Prior art keywords
workpiece
production line
information
shelf
label information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610626446.4A
Other languages
Chinese (zh)
Inventor
段文彬
胡冲
阳力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Microid Technology Co Ltd
Original Assignee
Chongqing Microid Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Microid Technology Co Ltd filed Critical Chongqing Microid Technology Co Ltd
Priority to CN201610626446.4A priority Critical patent/CN106296082A/en
Publication of CN106296082A publication Critical patent/CN106296082A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06KGRAPHICAL DATA READING; PRESENTATION OF DATA; RECORD CARRIERS; HANDLING RECORD CARRIERS
    • G06K7/00Methods or arrangements for sensing record carriers, e.g. for reading patterns
    • G06K7/0008General problems related to the reading of electronic memory record carriers, independent of its reading method, e.g. power transfer

Abstract

The present invention provides management method and the system of a kind of workshop workpiece stock, belongs to the radio-frequency technique application in workshop management, and wherein, described management method includes: obtain the label information on the shelf of workpiece place that rolls off the production line;Roll off the production line described in the acquisition some or all of machining information of workpiece is as its bin information, and with described label information, described bin information is associated storage;Roll off the production line described in having detected workpiece entry/exit storehouse time, roll off the production line described in acquisition the label information on the shelf of workpiece place, and stored to time of major general's part/bin information of all associating with described label information and the described workpiece entry/exit storehouse that rolls off the production line as the described record rolling off the production line workpiece entry/exit storehouse, present invention achieves the fine-grained management of stock, improve work efficiency for enterprise, reduce production cost.

