CN203022777U - Shed erection support at underground fork or tunnel opening - Google Patents

Shed erection support at underground fork or tunnel opening Download PDF

Info

Publication number
CN203022777U
CN203022777U CN 201320024322 CN201320024322U CN203022777U CN 203022777 U CN203022777 U CN 203022777U CN 201320024322 CN201320024322 CN 201320024322 CN 201320024322 U CN201320024322 U CN 201320024322U CN 203022777 U CN203022777 U CN 203022777U
Authority
CN
China
Prior art keywords
canopy
shed
legs
fork
erection support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320024322
Other languages
Chinese (zh)
Inventor
周达义
陈全合
刘鹏
杨成华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Panjiang Refined Coal Co Ltd
Original Assignee
Guizhou Panjiang Refined Coal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Panjiang Refined Coal Co Ltd filed Critical Guizhou Panjiang Refined Coal Co Ltd
Priority to CN 201320024322 priority Critical patent/CN203022777U/en
Application granted granted Critical
Publication of CN203022777U publication Critical patent/CN203022777U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a shed erection support at an underground fork or a tunnel opening. The shed erection support comprises a first close-leg shed (3) and a second close-leg shed (4) combined by every two close legs of a U shed (1), and an I-shaped steel beam (5), wherein a wire mesh (7) and wood back plates (8) are laid on the shed top of a temporary U shed (2); and the shed erection support is characterized in that the first close-leg shed (3) is connected with the second close-leg shed (4) through the I-shaped steel beam (5); and the temporary U shed (2) is arranged between the first close-leg shed (3) and the second close-leg shed (4). According to the shed erection support, the compressive capacity of the fork and opening positions can be greatly improved, the shed erection support is widely applied in underground coal mine production, a safe and reliable guarantee is provided for underground important fork repair and long-distance later tunnel advancement, and the shed erection support has safe and practical significance.

