CN106285690A - A kind of ultradeep well shaft bottom fine ore collection vertical shaft and rapid construction method for protecting support thereof - Google Patents

A kind of ultradeep well shaft bottom fine ore collection vertical shaft and rapid construction method for protecting support thereof Download PDF

Info

Publication number
CN106285690A
CN106285690A CN201610648505.8A CN201610648505A CN106285690A CN 106285690 A CN106285690 A CN 106285690A CN 201610648505 A CN201610648505 A CN 201610648505A CN 106285690 A CN106285690 A CN 106285690A
Authority
CN
China
Prior art keywords
liner plate
country rock
fine ore
vertical shaft
ore collection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610648505.8A
Other languages
Chinese (zh)
Other versions
CN106285690B (en
Inventor
严庆文
陆跃邦
李国清
朱家锐
彭天松
滕高礼
周关虎
黎飞
孙超
李春祥
张泽裕
杨海辉
毛明发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Chihong Zinc and Germanium Co Ltd
Original Assignee
Yunnan Chihong Zinc and Germanium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Chihong Zinc and Germanium Co Ltd filed Critical Yunnan Chihong Zinc and Germanium Co Ltd
Priority to CN201610648505.8A priority Critical patent/CN106285690B/en
Publication of CN106285690A publication Critical patent/CN106285690A/en
Application granted granted Critical
Publication of CN106285690B publication Critical patent/CN106285690B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D8/00Shafts not provided for in groups E21D1/00 - E21D7/00
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • E21D1/03Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws
    • E21D1/06Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws with shaft-boring cutters
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/04Lining shafts; Linings therefor with brick, concrete, stone, or similar building materials
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D5/00Lining shafts; Linings therefor
    • E21D5/12Accessories for making shaft linings, e.g. suspended cradles, shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)
  • Revetment (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to a kind of ultradeep well shaft bottom fine ore collection vertical shaft and rapid construction method for protecting support thereof, belong to fine ore collection Construction Technology field;Described ultradeep well shaft bottom fine ore collection vertical shaft includes liner plate, weldering nail, country rock, concrete supporting four part;Described liner plate is fixed on inside country rock, and liner plate is as the interim protective measure of country rock early stage, and also serves as later stage concrete-pouring template, and described weldering nail is connected with liner plate, forms entirety in order to realize liner plate with concrete;Leave between liner plate and country rock and certain thickness pour gap, as the permanent support measure of ultradeep well shaft bottom fine ore collection vertical shaft after casting concrete in gap.The present invention can realize the borehole wall is carried out quick supporting, improves working environment, strengthens prop intensity, it is ensured that adjoining rock stability is run.

Description

A kind of ultradeep well shaft bottom fine ore collection vertical shaft and rapid construction method for protecting support thereof
Technical field
The invention belongs to fine ore collection Construction Technology field, specifically, relate to a kind of ultradeep well shaft bottom fine ore and return Receive vertical shaft and rapid construction method for protecting support thereof.
Background technology
Skip in shaft promotes and there is Ore and fine ore scatters problem, although through for many years it was verified that adopt in design Take corresponding technical measures, production is strengthened management, also can only reduce the amount of scattering of fine ore, it is impossible to avoid fine ore to scatter phenomenon Occur.Fine ore collection mode need to combine with mine development mode, has auxiliary shaft recovery, inclined shaft to reclaim at present and reclaims three with staple Plant fine ore collection mode.The features such as it is little that vertical shaft way of recycling has quantities, and the duration is short, it is adaptable to be provided with tail rope and steel guide Vertical shaft.Yet with factors such as heavily stressed, high confining pressure, High-geotemperatures that ultra-deep portion environment brings, and thus cause rock burst, floods The unfavorable conditions such as evil, often there will be borehole wall wall caving, the accident such as collapse when constructing powder ore recovery system, and affect later stage safety Stable operation, it would therefore be highly desirable to provide a kind of fine ore collection vertical shaft being adapted under this special environment can quickly carry out safe construction.
Summary of the invention
For the problems referred to above, the present invention proposes a kind of ultradeep well shaft bottom fine ore collection vertical shaft and rapid construction supporting side thereof Method, use liner plate is as the gib measure of country rock early stage, and also serves as later stage concrete-pouring template, and it is applicable to ultra-deep Country rock fast and safe construction under the conditions of portion, rich water, severe geology, it is to avoid during construction powder ore recovery system, borehole wall wall caving occurs, collapse The accident such as collapse, have influence on the safe and stable operation of construction in later period.
In order to solve the problems referred to above, the technical solution adopted in the present invention:
Described ultradeep well shaft bottom fine ore collection vertical shaft includes liner plate 1, weldering nail 2, country rock 3, concrete supporting 4, and described encloses Rock 3 be internally provided with liner plate 1, weldering nail 2 is uniformly crisscross arranged on the outer wall of liner plate 1, leaves and water between liner plate 1 and country rock 3 Build gap, the gap between liner plate 1 and country rock 3 has poured concrete supporting 4.
As preferably, described weldering nail 2 uses the mode welded to be attached with liner plate 1.
As preferably, it is h that described country rock 3 is reserved with thickness2The deficient layer that digs of=0~50mm, length L of weldering nail 2 and coagulation The relation of the thickness D of soil sheath 4 is D=L+h1+h2, wherein, h1=30~50mm, for the concrete cover of code requirement.
The rapid construction method for protecting support of the ultradeep well shaft bottom fine ore collection vertical shaft more than recorded, comprises the following steps:
Step 1: drilling well
Use raise boring machine 5 the most vertically driving, it is achieved the molding of fine ore collection vertical shaft country rock;
Step 2: supporting
The most vertically tunnel the internal supporting liner plate 1 of the country rock 3 interim protective measure as country rock 3 of molding, liner plate 1 by Lower and upper segmentation is installed, and uses the mode of welding to be attached between adjacent liner plates 1;During supporting, liner plate 1 and country rock 3 it Between leave and pour gap;
Step 3: pour
That reserves between liner plate 1 and country rock 3 pours casting concrete in gap, makes on concrete slurry solidification and liner plate 1 The inwall of weldering nail 2 and country rock 3 forms integrative-structure, it is achieved fixing liner plate 1, makes liner plate 1 as the permanent support of country rock 3 Measure;
Step 4: preservative treatment
Concreting carries out preservative treatment to liner plate 1 in terminating latter 3 days, uses the mode of mopping to realize at the anticorrosion of liner plate 1 Reason, it is to avoid liner plate 1 contacts corrosion with malaria in ultradeep well.
Beneficial effects of the present invention:
The present invention uses liner plate as the interim protective measure of country rock early stage, and also serves as later stage concrete-pouring template, Ke Yishi Now the borehole wall is carried out quick supporting, improve working environment, strengthen prop intensity, it is ensured that adjoining rock stability is run.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is raise boring machine rapid construction fine ore collection vertical shaft simplified schematic diagram of the present invention.
In figure, 1-liner plate, 2-weld nail, 3-country rock, 4-concrete supporting, 5-raise boring machine.
Detailed description of the invention
Below in conjunction with the embodiment of the present invention and accompanying drawing, the technical scheme in the embodiment of the present invention is carried out clear, complete Ground describes, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments.Based on this Embodiment in invention, the every other reality that those of ordinary skill in the art are obtained under not making creative work premise Execute example, broadly fall into the scope of protection of the invention.
Embodiment 1
Described ultradeep well shaft bottom fine ore collection vertical shaft includes liner plate 1, weldering nail 2, country rock 3, concrete supporting 4, and described encloses Rock 3 be internally provided with liner plate 1, weldering nail 2 is uniformly crisscross arranged on the outer wall of liner plate 1, and weldering nail 2 welds with liner plate 1 employing Mode is attached;Leave between liner plate 1 and country rock 3 and pour gap, the gap between liner plate 1 and country rock 3 has poured coagulation Soil sheath 4;When country rock 3 occurs owing to dig h2Time, length L of described weldering nail 2 and the relation of the thickness D of concrete supporting 4 For D=L+h1, reserve and owe to dig thickness h2Being present to ensure that when country rock 3 occurs owing to dig, weldering nail 2 still has the concrete of code requirement to protect Covering thickness h1, it is ensured that the supporting intensity of ultradeep well shaft bottom fine ore collection vertical shaft.
The rapid construction method for protecting support of the ultradeep well shaft bottom fine ore collection vertical shaft more than recorded, comprises the following steps:
Step 1: drilling well
Use raise boring machine 5 the most vertically driving, it is achieved the molding of fine ore collection vertical shaft country rock;
Step 2: supporting
The most vertically tunnel the internal supporting liner plate 1 of the country rock 3 interim protective measure as country rock 3 of molding, liner plate 1 by Lower and upper segmentation is installed, and uses the mode of welding to be attached between adjacent liner plates 1;During supporting, liner plate 1 and country rock 3 it Between leave and pour gap;
Step 3: pour
That reserves between liner plate 1 and country rock 3 pours casting concrete in gap, makes on concrete slurry solidification and liner plate 1 The inwall of weldering nail 2 and country rock 3 forms integrative-structure, it is achieved fixing liner plate 1, makes liner plate 1 as the permanent support of country rock 3 Measure;
Step 4: preservative treatment
Concreting carries out preservative treatment to liner plate 1 in terminating latter 3 days, uses the mode of mopping to realize at the anticorrosion of liner plate 1 Reason, it is to avoid liner plate 1 contacts corrosion with malaria in ultradeep well.
Embodiment 2
Described ultradeep well shaft bottom fine ore collection vertical shaft includes liner plate 1, weldering nail 2, country rock 3, concrete supporting 4, and described encloses Rock 3 be internally provided with liner plate 1, weldering nail 2 is uniformly crisscross arranged on the outer wall of liner plate 1, and weldering nail 2 welds with liner plate 1 employing Mode is attached;Leave between liner plate 1 and country rock 3 and pour gap, the gap between liner plate 1 and country rock 3 has poured coagulation Soil sheath 4.When country rock 3 does not occurs owing to dig, length L of described weldering nail 2 and the relation of the thickness D of concrete supporting 4 For D=L+h1+h2, expand the thickness of concrete supporting 4, to strengthen the supporting intensity of ultradeep well shaft bottom fine ore collection vertical shaft, Guarantee that country rock 3 can steady operation, it is ensured that the stable operation of fine ore collection work.
The rapid construction method for protecting support of the ultradeep well shaft bottom fine ore collection vertical shaft more than recorded, comprises the following steps:
Step 1: drilling well
Use raise boring machine 5 the most vertically driving, it is achieved the molding of fine ore collection vertical shaft country rock;
Step 2: supporting
The most vertically tunnel the internal supporting liner plate 1 of the country rock 3 interim protective measure as country rock 3 of molding, liner plate 1 by Lower and upper segmentation is installed, and uses the mode of welding to be attached between adjacent liner plates 1;During supporting, liner plate 1 and country rock 3 it Between leave and pour gap;
Step 3: pour
That reserves between liner plate 1 and country rock 3 pours casting concrete in gap, makes on concrete slurry solidification and liner plate 1 The inwall of weldering nail 2 and country rock 3 forms integrative-structure, it is achieved fixing liner plate 1, makes liner plate 1 as the permanent support of country rock 3 Measure;
Step 4: preservative treatment
Concreting carries out preservative treatment to liner plate 1 in terminating latter 3 days, uses the mode of mopping to realize at the anticorrosion of liner plate 1 Reason, it is to avoid liner plate 1 contacts corrosion with malaria in ultradeep well.
The operation principle of the present invention: country rock 3 uses raise boring machine speedy drivage to be formed, after country rock 3 driving terminates, edge immediately Country rock 3 inwall fixes liner plate 1, quickly to form interim protective measure, and uses stud welding weldering nail on liner plate 1, liner plate 1 with Reserved concreting gap between country rock 3;After liner plate 1 is completely fixed end, carry out concreting immediately, to form coagulation The soil borehole wall carries out permanent support, makes liner plate 1, weldering nail 2 and concrete supporting 4 form an entirety, shape after concreting Become the permanent support layer of country rock 3;Concreting carries out preservative treatment to liner plate 1 in terminating latter 3 days, it is to avoid liner plate 1 and ultra-deep Malaria contact corrosion in well.
Finally illustrating, above example is only in order to illustrate technical scheme and unrestricted, although by upper State preferred embodiment the present invention to be described in detail, it is to be understood by those skilled in the art that can be in form Above and it is made various change, without departing from claims of the present invention limited range in details.

Claims (4)

1. a ultradeep well shaft bottom fine ore collection vertical shaft, it is characterised in that: described ultradeep well shaft bottom fine ore collection vertical shaft includes Liner plate (1), weldering nail (2), country rock (3), concrete supporting (4), described country rock (3) be internally provided with liner plate (1), weldering nail (2) be uniformly crisscross arranged on the outer wall of liner plate (1), leave between liner plate (1) and country rock (3) and pour gap, liner plate (1) with enclose Gap between rock (3) has poured concrete supporting (4).
A kind of ultradeep well shaft bottom the most according to claim 1 fine ore collection vertical shaft, it is characterised in that: described weldering nail (2) The mode welded is used to be attached with liner plate (1).
A kind of ultradeep well shaft bottom the most according to claim 1 fine ore collection vertical shaft, it is characterised in that: described country rock (3) Being reserved with thickness is h2The deficient layer that digs of=0~50mm, length L of weldering nail (2) with the relation of the thickness D of concrete supporting (4) is D=L+h1+h2, wherein, h1=30~50mm, for the concrete cover of code requirement.
4. the rapid construction method for protecting support of the ultradeep well shaft bottom fine ore collection vertical shaft that one claim of any of the above is recorded, it is special Levy and be, comprise the following steps:
Step 1: drilling well
Use raise boring machine (5) the most vertically driving, it is achieved the molding of fine ore collection vertical shaft country rock;
Step 2: supporting
The most vertically tunnel the internal supporting liner plate (1) of country rock (3) the interim protective measure as country rock (3) of molding, lining Plate (1) from bottom to top segmentation is installed, and uses the mode of welding to be attached between adjacent liner plates (1);During supporting, liner plate (1) and leave between country rock (3) and pour gap;
Step 3: pour
That reserves between liner plate (1) and country rock (3) pours casting concrete in gap, makes concrete slurry solidification and liner plate (1) weldering nail (2) and the inwall of country rock (3) on form integrative-structure, it is achieved fix liner plate (1), make liner plate (1) conduct The permanent support measure of country rock (3);
Step 4: preservative treatment
Concreting carries out preservative treatment to liner plate (1) in terminating latter 3 days, uses the mode of mopping to realize the anti-of liner plate (1) Rotten process, it is to avoid liner plate (1) contacts corrosion with malaria in ultradeep well.
CN201610648505.8A 2016-08-10 2016-08-10 A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support Active CN106285690B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610648505.8A CN106285690B (en) 2016-08-10 2016-08-10 A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610648505.8A CN106285690B (en) 2016-08-10 2016-08-10 A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support

Publications (2)

Publication Number Publication Date
CN106285690A true CN106285690A (en) 2017-01-04
CN106285690B CN106285690B (en) 2018-07-03

Family

ID=57667427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610648505.8A Active CN106285690B (en) 2016-08-10 2016-08-10 A kind of ultradeep well shaft bottom fine ore collection vertical shaft and its rapid construction method for protecting support

Country Status (1)

Country Link
CN (1) CN106285690B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756889A (en) * 2018-06-08 2018-11-06 北京中煤矿山工程有限公司 Anti- well drilling machine reaming construction broken formation gib technique

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101349064A (en) * 2008-08-26 2009-01-21 中国水利水电第五工程局 Construction method of hydroelectric power station surge chamber vertical shaft under soft rock geological condition
CN103696774A (en) * 2013-12-06 2014-04-02 马钢(集团)控股有限公司 Development method of blind shaft frame for surface and underground parallel construction
CN203783634U (en) * 2014-03-14 2014-08-20 河北钢铁集团矿业有限公司 Mineral powder recycling structure for underground mine
CN203948125U (en) * 2014-07-24 2014-11-19 山东黄金矿业(莱州)有限公司焦家金矿 Lower ventilating shaft fine ore retracting device
CN204041105U (en) * 2014-08-13 2014-12-24 中国瑞林工程技术有限公司 A kind of skip bucket main vertical shaft fine ore collection device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101349064A (en) * 2008-08-26 2009-01-21 中国水利水电第五工程局 Construction method of hydroelectric power station surge chamber vertical shaft under soft rock geological condition
CN103696774A (en) * 2013-12-06 2014-04-02 马钢(集团)控股有限公司 Development method of blind shaft frame for surface and underground parallel construction
CN203783634U (en) * 2014-03-14 2014-08-20 河北钢铁集团矿业有限公司 Mineral powder recycling structure for underground mine
CN203948125U (en) * 2014-07-24 2014-11-19 山东黄金矿业(莱州)有限公司焦家金矿 Lower ventilating shaft fine ore retracting device
CN204041105U (en) * 2014-08-13 2014-12-24 中国瑞林工程技术有限公司 A kind of skip bucket main vertical shaft fine ore collection device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756889A (en) * 2018-06-08 2018-11-06 北京中煤矿山工程有限公司 Anti- well drilling machine reaming construction broken formation gib technique

Also Published As

Publication number Publication date
CN106285690B (en) 2018-07-03

Similar Documents

Publication Publication Date Title
CN107339104B (en) Security personnel's curtain wall recovery method
CN110985058B (en) Grouting reinforcement method for fault fracture zone of coal face
CN104790978B (en) The tunnel ring-shaped base tunnel construction method of small interval crossings on different level
CN103643979B (en) Hydraulic support used for roadway temporary support and erecting and use method of hydraulic support
CN107060758B (en) A kind of section fender, which stays, sets construction method
CN110374600B (en) Non-offset arrangement method for mining roadway of extremely-close coal seam group
CN109209392B (en) Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel
CN110939466B (en) Pier stud non-blasting roof cutting gob-side entry driving method
RU2581587C1 (en) Method of filling hole under anchor, drilled in roof of mine working cartridges with resin
CN107355226B (en) Broken area hole section processing structure of TBM construction tunnel fault
CN104405436B (en) A kind of method improving ore body Tight filling rate
CN104532818A (en) Treatment method for strip mine goaf
CN103670427B (en) Formula method for tunnel construction is torn open after right-angled intersection excavation supports
CN203924085U (en) A kind of caisson structure that is applied to collecting well
CN208502796U (en) Tunnel arch wall preliminary bracing invades limit and changes arch construction gantry type support construction
CN109026029A (en) A kind of construction method suitable for breaking surrounding rock tunnel excavation support
CN110685716A (en) Sleeve valve pipe grouting method after boulder blasting treatment
AU2021447461A1 (en) Extra-thick coal seam upper layer old goaf roof reconstruction method and construction method
CN109707422A (en) A kind of goaf roadway fender grouting method for protecting support
CN106089207A (en) Super high seam work surface gob side entry driving thin coal pillar stays equipment, method
Fan et al. Opencast to underground iron ore mining method
CN106285690A (en) A kind of ultradeep well shaft bottom fine ore collection vertical shaft and rapid construction method for protecting support thereof
CN107956481A (en) A kind of suspension device for superelevation tunnel gob side entry retaining
CN116956597A (en) Method for designing parameters of open pit coal mine end slope filling mining support coal pillar
CN209818093U (en) Be used for soft rock tunnel face reinforcing apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant