) Adopt Internet device in fully-mechanized mining working compound roof end
LU100382B1 (en) Hydraulic Support for Soil-like Coal Working Face and Coal Seam Mining Protection Method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170125

RJ01 Rejection of invention patent application after publication