Description

The management method of a kind of workshop workpiece stock and system
Technical field
The present invention relates to shop logistics management technique, particularly relate to the management method of a kind of workshop workpiece stock and be System.
Background technology
In existing press workshop, need stamping products is rolled off the production line, put in storage, the Job Operations such as outbound, and the most right The management of processing site stamping products, also in the mode of labor management, obtains, by the way of artificial registration, the punching press rolled off the production line The quantity of product, and the management of stamping products in/out storehouse situation, thus manage the stock of stamping products, arrange with this Generation progress.But this above-mentioned existing method has certain limitation, it is impossible to timely and accurately obtain plant site and produce The truthful data of product stock, and then it is unfavorable for enterprise's field management, it is impossible to realize the rational configuration of resource.
Summary of the invention
The shortcoming of prior art in view of the above, it is an object of the invention to provide the management of a kind of workshop workpiece stock Method and system, for solving the problem that existing press workshop cannot quickly and accurately obtain on-the-spot product inventory truthful data.
For achieving the above object and other relevant purposes, the present invention provides techniques below scheme:
The management method of a kind of workshop workpiece stock, described management method comprises the following steps: obtain workpiece place of rolling off the production line Label information on shelf;Roll off the production line described in the acquisition some or all of machining information of workpiece is as its bin information, and by institute State bin information and associated storage with described label information;Roll off the production line described in having detected workpiece entry/exit storehouse time, obtain described Roll off the production line the label information on the shelf of workpiece place, and to major general's part/bin information of all associating with described label information and The time of the described workpiece entry/exit storehouse that rolls off the production line is stored as the described record rolling off the production line workpiece entry/exit storehouse.
Preferably, further comprise the steps of: when rolling off the production line workpiece entry/exit storehouse described in having detected, if obtaining described lower lineman Label information failure on the shelf of part place, then send the first alerting signal;If rolling off the production line described in Huo Quing on the shelf of workpiece place Label information success, then send the second alerting signal.
Preferably, when the workpiece that rolls off the production line described in having detected goes out storehouse, also include rolling off the production line described in initialization label place goods The step of label information on frame.
Preferably, the label information on described shelf is the label information being previously written in electronic tag, described electronics Label is arranged on described shelf.
Additionally, additionally provide the management system of a kind of workshop workpiece stock, described management system includes: first information collection System, for obtaining the label information on the shelf of workpiece place that rolls off the production line;Second information acquisition system, be used for having detected described under During lineman's part entry/exit storehouse, roll off the production line described in acquisition the label information on the shelf of workpiece place, and server system is used for obtaining institute State the some or all of machining information of the workpiece that rolls off the production line as its bin information, and described bin information is believed with by described first The described label information that breath acquisition system obtains is associated storage;And to major general part/all associate with described label information Bin information and time of the described workpiece entry/exit storehouse that rolls off the production line stored up as the described record rolling off the production line workpiece entry/exit storehouse Deposit.
Preferably, also include: tag read state prompt system, for workpiece entry/exit storehouse of rolling off the production line described in detected Fang Shi, if the label information failure rolled off the production line described in Huo Quing on the shelf of workpiece place, then sends the first alerting signal;If obtaining described The label information on the shelf of workpiece place that rolls off the production line is successful, then send the second alerting signal.
Preferably, described server system also includes: label initialization module, for the workpiece that rolls off the production line described in detected When going out storehouse, also include initializing described in roll off the production line the step of label information on the shelf of label place.
Preferably, the label information on described shelf is the label information being previously written in electronic tag, described electronics Label is arranged on described shelf.
As it has been described above, the method have the advantages that the present invention realizes by binding electronic tag on shelf Associating of the workpiece that rolls off the production line is loaded, as long as the label information in reading electronic labels comes whenever shelf turnover storehouse afterwards with it Obtain the workpiece information of turnover storehouse, and the time of the workpiece turnover storehouse that rolls off the production line is carried out record, reach the fine of stock control Change, thus improve work efficiency, reduce production cost.
Accompanying drawing explanation
Fig. 1 is shown as a kind of implementing procedure figure of the management method of a kind of workshop of present invention workpiece stock.
Fig. 2 is shown as the another kind of implementing procedure figure of the management method of a kind of workshop of present invention workpiece stock.
Fig. 3 is shown as a kind of of the management system of a kind of workshop of present invention workpiece stock and implements schematic diagram.
Fig. 4 is shown as the another kind of of the management system of a kind of workshop of present invention workpiece stock and implements schematic diagram.
Drawing reference numeral explanation
100 first information acquisition systems
200 second information acquisition systems
300 server systems
400 tag read state prompt systems
500 label initialization modules
S10~S50 step
Detailed description of the invention
