CN106339554A - 一种基坑开挖引起邻近既有地铁隧道位移的计算方法 - Google Patents

一种基坑开挖引起邻近既有地铁隧道位移的计算方法 Download PDF

Info

Publication number
CN106339554A
CN106339554A CN201610757176.0A CN201610757176A CN106339554A CN 106339554 A CN106339554 A CN 106339554A CN 201610757176 A CN201610757176 A CN 201610757176A CN 106339554 A CN106339554 A CN 106339554A
Authority
CN
China
Prior art keywords
tau
tunnel
foundation pit
displacement
unit symbol
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610757176.0A
Other languages
English (en)
Other versions
CN106339554B (zh
Inventor
魏纲
赵城丽
林雄
朱田宇
陆世杰
宋宥整
许奎鑫
张鑫海
黄文�
王彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201610757176.0A priority Critical patent/CN106339554B/zh
Publication of CN106339554A publication Critical patent/CN106339554A/zh
Application granted granted Critical
Publication of CN106339554B publication Critical patent/CN106339554B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Civil Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Architecture (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明提供一种基坑开挖引起邻近既有地铁隧道位移的计算方法,具体包括如下步骤:先建立计算模型,进行坑底卸荷分析,再进行基坑侧壁卸荷分析,最后通过利用叠加原理,得到由基坑坑底和四周侧壁产生的卸荷应力,所引起的隧道外侧某一点(x1,y1,z1)的水平总位移Sx与竖向总位移Sz;为精确计算在基坑坑底荷载与四周侧壁荷载作用下所引起的隧道外侧位移,取朝向基坑侧的半侧隧道,均分若干个点,分别计算这若干个点的位移值,最后取平均位移值作为隧道位移值。因此施工前可通过本发明方法对具体工程的施工进行模拟,计算出指定工况下的地铁隧道位移大小,若隧道超过相应允许值,可调整相关施工参数进行试算,直至达到安全标准。

