The method of well casing and its embedded well casing Download PDFInfo
- Publication number
- CN106284388B CN106284388B CN201610751152.4A CN201610751152A CN106284388B CN 106284388 B CN106284388 B CN 106284388B CN 201610751152 A CN201610751152 A CN 201610751152A CN 106284388 B CN106284388 B CN 106284388B
- Authority
- CN
- China
- Prior art keywords
- well casing
- pipe
- iron plate
- iron
- drill steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Earth Drilling (AREA)
Abstract
The present invention relates to building field water proof anti-seepage technical fields, more particularly to a kind of well casing, including water level monitoring pipe and ferrule, the lower loop week of the water level monitoring pipe has permeable hole, the ferrule is made of iron plate with holes and iron pipe, the iron pipe covers on the water level monitoring pipe and affixed with it, the iron plate and the iron pipe are affixed, the outer diameter of the iron plate is greater than the outer diameter of the iron pipe, the internal diameter of the iron plate is less than the internal diameter of water level monitoring pipe, the lower loop week of the iron plate is equipped with crushing shell, the tip shaped of the crushing shell.Present apparatus high construction efficiency, expense is low, simple and convenient, greatly shortens the down tube time, completes a underground buried tube and does not exceed a hour.
Description
Technical field
The present invention relates to building field water proof anti-seepage technical field more particularly to the sides of a kind of well casing and its embedded well casing
Method.
Background technique
Currently, diameter is generally more than 300cm in digging diameter bigger dewatering well, traditional construction method is to utilize
Boring mechanic drilled as holes or water rush equipment pore-forming, need to be aided with mud off according to stratum to prevent collapse hole, will after pore-forming later
Prefabricated downcast well pipe inserts in the hole, and fills sand filter blanket in the gap around well casing, ultimately forms precipitation well point, finally exists
It is constantly drawn water in well casing by water pump, until water is limpid in well casing.Since drilling machine construction speed is slow, pore-forming efficiency is low, at
It is easy shrinkage cavity during hole, may cause well casing insertion difficulty or causes sand filtering layer around well casing excessively thin, to influence precipitation
Efficiency.
Summary of the invention
It is an object of the invention to overcome the shortcomings of above-mentioned technology, and a kind of method of well casing and its embedded well casing is provided,
It is low, time saving and energy saving suitable for bigbore well, expense.
The present invention to achieve the above object, using following technical scheme:
A kind of well casing, it is characterised in that: including water level monitoring pipe and ferrule, the lower loop week of the water level monitoring pipe
With permeable hole, the ferrule is made of iron plate with holes and iron pipe, and the iron pipe covers on the water level monitoring pipe simultaneously
Affixed with it, the iron plate and the iron pipe are affixed, and the outer diameter of the iron plate is greater than the outer diameter of the iron pipe, the iron plate it is interior
Diameter is less than the internal diameter of water level monitoring pipe, is equipped with crushing shell, the tip shaped of the crushing shell in the lower loop week of the iron plate.
Preferably, the water level monitoring pipe is permeable bellows.
Preferably, the permeable bellows is wrapped with filter layer.
Preferably, the filter layer is sponge and geotextiles, and the sponge wrapping is outside the permeable bellows, the soil
Work cloth is wrapped in outside the sponge.
Preferably, the surface of the permeable bellows is made of permeable non-woven fabrics.
A method of for burying well casing, it is characterised in that:
It is embedded to underground the following steps are included:
Step 1: first improving to traditional quartering hammer, an annular chuck, pricker are provided in the drill steel end of quartering hammer
The middle part of bar is provided with an exhalant canal from top to down, then an intake tunnel, the lower part peace of intake tunnel are opened in the end of drill steel
Spray head is filled, intake tunnel top connects a high-pressure water pipe, and high-pressure water pipe connects high-pressure pump;
Step 2: drill steel improved in step 1 is inserted into the well casing, annular chuck is pressed in well casing on drill steel
On iron plate on, start quartering hammer, quartering hammer drives drill steel to shake iron plate downwards, and the crushing shell of iron plate lower part is crushed ground;
Step 3: starting high-pressure pump, the high pressure water that high-pressure pump pump generates enters in spray head from intake tunnel, and spray head is to ground
High pressure water is sprayed in face, and soil is broken up, and as well casing moves down, the mud that high pressure water generates is automatically from exhalant canal to well outlet
Out.
It preferably, further include first passing through drill steel using the vibration of quartering hammer to break the harder soil layer in ground in step 2
It opens, the step of using drill steel penetrated surface.
The beneficial effects of the present invention are: compared with the existing technology, the present apparatus is suitable for the biggish dewatering well of bore, primary to press
Pull out can disposable Cheng Jing, shrinkage cavity will not occur, working procedure is few, easy to operate, quick, and one liang is only needed in the way of such
Name staff can be operated, and efficiently, expense is low, simple and convenient, greatly shortens the down tube time, completes a underground buried tube
A hour is not exceeded.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Enlarged drawing in the present invention of the position Fig. 2 at A.
Specific embodiment
With reference to the accompanying drawing and the preferred embodiment specific embodiment that the present invention will be described in detail.As shown in Figure 1, a kind of well
Pipe, including water level monitoring pipe 1 and ferrule have permeable hole a lower loop week of the water level monitoring pipe, the ferrule by
Iron plate 2 with holes and iron pipe 3 are constituted, and the iron pipe covers on the water level monitoring pipe and affixed with it, the iron plate and institute
State that iron pipe is affixed, the outer diameter of the iron plate is greater than the outer diameter of the iron pipe, and the internal diameter of the iron plate is less than the interior of water level monitoring pipe
The lower loop week of diameter, the iron plate is equipped with crushing shell 4, the tip shaped of the crushing shell.
In the present invention, the water level monitoring pipe is tubing or permeable bellows 5.The tubing is wrapped with filter layer.
For being filtered to underground water, specific structure is that the filter layer is sponge 6 and geotextiles 7, and the sponge wrapping is described
Outside water level monitoring pipe, the geotextiles are wrapped in outside the sponge.
In the present invention, permeable bellows is also a modification of the present invention, and traditional bellows is changed to permeable nonwoven
Cloth.Since bellows can be shunk, thus, occupied space is very small, and it is also very light, drill steel is inserted into ripple when construction
The lower end of pipe drives bellows mobile, and bellows upper end is fixed, and such bellows can be extended into slowly in well.
As shown in Fig. 2, the present invention also provides a kind of method for burying well casing,
It is embedded to underground the following steps are included:
Step 1: first improving to traditional quartering hammer, it is provided with an annular chuck 9 in 8 end of drill steel of quartering hammer,
The middle part of drill steel is provided with an exhalant canal 10 from top to down, then an intake tunnel 11 is opened in the end of drill steel, intake tunnel
Spray head 12 is installed in lower part, and intake tunnel top connects a high-pressure water pipe 13, and high-pressure water pipe connects high-pressure pump;
Step 2: drill steel improved in step 1 is inserted into the well casing, annular chuck is pressed in well casing on drill steel
On iron plate on, start quartering hammer, quartering hammer drives drill steel to shake iron plate downwards, and the crushing shell of iron plate lower part is crushed ground;
Step 3: starting high-pressure pump, the high pressure water that high-pressure pump pump generates enters in spray head from intake tunnel, and spray head is to ground
High pressure water is sprayed in face, and soil is broken up, and as well casing moves down, the mud that high pressure water generates is automatically from exhalant canal to well outlet
Out.
Further include first passing through drill steel using the vibration of quartering hammer to break the harder soil layer in ground in step 2, utilizes
The step of drill steel penetrated surface.
The beneficial effects of the present invention are: compared with the existing technology, the present apparatus is suitable for the biggish dewatering well of bore, primary to press
Pull out can disposable Cheng Jing, shrinkage cavity will not occur, working procedure is few, easy to operate, quick, and one liang is only needed in the way of such
Name staff can be operated, and efficiently, expense is low, simple and convenient, greatly shortens the down tube time, completes a underground buried tube
A hour is not exceeded.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (7)
1. a kind of well casing, it is characterised in that: including water level monitoring pipe and ferrule, the lower loop week band of the water level monitoring pipe
Have permeable hole, the ferrule is made of iron plate with holes and iron pipe, the iron pipe cover on the water level monitoring pipe and with
Its is affixed, and the iron plate and the iron pipe are affixed, and the outer diameter of the iron plate is greater than the outer diameter of the iron pipe, the internal diameter of the iron plate
Less than the internal diameter of water level monitoring pipe, the lower loop week of the iron plate is equipped with crushing shell, the tip shaped of the crushing shell.
2. well casing according to claim 1, it is characterised in that: the water level monitoring pipe is permeable bellows.
3. well casing according to claim 2, it is characterised in that: the permeable bellows is wrapped with filter layer.
4. well casing according to claim 3, it is characterised in that: the filter layer is sponge and geotextiles, the sponge packet
It is rolled in outside the permeable bellows, the geotextiles are wrapped in outside the sponge.
5. well casing according to claim 2, it is characterised in that: the surface of the permeable bellows is by permeable non-woven fabrics structure
At.
6. a kind of method for burying well casing described in claim 1 to 5 any one, it is characterised in that:
It is embedded to underground the following steps are included:
Step 1: first improving to traditional quartering hammer, it is provided with an annular chuck in the drill steel end of quartering hammer, drill steel
Middle part is provided with an exhalant canal from top to down, then an intake tunnel is opened in the end of drill steel, and spray is installed in the lower part of intake tunnel
Head, intake tunnel top connect a high-pressure water pipe, and high-pressure water pipe connects high-pressure pump;
Step 2: drill steel improved in step 1 is inserted into the well casing, annular chuck is pressed on well casing on drill steel
On iron plate, start quartering hammer, quartering hammer drives drill steel to shake iron plate downwards, and the crushing shell of iron plate lower part is crushed ground;
Step 3: starting high-pressure pump, the high pressure water that high-pressure pump pump generates enters in spray head from intake tunnel, and spray head sprays to the ground
High pressure water is penetrated, soil is broken up, as well casing moves down, the mud that high pressure water generates is discharged from exhalant canal to outside well automatically.
7. the method according to claim 6 for burying well casing described in claim 1 to 5 any one, it is characterised in that:
In step 2, further includes first passing through drill steel using the vibration of quartering hammer to break the harder soil layer in ground, penetrated using drill steel
The step of ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610751152.4A CN106284388B (en) | 2016-08-28 | 2016-08-28 | The method of well casing and its embedded well casing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610751152.4A CN106284388B (en) | 2016-08-28 | 2016-08-28 | The method of well casing and its embedded well casing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106284388A CN106284388A (en) | 2017-01-04 |
CN106284388B true CN106284388B (en) | 2019-04-05 |
Family
ID=57677565
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610751152.4A Active CN106284388B (en) | 2016-08-28 | 2016-08-28 | The method of well casing and its embedded well casing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284388B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110206481A (en) * | 2019-04-24 | 2019-09-06 | 武汉一冶建筑安装工程有限责任公司 | Dewatering well constructing device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002012637A1 (en) * | 2000-08-02 | 2002-02-14 | Nishimatsu Construction Co., Ltd. | Underground water pumping device |
CN103061667A (en) * | 2012-03-08 | 2013-04-24 | 杨晓胤 | Water hammer type well drill |
CN203498848U (en) * | 2013-09-03 | 2014-03-26 | 中铁建设集团有限公司 | Light-weight well point downcast pipe hole forming device |
CN105386480A (en) * | 2015-12-11 | 2016-03-09 | 神翼航空器科技(天津)有限公司 | Pore-forming device for breaking hammer type cast-in-place pile |
CN105649096A (en) * | 2015-12-29 | 2016-06-08 | 上海广联环境岩土工程股份有限公司 | Standby and observation well for foundation pit dewatering |
CN206173985U (en) * | 2016-08-28 | 2017-05-17 | 神翼航空器科技(天津)有限公司 | Well casing |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100497842C (en) * | 2006-01-09 | 2009-06-10 | 立基工程有限公司 | Bottom impacting type steel pipe concrete pole and construction method thereof |
CN205329702U (en) * | 2016-01-08 | 2016-06-22 | 孔祥瑞 | Building engineering foundation ditch precipitation is with from towards formula step -down well |
-
2016
- 2016-08-28 CN CN201610751152.4A patent/CN106284388B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002012637A1 (en) * | 2000-08-02 | 2002-02-14 | Nishimatsu Construction Co., Ltd. | Underground water pumping device |
CN103061667A (en) * | 2012-03-08 | 2013-04-24 | 杨晓胤 | Water hammer type well drill |
CN203498848U (en) * | 2013-09-03 | 2014-03-26 | 中铁建设集团有限公司 | Light-weight well point downcast pipe hole forming device |
CN105386480A (en) * | 2015-12-11 | 2016-03-09 | 神翼航空器科技(天津)有限公司 | Pore-forming device for breaking hammer type cast-in-place pile |
CN105649096A (en) * | 2015-12-29 | 2016-06-08 | 上海广联环境岩土工程股份有限公司 | Standby and observation well for foundation pit dewatering |
CN206173985U (en) * | 2016-08-28 | 2017-05-17 | 神翼航空器科技(天津)有限公司 | Well casing |
Also Published As
Publication number | Publication date |
---|---|
CN106284388A (en) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102926770B (en) | Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas | |
CN105443098B (en) | A kind of coal mine down-hole drilling segmentation fixed point hydraulic fracturing pore-fixing device and method | |
CN109026097A (en) | A kind of double drill bit drilling construction methods of anti-float anchor rod | |
CN110318410A (en) | A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method | |
CN104594870A (en) | Fracturing stimulation method | |
CN106284388B (en) | The method of well casing and its embedded well casing | |
CN104389634B (en) | A kind of mine vertical shaft sieve well shaft wall structure and controlled trapping method thereof | |
CN206173985U (en) | Well casing | |
CN201301714Y (en) | Water-stopping device for procedure of exiting starting well or entering receiving well of tunneling machine tool | |
CN212337256U (en) | Fracturing is returned and is arranged gas production integration tubular column | |
CN203050780U (en) | Pipe-jacking ground-water lowering device of low-permeability saturated silty sand stratum tunnel construction | |
CN205502044U (en) | Be applied to precipitation structure in grittiness water -bearing stratum under building | |
CN110206481A (en) | Dewatering well constructing device | |
CN108868702B (en) | Coal bed gas ultrasonic desorption drainage method | |
CN110130377A (en) | Combined shaft and application are shared for the double plate water isolation types of foundation pit drainage-decompression inward turning | |
CN110318661A (en) | Dewatering well construction method | |
CN103615014B (en) | A kind of dewatering device of soft soil foundation pit and using method thereof | |
CN202787289U (en) | Shut-in dewatering device for tube well | |
CN204326061U (en) | A kind of pile tube be drawn out easily | |
CN205713982U (en) | A kind of pile foundation construction drilling equipment being applicable to karst area | |
CN206015695U (en) | Buried pipe | |
CN109403326A (en) | Serious collapse hole occurs based on drilled pile and takes out steel reinforcement cage method | |
CN106245661B (en) | The method of buried pipe and its embedded buried pipe | |
CN208486912U (en) | A kind of interim concentration ejectment device for lithologic character stratum Tunnel Gushing | |
CN212104106U (en) | A vibration drainage stock supporting construction for sand type soil layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220315 Address after: 300000 6-902, No.60, 1st Street, Binhai New Area Development Zone, Tianjin Patentee after: TIANJIN JIANYAN ROCK AND SOIL ENGINEERING Co.,Ltd. Address before: 300000 Tianjin Jinnan District Jinnan Economic Development Zone (West District) Hongkong block 3, block B 206-4. Patentee before: TIANJIN DIVINE WING AIRCRAFT TECHNOLOGY CO.,LTD. |