CN206409254U - Adopt Internet device in fully-mechanized mining working compound roof end - Google Patents
Adopt Internet device in fully-mechanized mining working compound roof end Download PDFInfo
- Publication number
- CN206409254U CN206409254U CN201621427871.2U CN201621427871U CN206409254U CN 206409254 U CN206409254 U CN 206409254U CN 201621427871 U CN201621427871 U CN 201621427871U CN 206409254 U CN206409254 U CN 206409254U
- Authority
- CN
- China
- Prior art keywords
- graticules
- time
- biplate
- monolithic
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Adopt Internet device in a kind of fully-mechanized mining working compound roof end, belong to Coal Mining Technology field, end can be solved and adopt that network process moves towards steel wire rope and graticules is easily cut off, cause the problem of hydraulic support organic efficiency is low, including some monolithic graticules, some biplate graticules, some tendency steel wire ropes, it is some to move towards steel wire rope and support beam, first time monolithic graticules is fixed on top plate, the long side of second time biplate graticules and the long edge lap of first time monolithic graticules, 3rd time monolithic graticules and second time biplate graticules are overlapped, 4th time biplate graticules and three times monolithic graticules are overlapped, odd number time is single mesh on the net, even numbers time is biplate net on the net, the like, untill the formation of working face passage, being netted since the 4th time tendency steel wire rope is connect along the short side direction of graticules, connect being netted since the 7th time along the long side direction on graticules top and move towards steel wire rope.The utility model creates conditions for the recovery hydraulic support in later stage.
Description
Technical field
The utility model belongs to Coal Mining Technology field, and in particular to adopt online in a kind of fully-mechanized mining working compound roof end
Device.
Background technology
Adopt the steel wire rope that moves towards for being to take and add the structure of double-deck graticules to carry out end in current high-seam working face end
Adopting and standardized, end adopts network process and is mainly the peace for ensureing that hydraulic support is reclaimed after fully-mechanized mining working back production is complete
Entirely, moving towards steel wire rope adds double-deck graticules to be the last excavating technology generally used, but the actual production under special geologic condition
During, there are many deficiencies in this single move towards steel wire rope and double-deck graticules, such as:Move towards steel wire rope and graticules warp
Often it is cut off;Face roof entirety large area is sunk;Roof fall, leakage cash often occur when reclaiming hydraulic support;Reclaim hydraulic pressure branch
Frame it is less efficient, safety coefficient is low.
The content of the invention
The utility model adopts upper network process to solve end of the prior art and moves towards steel wire rope under special geologic condition
Easily it is cut off with graticules, causes the problem of hydraulic support organic efficiency is low to be adopted there is provided a fully-mechanized mining working compound roof end
Internet device.
The utility model adopts the following technical scheme that realization:
Internet device is adopted at a kind of fully-mechanized mining working compound roof end, including some monolithic graticules, some biplate graticules,
Some tendency steel wire ropes, it is some move towards steel wire rope and support beam, first time monolithic graticules is fixed on top plate by anchor pole, the
The long edge lap of the monolithic graticules of long side first time of two times biplate graticules, the long side of the 3rd time monolithic graticules with second time
The long edge lap of biplate graticules, the long side of the 4th time biplate graticules and three times long edge laps of monolithic graticules, odd number time are online
For single mesh, even numbers time is biplate net on the net, the like, untill the formation of working face passage, edge being netted since the 4th time
The short side direction for graticules connects tendency steel wire rope, and the top of tendency steel wire rope is connected with the top that the 4th time is netted long side, from the
Seven times nets start to connect along the long side direction on graticules top and move towards steel wire rope, and working face has been cut after 8 knife coals, often cut later one to
Two knife coals on the back timber of support on a support beam.
The lap width of the long side of second time biplate graticules and first time monolithic graticules is 200mm.
The lap position of the 3rd time monolithic graticules and second time biplate graticules is two short for second time graticules
The center that the top of time monolithic graticules of the central junction line on side, i.e., the 3rd is located at two short sides of second time biplate graticules connects
The lap position of wiring, the 4th time biplate graticules and the 3rd time biplate graticules is the center of two short sides of the 3rd time graticules
The top of time biplate graticules of connecting line, i.e., the 4th is located at the central junction line of two short sides of the 3rd time monolithic graticules, according to
It is secondary to analogize.
The support beam is ∏ types beam or long plate-girder.
The spacing of the tendency steel wire rope is 900mm.
The spacing for moving towards steel wire rope is 300mm.
All graticules short side overlap joints are 500 mm, and the base of orlop net must be caught on during networking.