Description

The canopy supporting is lifted in fork, down-hole or laneway opening position
Technical field
The utility model relates to novel specification and lifts the canopy supporting and be applied to coal mine down-hole tunnel fork or support technology field, laneway opening position.
Background technology
Along with the pit mining time is longer, mine causes pressing and increases because of the open a mine increase of the degree of depth of coal seam, and the fork, tunnel reprocesses and newly dig in the laneway opening work progress, during roof cracking, when adopting anchor/rope/net supporting, do not reach the design supporting effect, cause potential safety hazard, cause the tunnel to be done over again.Therefore, fork, tunnel or laneway opening position support form are insoluble technical problems.
Summary of the invention
The technical problems to be solved in the utility model:A kind of Novel tunnel fork or laneway opening position supporting are provided, namely lift the canopy supporting, when solve adopting anchor/rope/net supporting, do not reach the technical problem of design supporting effect.
The technical solution of the utility model: a kind ofly lift the canopy supporting for fork, down-hole or laneway opening position, comprise: the U canopy joins legs in twos and is combined into join legs U canopy one and the U canopy two that joins legs, steel I-beam, interim U canopy ceiling arranges wire gauze and plank lagging, the U canopy one that joins legs connects by steel I-beam with the U canopy two that is connected, and interim U canopy is located at the U canopy one and joining legs between U canopy two of joining legs.
Described interim U canopy must exceed join legs U canopy one and U canopy two 300mm that join legs, and interim U canopy canopy distance is 700mm.
Describedly begun by opening or fork side, on the capplce of U canopy one and the U canopy two that joins legs that joins legs, the steel I-beam of 5,4,4,2 group is set respectively successively, every group of steel I-beam spacing 600mm, and use U-shaped canopy canopy to fasten steel I-beam.
The beneficial effects of the utility model: the utility model is lifted the canopy supporting can larger raising fork and aperture position anti-pressure ability, be used widely in the downhole production of colliery, reprocessing and grow apart from tunnel later stage driving for emphasis fork, down-hole provides safety, reliable guarantee, has very safe, practical significance.
Description of drawings
Fig. 1 is aperture position of the present utility model when being designed to anchor rod laneway, aperture position supporting plan view;
Fig. 2 is aperture position of the present utility model when being designed to anchor rod laneway, aperture position supporting sectional drawing;
Fig. 3 is aperture position of the present utility model when being designed to hacking shed tunnel, aperture position supporting plan view;
Fig. 4 is aperture position of the present utility model when being designed to hacking shed tunnel, aperture position supporting sectional drawing.
The specific embodiment:
By reference to the accompanying drawings, when the utility model solve is adopted anchor/rope/net supporting, do not reach the technical problem of design supporting effect, the technical scheme of taking is done following explanation:
Its static mounting structure: ask for an interview accompanying drawing: the utility model is mainly by to canopy one, consist of canopy two, interim canopy, steel I-beam.
Concrete implementation step is as follows:
(1) generally at the fork or the aperture position either side first set up the U canopy 1 that joins legs (specifications and models: the upper clear span of lower clear height *=5.05m*3.1m);
(2) then set up interim U canopy 2 (specifications and models: the upper clear span of lower clear height *=4.5m*3.2m) by frame successively toward U canopy 24 directions that join legs, the canopy distance is 700mm, notice that interim U canopy 2 must exceed the U canopy 300mm that joins legs, after the U canopy 24 of being convenient to join legs sets up, intert steel I-beam 5 on joining legs the U capplce at two groups;
(3) set up the U canopy 24 that joins legs behind U canopy 24 positions of joining legs;
(4) two join legs after U canopy 3,4 establishes, begun by opening or fork side, successively on the U canopy 3 that joins legs, 4 capplces respectively by 5,4,4,2 one group, interspersed the 1st group ~ the 4th group leader 6.2m11# mining i beam beam 5, every group of i iron spacing 600mm, amount to 15, steel I-beam 5 is lifted canopy lap length 500mm with every group, and lap-joint is fixing with a secondary U-shaped canopy canopy card 6, prevent that steel I-beam 5 from sliding, insert between beam with wooden gallows timber interlocking.
(5) after steel I-beam 5 is put on, remove join legs interim U canopy 2 canopy legs between U canopy 3,4 of open side two.
(6) lift on ceiling and to adopt 10# wire gauze 7(specification: long * is wide=3.0m*0.9m) coordinate round log, half round timber and plank lagging 8 to carry on the back to establish tight, and wire gauze 7 lap length are 100mm, and wire gauze 7 lap-joints network with the 12# iron wire; Plank lagging 8 is along lane layout and spacing≤500mm, and empty very useful round log or half round timber are beaten grillage and connect the top.

Claims (3)

  1. One kind be used for fork, down-hole or laneway opening position lift the canopy supporting, comprise: U canopy (1) joins legs in twos and is combined into join legs U canopy one (3) and the U canopy two (4) that joins legs, steel I-beam (5), interim U canopy (2) ceiling arranges wire gauze (7) and plank lagging (8), it is characterized in that: the U canopy one (3) that joins legs connects by steel I-beam (5) with the U canopy two (4) of being connected, and interim U canopy (2) is located at the U canopy one (3) and joining legs between U canopy two (4) of joining legs.
  2. According to claim 1 a kind of for fork, down-hole or laneway opening position lift the canopy supporting, it is characterized in that: interim U canopy (2) must exceed join legs U canopy one (3) and U canopy two (4) 300mm that join legs, interim U canopy (2) canopy distance is 700mm.
  3. 3. according to claim 1ly a kind ofly lift the canopy supporting for fork, down-hole or laneway opening position, it is characterized in that: begun by opening or fork side, the steel I-beam (5) of 5,4,4 and 2 one group is set respectively on the capplce of U canopy one (3) and the U canopy two (4) that joins legs that joins legs successively, every group of steel I-beam (5) spacing 600mm, and use fixedly steel I-beam of U-shaped canopy canopy card (6).
CN 201320024322 2013-01-17 2013-01-17 Shed erection support at underground fork or tunnel opening Expired - Fee Related CN203022777U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320024322 CN203022777U (en) 2013-01-17 2013-01-17 Shed erection support at underground fork or tunnel opening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320024322 CN203022777U (en) 2013-01-17 2013-01-17 Shed erection support at underground fork or tunnel opening

Publications (1)

Publication Number Publication Date
CN203022777U true CN203022777U (en) 2013-06-26

Family

ID=48646768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320024322 Expired - Fee Related CN203022777U (en) 2013-01-17 2013-01-17 Shed erection support at underground fork or tunnel opening

Country Status (1)

Country Link
CN (1) CN203022777U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470275A (en) * 2013-10-16 2013-12-25 中国水利水电第十四工程局有限公司 Method for excavating and supporting large-span level-crossing fork of underground chamber
CN106640148A (en) * 2016-12-27 2017-05-10 山西晋城无烟煤矿业集团有限责任公司 Permanent reinforcing technology for coal mine underwell superhigh tunnel
CN107676111A (en) * 2017-10-23 2018-02-09 洛阳坤宇矿业有限公司 A kind of method for protecting support for the prefabricated steel bracket of well lane engineering

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470275A (en) * 2013-10-16 2013-12-25 中国水利水电第十四工程局有限公司 Method for excavating and supporting large-span level-crossing fork of underground chamber
CN103470275B (en) * 2013-10-16 2015-09-30 中国水利水电第十四工程局有限公司 A kind of large-span underground chamber usual friendship junctions excavation supporting method
CN106640148A (en) * 2016-12-27 2017-05-10 山西晋城无烟煤矿业集团有限责任公司 Permanent reinforcing technology for coal mine underwell superhigh tunnel
CN107676111A (en) * 2017-10-23 2018-02-09 洛阳坤宇矿业有限公司 A kind of method for protecting support for the prefabricated steel bracket of well lane engineering

Similar Documents

Publication Publication Date Title
CN103821087B (en) Prefabricated bridge Steel Space pipe concrete truss combination beams and construction method
CN109210274B (en) Pipe jacking pipeline butt joint device and method
CN103061771B (en) Second mining mine fully mechanized coal face cuts eye driving and supporting method thereof
CN205712137U (en) Foundation pit supporting construction
CN204000830U (en) Merogenesis take-over type sand drain machine
CN203022777U (en) Shed erection support at underground fork or tunnel opening
CN104518473A (en) Suspension protection structure and method of cable box culvert pipeline
CN105090613A (en) Hoisting method of gas pipeline in external wall of super high-rise building
CN204282391U (en) A kind of heel foundation formwork erecting structure
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN108166395A (en) A kind of construction method that beam bridge is built across Business Line
JP4559370B2 (en) Girder erection method by erection gutter from the side of bridge
CN103882883B (en) Tower crane and garage frame post share a foundation construction method
CN204982628U (en) Horizontal drawing cable bridge
CN203891905U (en) Leg-free shed support
CN208619141U (en) A kind of anchor cable bundle branch protection unit
CN209277169U (en) Two bors d's oeuveres bracing members node apparatus
CN206289946U (en) Hoistway operating platform
CN104453966A (en) large mining height end-mining fully-mechanized excavating machine manufacturing removing frame channel collapse column passing leg-less supporting erecting construction method
CN203730041U (en) Suspended air bridge
CN204238220U (en) The concrete construction passage that vertically puts in storage
CN204793909U (en) Insert ground cable support
CN203247592U (en) Building foundation ditch structure
CN203514346U (en) Single underground pipeline transverse lifting and longitudinal picking protection device
CN203613545U (en) Angle steel lattice column for deep foundation pit support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130626

Termination date: 20160117

EXPY Termination of patent right or utility model