CN106285690B - A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support - Google Patents

A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support Download PDF

Info

Publication number
CN106285690B
CN106285690B CN201610648505.8A CN201610648505A CN106285690B CN 106285690 B CN106285690 B CN 106285690B CN 201610648505 A CN201610648505 A CN 201610648505A CN 106285690 B CN106285690 B CN 106285690B
Authority
CN
China
Prior art keywords
liner plate
country rock
fine ore
vertical shaft
ore collection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610648505.8A
Other languages
Chinese (zh)
Other versions
CN106285690A (en
Inventor
严庆文
陆跃邦
李国清
朱家锐
彭天松
滕高礼
周关虎
黎飞
孙超
李春祥
张泽裕
杨海辉
毛明发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Chihong Zinc and Germanium Co Ltd
Original Assignee
Yunnan Chihong Zinc and Germanium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Chihong Zinc and Germanium Co Ltd filed Critical Yunnan Chihong Zinc and Germanium Co Ltd
Priority to CN201610648505.8A priority Critical patent/CN106285690B/en
Publication of CN106285690A publication Critical patent/CN106285690A/en
Application granted granted Critical
Publication of CN106285690B publication Critical patent/CN106285690B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D8/00Shafts not provided for in groups E21D1/00 - E21D7/00
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • E21D1/03Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws
    • E21D1/06Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws with shaft-boring cutters
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/04Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/12Accessories for making shaft linings, e.g. suspended cradles, shutterings

Abstract

The present invention relates to a kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support, belong to fine ore collection Construction Technology field;The ultradeep well shaft bottom fine ore collection vertical shaft includes liner plate, weldering nail, country rock, four part of concrete supporting;The liner plate is fixed on inside country rock, interim safeguard measure of the liner plate as country rock early period, and also serves as later stage concrete-pouring template, and the weldering nail is connect with liner plate, to realize that liner plate and concrete form entirety;Gap is poured there are certain thickness between liner plate and country rock, the permanent support measure in gap after casting concrete as ultradeep well shaft bottom fine ore collection vertical shaft.Patent of the present invention can be realized carries out quick supporting to the borehole wall, improves operating environment, enhances prop intensity, it is ensured that adjoining rock stability is run.

