CN106314469B - 一种改善轨道车辆转向架整体性能的方法及悬挂减振系统 - Google Patents
一种改善轨道车辆转向架整体性能的方法及悬挂减振系统 Download PDFInfo
- Publication number
- CN106314469B CN106314469B CN201510709115.2A CN201510709115A CN106314469B CN 106314469 B CN106314469 B CN 106314469B CN 201510709115 A CN201510709115 A CN 201510709115A CN 106314469 B CN106314469 B CN 106314469B
- Authority
- CN
- China
- Prior art keywords
- rigidity
- pivoted arm
- stiffness
- rubber
- flexural pivot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61F—RAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES
- B61F5/00—Constructional details of bogies; Connections between bogies and vehicle underframes; Arrangements or devices for adjusting or allowing self-adjustment of wheel axles or bogies when rounding curves
- B61F5/02—Arrangements permitting limited transverse relative movements between vehicle underframe or bolster and bogie; Connections between underframes and bogies
- B61F5/22—Guiding of the vehicle underframes with respect to the bogies
- B61F5/24—Means for damping or minimising the canting, skewing, pitching, or plunging movements of the underframes
Abstract
Description
Claims (12)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510709115.2A CN106314469B (zh) | 2015-07-03 | 2015-10-28 | 一种改善轨道车辆转向架整体性能的方法及悬挂减振系统 |
PCT/CN2016/070656 WO2017071119A1 (zh) | 2015-10-28 | 2016-01-12 | 一种改善轨道车辆转向架整体性能的方法及悬挂减振系统 |
EP16858570.1A EP3369640A4 (en) | 2015-10-28 | 2016-01-12 | Method for improving overall performance of rail vehicle bogie and suspension damping system |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510382470.3A CN104925079A (zh) | 2015-07-03 | 2015-07-03 | 一种扭杆防横向窜动支撑球铰及其支撑球铰装置 |
CN2015103824703 | 2015-07-03 | ||
CN201510709115.2A CN106314469B (zh) | 2015-07-03 | 2015-10-28 | 一种改善轨道车辆转向架整体性能的方法及悬挂减振系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106314469A CN106314469A (zh) | 2017-01-11 |
CN106314469B true CN106314469B (zh) | 2018-06-05 |
Family
ID=54112589
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510382470.3A Pending CN104925079A (zh) | 2015-07-03 | 2015-07-03 | 一种扭杆防横向窜动支撑球铰及其支撑球铰装置 |
CN201510709115.2A Active CN106314469B (zh) | 2015-07-03 | 2015-10-28 | 一种改善轨道车辆转向架整体性能的方法及悬挂减振系统 |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510382470.3A Pending CN104925079A (zh) | 2015-07-03 | 2015-07-03 | 一种扭杆防横向窜动支撑球铰及其支撑球铰装置 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN104925079A (zh) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3369640A4 (en) * | 2015-10-28 | 2018-11-14 | Zhuzhou Times New Material Technology Co., Ltd. | Method for improving overall performance of rail vehicle bogie and suspension damping system |
CN106777796B (zh) * | 2017-01-12 | 2019-09-03 | 山东理工大学 | 车辆悬架三级渐变板簧各级刚度与接触载荷的匹配方法 |
CN106777794B (zh) * | 2017-01-12 | 2019-09-10 | 山东理工大学 | 高强度两级渐变刚度板簧的主簧挠度的计算方法 |
CN107364463B (zh) * | 2017-07-26 | 2023-05-26 | 株洲时代新材料科技股份有限公司 | 牵引拉杆节点的橡胶型面设计方法及牵引拉杆节点 |
CN107161169B (zh) * | 2017-07-26 | 2023-06-23 | 株洲时代新材料科技股份有限公司 | 轨道车辆用牵引球铰及其刚度设计方法 |
CN107856697A (zh) * | 2017-11-27 | 2018-03-30 | 株洲飞马橡胶实业有限公司 | 一种橡胶球铰结构及其轨道车辆减振器总成 |
CN108710768B (zh) * | 2018-05-29 | 2022-03-11 | 株洲时代新材料科技股份有限公司 | 一种轨道车辆转向架牵引装置系统刚度的计算方法及装置 |
CN110275530B (zh) * | 2019-06-17 | 2022-03-01 | 深圳市瑞源祥橡塑制品有限公司 | 一种组合车组建方法、装置及其应用 |
CN112078622B (zh) * | 2020-09-07 | 2021-09-07 | 中国铁建重工集团股份有限公司 | 悬挂装置和车辆 |
CN112158222B (zh) * | 2020-09-25 | 2021-10-01 | 株洲时代新材料科技股份有限公司 | 抗侧滚扭杆组件及其防窜方法 |
CN114739559B (zh) * | 2021-03-08 | 2023-06-27 | 石家庄铁道大学 | 用于轮轨力及钢轨中性轴测试位置的定位组件、工艺 |
CN113700785B (zh) * | 2021-08-12 | 2023-01-24 | 株洲时代瑞唯减振装备有限公司 | 一种具有高承载力的抗疲劳橡胶节点 |
CN114321197B (zh) * | 2021-11-29 | 2023-04-07 | 株洲时代新材料科技股份有限公司 | 一种刚度可调的紧凑式联轴器 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0641702A1 (de) * | 1993-08-31 | 1995-03-08 | AEG Schienenfahrzeuge GmbH | Hydraulische Drehstabilisierung für Schienenfahrzeuge |
JP2005289286A (ja) * | 2004-04-02 | 2005-10-20 | Sumitomo Metal Ind Ltd | 鉄道用台車及び鉄道車両 |
CN201677889U (zh) * | 2010-05-12 | 2010-12-22 | 株洲时代新材料科技股份有限公司 | 一种地铁车辆用牵引橡胶关节 |
CN201837533U (zh) * | 2010-03-22 | 2011-05-18 | 株洲时代新材料科技股份有限公司 | 橡胶弹性组件径向、轴向、剪切、扭转4向加载疲劳试验装置 |
CN201863861U (zh) * | 2010-10-27 | 2011-06-15 | 株洲时代新材料科技股份有限公司 | 一种轨道车辆用抗侧滚扭杆系统 |
CN201914270U (zh) * | 2010-12-24 | 2011-08-03 | 南车南京浦镇车辆有限公司 | 对半式扭杆橡胶套 |
CN102865324A (zh) * | 2012-10-22 | 2013-01-09 | 株洲时代新材料科技股份有限公司 | 一种轨道车辆转臂定位装置及其加工方法 |
-
2015
- 2015-07-03 CN CN201510382470.3A patent/CN104925079A/zh active Pending
- 2015-10-28 CN CN201510709115.2A patent/CN106314469B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0641702A1 (de) * | 1993-08-31 | 1995-03-08 | AEG Schienenfahrzeuge GmbH | Hydraulische Drehstabilisierung für Schienenfahrzeuge |
JP2005289286A (ja) * | 2004-04-02 | 2005-10-20 | Sumitomo Metal Ind Ltd | 鉄道用台車及び鉄道車両 |
CN201837533U (zh) * | 2010-03-22 | 2011-05-18 | 株洲时代新材料科技股份有限公司 | 橡胶弹性组件径向、轴向、剪切、扭转4向加载疲劳试验装置 |
CN201677889U (zh) * | 2010-05-12 | 2010-12-22 | 株洲时代新材料科技股份有限公司 | 一种地铁车辆用牵引橡胶关节 |
CN201863861U (zh) * | 2010-10-27 | 2011-06-15 | 株洲时代新材料科技股份有限公司 | 一种轨道车辆用抗侧滚扭杆系统 |
CN201914270U (zh) * | 2010-12-24 | 2011-08-03 | 南车南京浦镇车辆有限公司 | 对半式扭杆橡胶套 |
CN102865324A (zh) * | 2012-10-22 | 2013-01-09 | 株洲时代新材料科技股份有限公司 | 一种轨道车辆转臂定位装置及其加工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104925079A (zh) | 2015-09-23 |
CN106314469A (zh) | 2017-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106314469B (zh) | 一种改善轨道车辆转向架整体性能的方法及悬挂减振系统 | |
CN201186655Y (zh) | 一系悬挂结构 | |
CN201472404U (zh) | 轨道车辆一系悬挂结构 | |
EP3369640A1 (en) | Method for improving overall performance of rail vehicle bogie and suspension damping system | |
CN205872075U (zh) | 低地板铰接式轨道车辆转向架悬挂牵引装置 | |
CN103241258A (zh) | 一种转向架构架 | |
CN109532916B (zh) | 轨道车辆用转臂节点及其设计方法 | |
US8701564B2 (en) | Self-steering radial bogie | |
Orlova et al. | The anatomy of railway vehicle running gear | |
CN105923003A (zh) | 一种低地板轨道车辆转向架二系悬挂装置及转向架 | |
CN207875659U (zh) | 无人驾驶机车转向架 | |
CN106080642A (zh) | 低地板轨道车辆转向架摇枕结构及转向架 | |
CN205769308U (zh) | 一种低地板轨道车辆转向架二系悬挂装置及转向架 | |
CN205706688U (zh) | 一种低地板铰接式轨道车辆转向架悬挂牵引装置 | |
CN218971714U (zh) | 一种带缓冲块的新型副车架衬套 | |
CN106627638A (zh) | 通过调整橡胶层厚度防止轴箱轴承磨损的方法及转臂节点 | |
CN205930746U (zh) | 转向架 | |
CN106627643A (zh) | 调整橡胶层预压缩量改变转臂节点刚度的方法及转臂节点 | |
JPS5950546B2 (ja) | 鉄道の車台受け装置 | |
CN210083223U (zh) | 轴箱橡胶垫及轨道车辆转向架 | |
JPH01500259A (ja) | レール車両用機械式制御装置 | |
CN207311469U (zh) | 一种观光火车小曲线减磨转向架 | |
CN205769310U (zh) | 一种低地板轨道车辆转向架摇枕结构及转向架 | |
CN205706687U (zh) | 一种低地板轨道车辆转向架牵引装置及转向架 | |
CN105923006A (zh) | 一种低地板轨道车辆转向架摇枕结构及转向架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200602 Address after: 412007 No.301, physical and chemical building, Liyu Industrial Park, no.639, Heilongjiang Road, Tianyuan District, Zhuzhou City, Hunan Province Patentee after: Zhuzhou Times Ruiwei damping equipment Co., Ltd Address before: 412007 No. 18 Haitian Road, Tianyuan District, Hunan, Zhuzhou Patentee before: Zhuzhou Times New Material Technology Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201014 Address after: 412007 No. 18 Haitian Road, Tianyuan District, Hunan, Zhuzhou Patentee after: Zhuzhou Times New Material Technology Co.,Ltd. Address before: 412007 No.301, physical and chemical building, Liyu Industrial Park, no.639, Heilongjiang Road, Tianyuan District, Zhuzhou City, Hunan Province Patentee before: Zhuzhou Times Ruiwei damping equipment Co., Ltd |
|
TR01 | Transfer of patent right | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20170111 Assignee: Zhuzhou Times Ruiwei damping equipment Co., Ltd Assignor: ZHUZHOU TIMES NEW MATERIAL TECHNOLOGY Co.,Ltd. Contract record no.: X2021980010561 Denomination of invention: A method for improving the overall performance of rail vehicle bogie and suspension damping system Granted publication date: 20180605 License type: Common License Record date: 20211012 |
|
EE01 | Entry into force of recordation of patent licensing contract |