The beneficial effects of the utility model are as follows:
The utility model solves the problem of roof cracking when online is adopted at end, is that the recovery hydraulic support in later stage creates bar
Part, good effect is have received through practice test, and 5309 working faces split run highest under the conditions of breaking roof reclaimed 12 liquid
Support is pressed, complete 129 hydraulic supports of working face are reclaimed within 6 days.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model support beam connection diagram;
Wherein:First time monolithic graticules of 1-;Second time biplate graticules of 2-;The 3rd time monolithic graticules of 3-;4- is inclined to
Steel wire rope;5- moves towards steel wire rope;6- support beams;7- hydraulic supports.
Embodiment
With reference to accompanying drawing, the utility model is described in further detail.
Internet device is adopted at a kind of fully-mechanized mining working compound roof end, including some monolithic graticules, some biplate graticules,
It is some tendency steel wire ropes, it is some move towards steel wire rope and support beam, first time monolithic graticules 1 is fixed on top plate by anchor pole,
The long edge lap of the monolithic graticules 1 of long side first time of second time biplate graticules 2, the long side of the 3rd time monolithic graticules 3 with
Second time long edge lap of biplate graticules 2, the long side of the 4th time biplate graticules and three times long edge laps of monolithic graticules 3, it is single
Several times are single mesh on the net, and even numbers time is biplate net on the net, the like, untill the formation of working face passage, from the 4th time
Net starts to connect tendency steel wire rope 4, the top for being inclined to steel wire rope 4 and the top for netting long side for the 4th time along the short side direction of graticules
Connection, connects along the long side direction on graticules top being netted since the 7th time and moves towards steel wire rope 5, working face has been cut after 8 knife coals, with
Often cut afterwards one to two knife coal on the back timber of support on a support beam 6.
The lap width of the long side of second time biplate graticules 2 and first time monolithic graticules 1 is 200mm.
The lap position of the 3rd time monolithic graticules 3 and second time biplate graticules 2 is second time graticules 2 two
The top of time monolithic graticules 3 of the central junction line of short side, i.e., the 3rd is located in two short sides of second time biplate graticules 2
The lap position of heart connecting line, the 4th time biplate graticules and the 3rd time biplate graticules 3 is 3 two short sides of the 3rd time graticules
Central junction line, i.e., the center that the top of the 4th time biplate graticules is located at two short sides of the 3rd time monolithic graticules 3 connects
Wiring, the like.
The support beam 6 is ∏ types beam or long plate-girder.
The spacing of the tendency steel wire rope 4 is 900mm.
The spacing for moving towards steel wire rope 5 is 300mm.
All graticules short side overlap joints are 500 mm, and the base of orlop net must be caught on during networking.
Claims (7)
1. Internet device is adopted at a kind of fully-mechanized mining working compound roof end, it is characterised in that:Including some monolithic graticules, Ruo Ganshuan
Piece graticules, some tendency steel wire ropes, some move towards steel wire rope and support beam, first time monolithic graticules(1)It is solid by anchor pole
It is scheduled on top plate, second time biplate graticules(2)The monolithic graticules of long side first time(1)Long edge lap, the 3rd time monolithic
Graticules(3)Long side and second time biplate graticules(2)Long edge lap, the long side of the 4th time biplate graticules and three times monolithics
Graticules(3)Long edge lap, odd number time is single mesh on the net, and even numbers time is biplate net on the net, the like, until working face is logical
Untill road formation, tendency steel wire rope is connect along the short side direction of graticules being netted since the 4th time(4), it is inclined to steel wire rope(4)'s
Top is connected with the top that the 4th time is netted long side, is connect being netted since the 7th time along the long side direction on graticules top and is moved towards steel wire
Rope(5), working face cut after 8 knife coals, often cut later one to two knife coal on the back timber of support on a support beam(6).
2. Internet device is adopted at a kind of fully-mechanized mining working compound roof end according to claim 1, it is characterised in that:Described
Two times biplate graticules(2)Long side and first time monolithic graticules(1)Lap width be 200mm.
3. Internet device is adopted at a kind of fully-mechanized mining working compound roof end according to claim 1, it is characterised in that:Described
Three times monolithic graticules(3)With second time biplate graticules(2)Lap position be second time graticules(2)In two short sides
Time monolithic graticules of heart connecting line, i.e., the 3rd(3)Top be located at second time biplate graticules(2)Two short sides center connect
Wiring, the 4th time biplate graticules and the 3rd time biplate graticules(3)Lap position be the 3rd time graticules(3)Two short sides
Central junction line, i.e., the top of the 4th time biplate graticules is located at the 3rd time monolithic graticules(3)Two short sides center
Connecting line, the like.
4. Internet device is adopted at a kind of fully-mechanized mining working compound roof end according to claim 1, it is characterised in that:The branch
Support beam(6)For ∏ types beam or long plate-girder.
5. Internet device is adopted at a kind of fully-mechanized mining working compound roof end according to claim 1, it is characterised in that:It is described to incline
To steel wire rope(4)Spacing be 900mm.
6. Internet device is adopted at a kind of fully-mechanized mining working compound roof end according to claim 1, it is characterised in that:It is described walk
To steel wire rope(5)Spacing be 300mm.
7. Internet device is adopted at a kind of fully-mechanized mining working compound roof end according to claim 1-6 any one, its feature
It is:All graticules short side overlap joints are 500 mm, and the base of orlop net must be caught on during networking.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621427871.2U CN206409254U (en) | 2016-12-24 | 2016-12-24 | Adopt Internet device in fully-mechanized mining working compound roof end |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621427871.2U CN206409254U (en) | 2016-12-24 | 2016-12-24 | Adopt Internet device in fully-mechanized mining working compound roof end |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206409254U true CN206409254U (en) | 2017-08-15 |
Family
ID=59553249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621427871.2U Active CN206409254U (en) | 2016-12-24 | 2016-12-24 | Adopt Internet device in fully-mechanized mining working compound roof end |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206409254U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108775250A (en) * | 2018-08-10 | 2018-11-09 | 北京天地华泰矿业管理股份有限公司 | Adopt online Lanyard device and equipment recovery method in a kind of end applied to coal mine fully-mechanized mining working |
-
2016
- 2016-12-24 CN CN201621427871.2U patent/CN206409254U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108775250A (en) * | 2018-08-10 | 2018-11-09 | 北京天地华泰矿业管理股份有限公司 | Adopt online Lanyard device and equipment recovery method in a kind of end applied to coal mine fully-mechanized mining working |
CN108775250B (en) * | 2018-08-10 | 2024-02-13 | 北京天地华泰矿业管理股份有限公司 | Last-mining net-surfing rope hanging device applied to fully-mechanized coal mining face and equipment recovery method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102022122B (en) | Support-type comprehensive tunneler | |
CN102777182B (en) | Rapid end extracting method of large mining height working face | |
CN103061771A (en) | Remining mine fully-mechanized coal mining face open-off cut tunneling process and supporting method | |
CN201857975U (en) | Supported comprehensive tunnel boring machine | |
CN105781590A (en) | Technology for disassembling negative rings of TBM (tunnel boring machine) arrival hole | |
CN107178384A (en) | The advanced telescopic cantilever suspension device of tunnelling and its construction method | |
CN109209490A (en) | It adopts bank face and withdraws method in a kind of waste filling auxiliary end | |
CN108222953B (en) | Construction method for U-shaped open shield tunneling machine to pass through nonstandard section of pipe gallery | |
CN206409254U (en) | Adopt Internet device in fully-mechanized mining working compound roof end | |
CN110985083B (en) | Stoping roadway stack type support supporting system and method | |
CN104389605B (en) | A kind of coal-face intensive steel cord shielding withdraws method | |
CN107387139B (en) | Downward dismantling process for large-inclination-angle retracting working surface support | |
CN103527226B (en) | Steeply inclined seam working face shielding and retracing method | |
CN205100527U (en) | A cantilever construction platform for surmounting retaining wall | |
CN203022777U (en) | Shed erection support at underground fork or tunnel opening | |
CN109630050B (en) | Novel working face recovery channel supporting process | |
CN208182248U (en) | A kind of timber stacking knot installation and Wood Transportation system | |
CN206728908U (en) | A kind of frame structure of cage culture | |
CN108502578A (en) | A kind of timber stacking knot installation and Wood Transportation system | |
CN104453966B (en) | Large mining height end is adopted fully-mechanized digging machine and is removed frame passage passing sunk pillars on full frame acnemia canopy construction method | |
CN205204769U (en) | Supplementary overheadhoist of prefabricated fence board | |
CN107130990A (en) | A kind of large-mining-height working surface tears frame method open | |
CN203939521U (en) | Movable drag conveyor is received coal device | |
CN112727509A (en) | Anchor net cable rope supporting method and structure for heavy seam large mining height fully-mechanized mining support withdrawing channel | |
CN208533529U (en) | A kind of fishing device of punching drilling machine pile monkey |