Description

一种基坑开挖引起邻近既有地铁隧道位移的计算方法
技术领域
本发明涉及一种基坑开挖引起邻近既有地铁隧道位移的计算方法,属于地下工程技术领域。
背景技术
(1)前人或考虑了四周坑壁应力释放作用。由于Mindlin解只适用于弹性半空间体,基坑开挖后,只能计算邻近隧道侧的坑壁应力所引起的位移;远离隧道一侧的坑壁应力由于不能通过土体(已挖除)传递,是无法计算的。因此从计算方法方面分析,考虑四周坑壁应力是有问题。
(2)或仅考虑邻近隧道一侧的坑壁应力。从理论上分析,只考虑一侧的坑壁应力,会导致隧道位移和影响范围的增加,因此也不合理。
(3)或均将基坑开挖产生的侧壁附加应力等效为三角形荷载,大小为:
K0γz
式中:K0为静止土压力系数;
γ为土的重度,单位符号为kN/m3
z为计算点离地面的竖向距离,单位符号为mm。
该方法没有考虑基坑围护结构的支撑作用,导致侧壁附加应力偏大。
(4)或均将基坑开挖产生的坑底土体应力释放等效为向上的矩形均布荷载,大小为:
Γd;
式中:d为基坑开挖深度,单位符号为mm。
该假设条件仅适用于基坑底部以下没有围护结构的工况。
而大多数基坑底部以下有围护结构,没有考虑基坑底部围护结构的遮拦效应,即基坑底部的等效荷载是无法直接作用到邻近隧道上的。
(5)或均将隧道结构视为弹性地基无限长梁,仅假设一侧有土体弹簧作用。
隧道在土体中受到四周围压作用,即上、下、左、右均应有土体弹簧,而不是仅一侧有。因此隧道并非产生整体水平移动,其表面位移均不相同,而现有方法无法计算隧道的水平向收敛值。
发明内容
随着城市地铁隧道的开发与利用,带动了沿线地区的房产建设,造成基坑越来越靠近地铁隧道。
基坑开挖卸荷引起的土体变形必然会带动隧道结构产生位移,过大位移会影响隧道结构的稳定,从而影响地铁列车的正常运营。
因此,对基坑开挖引起的邻近既有地铁隧道的位移预测具有重要意义。
本发明专利通过建立简化的基坑开挖力学计算模型,并考虑基坑围护结构的影响,采用Mindlin解,推导出基坑坑底与坑壁卸荷引起的邻近既有隧道位移的计算公式。
为了达到上述的目的,本发明采用了以下的技术方案:
提供一种基坑开挖引起邻近既有地铁隧道位移的计算方法,考虑到:
(1)基坑开挖时有围护结构保护(包括井壁和内支撑或外支撑),因此不会全部卸载;基坑开挖产生的侧壁等效附加应力计算公式是应乘以一个折减系数β,其中:β为基坑围护结构的应力损失率,等于最终释放的侧壁应力与初始侧壁应力的比值,β<1;
则等效荷载变为:βK0γz;
应考虑四个侧壁的共同作用,令四个侧壁的β值相同;
(2)由于盾构隧道刚度较大,靠近隧道侧的基坑土体应力释放引起的盾构隧道表面处的土体水平位移S1(朝向基坑侧),要远大于隧道水平位移S;
隧道的刚度作用,假设为有弹簧拉住了盾构隧道表面处的土体,或是对隧道表面处的土体施加了一个反向作用力,使其产生一个反向的位移S2(远离隧道侧);
两者叠加,最终结果是导致隧道水平位移影响范围和隧道最大水平位移值,均小于盾构隧道表面处的土体S1;
(3)本专利在计算基坑围护结构底部平面处土体的残余应力的同时,还考虑力在向下传递时围护结构侧壁的摩阻力影响;
(4)本专利将计算邻近基坑侧的半个隧道表面的位移值,具体分析隧道的位移变化,得到隧道的水平向收敛值;
具体包括如下步骤:
步骤1)、建立计算模型:(计算模型见图1)
基坑的四个侧壁的编号分别为①、②、③和④;
基坑长度L,单位符号为mm;
基坑宽度B,单位符号为mm;
离基坑中心点o的横向水平距离为x,以o点到侧壁①为正,单位符号为mm;
离o点的纵向水平距离为y,以o点到侧壁③为正,单位符号为mm;
基坑开挖面底部到基坑围护结构底面的距离d0,单位符号为mm;
开挖面与隧道的最小净距离s,单位符号为mm;
基坑围护结构深度H,H=d+d0,单位符号为mm;
地面到隧道底部的竖向距离h,单位符号为mm;
隧道外径D,单位符号为mm;
计算假定:
(1)土体为均质、弹性半空间体,隧道纵轴线方向平行于矩形基坑的长边;
(2)不考虑基坑开挖的时间和空间因素,不考虑降水;
(3)当基坑开挖到坑底时会导致土体应力释放,转化为在坑底平面处施加竖直向上的均布荷载γd;
(4)基坑四周侧壁在开挖后会产生应力释放,等效为在侧壁施加向坑内的三角形水平向分布荷载βK0γz;
(5)不考虑隧道存在对土体附加应力计算的影响;
(6)通过考虑远离隧道侧的基坑侧壁释放应力,来代替隧道刚度作用;
步骤2)、坑底卸荷分析:
由于基坑底部围护结构的保护作用,形成遮拦效应,故坑底释放的应力会受到围护结构产生的侧摩阻力影响,该侧摩阻力计算公式为:
qs=c+K0σztanφ;
式中:
qs为单位等效实体侧摩阻力,单位符号为Pa;
c为土的粘聚力,单位符号为Pa;
σz为基坑坑底到围护结构底的任意面处的土应力,单位符号为Pa;
φ为土的内摩擦角,单位符号为°;
根据实际工况,改为平均侧摩阻力计算公式为:
qs1=c+1/2(γd+γH)K0tanφ;
式中:
qs1平均单位侧摩阻力,单位符号为Pa;
如图2所示,则基坑围护结构底面水平平面处土体受到的等效荷载为:
式中:
σ为基坑围护结构底面水平平面处土体受到的等效荷载,单位符号为Pa;
α为残余应力系数;
由Mindlin竖向荷载的基本位移解,通过积分,在围护结构底面处水平面上某点(ξ,η)的单位力σdξdη作用下,引起的隧道外侧某点(x1,y1,z1)的水平位移与竖向位移 分别为:
式中:
ξ为围护结构底面处水平面上某点横坐标,单位符号为mm;
η为围护结构底面处水平面上某点纵坐标,单位符号为mm;
μ为土的泊松比;
G为土的剪切弹性模量,单位符号为Pa;
Es为土的压缩模量,单位符号为Pa;
步骤3)、基坑侧壁卸荷分析:
由Mindlin水平荷载的基本位移解,通过积分,在编号为①的基坑侧壁三角形分布荷载中某点(η,τ)的单位力βK0γdηdτ作用下,引起隧道外侧某一点(x1,y1,z1)的水平位移与竖向位移分别为:
式中:
τ为编号①的基坑侧壁三角形分布荷载中某点的纵坐标,单位符号为mm;
在编号为②的基坑侧壁三角形分布荷载作用下,引起隧道外侧某一点(x1,y1,z1)的水平位移与竖向位移分别为:
式中:
在编号为③的基坑侧壁三角形分布荷载τ作用下,引起隧道外侧某一点(x1,y1,z1)的水平位移与竖向位移分别为:
式中:
在编号为④的基坑侧壁三角形分布荷载作用下,引起隧道外侧某一点(x1,y1,z1)的水平位移与竖向位移分别为:
式中:
步骤4)、总的计算公式:
利用叠加原理,得到由基坑坑底和四周侧壁产生的卸荷应力,所引起的隧道外侧某一点(x1,y1,z1)的水平总位移Sx与竖向总位移Sz分别为:
为精确计算在基坑坑底荷载与四周侧壁荷载作用下所引起的隧道外侧位移,取朝向基坑侧的半侧隧道,均分若干个点,分别计算这若干个点的位移值,最后取平均位移值作为隧道位移值。
本专利的理论基础扎实,研究了基坑开挖引起邻近既有地铁隧道位移计算公式。
施工前可根据具体的现场施工参数,如静止土压力系数K0、土的重度γ、基坑开挖深度d、基坑长度L、基坑宽度B,基坑开挖面底部到基坑围护结构底面的距离d0、开挖面与隧道的最小净距离s,基坑围护结构深度H,地面到隧道底部的竖向距离h,隧道外径D,土的粘聚力c,土的内摩擦角残余应力系数α、土的泊松比μ、为土的压缩模量Es,模拟不同参数的施工条件下,基坑开挖可能对邻近既有地铁隧道产生的位移大小。
在实际情况中,工程施工对隧道位移大小有严格控制,若隧道位移超过相应允许值,则存在工程安全隐患,甚至造成地表塌陷、周边建筑物倾斜、地下管线破坏等严重后果。
因此施工前可通过本专利的公式对具体工程的施工进行模拟,计算出指定工况下的地铁隧道位移大小,若隧道超过相应允许值,可调整相关施工参数进行试算,直至达到安全标准。
本专利通过理论公式,对实际基坑开挖引起邻近既有地铁隧道位移大小进行预测,对工程具有预防、指导作用,并且为今后有关基坑开挖对邻近隧道影响方面的研究提供了理论基础。
附图说明
图1是本发明中的计算模型的前视图;
图2是本发明中的计算模型的右视图;
图3是本发明中的计算模型的俯视图;
图4是本发明中的计算模型中基坑围护结构底面处的荷载示意图;
图5是本发明中的计算模型中四个侧壁卸荷引起的隧道水平位移变化曲线示意图;
图6是本发明中隧道长度与基坑开挖长度的对比示意图。
具体实施方式
下面结合附图对本发明的具体实施方式做一个详细的说明。
如图1~6所示,本发明提供一种基坑开挖引起邻近既有地铁隧道位移的计算方法的具体实施例,由于考虑到:
(1)基坑开挖时有围护结构保护(包括井壁和内支撑或外支撑),因此不会全部卸载;基坑开挖产生的侧壁等效附加应力计算公式是应乘以一个折减系数β,其中:β为基坑围护结构的应力损失率,等于最终释放的侧壁应力与初始侧壁应力的比值,β<1;
则等效荷载变为:βK0γz;
应考虑四个侧壁的共同作用,令四个侧壁的β值相同;
(3)由于盾构隧道刚度较大,靠近隧道侧的基坑土体应力释放引起的盾构隧道表面处的土体水平位移S1(朝向基坑侧),要远大于隧道水平位移S;
隧道的刚度作用,假设为有弹簧拉住了盾构隧道表面处的土体,或是对隧道表面处的土体施加了一个反向作用力,使其产生一个反向的位移S2(远离隧道侧);
两者叠加,最终结果是导致隧道水平位移影响范围和隧道最大水平位移值,均小于盾构隧道表面处的土体S1;
(3)本专利在计算基坑围护结构底部平面处土体的残余应力的同时,还考虑力在向下传递时围护结构侧壁的摩阻力影响;
(4)本专利将计算邻近基坑侧的半个隧道表面的位移值,具体分析隧道的位移变化,得到隧道的水平向收敛值;
具体包括如下步骤:
步骤1)、建立计算模型:(计算模型参见图1~3)
令基坑的四个侧壁的编号分别为①、②、③和④;
基坑长度L,单位符号为mm;
基坑宽度B,单位符号为mm;
离基坑中心点o的横向水平距离为x,以o点到侧壁①为正,单位符号为mm;
离o点的纵向水平距离为y,以o点到侧壁③为正,单位符号为mm;
基坑开挖面底部到基坑围护结构底面的距离d0,单位符号为mm;
开挖面与隧道的最小净距离s,单位符号为mm;
基坑围护结构深度H,H=d+d0,单位符号为mm;
地面到隧道底部的竖向距离h,单位符号为mm;
隧道外径D,单位符号为mm;
计算假定:
(7)土体为均质、弹性半空间体,隧道纵轴线方向平行于矩形基坑的长边;
(8)不考虑基坑开挖的时间和空间因素,不考虑降水;
(9)当基坑开挖到坑底时会导致土体应力释放,转化为在坑底平面处施加竖直向上的均布荷载γd;
(10)基坑四周侧壁在开挖后会产生应力释放,等效为在侧壁施加向坑内的三角形水平向分布荷载βK0γz;
(11)不考虑隧道存在对土体附加应力计算的影响;
(12)通过考虑远离隧道侧的基坑侧壁释放应力,来代替隧道刚度作用;
步骤2)、坑底卸荷分析:
由于基坑底部围护结构的保护作用,形成遮拦效应,故坑底释放的应力会受到围护结构产生的侧摩阻力影响,该侧摩阻力计算公式为:
qs=c+K0σztanφ;
式中:
qs为单位等效实体侧摩阻力,单位符号为Pa;
c为土的粘聚力,单位符号为Pa;
σz为基坑坑底到围护结构底的任意面处的土应力,单位符号为Pa;
φ为土的内摩擦角,单位符号为°;
根据实际工况,改为平均侧摩阻力计算公式为:
qs1=c+1/2(γd+γH)K0tanφ;
式中:
qs1平均单位侧摩阻力,单位符号为Pa;
如图4所示,则基坑围护结构底面水平平面处土体受到的等效荷载为:
式中:
σ为基坑围护结构底面水平平面处土体受到的等效荷载,单位符号为Pa;
α为残余应力系数;
由Mindlin竖向荷载的基本位移解,通过积分,在围护结构底面处水平面上某点(ξ,η)的单位力σdξdη作用下,引起的隧道外侧某点(x1,y1,z1)的水平位移与竖向位移 分别为:
式中:
ξ为围护结构底面处水平面上某点横坐标,单位符号为mm;
η为围护结构底面处水平面上某点纵坐标,单位符号为mm;
μ为土的泊松比;
G为土的剪切弹性模量,单位符号为Pa;
Es为土的压缩模量,单位符号为Pa;
步骤3)、基坑侧壁卸荷分析:
由Mindlin水平荷载的基本位移解,通过积分,在编号为①的基坑侧壁三角形分布荷载中某点(η,τ)的单位力βK0γdηdτ作用下,引起隧道外侧某一点(x1,y1,z1)的水平位移与竖向位移分别为:
式中:
τ为编号①的基坑侧壁三角形分布荷载中某点的纵坐标,单位符号为mm;
在编号为②的基坑侧壁三角形分布荷载作用下,引起隧道外侧某一点(x1,y1,z1)的水平位移与竖向位移分别为:
式中:
在编号为③的基坑侧壁三角形分布荷载τ作用下,引起隧道外侧某一点(x1,y1,z1)的水平位移与竖向位移分别为:
式中:
在编号为④的基坑侧壁三角形分布荷载作用下,引起隧道外侧某一点(x1,y1,z1)的水平位移与竖向位移分别为:
式中:
步骤4)、总的计算公式:
利用叠加原理,得到由基坑坑底和四周侧壁产生的卸荷应力,所引起的隧道外侧某一点(x1,y1,z1)的水平总位移Sx与竖向总位移Sz分别为:
为精确计算在基坑坑底荷载与四周侧壁荷载作用下所引起的隧道外侧位移,取朝向基坑侧的半侧隧道,均分若干个点,分别计算这若干个点的位移值,最后取平均位移值作为隧道位移值。
本专利的理论基础扎实,研究了基坑开挖引起邻近既有地铁隧道位移计算公式。
施工前可根据具体的现场施工参数,如静止土压力系数K0、土的重度γ、基坑开挖深度d、基坑长度L、基坑宽度B,基坑开挖面底部到基坑围护结构底面的距离d0、开挖面与隧道的最小净距离s,基坑围护结构深度H,地面到隧道底部的竖向距离h,隧道外径D,土的粘聚力c,土的内摩擦角残余应力系数α、土的泊松比μ、为土的压缩模量Es,模拟不同参数的施工条件下,基坑开挖可能对邻近既有地铁隧道产生的位移大小。
在实际情况中,工程施工对隧道位移大小有严格控制,若隧道位移超过相应允许值,则存在工程安全隐患,甚至造成地表塌陷、周边建筑物倾斜、地下管线破坏等严重后果。
因此施工前可通过本专利的公式对具体工程的施工进行模拟,计算出指定工况下的地铁隧道位移大小,若隧道超过相应允许值,可调整相关施工参数进行试算,直至达到安全标准。
本专利通过理论公式,对实际基坑开挖引起邻近既有地铁隧道位移大小进行预测,对工程具有预防、指导作用,并且为今后有关基坑开挖对邻近隧道影响方面的研究提供了理论基础。
其中:Mindlin水平荷载的基本位移解:
式中:S为土体位移,单位符号为mm;
P为作用在l深度处的水平集中力,单位符号为N;
l为计算点距地表的距离,单位符号为mm;
M为荷载作用点作用点到土体沉降计算点之间的距离,单位符号为mm;
N为荷载作用点关于地面的对称点到土体沉降计算点之间的距离,单位符号为mm。
Mindlin竖向荷载的基本位移解:
由于标准工况计算参数:假定某基坑平面开挖尺寸长L=20m,宽B=10m,开挖深度d=15m,基坑围护结构深度H=27m。地铁隧道外径D=6.2m,隧道底部深度h=15m,基坑开挖面与隧道最小净距离为s=5m。土的重度γ=18.5kN/m3,静止土压力系数K0=0.53,土的压缩模量Es=10MPa,土的泊松比μ=0.35,土的粘聚力c=12kPa,土的内摩擦角基坑围护结构的应力损失率β=25%。
计算结果表明,该标况下围护结构底部平面处的土体附加竖向荷载为0。由于竖向荷载需考虑的因素复杂,易受基坑围护深度、降水等影响,所以本专利将重点分析基坑开挖引起的旁边既有隧道的水平位移变化。
如图5所示,四个侧壁卸荷所引起的隧道位移变化不一样,侧壁①卸荷应力促使隧道向基坑侧靠近,侧壁②则与①相反,能减小隧道变形,说明在加固时需对侧壁①引起重视。侧壁③与④的卸荷应力对隧道位移的影响小,且呈不规则变化。
将本专利方法计算得到的隧道水平位移值,与隧道水平位移实测值和有限元模拟结果作无量纲对比分析,结果见图6。如图所示:(1)本文方法(考虑四个侧壁)计算值与实测和有限元模拟结果非常吻合,表明本文提出的半解析半经验解具有一定可靠性。若本文仅考虑侧壁①,显然与实测和有限元的无量纲曲线有很大出入,影响范围明显偏大;(2)隧道水平位移曲线基本呈正态分布,隧道水平位移的影响范围约为基坑沿隧道纵向开挖长度L的2~3倍。本文标况下的影响范围约为2L(即±L),与实测和有限元模拟结果的影响范围吻合。
另外图6中参考文献【1】~【7】作如下简单说明:
[1]上海市市政工程管理局.上海市地铁沿线建筑施工保护地铁技术管理暂行规定[S].上海:上海市政管理局,1994.
Shanghai Road Administration Bureau.The provisional rules of subwaytechnical management about protecting the building-construction along thesubway lines in Shanghai[S].Shanghai:Shanghai Municipal Management Bureau,1994.
[2]况龙川.深基坑施工对地铁隧道的影响[J].岩土工程学报,2000,22(3):284-288.
KUANG Long-chuan.Influence of construction of deep foundation pit ontunnels of metro[J].Chinese Journal of Geotechnical
Engineering,2000,22(3):284-288.
[3]邵华,王蓉.基坑开挖施工对邻近地铁影响的实测分析[J].地下空间与工程学报,2011,7(增刊1):1403-1408.
SHAO Hua,WANG Rong.Monitoring data analysis on influence of operatingmetro tunnel by nearly excavation construction[J].Chinese Journal ofUnderground Space and Engineering,2011,7(Supp.1):1403-1408.
[4]高广运,高盟,杨成斌,等.基坑施工对运营地铁隧道的变形影响及控制研究[J].岩土工程学报,2010,32(3):453-459.
GAO Guang-yun,GAO Meng,YANG Cheng-bin,et al.Influence of deepexcavation on deformation of operating metro tunnels and countermeasures[J].Chinese Journal of Geotechnical Engineering,2010,32(3):453-459.
[5]周建昆,李志宏.紧邻隧道基坑工程对隧道变形影响的数值分析[J].地下空间与工程学报,2010,6(增刊1):1398-1403.
ZHOU Jian-kun,LI Zhi-hong.Numerical Analysis on deformation effect ofmetro tunnels due to adjacent excavation project[J].Chinese Journal ofUnderground Space and Engineering,2010,6(Supp.1):1398-1403.
[6]邹家南,杨小平,刘庭金.邻近地铁盾构隧道的深基坑支护分析[J].铁道建筑,2013,(9):63-67.
ZOU Jia-nan,YANG Xiao-ping,LIU Ting-jin.Analysis on retainingstructure of the deep excavation adjacent to metro tunnels[J].RailwayEngineering,2013,(9):63-67.
[7]郭典塔,周翠英,朱远辉.基坑开挖对近接地铁隧道的影响规律研究[J].广东土木与建筑,2014,(6):16-19.
Guo Dian-ta,Zhou Cui-ying,Zhu Yuan-hui.Study on effect of metrotunnel mechanic behaviors due to adjacent excavation[J].
Guangdong Architecture Civil Engineering,2014,(6):16-19。

Claims (1)

1.一种基坑开挖引起邻近既有地铁隧道位移的计算方法,其特征在于,
(1)基坑开挖时有围护结构保护,因此不会全部卸载;基坑开挖产生的侧壁等效附加应力计算公式是应乘以一个折减系数β,其中:β为基坑围护结构的应力损失率,等于最终释放的侧壁应力与初始侧壁应力的比值,β<1;
则等效荷载变为:βK0γz;
应考虑四个侧壁的共同作用,令四个侧壁的β值相同;
(2)由于盾构隧道刚度较大,靠近隧道侧的基坑土体应力释放引起的盾构隧道表面处的土体水平位移S1,要远大于隧道水平位移S;
隧道的刚度作用,假设为有弹簧拉住了盾构隧道表面处的土体,或是对隧道表面处的土体施加了一个反向作用力,使其产生一个反向的位移S2;
两者叠加,最终结果是导致隧道水平位移影响范围和隧道最大水平位移值,均小于盾构隧道表面处的土体S1;
(3)本专利在计算基坑围护结构底部平面处土体的残余应力的同时,还考虑力在向下传递时围护结构侧壁的摩阻力影响;
(4)本专利将计算邻近基坑侧的半个隧道表面的位移值,具体分析隧道的位移变化,得到隧道的水平向收敛值;
具体包括如下步骤:
步骤1)、建立计算模型:
基坑的四个侧壁的编号分别为①、②、③和④;
基坑长度L,单位符号为mm;
基坑宽度B,单位符号为mm;
离基坑中心点o的横向水平距离为x,以o点到侧壁①为正,单位符号为mm;
离o点的纵向水平距离为y,以o点到侧壁③为正,单位符号为mm;
基坑开挖面底部到基坑围护结构底面的距离d0,单位符号为mm;
开挖面与隧道的最小净距离s,单位符号为mm;
基坑围护结构深度H,H=d+d0,单位符号为mm;
地面到隧道底部的竖向距离h,单位符号为mm;
隧道外径D,单位符号为mm;
计算假定:
(1)土体为均质、弹性半空间体,隧道纵轴线方向平行于矩形基坑的长边;
(2)不考虑基坑开挖的时间和空间因素,不考虑降水;
(3)当基坑开挖到坑底时会导致土体应力释放,转化为在坑底平面处施加竖直向上的均布荷载γd;
(4)基坑四周侧壁在开挖后会产生应力释放,等效为在侧壁施加向坑内的三角形水平向分布荷载βK0γz;
(5)不考虑隧道存在对土体附加应力计算的影响;
(6)通过考虑远离隧道侧的基坑侧壁释放应力,来代替隧道刚度作用;
步骤2)、坑底卸荷分析:
由于基坑底部围护结构的保护作用,形成遮拦效应,故坑底释放的应力会受到围护结构产生的侧摩阻力影响,该侧摩阻力计算公式为:
qs=c+K0σztanφ;
式中:
qs为单位等效实体侧摩阻力,单位符号为Pa;
c为土的粘聚力,单位符号为Pa;
σz为基坑坑底到围护结构底的任意面处的土应力,单位符号为Pa;
φ为土的内摩擦角,单位符号为°;
根据实际工况,改为平均侧摩阻力计算公式为:
qs1=c+1/2(γd+γH)K0tanφ;
式中:
qs1平均单位侧摩阻力,单位符号为Pa;
则基坑围护结构底面水平平面处土体受到的等效荷载为:
&sigma; = &gamma; d ( 1 - &alpha; ) B L - q s 1 &gamma;d 0 ( 2 B + 2 L ) B L ;
式中:
σ为基坑围护结构底面水平平面处土体受到的等效荷载,单位符号为Pa;
α为残余应力系数;
由Mindlin竖向荷载的基本位移解,通过积分,在围护结构底面处水平面上某点(ξ,η)的单位力σdξdη作用下,引起的隧道外侧某点(x1,y1,z1)的水平位移与竖向位移分别为:
S x d = - &sigma; 16 &pi; G ( 1 - &mu; ) &Integral; - B / 2 B / 2 &Integral; - L / 2 L / 2 ( x 1 - &xi; ) &lsqb; z 1 - H T 1 3 + ( 3 - 4 &mu; ) ( z 1 - H ) T 2 3 - 4 ( 1 - 2 &mu; ) ( 1 - &mu; ) T 2 ( T 2 + z 1 + d ) + 6 dz 1 ( z 1 + H ) T 2 5 &rsqb; d &xi; d &eta; ;
S z d = - &sigma; 16 &pi; G ( 1 - &mu; ) &Integral; - B / 2 B / 2 &Integral; - L / 2 L / 2 &lsqb; 3 - 4 &mu; T 1 + 8 ( 1 - &mu; ) 2 - ( 3 - 4 &mu; ) T 2 + ( z 1 - H ) 2 T 1 3 + ( 3 - 4 &mu; ) ( z 1 + H ) 2 - 2 dz 1 T 2 3 + 6 dz 1 ( z 1 + H ) 2 T 2 5 &rsqb; d &xi; d &eta; ;
式中:
ξ为围护结构底面处水平面上某点横坐标,单位符号为mm;
η为围护结构底面处水平面上某点纵坐标,单位符号为mm;
μ为土的泊松比;
G为土的剪切弹性模量,单位符号为Pa;
Es为土的压缩模量,单位符号为Pa;
T 1 = ( x 1 - &xi; ) 2 + ( y 1 - &eta; ) 2 + ( z 1 - d ) 2 ;
T 2 = ( x 1 - &xi; ) 2 + ( y 1 - &eta; ) 2 + ( z 1 + d ) 2 ;
步骤3)、基坑侧壁卸荷分析:
由Mindlin水平荷载的基本位移解,通过积分,在编号为①的基坑侧壁三角形分布荷载中某点(η,τ)的单位力βK0γdηdτ作用下,引起隧道外侧某一点(x1,y1,z1)的水平位移与竖向位移分别为:
S x c 1 = - &beta;K 0 &gamma; 16 &pi; G ( 1 - &mu; ) &Integral; - L / 2 L / 2 &Integral; 0 d &lsqb; 3 - 4 &mu; R 1 + 1 R 2 + ( x 1 + B / 2 ) 2 R 1 3 + ( 3 - 4 &mu; ) ( x 1 - B / 2 ) 2 R 2 3 + 2 &tau;z 1 R 2 3 ( 1 - 3 ( x 1 + B / 2 ) 2 R 2 2 ) + 4 ( 1 - &mu; ) ( 1 - 2 &mu; ) R 2 + z 1 + &tau; ( 1 - ( x 1 - B / 2 ) 2 R 2 + z 1 + &tau; ) &rsqb; &tau; d &eta; d &tau; ;
S z c 1 = - &beta;K 0 &gamma; ( x 1 - B / 2 ) 16 &pi; G ( 1 - &mu; ) &Integral; - L / 2 L / 2 &Integral; 0 d &lsqb; z 1 - &tau; R 1 3 + ( 3 - 4 &mu; ) ( z 1 - &tau; ) R 2 3 - 6 &tau;z 1 ( z 1 + &tau; ) R 2 5 + 4 ( 1 - &mu; ) ( 1 - 2 &mu; ) R 2 ( R 2 + z 1 + &tau; ) &rsqb; &tau; d &eta; d &tau; ;
式中:
τ为编号①的基坑侧壁三角形分布荷载中某点的纵坐标,单位符号为mm;
R 1 = ( x 1 - B / 2 ) 2 + ( y 1 - &eta; ) 2 + ( z 1 - &tau; ) 2 ;
R 2 = ( x 1 - B / 2 ) 2 + ( y 1 - &eta; ) 2 + ( z 1 + &tau; ) 2 ;
在编号为②的基坑侧壁三角形分布荷载作用下,引起隧道外侧某一点(x1,y1,z1)的水平位移与竖向位移分别为:
S x c 2 = &beta;K 0 &gamma; 16 &pi; G ( 1 - &mu; ) &Integral; - L / 2 L / 2 &Integral; 0 d &lsqb; 3 - 4 &mu; R 3 + 1 R 4 + ( x 1 + B / 2 ) 2 R 3 3 + ( 3 - 4 &mu; ) ( x 1 + B / 2 ) 2 R 4 3 + 2 &tau;z 1 R 4 3 ( 1 - 3 ( x 1 + B / 2 ) 2 R 4 2 )
+ 4 ( 1 - &mu; ) ( 1 - 2 &mu; ) R 4 + z 1 + &tau; ( 1 - ( x 1 + B / 2 ) 2 R 4 ( R 4 + z 1 + &tau; ) ) &rsqb; &tau; d &eta; d &tau; ; S z c 2 = &beta;K 0 &gamma; ( x 1 + B / 2 ) 16 &pi; G ( 1 - &mu; ) &Integral; - L / 2 L / 2 &Integral; 0 d &lsqb; z 1 - &tau; R 3 3 + ( 3 - 4 &mu; ) ( z 1 - &tau; ) R 4 3 - 6 &tau;z 1 ( z 1 + &tau; ) R 4 5 + 4 ( 1 - &mu; ) ( 1 - 2 &mu; ) R 4 ( R 4 + z 1 + &tau; ) &rsqb; &tau; d &eta; d &tau; ;
式中:
R 3 = ( x 1 + B / 2 ) 2 + ( y 1 - &eta; ) 2 + ( z 1 - &tau; ) 2 ;
R 4 = ( x 1 + B / 2 ) 2 + ( y 1 - &eta; ) 2 + ( z 1 + &tau; ) 2 ;
在编号为③的基坑侧壁三角形分布荷载τ作用下,引起隧道外侧某一点(x1,y1,z1)的水平位移与竖向位移分别为:
S x c 3 = &beta;K 0 &gamma; ( y 1 + L / 2 ) 16 &pi; G ( 1 - &mu; ) &Integral; - B / 2 B / 2 &Integral; 0 d ( x 1 - &xi; ) &lsqb; 1 R 5 3 + 3 - 4 &mu; R 6 3 - 6 &tau;z 1 R 6 5 - 4 ( 1 - &mu; ) ( 1 - 2 &mu; ) R 6 ( R 6 + z 1 + &tau; ) 2 &rsqb; &tau; d &xi; d &tau; ;
S z c 3 = &beta;K 0 &gamma; ( y 1 - L / 2 ) 16 &pi; G ( 1 - &mu; ) &Integral; - B / 2 B / 2 &Integral; 0 d &lsqb; z 1 - &tau; R 5 3 + ( 3 - 4 &mu; ) ( z 1 - &tau; ) R 6 3 - 6 &tau;z 1 ( z 1 + &tau; ) R 6 5 + 4 ( 1 - &mu; ) ( 1 - 2 &mu; ) R 6 ( R 6 + z 1 + &tau; ) &rsqb; &tau; d &xi; d &tau; ;
式中:
R 5 = ( x 1 - &xi; ) 2 + ( y 1 - L / 2 ) 2 + ( z 1 - &tau; ) 2 ;
R 6 = ( x 1 - &xi; ) 2 + ( y 1 - L / 2 ) 2 + ( z 1 + &tau; ) 2 ;
在编号为④的基坑侧壁三角形分布荷载作用下,引起隧道外侧某一点(x1,y1,z1)的水平位移与竖向位移分别为:
S x c 4 = - &beta;K 0 &gamma; ( y 1 + L / 2 ) 16 &pi; G ( 1 - &mu; ) &Integral; - B / 2 B / 2 &Integral; 0 d ( x 1 - &xi; ) &lsqb; 1 R 7 3 + 3 - 4 &mu; R 8 3 - 6 &tau;z 1 R 8 5 - 4 ( 1 - &mu; ) ( 1 - 2 &mu; ) R 8 ( R 8 + z 1 + &tau; ) &rsqb; &tau; d &xi; d &tau; ;
S z c 4 = - &beta;K 0 &gamma; ( y 1 + L / 2 ) 16 &pi; G ( 1 - &mu; ) &Integral; - B / 2 B / 2 &Integral; 0 d &lsqb; z 1 - &tau; R 7 3 + ( 3 - 4 &mu; ) ( z 1 - &tau; ) R 8 3 - 6 &tau;z 1 ( z 1 + &tau; ) R 8 5 + 4 ( 1 - &mu; ) ( 1 - 2 &mu; ) R 8 ( R 8 + z 1 + &tau; ) &rsqb; &tau; d &xi; d &beta; ;
式中:
R 7 = ( x 1 - &xi; ) 2 + ( y 1 + L / 2 ) 2 + ( z 1 - &tau; ) 2 ;
R 8 = ( x 1 - &xi; ) 2 + ( y 1 + L / 2 ) 2 + ( z 1 + &tau; ) 2 ;
步骤4)、总的计算公式:
利用叠加原理,得到由基坑坑底和四周侧壁产生的卸荷应力,所引起的隧道外侧某一点(x1,y1,z1)的水平总位移Sx与竖向总位移Sz分别为:
S x = S x d + S x c 1 + S x c 2 + S x c 3 + S x c 4 ;
S z = S z d + S z c 1 + S z c 2 + S z c 3 + S z c 4 ;
为精确计算在基坑坑底荷载与四周侧壁荷载作用下所引起的隧道外侧位移,取朝向基坑侧的半侧隧道,均分若干个点,分别计算这若干个点的位移值,最后取平均位移值作为隧道位移值。
CN201610757176.0A 2016-08-29 2016-08-29 一种基坑开挖引起邻近既有地铁隧道位移的计算方法 Active CN106339554B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610757176.0A CN106339554B (zh) 2016-08-29 2016-08-29 一种基坑开挖引起邻近既有地铁隧道位移的计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610757176.0A CN106339554B (zh) 2016-08-29 2016-08-29 一种基坑开挖引起邻近既有地铁隧道位移的计算方法

Publications (2)

Publication Number Publication Date
CN106339554A true CN106339554A (zh) 2017-01-18
CN106339554B CN106339554B (zh) 2019-06-25

Family

ID=57823211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610757176.0A Active CN106339554B (zh) 2016-08-29 2016-08-29 一种基坑开挖引起邻近既有地铁隧道位移的计算方法

Country Status (1)

Country Link
CN (1) CN106339554B (zh)

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107562977A (zh) * 2017-07-04 2018-01-09 北京交通大学 一种盾构下穿施工引起既有隧道变形的预测方法
CN107657091A (zh) * 2017-09-13 2018-02-02 河北建筑工程学院 小净距重载铁路交叉隧道隧底位移的计算方法
CN108460185A (zh) * 2018-01-31 2018-08-28 浙江大学城市学院 基坑开挖施工对邻近既有公路隧道及电力管线影响数值分析方法
CN109255504A (zh) * 2018-11-16 2019-01-22 福建工程学院 市政管道破洞诱发路基空洞形成范围的预测方法
CN109271752A (zh) * 2018-11-16 2019-01-25 福建工程学院 市政管线破损诱发路基空洞形成时间的预测方法
CN109299578A (zh) * 2018-11-20 2019-02-01 中南大学 基坑开挖引起下卧既有盾构隧道隆起变形的计算方法
CN109460589A (zh) * 2018-10-22 2019-03-12 西南交通大学 一种基于变形-结构法的隧道初期支护动态设计方法
CN109543286A (zh) * 2018-11-20 2019-03-29 中南大学 隧道开挖及爆破荷载作用下邻近埋地管道的力学分析模型及振速控制标准确定方法
CN109543338A (zh) * 2019-01-04 2019-03-29 陈建永 一种地震波作用下基坑稳定性安全系数的计算方法
CN109682416A (zh) * 2018-12-19 2019-04-26 中国地质大学(武汉) 测量隧道水土压力分布及隧道变形规律的实验装置及方法
CN109827788A (zh) * 2019-01-18 2019-05-31 中国矿业大学(北京) 一种近接地铁支护模拟装置及使用方法
CN109948294A (zh) * 2019-04-02 2019-06-28 河北省交通规划设计院 一种隧道极限位移的确定方法
CN110188413A (zh) * 2019-05-13 2019-08-30 浙江大学城市学院 一种基坑开挖引起的旁侧盾构隧道围压变化的预测方法
CN110298074A (zh) * 2019-05-22 2019-10-01 中交第四航务工程局有限公司 施工荷载引起曲线盾构隧道土体变形的计算方法
CN110727985A (zh) * 2019-09-30 2020-01-24 天津大学 一种邻近基坑工程的既有地铁隧道竖向变形的预测方法
CN111680383A (zh) * 2020-03-03 2020-09-18 浙江大学城市学院 一种基坑开挖引起的下方盾构隧道附加围压变化预测方法
CN111860842A (zh) * 2020-07-29 2020-10-30 天津市勘察院 一种邻近基坑工程的既有地铁隧道水平位移的预测方法
CN112597681A (zh) * 2020-12-22 2021-04-02 上海勘察设计研究院(集团)有限公司 一种大面积堆载引起的水平位移计算方法及计算系统
CN112597674A (zh) * 2020-12-05 2021-04-02 福建工程学院 一种基坑开挖引起旁侧管道横向附加内力的确定方法
CN112989647A (zh) * 2021-02-03 2021-06-18 浙江大学 富水地层基坑降水开挖诱发邻近已建隧道力学响应的简化估算方法
CN113128061A (zh) * 2021-04-25 2021-07-16 交通运输部公路科学研究所 一种邻接地下工程非同步施工的土压力获取方法
CN113536445A (zh) * 2021-09-16 2021-10-22 湖南大学 一种上方基坑开挖引起隧道纵向上浮变形的简易确定方法
CN114218816A (zh) * 2021-07-28 2022-03-22 浙江大学 一种基坑开挖引发下卧地铁隧道纵向最大位移的计算方法
CN116227267A (zh) * 2022-12-29 2023-06-06 东南大学 一种基坑开挖影响区及坑外既有隧道位移预测方法
CN116680934A (zh) * 2023-07-28 2023-09-01 安徽建筑大学 基于卸荷率的地层开挖引起下部隧道竖向变形计算方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004308362A (ja) * 2003-04-10 2004-11-04 Tatsuro Muro 岩盤掘削機を用いた深礎工法
CN104598296A (zh) * 2015-01-23 2015-05-06 陈建永 软土深基坑变形数值模拟分析方法
CN105220718A (zh) * 2015-10-26 2016-01-06 青岛理工大学 一种建筑施工对邻近既有隧道的影响预测定方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004308362A (ja) * 2003-04-10 2004-11-04 Tatsuro Muro 岩盤掘削機を用いた深礎工法
CN104598296A (zh) * 2015-01-23 2015-05-06 陈建永 软土深基坑变形数值模拟分析方法
CN105220718A (zh) * 2015-10-26 2016-01-06 青岛理工大学 一种建筑施工对邻近既有隧道的影响预测定方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
ZHANG J F 等: "Prediction of tunnel displacement induced by adjacent excavation in soft soil", 《TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY》 *
魏纲 等: "基坑开挖引起临近地铁隧道的附加荷载计算方法", 《岩石力学与工程学报》 *