Description

A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support
Technical field
The invention belongs to fine ore collection Construction Technology field, returned specifically, being related to a kind of ultradeep well shaft bottom fine ore Receive vertical shaft and its rapid construction method for protecting support.
Background technology
Skip in shaft promotion has that ore and fine ore scatter, by for many years it was verified that although adopting in design Corresponding technical measures are taken, are strengthened management in production, can only also reduce the amount of scattering of fine ore, it is impossible to fine ore be avoided to scatter phenomenon Occur.Fine ore collection mode need to be combined with mine development mode, have auxiliary shaft recycling, inclined shaft recycling to recycle three with staple at present Kind fine ore collection mode.Vertical shaft way of recycling has quantities small, the features such as short time limit, suitable for being equipped with tail rope and steel guide Vertical shaft.The factors such as high stress, high confining pressure, the High-geotemperature brought however, as ultra-deep portion environment, and thus cause rock burst, floods The unfavorable conditions such as evil such as often will appear borehole wall wall caving when construct powder ore recovery system, collapse at the accidents, and it is safe to influence the later stage Stable operation, it would therefore be highly desirable to provide a kind of fine ore collection vertical shaft for being adapted to and safe construction can quickly being carried out under the particular surroundings.
Invention content
In view of the above-mentioned problems, the present invention proposes a kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction supporting side Method using liner plate as the gib measure of country rock early period, and also serves as later stage concrete-pouring template, and it is suitable for ultra-deep Country rock fast and safe construction under the conditions of portion, rich water, severe geology avoids occurring the borehole wall wall caving during construction powder ore recovery system, collapsing It the accidents such as collapses, influences the safe and stable operation of construction in later period.
To solve the above-mentioned problems, the technical solution adopted in the present invention:
The ultradeep well shaft bottom fine ore collection vertical shaft includes liner plate 1, weldering nail 2, country rock 3, concrete supporting 4, described Country rock 3 be internally provided with liner plate 1, weldering nail 2 is uniformly staggered on the outer wall of liner plate 1, stayed between liner plate 1 and country rock 3 Gap is poured, concrete supporting 4 has been poured in the gap between liner plate 1 and country rock 3.
Preferably, the weldering nail 2 is attached with liner plate 1 by the way of welding.
Preferably, the country rock 3 is reserved with thickness as h2The deficient digging layer of=0~50mm, the length L and coagulation of weldering nail 2 The relationship of the thickness D of native branch sheath 4 is D=L+h1+h2, wherein, h1=30~50mm is the concrete cover of code requirement.
The rapid construction method for protecting support of ultradeep well shaft bottom fine ore collection vertical shaft recorded above, includes the following steps:
Step 1:Drilling well
Using the quick vertical driving of raise boring machine 5, the molding of fine ore collection vertical shaft country rock is realized;
Step 2:Supporting
Tunnel interim safeguard measure of the molding 3 inside supporting liner plate 1 of country rock as country rock 3, liner plate vertically in step 1 1 from bottom to top segmentation installed, between adjacent liner plates 1 using weld by the way of be attached;During supporting, liner plate 1 and country rock 3 Between there are pour gap;
Step 3:It pours
That is reserved between liner plate 1 and country rock 3 pours casting concrete in gap, makes concrete slurry solidification and liner plate 1 On weldering nail 2 and country rock 3 inner wall formed integral structure, realize the fixation to liner plate 1, make liner plate 1 as the permanent of country rock 3 Supporting measure;
Step 4:Preservative treatment
Preservative treatment is carried out to liner plate 1 in 3 days after concreting, the anti-of liner plate 1 is realized by the way of mopping Corruption processing, avoids liner plate 1 from contacting corrosion with wet air in ultradeep well.
Beneficial effects of the present invention:
The present invention uses interim safeguard measure of the liner plate as country rock early period, and also serve as later stage concrete-pouring template, can Quick supporting is carried out to the borehole wall to realize, improves operating environment, enhances prop intensity, it is ensured that adjoining rock stability is run.
Description of the drawings
Fig. 1 is the structure diagram of the present invention;
Fig. 2 is raise boring machine rapid construction fine ore collection vertical shaft simplified schematic diagram of the present invention.
In figure, 1- liner plates, 2- welderings nail, 3- country rocks, 4- concrete supportings, 5- raise boring machines.
Specific embodiment
Below in conjunction with the embodiment of the present invention and attached drawing, the technical solution in the embodiment of the present invention is carried out clear, complete Ground describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.Based on this Embodiment in invention, the every other reality that those of ordinary skill in the art are obtained without making creative work Example is applied, shall fall within the protection scope of the present invention.
Embodiment 1
The ultradeep well shaft bottom fine ore collection vertical shaft includes liner plate 1, weldering nail 2, country rock 3, concrete supporting 4, described Country rock 3 be internally provided with liner plate 1, weldering nail 2 is uniformly staggered on the outer wall of liner plate 1, weldering nail 2 is with liner plate 1 using weldering The mode connect is attached;There are gap is poured between liner plate 1 and country rock 3, poured in the gap between liner plate 1 and country rock 3 Concrete supporting 4;When country rock 3 occurs owing to dig h2When, the length L of the weldering nail 2 is with the thickness D's of concrete supporting 4 Relationship is D=L+h1, reserve and owe to dig thickness h2It is when being dug in order to ensure the appearance of country rock 3 is deficient, weldering nail 2 still has the coagulation of code requirement Protective soil layer thickness h1, it is ensured that the supporting intensity of ultradeep well shaft bottom fine ore collection vertical shaft.
The rapid construction method for protecting support of ultradeep well shaft bottom fine ore collection vertical shaft recorded above, includes the following steps:
Step 1:Drilling well
Using the quick vertical driving of raise boring machine 5, the molding of fine ore collection vertical shaft country rock is realized;
Step 2:Supporting
Tunnel interim safeguard measure of the molding 3 inside supporting liner plate 1 of country rock as country rock 3, liner plate vertically in step 1 1 from bottom to top segmentation installed, between adjacent liner plates 1 using weld by the way of be attached;During supporting, liner plate 1 and country rock 3 Between there are pour gap;
Step 3:It pours
That is reserved between liner plate 1 and country rock 3 pours casting concrete in gap, makes concrete slurry solidification and liner plate 1 On weldering nail 2 and country rock 3 inner wall formed integral structure, realize the fixation to liner plate 1, make liner plate 1 as the permanent of country rock 3 Supporting measure;
Step 4:Preservative treatment
Preservative treatment is carried out to liner plate 1 in 3 days after concreting, the anti-of liner plate 1 is realized by the way of mopping Corruption processing, avoids liner plate 1 from contacting corrosion with wet air in ultradeep well.
Embodiment 2
The ultradeep well shaft bottom fine ore collection vertical shaft includes liner plate 1, weldering nail 2, country rock 3, concrete supporting 4, described Country rock 3 be internally provided with liner plate 1, weldering nail 2 is uniformly staggered on the outer wall of liner plate 1, weldering nail 2 is with liner plate 1 using weldering The mode connect is attached;There are gap is poured between liner plate 1 and country rock 3, poured in the gap between liner plate 1 and country rock 3 Concrete supporting 4.When country rock 3 does not occur owing to dig, the length L of the weldering nail 2 is with the thickness D's of concrete supporting 4 Relationship is D=L+h1+h2, the thickness of concrete supporting 4 is expanded, it is strong to enhance the supporting of ultradeep well shaft bottom fine ore collection vertical shaft Degree, it is ensured that country rock 3 can steady operation, ensure fine ore collection work stable operation.
The rapid construction method for protecting support of ultradeep well shaft bottom fine ore collection vertical shaft recorded above, includes the following steps:
Step 1:Drilling well
Using the quick vertical driving of raise boring machine 5, the molding of fine ore collection vertical shaft country rock is realized;
Step 2:Supporting
Tunnel interim safeguard measure of the molding 3 inside supporting liner plate 1 of country rock as country rock 3, liner plate vertically in step 1 1 from bottom to top segmentation installed, between adjacent liner plates 1 using weld by the way of be attached;During supporting, liner plate 1 and country rock 3 Between there are pour gap;
Step 3:It pours
That is reserved between liner plate 1 and country rock 3 pours casting concrete in gap, makes concrete slurry solidification and liner plate 1 On weldering nail 2 and country rock 3 inner wall formed integral structure, realize the fixation to liner plate 1, make liner plate 1 as the permanent of country rock 3 Supporting measure;
Step 4:Preservative treatment
Preservative treatment is carried out to liner plate 1 in 3 days after concreting, the anti-of liner plate 1 is realized by the way of mopping Corruption processing, avoids liner plate 1 from contacting corrosion with wet air in ultradeep well.
The operation principle of the present invention:Country rock 3 is formed using raise boring machine speedy drivage, after country rock 3 tunnels, edge immediately 3 inner wall of country rock fixes liner plate 1, quickly to form interim safeguard measure, and using stud welding weldering nail on liner plate 1, liner plate 1 with Concreting gap is reserved between country rock 3;After liner plate 1 is completely fixed, concreting is carried out immediately, to form coagulation The native borehole wall carries out permanent support, and liner plate 1, weldering nail 2 and concrete supporting 4 is made to form an entirety, shape after concreting Into the permanent support layer of country rock 3;Preservative treatment is carried out to liner plate 1 in 3 days after concreting, avoids liner plate 1 and ultra-deep Wet air contacts corrosion in well.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although by upper It states preferred embodiment the present invention is described in detail, however, those skilled in the art should understand that, can be in form Various changes are made to it in upper and details, without departing from claims of the present invention limited range.

