CN106284398A - 一种插入式铁塔基础浇制模具及施工方法 - Google Patents
一种插入式铁塔基础浇制模具及施工方法 Download PDFInfo
- Publication number
- CN106284398A CN106284398A CN201610763819.2A CN201610763819A CN106284398A CN 106284398 A CN106284398 A CN 106284398A CN 201610763819 A CN201610763819 A CN 201610763819A CN 106284398 A CN106284398 A CN 106284398A
- Authority
- CN
- China
- Prior art keywords
- leading screw
- handling part
- hole
- fixed
- waters
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Abstract
本发明提供一种插入式铁塔基础浇制模具,包括:四根丝杠体;丝杠体包括:丝杠和方形装卸件;方形装卸件设有固设面和与固设面成垂直设置的通孔,通孔内设有内螺纹,内螺纹与丝杠的外螺纹相适配;丝杠设有丝杠头部和丝杠尾部;丝杠头部与方形装卸件的固设面固定连接,丝杠尾部与其他丝杠体方形装卸件的通孔螺纹连接;四根丝杠体首尾连接形成一井字形。
Description
技术领域
本发明涉及铁塔基础领域,尤其涉及一种插入式铁塔基础浇制模具及施工方法。
背景技术
插入式铁塔基础在进行浇筑时,需要通过固定模板,把混凝土震动着灌入模具中,此时需要模板非常稳固才可以。铁塔基础是长方体,并且带有一定的倾斜角度,一般需要挖四米的坑进行浇筑,目前采用的是井字法进行加箍模板,每面模板需要两根空心柱体与一根细丝杠,通过丝杠把两根空心柱固定柱,模板加固一圈就需要8根空心柱体和四根丝杠,例如一个三米深的基础,根据压力计算,一般需要自底部到顶部需要加固五次,也就是需要40根空心柱体和20根丝杠。由于基础是位于地平面以下,需要工人把加箍材料运到下面,并且在加固过程中至少需要两人,才可以把模板搭接完整,一般两天两人才可以固定一个基础,费时费力,费工,并且采用的丝杠较细,在体积较大的基础中,可能会出现丝杠断裂的情况。
发明内容
为了克服上述现有技术中的不足,本发明的目的在于,提供一种插入式铁塔基础浇制模具,包括:四根丝杠体;
丝杠体包括:丝杠和方形装卸件;方形装卸件设有固设面和与固设面成垂直设置的通孔,通孔内设有内螺纹,内螺纹与丝杠的外螺纹相适配;
丝杠设有丝杠头部和丝杠尾部;丝杠头部与方形装卸件的固设面固定连接,丝杠尾部与其他丝杠体方形装卸件的通孔螺纹连接;
四根丝杠体首尾连接形成一井字形。
优选地,丝杠尾部与其他丝杠体方形装卸件的通孔螺纹连接的同时,在与丝杠尾部相反的方向设置一固定螺栓,固定螺栓与通孔螺纹连接,并且固定螺栓与丝杠尾部相抵接,使丝杠尾部固定在通孔内部。
优选地,丝杠头部与方形装卸件的固设面固定连接方式采用焊接。
优选地,丝杠的直径为50mm至100mm。
一种插入式铁塔基础浇制模具的施工方法,包括:
四根丝杠体进行首尾相连,一根丝杠体的头部插入到另一根丝杠体方形装卸件的通孔内,并用固定螺栓进行固定,四根丝杠体组装后,卡在模板的外面,如果模板出现晃动或者漏浆现象,并通过调节固定螺栓来调节间隙,完成基础浇制。
从以上技术方案可以看出,本发明具有以下优点:
插入式铁塔基础浇制模具提高了牢固程度,具有易安装,易拆卸,易运输,易调节的优点。
附图说明
为了更清楚地说明本发明的技术方案,下面将对描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为丝杠体的结构图;
图2为插入式铁塔基础浇制模具的示意图。
具体实施方式
为使得本发明的发明目的、特征、优点能够更加的明显和易懂,下面将运用具体的实施例及附图,对本发明保护的技术方案进行清楚、完整地描述,显然,下面所描述的实施例仅仅是本发明一部分实施例,而非全部的实施例。基于本专利中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本专利保护的范围。
本实施例提供一种插入式铁塔基础浇制模具,如图1和图2所示,包括:四根丝杠体1;
丝杠体1包括:丝杠2和方形装卸件3;方形装卸件3设有固设面5和与固设面5成垂直设置的通孔4,通孔4内设有内螺纹,内螺纹与丝杠2的外螺纹相适配;
丝杠2设有丝杠头部6和丝杠尾部7;丝杠头部6与方形装卸件的固设面5固定连接,丝杠尾部7与其他丝杠体方形装卸件的通孔4螺纹连接;四根丝杠体首尾连接形成一井字形。
丝杠尾部7与其他丝杠体方形装卸件的通孔4螺纹连接的同时,在与丝杠尾部7相反的方向设置一固定螺栓8,固定螺栓8与通孔4螺纹连接,并且固定螺栓8与丝杠尾部7相抵接,使丝杠尾部7固定在通孔4内部。
丝杠头部6与方形装卸件的固设面5固定连接方式采用焊接。丝杠的直径为50mm至100mm。
本发明还提供一种插入式铁塔基础浇制模具的施工方法,包括:
四根丝杠体进行首尾相连,一根丝杠体的头部插入到另一根丝杠体方形装卸件的通孔内,并用固定螺栓进行固定,四根丝杠体组装后,卡在模板的外面,如果模板出现晃动或者漏浆现象,并通过调节固定螺栓来调节间隙,完成基础浇制。
通过此方法,例如,一个三米深的基础,同样加固五次,只需要20根丝杠,在工器具传递过程中,非常省力,并且根据实际运用,一人就可以进行对模板进行加箍,大大提高工作效率,一人一天就可以完成两个基础固定。另外此方法加箍的模板比以前要牢固,以前采用的是两根空心的柱体与一根直径48mm,本设计采用直径80mm的实心丝杠,提高了牢固程度,此方法具有易安装,易拆卸,易运输,易调节的优点。
本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参考即可。
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。
Claims (5)
1.一种插入式铁塔基础浇制模具,其特征在于,包括:四根丝杠体;
丝杠体包括:丝杠和方形装卸件;方形装卸件设有固设面和与固设面成垂直设置的通孔,通孔内设有内螺纹,内螺纹与丝杠的外螺纹相适配;
丝杠设有丝杠头部和丝杠尾部;丝杠头部与方形装卸件的固设面固定连接,丝杠尾部与其他丝杠体方形装卸件的通孔螺纹连接;
四根丝杠体首尾连接形成一井字形。
2.根据权利要求1所述的插入式铁塔基础浇制模具,其特征在于,
丝杠尾部与其他丝杠体方形装卸件的通孔螺纹连接的同时,在与丝杠尾部相反的方向设置一固定螺栓,固定螺栓与通孔螺纹连接,并且固定螺栓与丝杠尾部相抵接,使丝杠尾部固定在通孔内部。
3.根据权利要求1所述的插入式铁塔基础浇制模具,其特征在于,
丝杠头部与方形装卸件的固设面固定连接方式采用焊接。
4.根据权利要求1所述的插入式铁塔基础浇制模具,其特征在于,
丝杠的直径为50mm至100mm。
5.一种插入式铁塔基础浇制模具的施工方法,其特征在于,包括:
四根丝杠体进行首尾相连,一根丝杠体的头部插入到另一根丝杠体方形装卸件的通孔内,并用固定螺栓进行固定,四根丝杠体组装后,卡在模板的外面,如果模板出现晃动或者漏浆现象,并通过调节固定螺栓来调节间隙,完成基础浇制。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610763819.2A CN106284398B (zh) | 2016-08-30 | 2016-08-30 | 一种插入式铁塔基础浇制模具及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610763819.2A CN106284398B (zh) | 2016-08-30 | 2016-08-30 | 一种插入式铁塔基础浇制模具及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106284398A true CN106284398A (zh) | 2017-01-04 |
CN106284398B CN106284398B (zh) | 2019-03-12 |
Family
ID=57674309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610763819.2A Expired - Fee Related CN106284398B (zh) | 2016-08-30 | 2016-08-30 | 一种插入式铁塔基础浇制模具及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284398B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102709001A (zh) * | 2012-06-01 | 2012-10-03 | 无锡锡洲电磁线有限公司 | 新型的漆包线涂漆模具 |
KR101304985B1 (ko) * | 2013-04-08 | 2013-09-06 | 주식회사 썬로드에너지 | 기초볼트 높낮이 조절용 기초블록 설치대 |
CN203200774U (zh) * | 2013-04-12 | 2013-09-18 | 浙江萧峰建设集团有限公司 | 一种大体积高杯口柱基础杯芯模板位置固定改进装置 |
CN203514341U (zh) * | 2013-10-17 | 2014-04-02 | 中建七局(上海)有限公司 | 大型设备混凝土基础孔的支模结构 |
CN104047295A (zh) * | 2014-06-10 | 2014-09-17 | 国家电网公司 | 一种可调式现浇基础模板支撑装置 |
CN205062828U (zh) * | 2015-08-06 | 2016-03-02 | 咸阳亨通电力检修有限公司 | 一种用于电线杆基础固定的装置 |
-
2016
- 2016-08-30 CN CN201610763819.2A patent/CN106284398B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102709001A (zh) * | 2012-06-01 | 2012-10-03 | 无锡锡洲电磁线有限公司 | 新型的漆包线涂漆模具 |
KR101304985B1 (ko) * | 2013-04-08 | 2013-09-06 | 주식회사 썬로드에너지 | 기초볼트 높낮이 조절용 기초블록 설치대 |
CN203200774U (zh) * | 2013-04-12 | 2013-09-18 | 浙江萧峰建设集团有限公司 | 一种大体积高杯口柱基础杯芯模板位置固定改进装置 |
CN203514341U (zh) * | 2013-10-17 | 2014-04-02 | 中建七局(上海)有限公司 | 大型设备混凝土基础孔的支模结构 |
CN104047295A (zh) * | 2014-06-10 | 2014-09-17 | 国家电网公司 | 一种可调式现浇基础模板支撑装置 |
CN205062828U (zh) * | 2015-08-06 | 2016-03-02 | 咸阳亨通电力检修有限公司 | 一种用于电线杆基础固定的装置 |
Non-Patent Citations (1)
Title |
---|
《低碳世界》 * |
Also Published As
Publication number | Publication date |
---|---|
CN106284398B (zh) | 2019-03-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018152956A1 (zh) | 一种装配式圆形钢管套管纤维混凝土柱连接节点及安装方法 | |
CN109098358A (zh) | 一种自锁式钢筋连接灌浆套筒 | |
CN207044355U (zh) | 一种梁板预制混凝土浇筑模板 | |
CN107060219A (zh) | 一种钢筋机械连接结构及方法 | |
CN210918430U (zh) | 风电塔筒预制环片的竖缝后浇受力键 | |
CN105317168A (zh) | 分体式钢筋套筒全灌浆接头 | |
CN208884849U (zh) | 一种自锁式钢筋连接灌浆套筒 | |
CN203613533U (zh) | 一种加强型预应力管桩 | |
CN104196023A (zh) | 一种带机械连接装置的混凝土预制管桩桩尖及其使用方法 | |
CN205976072U (zh) | 装配式建筑墙体以及装配式混凝土结构 | |
CN106284398A (zh) | 一种插入式铁塔基础浇制模具及施工方法 | |
CN206667596U (zh) | 一种可拆卸装配式圆钢管混凝土柱 | |
CN203579870U (zh) | 预应力组合支护桩钢模结构 | |
CN205975996U (zh) | 浆锚搭接连接结构以及墙体 | |
CN205976532U (zh) | 套筒灌浆连接结构以及墙体 | |
CN203049875U (zh) | 一种用卡组体的砖块装置 | |
CN102141466A (zh) | 薄壁圆柱壳结构试验中的边界模拟装置及方法 | |
CN206495329U (zh) | 可调式高精度地脚螺栓加固模具及加固系统 | |
CN205205862U (zh) | 一种可兼容性塑料检查井及其与管道的连接结构 | |
CN104908150B (zh) | 一种管道井制作模板及基于工厂化生产管道井的方法 | |
CN204456093U (zh) | 一种管桩连接装置 | |
CN107419897A (zh) | 一种窗台压顶模板的加固模具 | |
CN206554510U (zh) | 用于提高建筑工程砼接缝质量的螺栓组件 | |
CN202745050U (zh) | 预应力混凝土离心方桩 | |
CN206723622U (zh) | 一种可重复使用的吊模工具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190312 Termination date: 20190830 |