Below by way of specific instantiation, embodiments of the present invention being described, those skilled in the art can be by this specification Disclosed content understands other advantages and effect of the present invention easily.The present invention can also be by the most different concrete realities The mode of executing is carried out or applies, the every details in this specification can also based on different viewpoints and application, without departing from Various modification or change is carried out under the spirit of the present invention.It should be noted that, in the case of not conflicting, following example and enforcement Feature in example can be mutually combined.
It should be noted that the diagram provided in following example illustrates the basic structure of the present invention the most in a schematic way Think, the most graphic in component count, shape and size time only display with relevant assembly in the present invention rather than is implemented according to reality Drawing, during its actual enforcement, the kenel of each assembly, quantity and ratio can be a kind of random change, and its assembly layout kenel is also It is likely more complexity.
Embodiment 1
Referring to Fig. 1, the present embodiment provides the management method of a kind of workshop workpiece stock, and it can include that implemented below walks Rapid:
Step S10, obtains the label information on the shelf of workpiece place that rolls off the production line;
Step S20, the some or all of machining information of the workpiece that rolls off the production line described in acquisition is as its bin information, and by described Bin information is associated storage with described label information;
Step S30, detected described in roll off the production line workpiece entry/exit storehouse time, roll off the production line on the shelf of workpiece place described in acquisition Label information, and to major general's part/bin information of all associating with described label information and the described workpiece entry/exit storehouse that rolls off the production line Time stored as the described record rolling off the production line workpiece entry/exit storehouse.
In above-mentioned steps S10, the workpiece that rolls off the production line refers to the workpiece after machining.The workpiece that rolls off the production line can be loaded on shelf, So that transporting storehouse to, such as with forklift picking frame.And on each shelf, there is a label information, described label information Realize by installing an electronic tag on shelf, i.e. can be previously written label information in electronic tag and make For label information, the such as coding of artificial write;The labelling that electronic tag itself can also be utilized to have is used as label information, The serial number of such as electronic tag.Shelf are installed electronic tag be equivalent to number to shelf, read goods by this step Label information in electronic tag on frame, can be to record lineman's part turnover storehouse in subsequent step to prepare.
In above-mentioned steps S20, the work pieces process that rolls off the production line after completing to roll off the production line relative machining information be can be from processing line Upper reading, i.e. can read the information relevant to the workpiece that rolls off the production line by data-interface, the most existing press, can be from it Upper reading is rolled off the production line under the vehicle of workpiece, part name, packing number, date of manufacture, production order of classes or grades at school, shelf on-line time, shelf The machining informations such as line time.The machining information obtaining the workpiece that rolls off the production line can specify its bin information on shelf, such as, workpiece Quantity and type etc., i.e. can may know that the situation of the workpiece that rolls off the production line on shelf.And then by bin information and shelf Label information is associated storing, and is stored by this association and just indirectly can obtain on shelf by reading label information Roll off the production line the bin information of workpiece.
It is to be appreciated that not necessarily according to the order of step S20 after first step S10 between above-mentioned steps S20 and step S10 It is practiced, both arbitrarily can carry out above-mentioned steps S10 and step S20 by sequencing, it is also possible to be step S10 and step S20 is carried out simultaneously.
Above-mentioned steps S30, can transport storehouse by the workpiece that rolls off the production line thereon by shelf, be transported further according to demand afterwards Go out storehouse, when shelf turnover storehouse, read label information thereon, and then understand the bin information of its upper and lower lineman's part, that Just the workpiece that rolls off the production line can be carried out record, such that it is able to understand in real time according to the time of this bin information and turnover storehouse Roll off the production line the inventory data of workpiece.
Concrete, obtaining time of shelf entry/exit storehouse both can be by being used as reading the time of label information Roll off the production line time of workpiece entry/exit storehouse, it is also possible to be used as being read out self-contained temporal information by label information Roll off the production line time of workpiece entry/exit storehouse.
In being embodied as, as a example by punching press vehicle frame, the process that realizes of above-mentioned management method can be: first specifies shelf The advanced order gone out again is come by storehouse, workpiece is processed complete after first case, the workpiece that will roll off the production line loads extremely On shelf with label information, and the machining information reading shelf upper and lower lineman part from press is used as bin information, By fork truck, the shelf being loaded with the workpiece that rolls off the production line are transported into storehouse afterwards, then carry it out storehouse, Mei Danghuo further according to needs When frame is transported entry/exit storehouse, all can be read into label information the most thereon and the time of entry/exit storehouse, then utilize This label information obtains the information of the workpiece that rolls off the production line of entry/exit storehouse indirectly, and remembers according to the time of this entry/exit storehouse Record, thus obtain the information of the workpiece that rolls off the production line of all entry/exit storehouses, generally comprise quantity, type and turnover time, it is achieved under to The management of the Real-time inventory data of lineman's part.
In a preferred embodiment, see Fig. 2, owing to shelf are dependent on what fork truck was carried at entry/exit storehouse, the department of fork truck Machine can't know whether the label information on shelf is successfully read, and therefore can remind driver's label by following steps Whether information is successfully read:
Step S40, when rolling off the production line workpiece entry/exit storehouse described in having detected, if rolling off the production line workpiece place shelf described in Huo Quing On label information failure, then send the first alerting signal;If rolling off the production line described in Huo Quing, the label information on the shelf of workpiece place becomes Merit, then send the second alerting signal.
By above-mentioned steps S40, it is possible to prevent the skip of label information, it is to avoid thereby result in the confusion of stock control.
In addition, it is contemplated that shelf are after the workpiece delivery that will roll off the production line goes out storehouse, it is also possible to again it is reused, also May comprise steps of:
Step S50, when the workpiece that rolls off the production line described in having detected goes out storehouse, also include rolling off the production line described in initialization label place goods The step of label information on frame.
By above-mentioned steps S50, label information being carried out initialization makes it to reuse, and specifically, i.e. releases The incidence relation of label information.
Embodiment 2
Seeing that Fig. 3, the present embodiment additionally provide the management system of a kind of workshop workpiece stock, it includes first information collection system System 100, for obtaining the label information on the shelf of workpiece place that rolls off the production line;Second information acquisition system 200, is used for detecting Stating when rolling off the production line workpiece entry/exit storehouse, roll off the production line described in acquisition the label information on the shelf of workpiece place, and server system 300 is used for Roll off the production line described in the acquisition some or all of machining information of workpiece as its bin information, and by described bin information with by described The described label information that first information acquisition system 100 obtains is associated storage;And to major general part/all with described label The bin information of information association and the time of the described workpiece entry/exit storehouse that rolls off the production line are as the note of the described workpiece entry/exit storehouse that rolls off the production line Record is stored.
Above-mentioned first information acquisition system 100 and the second information acquisition system 200, can be by radio-frequency (RF) tag reader (hereinafter referred reader), antenna and communication network are constituted, concrete, can be to connect antenna on reader to read Label information in electronic tag, is sent the label information read by communication network the most again.Usually, the first letter Breath acquisition system 100 is arranged on workpiece and rolls off the production line out, and the second information acquisition system 200 arranges storehouse import/export, it is clear that first The quantity of information acquisition system 100 and the second information acquisition system 200 can set according to actual needs, can be multiple.
Above-mentioned server system 300, its respectively with first information acquisition system 100 and the second information acquisition system 200 net Network connects, additionally, it can also obtain the machining information of the workpiece that rolls off the production line from the processing line at workpiece place of rolling off the production line, for example, it is possible to The relevant information of workpiece is read, such as the roll off the production line vehicle of workpiece, part name, packing number, date of manufacture, production from press The information such as order of classes or grades at school, shelf on-line time, shelf downtime.
In being embodied as, the label information on described shelf is the label information being previously written in electronic tag, institute State electronic tag to be arranged on described shelf.
The operation principle of above-mentioned management system is: when workpiece rolls off the production line, cases it, is i.e. loaded in predetermined shelf On, read the bin information of workpiece on the label information on shelf and shelf, such as quantity, type etc. simultaneously, then incite somebody to action the two Binding association stores, and i.e. can indirectly obtain the information of shelf upper and lower lineman part by reading the label information on shelf;It After during the workpiece that rolls off the production line is with shelf turnover storehouse, can read the label information on shelf to obtain it upper and lower when entry/exit The information of lineman's part, and then recorded, this record can include rolling off the production line time of workpiece entry/exit storehouse, thus realize right The real-time management of workpiece stock.
In being embodied as, see Fig. 4, it is also possible to include tag read state prompt system 400, for detecting State when rolling off the production line workpiece entry/exit storehouse, if the label information failure rolled off the production line described in Huo Quing on the shelf of workpiece place, then send first and carry Awake signal;If rolling off the production line described in Huo Quing, the success of the label information on the shelf of workpiece place, then send the second alerting signal.
In being embodied as, see Fig. 4, it is also possible to include label initialization module 500, for rolling off the production line described in having detected When workpiece goes out storehouse, also include initializing described in roll off the production line the step of label information on the shelf of label place.
In sum, the present invention realizes being loaded the pass of the workpiece that rolls off the production line with it by binding electronic tag on shelf Connection, as long as whenever shelf turnover storehouse, the label information in reading electronic labels obtains the workpiece letter of turnover storehouse afterwards Breath, and the time of the workpiece turnover storehouse that rolls off the production line is carried out record, reaches becoming more meticulous of stock control, thus improve work efficiency, Reduce production cost.So, the present invention effectively overcomes various shortcoming of the prior art and has high industrial utilization.
The principle of above-described embodiment only illustrative present invention and effect thereof, not for limiting the present invention.Any ripe Above-described embodiment all can be modified under the spirit and the scope of the present invention or change by the personage knowing this technology.Cause This, have usually intellectual such as complete with institute under technological thought without departing from disclosed spirit in art All equivalences become are modified or change, and must be contained by the claim of the present invention.

Claims (8)

1. the management method of a workshop workpiece stock, it is characterised in that described management method comprises the following steps:
Obtain the label information on the shelf of workpiece place that rolls off the production line;
Roll off the production line described in the acquisition some or all of machining information of workpiece is as its bin information, and by described bin information and institute State label information and associated storage;
Roll off the production line described in having detected workpiece entry/exit storehouse time, roll off the production line described in acquisition the label information on the shelf of workpiece place, and extremely The time of major general's part/bin information of all associating with described label information and the described workpiece entry/exit storehouse that rolls off the production line is as institute The record stating the workpiece entry/exit storehouse that rolls off the production line is stored.
The management method of workshop workpiece stock the most according to claim 1, it is characterised in that further comprise the steps of:
When rolling off the production line workpiece entry/exit storehouse described in having detected, if the label information rolled off the production line described in Huo Quing on the shelf of workpiece place Failure, then send the first alerting signal;If rolling off the production line described in Huo Quing, the success of the label information on the shelf of workpiece place, then send second Alerting signal.
The management method of workshop workpiece stock the most according to claim 1, it is characterised in that roll off the production line described in having detected When workpiece goes out storehouse, also include initializing described in roll off the production line the step of label information on the shelf of label place.
The management method of workshop workpiece stock the most according to claim 1, it is characterised in that the label letter on described shelf Breath is the label information being previously written in electronic tag, and described electronic tag is arranged on described shelf.
5. the management system of a workshop workpiece stock, it is characterised in that including:
First information acquisition system, for obtaining the label information on the shelf of workpiece place that rolls off the production line;
Second information acquisition system, be used for having detected described in roll off the production line workpiece entry/exit storehouse time, workpiece place of rolling off the production line described in acquisition Label information on shelf,
Server system, the some or all of machining information of the workpiece that rolls off the production line described in obtain, and will as its bin information Described bin information is associated storage with the described label information obtained by described first information acquisition system;And to major general portion The bin information and the described time rolling off the production line workpiece entry/exit storehouse that divide/all associate with described label information roll off the production line as described The record of workpiece entry/exit storehouse is stored.
The management system of workshop workpiece stock the most according to claim 5, it is characterised in that also include:
Tag read state prompt system, for when rolling off the production line workpiece entry/exit storehouse, if rolling off the production line described in Huo Quing described in having detected Label information failure on the shelf of workpiece place, then send the first alerting signal;If rolling off the production line described in Huo Quing on the shelf of workpiece place Label information success, then send the second alerting signal.
The management system of workshop workpiece stock the most according to claim 5, it is characterised in that described server system also wraps Include:
Label initialization module, for when the workpiece that rolls off the production line described in having detected goes out storehouse, also include rolling off the production line described in initialization mark Sign the step of label information on the shelf of place.
The management system of workshop workpiece stock the most according to claim 5, it is characterised in that the label letter on described shelf Breath is the label information being previously written in electronic tag, and described electronic tag is arranged on described shelf.
CN201610626446.4A 2016-08-02 2016-08-02 The management method of a kind of workshop workpiece stock and system Pending CN106296082A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610626446.4A CN106296082A (en) 2016-08-02 2016-08-02 The management method of a kind of workshop workpiece stock and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610626446.4A CN106296082A (en) 2016-08-02 2016-08-02 The management method of a kind of workshop workpiece stock and system

Publications (1)

Publication Number Publication Date
CN106296082A true CN106296082A (en) 2017-01-04

Family

ID=57664447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610626446.4A Pending CN106296082A (en) 2016-08-02 2016-08-02 The management method of a kind of workshop workpiece stock and system

Country Status (1)

Country Link
CN (1) CN106296082A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108229796A (en) * 2017-12-15 2018-06-29 重庆微标科技股份有限公司 A kind of film production management system and method
CN111027905A (en) * 2019-12-04 2020-04-17 重庆微标科技股份有限公司 RFID doorway detection method and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201503591U (en) * 2009-06-02 2010-06-09 上海坤锐电子科技有限公司 Ultra-high-frequency reader and forklift terminal system
CN202976142U (en) * 2012-10-25 2013-06-05 广州市嘉诚国际物流股份有限公司 Shelf label RFID reader used in fork trucks
CN204824026U (en) * 2015-06-25 2015-12-02 福建坤华仪自动化仪器仪表有限公司 A fork truck for goods freezer intelligent management system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201503591U (en) * 2009-06-02 2010-06-09 上海坤锐电子科技有限公司 Ultra-high-frequency reader and forklift terminal system
CN202976142U (en) * 2012-10-25 2013-06-05 广州市嘉诚国际物流股份有限公司 Shelf label RFID reader used in fork trucks
CN204824026U (en) * 2015-06-25 2015-12-02 福建坤华仪自动化仪器仪表有限公司 A fork truck for goods freezer intelligent management system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108229796A (en) * 2017-12-15 2018-06-29 重庆微标科技股份有限公司 A kind of film production management system and method
CN111027905A (en) * 2019-12-04 2020-04-17 重庆微标科技股份有限公司 RFID doorway detection method and system

Similar Documents

Publication Publication Date Title
Michael et al. The pros and cons of RFID in supply chain management
US20090164305A1 (en) System and method for managing product quality
CN102999828B (en) For data processing method and the device of relief goods monitoring
US20090251294A1 (en) Article management system and article management method
KR101276495B1 (en) System and method for producing and managing medicine by using rfid
CN104680346A (en) Cycle logistics packaging operation management method based on RFID (Radio Frequency Identification Devices) electronic tag
Costa et al. Improving visibility using RFID–the case of a company in the automotive sector
CN104504552A (en) Warehousing operation device and method based on RFID (radio frequency identification device) technology
CN103761631A (en) Intelligent warehouse cargo management method adopting RFID technology
McCathie The advantages and disadvantages of barcodes and radio frequency identification in supply chain management
CN106203917A (en) A kind of intelligent storage Internet of Things
CN105528692A (en) IOT(internet of things) warehousing control system
CN108510214A (en) Inventory management system based on RFID technique
CN104182855A (en) Printed circuit board (PCB) quality tracing method
CN107180319A (en) A kind of unattended WMS based on RFID technique
CN106296082A (en) The management method of a kind of workshop workpiece stock and system
CN104537514A (en) Material delivery method based on RFID
CN109509003A (en) Supply chain system for tracing and managing based on RFID technique
CN107967584B (en) Goods transportation process monitoring method based on intelligent tray
CN110795601A (en) System and method for classifying and intelligently storing industrial waste salt
Qu et al. RFID-enabled smart assembly workshop management system
CN112712320A (en) Reinforcing steel bar transportation method, device and system
Ghelichi et al. A study on RFID-based Kanban system in inventory management
CN115310909A (en) Operation cargo transportation processing method and related equipment
US8686835B2 (en) Baggage arrangement management method and carrying apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104

RJ01 Rejection of invention patent application after publication