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107562977A (zh) * 2017-07-04 2018-01-09 北京交通大学 一种盾构下穿施工引起既有隧道变形的预测方法
CN107657091B (zh) * 2017-09-13 2021-02-02 河北建筑工程学院 小净距重载铁路交叉隧道隧底位移的计算方法
CN107657091A (zh) * 2017-09-13 2018-02-02 河北建筑工程学院 小净距重载铁路交叉隧道隧底位移的计算方法
CN108460185A (zh) * 2018-01-31 2018-08-28 浙江大学城市学院 基坑开挖施工对邻近既有公路隧道及电力管线影响数值分析方法
CN109460589A (zh) * 2018-10-22 2019-03-12 西南交通大学 一种基于变形-结构法的隧道初期支护动态设计方法
CN109460589B (zh) * 2018-10-22 2022-10-21 西南交通大学 一种基于变形-结构法的隧道初期支护动态设计方法
CN109271752A (zh) * 2018-11-16 2019-01-25 福建工程学院 市政管线破损诱发路基空洞形成时间的预测方法
CN109255504A (zh) * 2018-11-16 2019-01-22 福建工程学院 市政管道破洞诱发路基空洞形成范围的预测方法
CN109271752B (zh) * 2018-11-16 2022-06-21 福建工程学院 市政管线破损诱发路基空洞形成时间的预测方法
CN109299578A (zh) * 2018-11-20 2019-02-01 中南大学 基坑开挖引起下卧既有盾构隧道隆起变形的计算方法
CN109543286A (zh) * 2018-11-20 2019-03-29 中南大学 隧道开挖及爆破荷载作用下邻近埋地管道的力学分析模型及振速控制标准确定方法
CN109299578B (zh) * 2018-11-20 2022-12-13 中南大学 基坑开挖引起下卧既有盾构隧道隆起变形的计算方法
CN109543286B (zh) * 2018-11-20 2022-11-25 中南大学 隧道开挖及爆破荷载作用下邻近埋地管道的力学分析模型及振速控制标准确定方法
CN109682416A (zh) * 2018-12-19 2019-04-26 中国地质大学(武汉) 测量隧道水土压力分布及隧道变形规律的实验装置及方法
CN109543338A (zh) * 2019-01-04 2019-03-29 陈建永 一种地震波作用下基坑稳定性安全系数的计算方法
CN109827788A (zh) * 2019-01-18 2019-05-31 中国矿业大学(北京) 一种近接地铁支护模拟装置及使用方法
CN109948294A (zh) * 2019-04-02 2019-06-28 河北省交通规划设计院 一种隧道极限位移的确定方法
CN109948294B (zh) * 2019-04-02 2022-09-27 河北省交通规划设计研究院有限公司 一种隧道极限位移的确定方法
CN110188413A (zh) * 2019-05-13 2019-08-30 浙江大学城市学院 一种基坑开挖引起的旁侧盾构隧道围压变化的预测方法
CN110298074B (zh) * 2019-05-22 2020-03-31 中交第四航务工程局有限公司 施工荷载引起曲线盾构隧道土体变形的计算方法
CN110298074A (zh) * 2019-05-22 2019-10-01 中交第四航务工程局有限公司 施工荷载引起曲线盾构隧道土体变形的计算方法
CN110727985A (zh) * 2019-09-30 2020-01-24 天津大学 一种邻近基坑工程的既有地铁隧道竖向变形的预测方法
CN110727985B (zh) * 2019-09-30 2023-10-20 天津大学 一种邻近基坑工程的既有地铁隧道竖向变形的预测方法
CN111680383B (zh) * 2020-03-03 2023-07-07 浙江大学城市学院 一种基坑开挖引起的下方盾构隧道附加围压变化预测方法
CN111680383A (zh) * 2020-03-03 2020-09-18 浙江大学城市学院 一种基坑开挖引起的下方盾构隧道附加围压变化预测方法
CN111860842B (zh) * 2020-07-29 2024-01-26 天津市勘察设计院集团有限公司 一种邻近基坑工程的既有地铁隧道水平位移的预测方法
CN111860842A (zh) * 2020-07-29 2020-10-30 天津市勘察院 一种邻近基坑工程的既有地铁隧道水平位移的预测方法
CN112597674A (zh) * 2020-12-05 2021-04-02 福建工程学院 一种基坑开挖引起旁侧管道横向附加内力的确定方法
CN112597674B (zh) * 2020-12-05 2022-07-08 福建工程学院 一种基坑开挖引起旁侧管道横向附加内力的确定方法
CN112597681A (zh) * 2020-12-22 2021-04-02 上海勘察设计研究院(集团)有限公司 一种大面积堆载引起的水平位移计算方法及计算系统
CN112989647A (zh) * 2021-02-03 2021-06-18 浙江大学 富水地层基坑降水开挖诱发邻近已建隧道力学响应的简化估算方法
CN113128061B (zh) * 2021-04-25 2021-10-22 交通运输部公路科学研究所 一种邻接地下工程非同步施工的土压力获取方法
CN113128061A (zh) * 2021-04-25 2021-07-16 交通运输部公路科学研究所 一种邻接地下工程非同步施工的土压力获取方法
CN114218816A (zh) * 2021-07-28 2022-03-22 浙江大学 一种基坑开挖引发下卧地铁隧道纵向最大位移的计算方法
CN113536445A (zh) * 2021-09-16 2021-10-22 湖南大学 一种上方基坑开挖引起隧道纵向上浮变形的简易确定方法
CN116227267A (zh) * 2022-12-29 2023-06-06 东南大学 一种基坑开挖影响区及坑外既有隧道位移预测方法
CN116680934A (zh) * 2023-07-28 2023-09-01 安徽建筑大学 基于卸荷率的地层开挖引起下部隧道竖向变形计算方法
CN116680934B (zh) * 2023-07-28 2023-10-13 安徽建筑大学 基于卸荷率的地层开挖引起下部隧道竖向变形计算方法

Also Published As

Publication number Publication date
CN106339554B (zh) 2019-06-25

Similar Documents

Publication Publication Date Title
CN106339554A (zh) 一种基坑开挖引起邻近既有地铁隧道位移的计算方法
Saeedzadeh et al. Uplift response of buried pipelines in saturated sand deposit under earthquake loading
Herbut et al. Guidelines and recommendations for vibration control in the case of rapid impulse compaction
Masaeli et al. Rocking isolation of nonductile moderately tall buildings subjected to bidirectional near-fault ground motions
Rybak et al. Calibration of rapid impulse compaction on the basis of vibration velocity control
Ding et al. Analysis of the field monitoring data on soil movements and adjacent building settlement due to shield tunnelling
NHUNG et al. The effects of ground vibration induced by construction activities of urban railways in Hanoi
Koizumi et al. Numerical analysis of landslide behavior induced by tunnel excavation
Zucca et al. Seismic vulnerability assessment of an Italian historical masonry dry dock
Al-Farhan et al. Tunnel-soil-structure interaction under seismic load
Yang et al. Seismic earth pressures of retaining wall from large shaking table tests
Sun et al. Geotechnical seismic isolation system to protect cut-and-cover utility tunnels using tire-derived aggregates
Huang et al. Study on deformation monitoring of subway station deep foundation construction
Kwan et al. Recent advances in landslide risk management measures in Hong Kong
Soleimani Fard et al. Ground improvement with vibro compaction method to mitigate the liquefaction potential, case study
Lou et al. Investigation of Three‐Dimensional Deformation Behavior due to Long and Large Excavation in Soft Clays
CN117057101B (zh) 一种既有地下结构上部增层施工安全评价方法及系统
Khan et al. Response of twin transportation tunnel in earthquake loading: a review
Rostami et al. Steel Buildings' Seismic and Interaction Behavior, Under Different Shapes of Tunnel Drilling
CN205558913U (zh) 一种盾构施工中地层变形的监控系统
Wendeler et al. Multiple load case on flexible shallow landslide barriers–mudslide and rockfall
Du et al. Mitigation of rockfall geohazards: Full-scale investigation of the performance of a practical baffle design for direct use in the field
Aghamolaei et al. Evaluation of fault rupture propagation through earth dams subjected to reverse faulting: Outcomes from centrifuge simulation
Xing et al. Deformation and mechanic response of surrounding rock mass during shallow buried large-section tunnel excavation
Shiravi et al. Numerical Modeling of a New Mitigation Measure for Reverse Surface Fault Rupture Hazards Effects on Buildings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant