CN106346621A - High-efficiency spherical jade drilling device - Google Patents
High-efficiency spherical jade drilling device Download PDFInfo
- Publication number
- CN106346621A CN106346621A CN201610967888.5A CN201610967888A CN106346621A CN 106346621 A CN106346621 A CN 106346621A CN 201610967888 A CN201610967888 A CN 201610967888A CN 106346621 A CN106346621 A CN 106346621A
- Authority
- CN
- China
- Prior art keywords
- motor
- jade
- swingle
- transmission part
- support member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D5/00—Fine working of gems, jewels, crystals, e.g. of semiconductor material; apparatus or devices therefor
- B28D5/02—Fine working of gems, jewels, crystals, e.g. of semiconductor material; apparatus or devices therefor by rotary tools, e.g. drills
- B28D5/021—Fine working of gems, jewels, crystals, e.g. of semiconductor material; apparatus or devices therefor by rotary tools, e.g. drills by drilling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D5/00—Fine working of gems, jewels, crystals, e.g. of semiconductor material; apparatus or devices therefor
- B28D5/0058—Accessories specially adapted for use with machines for fine working of gems, jewels, crystals, e.g. of semiconductor material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D5/00—Fine working of gems, jewels, crystals, e.g. of semiconductor material; apparatus or devices therefor
- B28D5/0058—Accessories specially adapted for use with machines for fine working of gems, jewels, crystals, e.g. of semiconductor material
- B28D5/0082—Accessories specially adapted for use with machines for fine working of gems, jewels, crystals, e.g. of semiconductor material for supporting, holding, feeding, conveying or discharging work
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
The invention discloses a high-efficiency spherical jade drilling device which comprises a machine frame, a first cam, a first motor, a first rotation rod, a first feed hopper, a first pipeline, a support part, a fixed clamp and a movable clamp, wherein the movable clamp can move far away or close to the fixed clamp, a first arc portion is arranged on the fixed clamp, a second arc portion is arranged on the movable clamp, a first push column is further arranged on the machine frame, the tail end of the first push column abuts against the lateral end of the movable clamp, the first cam is arranged on the first rotation rod, a first spring is arranged between the fixed clamp and the movable clamp, a drilling cutter is inserted on the support part, an air cylinder is arranged at the bottom of the support part, a second motor is arranged at the bottom of the support through a motor base and above the air cylinder, the output shaft of the second motor is connected with the drilling cutter, and the air cylinder can push the motor base to slide up and down. The high-efficiency spherical jade drilling device can obviously reduce the labor intensity of workers, effectively guarantee the jade drilling quality and remarkably improve the processing efficiency.
Description
Technical field
The invention belongs to jade manufacture field is and in particular to a kind of drilling equipment of high-effective spherical jade.
Background technology
China is to exploit in the world and using beautiful earliest, most widely national.Jade is rich in the lot of trace of needed by human body
Element, such as zinc, ferrum, copper, manganese, magnesium, cobalt, selenium, chromium, titanium, lithium, calcium, potassium, sodium etc., often wear and use jadeware, to meridians blood vessels
Skin etc. is all beneficial, can play certain health-care effect.
The special molecular structure of jade can produce resonance absorption with human body cell, thus reaching improvement circulation, stimulating cell
The health-care effects such as regeneration, enzymatic activity improve, physiological function recovery.People especially like by multiple spherical jade strings together, so
After wear to neck or wrist, not only attractive in appearance but also health care.In order to by these spherical jade strings together, must be to these spherical jade
Stone is holed, and is then sequentially connected in series the jade of these borings by exquisite rope part.
At present, be typically with manual mode of operation Drilling operation is carried out to these jades so that boring after jade
Second-rate, the labor intensity of operator is very big, and the efficiency processed is not also high.
Content of the invention
For the deficiencies in the prior art, the object of the invention is intended to provide a kind of drilling equipment of high-effective spherical jade, can
Significantly reduce the labor intensity of workman, can effectively ensure that the drilling quality of jade, increase substantially working (machining) efficiency.
For achieving the above object, the present invention adopts the following technical scheme that
A kind of drilling equipment of high-effective spherical jade, including frame, the first cam, the first electricity being fixedly mounted in bottom of the frame
The first swingle that machine is connected with the output shaft of the first motor, the first feed hopper being fixedly mounted in frame, it is arranged on
The lower section of one feed hopper and be connected with the first feed hopper the first pipeline, be arranged on support member below the first pipeline, described
The top of support member is provided with fixation clamp, and the relative position of described fixation clamp is movably installed with activity folder, and described activity folder can
Be relatively fixed folder do away from or near motion, described fixation clamp is provided with the first curved portions, described activity folder is provided with
The second curved portions matching with the first curved portions, described frame is also equipped with the first promotion post, described first promotion post
The side phase that end is pressed from both sides with activity is supported, and described first cam is arranged on the first swingle, and the rotary motion of the first cam
The first promotion post can be promoted towards near the motion of the direction of fixation clamp, between described fixation clamp and activity folder, the first bullet is installed
Spring, described support member is fitted with drilling tool, and described support member is provided with the chamber for drilling tool plug-in mounting, described support
The bottom of part is provided with cylinder, and the bottom of described support member is provided with the second motor by motor cabinet above cylinder, described
The output shaft of the second motor is connected with drilling tool, and the expansion link of described cylinder is fixedly connected with motor cabinet, described motor cabinet
On be provided with the first slide block, described support member is provided with the first chute sliding up and down for the first slide block.
Second promotion post is also equipped with described frame, the end of described second promotion post is offseted with the side of support member
Top, described first swingle is also equipped with the second cam, the rotary motion of described second cam can promote the second promotion post court
Near the motion of the direction of support member, described support member is provided with the second slide block, described frame is provided with for the second slide block
The second chute horizontally slipping, is provided with second spring between described support member and frame;The bottom of described first feed hopper can
It is rotatably mounted rotation dish, described rotation dish is provided with multiple material holes, the bottom of described rotation dish is provided with the second rotation
Bar, the bottom of described frame is also equipped with the 3rd motor, and the output shaft of described 3rd motor is connected with the second swingle.
The top of described first feed hopper is connected with casing, and the top of described casing is provided with first charging aperture, described case
The bottom of body is provided with second charging aperture, and described second charging aperture is connected with the first feed hopper, and the top of described casing is installed
There is trachea, the side wall of described casing being installed having heaters, being provided with the jade for dropping at first charging aperture in described casing
Stone is delivered to the conveyer device at second charging aperture.
The first transmission part that described conveyer device includes being sequentially arranged in casing from top to bottom, the second transmission part and
3rd transmission part, the conveying direction of described first transmission part and the second transmission part is contrary, described first transmission part and
The conveying direction of the 3rd transmission part is identical, and the top of described first transmission part is corresponding with first charging aperture, and the described 3rd
The end of transmission part is corresponding with second charging aperture.
At described first charging aperture, second pipe is installed, described second pipe is communicated with the 3rd pipeline, the described 3rd
Second feed hopper is communicated with pipeline, is provided with described 3rd pipeline and can do the first plate moving left and right by relative its, described
The right-hand member of the first plate is fixedly connected with the 3rd promotion post, and the right-hand member of described 3rd promotion post is fixedly connected with the second plate, institute
State and the 3rd swingle is rotatably mounted with frame, described 3rd swingle is provided with for promoting the second plate relative to
Three pipelines do the 3rd cam moving left and right, and the rotary work of described 3rd swingle is driven by power set.
Described power set include the 4th that rack-mounted 4th motor is connected with the output shaft of the 4th motor
Swingle, the first drive being arranged on the 4th swingle, the second drive being arranged on the 3rd swingle, described first
Drive and the second drive are in transmission connection by driving-chain.
The present invention has the beneficial effects that:
The setting by said structure for the present invention, spherical jade hole to be drilled enters in the first feed hopper, then from first pipe
Fall at road on support member, then start the first motor, the first motor can drive the rotary motion of the first swingle, the first rotation
The rotary motion of bull stick can drive the synchronous rotary of the first cam, the rotary motion of the first cam can drive the first promotion post towards
Near the direction motion of activity folder and fixation clamp, finally drive activity folder towards near the motion of the direction of fixation clamp, living by jade
Can be clamped under the mating reaction of dynamic folder and fixation clamp, then start the second motor, drive the rotation of drilling tool, then start
Cylinder, drives the second motor and drilling tool to move upwardly together, that is, drilling tool while rotating also do to
Upper motion, is finally completed the boring work to jade, and thus, the present invention can significantly reduce the labor intensity of workman, can effectively protect
The drilling quality of card jade, increases substantially working (machining) efficiency.
Brief description
Fig. 1 is the schematic front view of the present invention first feed hopper (including the first feed hopper) following positional structure;
Fig. 2 is the local overlooking schematic diagram in Fig. 1;
Fig. 3 is the schematic front view of the above positional structure of the present invention first feed hopper.
Wherein, 1, frame;2nd, the first cam;3rd, the first motor;4th, the first swingle;5th, the first feed hopper;6th, first pipe
Road;7th, support member;8th, fixation clamp;9th, activity folder;10th, the second curved portions;11st, the first curved portions;12nd, the first promotion post;13rd,
One spring;14th, drilling tool;15th, cylinder;16th, motor cabinet;17th, the second motor;18th, the first chute;19th, the first slide block;20、
Second promotion post;21st, the second cam;22nd, the second slide block;23rd, second spring;24th, rotation dish;25th, expect hole;26th, first baffle;
27th, the second swingle;28th, the 3rd motor;29th, casing;30th, first charging aperture;31st, second charging aperture;32nd, trachea;33rd, heat
Device;34th, the first transmission part;35th, the second transmission part;36th, the 3rd transmission part;37th, second pipe;38th, the 3rd pipeline;
39th, the second feed hopper;40th, the first plate;41st, the 3rd promotion post;42nd, the second plate;43rd, the 3rd swingle;44th, the 3rd is convex
Wheel;45th, the 4th motor;46th, the 4th swingle;47th, the first drive;48th, the second drive;49th, driving-chain;50th, installing plate;
51st, screw;52nd, collar;53rd, fairlead;54th, cleaning brush;55th, second baffle;56th, the 3rd spring.
Specific embodiment
Below, in conjunction with accompanying drawing and specific embodiment, the present invention is described further:
In order to more clearly show the structure chart of the present invention, therefore the position of the first feed hopper more than 5 is carried out separate drafting, in reality
When border is installed, only casing 29 need to be placed on the first feed hopper 5 it is ensured that second charging aperture 31 is connected with the first feed hopper 5
?.
As Figure 1-3, be a kind of high-effective spherical jade of the present invention drilling equipment, including frame 1, the first cam 2,
The first swingle 4 that the first motor 3 being fixedly mounted on frame 1 bottom is connected with the output shaft of the first motor 3, fixing
The first feed hopper 5 being arranged in frame 1, the lower section being arranged on the first feed hopper 5 and be connected with the first feed hopper 5 first
Pipeline 6, it is arranged on the support member 7 of the first pipeline 6 lower section, the top of described support member 7 is provided with fixation clamp 8, described fixation clamp 8
Relative position be movably installed with activity folder 9, described activity folder 9 can be relatively fixed folder 8 do away from or near motion, described
First curved portions 11 are provided with fixation clamp 8, described activity folder 9 is provided with the second arc matching with the first curved portions 11
Portion 10, described frame 1 is also equipped with the first promotion post 12, the end of described first promotion post 12 and the side phase of activity folder 9
Support, described first cam 2 is arranged on the first swingle 4, and the rotary motion of the first cam 2 can promote the first promotion post 12
Towards near the motion of the direction of fixation clamp 8, between described fixation clamp 8 and activity folder 9, first spring 13, described support member are installed
It is fitted with drilling tool 14 on 7, described support member 7 is provided with the chamber for drilling tool 14 plug-in mounting, the bottom of described support member 7
Portion is provided with cylinder 15, and the bottom of described support member 7 is provided with the second motor 17, institute by motor cabinet 16 above cylinder 15
The output shaft stating the second motor 17 is connected with drilling tool 14, and the expansion link of described cylinder 15 is fixedly connected with motor cabinet 16,
First slide block 19 is provided with described motor cabinet 16, described support member 7 is provided with first sliding up and down for the first slide block 19
Chute 18.
Spherical jade hole to be drilled enters in the first feed hopper 5, then falls on support member 7 at the first pipeline 6,
Then start the first motor 3, the first motor 3 can drive the rotary motion of the first swingle 4, the rotary motion of the first swingle 4
The synchronous rotary of the first cam 2 can be driven, the rotary motion of the first cam 2 can drive the first promotion post 12 towards near activity folder
9 and fixation clamp 8 direction motion, finally drive activity folder 9 towards near fixation clamp 8 direction motion, jade activity folder 9 Hes
Can be clamped under the mating reaction of fixation clamp 8, then start the second motor 17, drive the rotation of drilling tool 14, then start
Cylinder 15, drives the second motor 17 and drilling tool 14 to move upwardly together, that is, drilling tool 14 is while rotating
Also move upwards doing, be finally completed the boring work to jade.
Jade can be preferably clamped by the first curved portions 11 and the second curved portions 10, in actual fabrication, can be
The side setting clip tooth portion of one curved portions 11 and the second curved portions 10, preferably can be clamped work to jade.Fixation clamp 8 He
Activity folder 9 can be installed by installing plate 50, and installing plate 50 can be arranged in frame 1 by screw 51.Fixation clamp 8 and activity
Folder 9 can be arranged on installing plate 50 by collar 52.
Second promotion post 20, the end of described second promotion post 20 and the side of support member 7 are also equipped with described frame 1
Mutually support, described first swingle 4 is also equipped with the second cam 21, the rotary motion of described second cam 21 can promote second
Promote post 20 towards near the motion of the direction of support member 7, described support member 7 is provided with the second slide block 22, described frame 1 sets
It is equipped with the second chute (not shown) horizontally slipping for the second slide block 22, between described support member 7 and frame 1, be provided with
Two springs 23, one end of described second spring 23 is arranged on support member 7, and the other end of described second spring 23 is arranged on frame
On 1;The bottom of described first feed hopper 5 is rotatably mounted with rotation dish 24, and described rotation dish 24 is provided with multiple material holes
25, the bottom of described rotation dish 24 is provided with the second swingle 27, and the bottom of described frame 1 is also equipped with the 3rd motor 28, institute
The output shaft stating the 3rd motor 28 is connected with the second swingle 27.The quantity in material hole 25 is multiple, along in rotation dish 24
Heart line circumference is arranged.
After jade is fallen into the first feed hopper 5, start the 3rd motor 28, drive the rotation of rotation dish 24, jade will fall
Drop down onto in material hole 25, when expecting that hole 25 rotates the position to the first pipeline 6, jade falls in the first pipeline 6 at material hole 25.
The size of the big I in material hole 25 and jade matches.In addition, first can be arranged above the corresponding rotation dish 24 of the first pipeline 6
Baffle plate 26, can effectively prevent jade from directly falling in the first pipeline 6.3rd motor 28 can be set to motor, controls
Jade enters the interval time in the first pipeline 6, so can facilitate jade entering in the first pipeline 6 one by one, carry out
Boring.
After jade completes boring work, in the presence of second spring 23, activity folder 9 starts to reset, then convex second
Under the turning effort of wheel 21, the second promotion post 20 can be promoted to move so that support member 7 occurs laterally towards the direction of support member 7
Mobile, the jade after boring just falls down from support member 7, can arrange catcher in the lower section of support member 7, after boring
Jade is collected.
In actual fabrication, the first cam 2 can be set, the second cam 21, first promotes post 12 and the second promotion post 20
Size, to realize above-mentioned functions.First promotion post 12 and the second promotion post 20 can be set to length adjustable, i.e. its length
Degree can carry out length regulation according to the actual requirements.
First promotion post 12 and the second promotion post 20 can be arranged in frame 1 by fairlead 53.Frame 1 may include correspondence
Installed part (not shown) at the position of support member 7, the second chute may be provided on this installed part, so can achieve and props up
Transverse shifting in frame 1 for the support member 7.
The top of described first feed hopper 5 is connected with casing 29, and the top of described casing 29 is provided with first charging aperture 30,
The bottom of described casing 29 is provided with second charging aperture 31, and described second charging aperture 31 is connected with the first feed hopper 5, described case
The top of body 29 is provided with trachea 32, and having heaters 33 installed by the side wall of described casing 29, be provided with described casing 29 for
The jade dropping at first charging aperture 30 is delivered to the conveyer device at second charging aperture 31.
Heater 33 is equipment of the prior art, the temperature in casing 29 can be increased to 30-40 degree Celsius.Through adding
Jade after heat, can be ready for its boring work, significantly improves the drilling effect of jade, keeps preferable gloss appearance.
Dampness after heating in casing 29 can be discharged from trachea 32, effectively plays the effect of dehumidifying.
Described conveyer device includes the first transmission part 34, the second transport part being sequentially arranged in casing 29 from top to bottom
Part 35 and the 3rd transmission part 36, the conveying direction of described first transmission part 34 and the second transmission part 35 is contrary, and described the
One transmission part 34 is identical with the conveying direction of the 3rd transmission part 36, and the top of described first transmission part 34 and first feeds
Mouth 30 is corresponding, and the end of described 3rd transmission part 36 and second charging aperture 31 are corresponding.As shown in figure 3, the second transport part
The right-hand member of part 35 can accept the jade dropping from the end of the first transmission part 34, the left end of the 3rd transmission part 36 can accept from
The jade dropping in the end of the second transmission part 35.
First transmission part 34, the second transmission part 35 and the 3rd transmission part 36 can be equipment of the prior art,
Enable the lateral transfer of jade.
In the presence of the first transmission part 34, the second transmission part 35 and the 3rd transmission part 36, can significantly extend
The time of staying in casing 29 for the jade, also can increase the attaching space of the air in jade and casing 29, so that jade
More sufficient heating and dehumidifying can be obtained.
Furthermore it is possible to install cleaning brush 54 above the first transmission part 34, jade preferably can be scrubbed, be protected
The cleannes of card jade.
Second pipe 37 is installed at described first charging aperture 30, described second pipe 37 is communicated with the 3rd pipeline 38,
Second feed hopper 39 is communicated with described 3rd pipeline 38, is provided with described 3rd pipeline 38 and relatively it can do and move left and right
First plate 40, the right-hand member of described first plate 40 is fixedly connected with the 3rd promotion post 41, the right-hand member of described 3rd promotion post 41
It is fixedly connected with the second plate 42, described frame 1 is rotatably mounted with the 3rd swingle 43, on described 3rd swingle 43
It is provided with for promoting the second plate 42 the 3rd pipeline 38 relatively to do the 3rd cam 44 moving left and right, described 3rd swingle 43
Rotary work driven by power set.
After jade falls into the 3rd pipeline 38 from the second feed hopper 39, the 3rd swingle 43 can be driven by power set
Rotary motion, and then drive the 3rd cam 44 rotary motion, thus promoting moving left and right of the second plate 42, finally can be by jade
Stone pushes to second pipe 37 from the 3rd pipeline 38, under gravity, falls on the first transmission part 34.
In addition, being installed with second baffle 55 in the outer right wall of the 3rd pipeline 38, described second baffle 55 and second
It is connected with the 3rd spring 56 between plate 42.In the presence of the 3rd spring 56, the second plate 42 and the first plate 40 can be facilitated
Reset work.
The relevant parameter of the 3rd cam 44 of the present invention, the length of the 3rd promotion post 41, second pipe 37 and the 3rd pipeline
The length value of 38 delivery position can be designed by actual size.
The 4th motor 45 that described power set include being arranged in frame 1 is connected with the output shaft of the 4th motor 45
The 4th swingle 46, the first drive 47 being arranged on the 4th swingle 46, be arranged on the 3rd swingle 43 second
Drive 48, described first drive 47 and the second drive 48 are in transmission connection by driving-chain 49.
The operation principle of power set is: starts the 4th motor 45, can drive the 4th swingle 46 and the first drive 47
Rotation, and then drive the second drive 48 rotation, finally drive the 3rd swingle 43 rotation.
For a person skilled in the art, can technical scheme as described above and design, make other each
Plant corresponding change and deform, and all these changes and deforms the protection model that all should belong to the claims in the present invention
Within enclosing.
Claims (5)
1. a kind of drilling equipment of high-effective spherical jade it is characterised in that: include frame, the first cam, be fixedly mounted on frame
The first swingle that the first motor on bottom is connected with the output shaft of the first motor, first being fixedly mounted in frame
Feed hopper, the first pipeline being arranged on the lower section of the first feed hopper and being connected with the first feed hopper, it is arranged under the first pipeline
The support member of side, the top of described support member is provided with fixation clamp, and the relative position of described fixation clamp is movably installed with activity
Folder, described activity folder can be relatively fixed folder do away from or near motion, described fixation clamp is provided with the first curved portions, described
It is provided with, on activity folder, the second curved portions matching with the first curved portions, described frame is also equipped with the first promotion post, institute
The side phase of the end and activity folder of stating the first promotion post is supported, and described first cam is arranged on the first swingle, and first
The rotary motion of cam can promote the first promotion post to move towards near the direction of fixation clamp, between described fixation clamp and activity folder
First spring is installed, described support member is fitted with drilling tool, described support member is provided with for drilling tool plug-in mounting
Chamber, the bottom of described support member is provided with cylinder, and the bottom of described support member is provided with by motor cabinet above cylinder
Second motor, the output shaft of described second motor is connected with drilling tool, and the expansion link of described cylinder is fixing with motor cabinet even
Connect, described motor cabinet is provided with the first slide block, described support member is provided with the first chute sliding up and down for the first slide block.
2. high-effective spherical jade as claimed in claim 1 drilling equipment it is characterised in that: the top of described first feed hopper
It is connected with casing, the top of described casing is provided with first charging aperture, and the bottom of described casing is provided with second charging aperture, described
Second charging aperture is connected with the first feed hopper, and the top of described casing is provided with trachea, and the side wall of described casing is provided with and adds
Hot device, is provided with described casing for the jade dropping at first charging aperture is delivered to the conveying dress at second charging aperture
Put.
3. high-effective spherical jade as claimed in claim 2 drilling equipment it is characterised in that: described conveyer device is included from upper
To under be sequentially arranged at the first transmission part in casing, the second transmission part and the 3rd transmission part, described first transport part
The conveying direction of part and the second transmission part is contrary, and the conveying direction of described first transmission part and the 3rd transmission part is identical,
The top of described first transmission part is corresponding with first charging aperture, the end of described 3rd transmission part and second charging aperture phase
Corresponding.
4. high-effective spherical jade as claimed in claim 2 drilling equipment it is characterised in that: at described first charging aperture install
There is second pipe, described second pipe is communicated with the 3rd pipeline, described 3rd pipeline is communicated with the second feed hopper, described
It is provided with three pipelines and can do the first plate moving left and right by relative its, the right-hand member of described first plate is fixedly connected with the 3rd and pushes away
Dynamic post, the right-hand member of described 3rd promotion post is fixedly connected with the second plate, and described frame is rotatably mounted with the 3rd rotation
Bar, described 3rd swingle is provided with for promoting the second plate to do, relative to the 3rd pipeline, the 3rd cam moving left and right, institute
The rotary work stating the 3rd swingle is driven by power set.
5. high-effective spherical jade as claimed in claim 4 drilling equipment it is characterised in that: described power set include install
The 4th swingle that is connected with the output shaft of the 4th motor in the 4th motor in frame, it is arranged on the 4th swingle
First drive, the second drive being arranged on the 3rd swingle, described first drive and the second drive pass through transmission
Chain conveyer connects.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610967888.5A CN106346621A (en) | 2016-11-05 | 2016-11-05 | High-efficiency spherical jade drilling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610967888.5A CN106346621A (en) | 2016-11-05 | 2016-11-05 | High-efficiency spherical jade drilling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106346621A true CN106346621A (en) | 2017-01-25 |
Family
ID=57864792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610967888.5A Pending CN106346621A (en) | 2016-11-05 | 2016-11-05 | High-efficiency spherical jade drilling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106346621A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107042592A (en) * | 2017-06-16 | 2017-08-15 | 龚俏枚 | A kind of pearl drilling equipment for being easy to clean |
CN112517198A (en) * | 2020-10-23 | 2021-03-19 | 甘肃明珠矿业有限责任公司 | Multistage crushing and screening device for processing barite raw ore and using method thereof |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006001066A (en) * | 2004-06-16 | 2006-01-05 | Yamato Shoko Kk | Drilling machine for coral sphere |
CN202750630U (en) * | 2012-09-27 | 2013-02-27 | 中山市百德富肠衣有限公司 | Casing cutting device of casing shrinkage machine |
CN103707423A (en) * | 2013-11-29 | 2014-04-09 | 灵璧县灵磁新材料有限公司 | Magnet boring machine tool |
CN104473393A (en) * | 2014-11-19 | 2015-04-01 | 浙江大学 | Pearl drilling-threading integrated device |
CN104802324A (en) * | 2015-04-19 | 2015-07-29 | 谢洁萍 | Drilling device of spherical jade |
CN204765257U (en) * | 2015-08-03 | 2015-11-18 | 江先庆 | Improved generation walnut shelled device |
CN105476202A (en) * | 2015-12-28 | 2016-04-13 | 东莞市汇腾智能设备科技有限公司 | Full-automatic spherical material perforating machine |
CN105538367A (en) * | 2016-02-16 | 2016-05-04 | 刘丽华 | Improved potato slicer |
CN105698510A (en) * | 2014-11-28 | 2016-06-22 | 天津北方宇良科技有限公司 | Drying cellarage with waste recovery device |
CN105690577A (en) * | 2016-03-13 | 2016-06-22 | 谢森涛 | Punching device of spherical jade |
-
2016
- 2016-11-05 CN CN201610967888.5A patent/CN106346621A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006001066A (en) * | 2004-06-16 | 2006-01-05 | Yamato Shoko Kk | Drilling machine for coral sphere |
CN202750630U (en) * | 2012-09-27 | 2013-02-27 | 中山市百德富肠衣有限公司 | Casing cutting device of casing shrinkage machine |
CN103707423A (en) * | 2013-11-29 | 2014-04-09 | 灵璧县灵磁新材料有限公司 | Magnet boring machine tool |
CN104473393A (en) * | 2014-11-19 | 2015-04-01 | 浙江大学 | Pearl drilling-threading integrated device |
CN105698510A (en) * | 2014-11-28 | 2016-06-22 | 天津北方宇良科技有限公司 | Drying cellarage with waste recovery device |
CN104802324A (en) * | 2015-04-19 | 2015-07-29 | 谢洁萍 | Drilling device of spherical jade |
CN204765257U (en) * | 2015-08-03 | 2015-11-18 | 江先庆 | Improved generation walnut shelled device |
CN105476202A (en) * | 2015-12-28 | 2016-04-13 | 东莞市汇腾智能设备科技有限公司 | Full-automatic spherical material perforating machine |
CN105538367A (en) * | 2016-02-16 | 2016-05-04 | 刘丽华 | Improved potato slicer |
CN105690577A (en) * | 2016-03-13 | 2016-06-22 | 谢森涛 | Punching device of spherical jade |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107042592A (en) * | 2017-06-16 | 2017-08-15 | 龚俏枚 | A kind of pearl drilling equipment for being easy to clean |
CN107042592B (en) * | 2017-06-16 | 2019-04-12 | 合肥多智科技开发有限公司 | One kind being convenient for clean pearl drilling equipment |
CN112517198A (en) * | 2020-10-23 | 2021-03-19 | 甘肃明珠矿业有限责任公司 | Multistage crushing and screening device for processing barite raw ore and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106346621A (en) | High-efficiency spherical jade drilling device | |
CN204075216U (en) | A kind of metal injection molding blank catalysis degreasing device | |
CN205852893U (en) | A kind of Herba Anoectochili roxburghii rhizome cutting device | |
CN201523626U (en) | Environment-friendly energy-saving sesame seed cake furnace | |
CN108870879A (en) | A kind of drying system | |
CN205192198U (en) | Loquat jasmine tea drying -machine | |
CN106393449A (en) | Improved drilling device for spherical jade | |
CN202697574U (en) | Corn baking box | |
CN106313348A (en) | Improved sphericaljade drilling device | |
CN208485245U (en) | A kind of organic fertilizer has the transmission device of drying function | |
CN106820922B (en) | Garlic peeling and mashed garlic processing integrated machine | |
CN207093406U (en) | A kind of manually guided blower | |
CN208450179U (en) | Station is used in a kind of production of crispy spring pigeon | |
CN203683467U (en) | Device for coproducing cedar oil and machine-made carbon | |
CN204874606U (en) | Normalizing system of drilling tool | |
CN201500025U (en) | Automatic rotating barbecue fork | |
CN201557649U (en) | Invisible zipper automatic zipping device | |
CN204799618U (en) | Dust exhaust dust absorption processing apparatus in green manufacturing | |
CN203762427U (en) | Energy-saving type shoe upper and shoe tree drying machine | |
CN209391041U (en) | A kind of high-efficient mushroom shaping grillING device | |
CN207481291U (en) | A kind of bamboo charcoal mechanical pressing device for facilitating discharging | |
CN209436152U (en) | Oblique milling formula is convenient for the equipment for extracting fish brain | |
CN203058263U (en) | Heat pump tobacco flue-curing device | |
CN204737945U (en) | Portable yellow rice wine steamed rice device | |
CN107062877A (en) | A kind of Chinese medicine dryer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170125 |