Claims (3)

1. a kind of ultradeep well shaft bottom fine ore collection vertical shaft, it is characterised in that:The ultradeep well shaft bottom fine ore collection vertical shaft includes Liner plate(1), weldering nail(2), country rock(3), concrete supporting(4), the country rock(3)Be internally provided with liner plate(1), weldering nail (2)Uniformly it is staggered in liner plate(1)Outer wall on, liner plate(1)With country rock(3)Between there are pour gap, liner plate(1)With enclosing Rock(3)Between gap in poured concrete supporting(4), the country rock(3)Thickness is reserved with as h2=0~50mm's It owes to dig layer, weldering nail(2)Length L and concrete supporting(4)Thickness D relationship be D=L+h1+h2, wherein, h1=30~ 50mm is the concrete cover of code requirement.
2. a kind of ultradeep well shaft bottom fine ore collection vertical shaft according to claim 1, it is characterised in that:The weldering nail(2) With liner plate(1)It is attached by the way of welding.
3. the rapid construction method for protecting support of ultradeep well shaft bottom fine ore collection vertical shaft that one claim of any of the above is recorded, special Sign is, includes the following steps:
Step 1:Drilling well
Using raise boring machine(5)Quick vertical driving, realizes the molding of fine ore collection vertical shaft country rock;
Step 2:Supporting
Tunnel molding country rock vertically in step 1(3)Internal supporting liner plate(1)As country rock(3)Interim safeguard measure, lining Plate(1)From bottom to top segmentation is installed, adjacent liner plates(1)Between using welding by the way of be attached;During supporting, liner plate (1)With country rock(3)Between there are pour gap;
Step 3:It pours
In liner plate(1)With country rock(3)Between reserve pour casting concrete in gap, make concrete slurry solidify and liner plate (1)On weldering nail(2)And country rock(3)Inner wall formed integral structure, realize to liner plate(1)Fixation, make liner plate(1)As Country rock(3)Permanent support measure;
Step 4:Preservative treatment
To liner plate in 3 days after concreting(1)Preservative treatment is carried out, liner plate is realized by the way of mopping(1)It is anti- Corruption processing, avoids liner plate(1)Corrosion is contacted with wet air in ultradeep well.
CN201610648505.8A 2016-08-10 2016-08-10 A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support Active CN106285690B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610648505.8A CN106285690B (en) 2016-08-10 2016-08-10 A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610648505.8A CN106285690B (en) 2016-08-10 2016-08-10 A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support

Publications (2)

Publication Number Publication Date
CN106285690A CN106285690A (en) 2017-01-04
CN106285690B true CN106285690B (en) 2018-07-03

Family

ID=57667427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610648505.8A Active CN106285690B (en) 2016-08-10 2016-08-10 A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support

Country Status (1)

Country Link
CN (1) CN106285690B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756889B (en) * 2018-06-08 2019-08-30 北京中煤矿山工程有限公司 Anti- well drilling machine reaming construction broken formation gib method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101349064A (en) * 2008-08-26 2009-01-21 中国水利水电第五工程局 Construction method of hydroelectric power station surge chamber vertical shaft under soft rock geological condition
CN103696774A (en) * 2013-12-06 2014-04-02 马钢(集团)控股有限公司 Development method of blind shaft frame for surface and underground parallel construction
CN203783634U (en) * 2014-03-14 2014-08-20 河北钢铁集团矿业有限公司 Mineral powder recycling structure for underground mine
CN203948125U (en) * 2014-07-24 2014-11-19 山东黄金矿业(莱州)有限公司焦家金矿 Lower ventilating shaft fine ore retracting device
CN204041105U (en) * 2014-08-13 2014-12-24 中国瑞林工程技术有限公司 A kind of skip bucket main vertical shaft fine ore collection device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101349064A (en) * 2008-08-26 2009-01-21 中国水利水电第五工程局 Construction method of hydroelectric power station surge chamber vertical shaft under soft rock geological condition
CN103696774A (en) * 2013-12-06 2014-04-02 马钢(集团)控股有限公司 Development method of blind shaft frame for surface and underground parallel construction
CN203783634U (en) * 2014-03-14 2014-08-20 河北钢铁集团矿业有限公司 Mineral powder recycling structure for underground mine
CN203948125U (en) * 2014-07-24 2014-11-19 山东黄金矿业(莱州)有限公司焦家金矿 Lower ventilating shaft fine ore retracting device
CN204041105U (en) * 2014-08-13 2014-12-24 中国瑞林工程技术有限公司 A kind of skip bucket main vertical shaft fine ore collection device

Also Published As

Publication number Publication date
CN106285690A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN105317459B (en) A kind of subregion placement method for being used to control tight roof large area caving disaster
CN103643979B (en) Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support
CA3022748C (en) Method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars
CN110939466B (en) Pier stud non-blasting roof cutting gob-side entry driving method
CN107725052B (en) One kind, which is adopted, stays integration exploitation gob side entry top plate constant-resistance anchor body beam method for protecting support
CN112855223A (en) Integrated grouting method for coal roadway penetrating through goaf wall rear-advance curtain space
CN112610251B (en) Control method of coal mining roadway top plate
CN107355226A (en) TBM construction tunnel fault belts hole section processing structure
CN109209392A (en) Loopful excavation method suitable for IV-V grade of country rock of large cross-section tunnel
CN106930766A (en) Great burying TBM construction tunnel rock burst processing structures
CN102777185A (en) Inclined well shaft construction technology
CN105756702A (en) Roadway-side mesh cage filling supporting gob-side entry retaining method
CN109595029A (en) Goaf partial stowage supporting structure and its construction method under the conditions of tight roof
CN106246195A (en) A kind of Open-type full-face rock ripper digs uses cutterhead lifting apparatus
CN113803071B (en) Thin ore body mining method based on remote intelligent heading machine
CN105240012A (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN106285690B (en) A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support
CN110578525A (en) micro-disturbance construction method for crossing operation subway tunnel by overlapping shield tunnel
CN204140092U (en) The inclined shaft deep hole grouting structure of a kind of effective reinforce adjoining rock and shutoff underground water burst
CN106522972B (en) A kind of TBM cutterheads and shield card machine processing method
CN116804369A (en) TBM (Tunnel boring machine) combined construction method for crossing bad stratum
CN207111096U (en) TBM construction tunnel fault belts hole section processing structure
CN104074526B (en) A kind of shape of a hoof open type shield structure body structure and shield construction technique thereof
CN207960680U (en) A kind of lock wall for underground coal mine waterproof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant