CN106284388A CN201610751152.4A CN201610751152A CN106284388A CN 106284388 A CN106284388 A CN 106284388A CN 201610751152 A CN201610751152 A CN 201610751152A CN 106284388 A CN106284388 A CN 106284388A
Authority
CN
China
Prior art keywords
pipe
well casing
iron plate
water level
level monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610751152.4A
Other languages
Chinese (zh)
Other versions
CN106284388B (en
Inventor
林威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JIANYAN ROCK AND SOIL ENGINEERING Co.,Ltd.
Original Assignee
Wing Aircraft Technology (tianjin) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wing Aircraft Technology (tianjin) Co Ltd filed Critical Wing Aircraft Technology (tianjin) Co Ltd
Priority to CN201610751152.4A priority Critical patent/CN106284388B/en
Publication of CN106284388A publication Critical patent/CN106284388A/en
Application granted granted Critical
Publication of CN106284388B publication Critical patent/CN106284388B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to building field water proof anti-seepage technical field, particularly relate to a kind of well casing, including water level monitoring pipe and ferrule, the lower loop week of described water level monitoring pipe is with permeable hole, described ferrule is made up of iron plate with holes and iron pipe, described iron pipe is enclosed within described water level monitoring pipe and affixed with it, described iron plate is affixed with described iron pipe, the external diameter of described iron plate is more than the external diameter of described iron pipe, the internal diameter of described iron plate is less than the internal diameter of water level monitoring pipe, the lower loop week of described iron plate is provided with crushing shell, the tip shaped of described crushing shell.This device high construction efficiency, expense is low, simple and convenient, is greatly shortened the down tube time, completes a underground buried tube not over one hour.

Description

Well casing and the method burying well casing underground thereof
Technical field
The present invention relates to building field water proof anti-seepage technical field, particularly relate to a kind of well casing and bury the side of well casing underground Method.
Background technology
At present, when digging the bigger dewatering well of diameter, diameter is generally more than 300cm, and traditional construction method is to utilize Boring mechanic drilled as holes or water rush equipment pore-forming, need to be aided with mud off to prevent collapse hole according to stratum, will after treating pore-forming Prefabricated downcast well pipe inserts in hole, and fills sand filter blanket in the space around well casing, ultimately forms precipitation well point, finally exists Constantly drawn water in well casing by water pump, until water is limpid in well casing.Owing to drilling machine construction speed is slow, pore-forming efficiency is low, becomes Easy shrinkage cavity during hole, may cause well casing to insert sand filtering layer around difficulty or cause well casing the thinnest, thus affect precipitation Efficiency.
Summary of the invention
It is an object of the invention to overcome the deficiency of above-mentioned technology, and a kind of well casing and the method burying well casing underground thereof be provided, It is applicable to bigbore well, expense low, time saving and energy saving.
The present invention for achieving the above object, by the following technical solutions:
A kind of well casing, it is characterised in that: include water level monitoring pipe and ferrule, the lower loop week of described water level monitoring pipe with Permeable hole, described ferrule is made up of iron plate with holes and iron pipe, and described iron pipe is enclosed within described water level monitoring pipe also and it Affixed, described iron plate is affixed with described iron pipe, and the external diameter of described iron plate is more than the external diameter of described iron pipe, and the internal diameter of described iron plate is little In the internal diameter of water level monitoring pipe, the lower loop week of described iron plate is provided with crushing shell, the tip shaped of described crushing shell.
Preferably, described water level monitoring pipe is tubing or permeable corrugated tube.
Preferably, described tubing is wrapped with filter course.
Preferably, described filter course is sponge and geotextiles, described sponge wrapping outside described water level monitoring pipe, described soil Work cloth is wrapped in outside described sponge.
Preferably, the surface of described permeable corrugated tube is made up of permeable non-woven fabrics.
A kind of method for burying well casing, it is characterised in that:
Its embedment underground comprises the following steps:
Step one, first traditional quartering hammer is improved, have an annular chuck in the drill steel end of quartering hammer, drill steel Middle part has an exhalant canal from top to down, then an intake tunnel is opened in the end of drill steel, and spray is installed in the bottom of intake tunnel Head, intake tunnel top connects a high-pressure water pipe, and high-pressure water pipe connects high-pressure pump;
Step 2, by step one improve drill steel be inserted in described well casing, on drill steel annular chuck be pressed on well casing On iron plate, starting quartering hammer, quartering hammer drives drill steel to shake downwards iron plate, and the crushing shell of iron plate bottom crushes ground;
Step 3, startup high-pressure pump, the water under high pressure that high-pressure pump pump produces enters into shower nozzle from intake tunnel, and shower nozzle sprays earthward Penetrating water under high pressure, broken up by soil, along with well casing moves down, the mud that water under high pressure produces is discharged to well from exhalant canal automatically.
Preferably, in step 2, also include that utilizing the vibration of quartering hammer to first pass through drill steel breaks soil layer harder for ground Open, utilize the step of drill steel penetrated surface.
The invention has the beneficial effects as follows: relative to prior art, this device is applicable to the dewatering well that bore is bigger, once Pressure is pulled out and is got final product disposable Cheng Jing, and shrinkage cavity will not occur, and working procedure is few, simple to operate, quick, utilizes this kind of mode to have only to one Two staff are the most operable, and efficiently, expense is low, simple and convenient, are greatly shortened the down tube time, complete a underground and bury Pipe was not over one hour.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Enlarged drawing at A in the present invention of Fig. 2 position.
Detailed description of the invention
Below in conjunction with the accompanying drawings and preferred embodiment describe in detail the present invention detailed description of the invention.As it is shown in figure 1, a kind of well Pipe, including water level monitoring pipe 1 and ferrule, the lower loop week of described water level monitoring pipe with permeable hole, described ferrule by Iron plate 2 with holes and iron pipe 3 are constituted, and described iron pipe is enclosed within described water level monitoring pipe and affixed with it, described iron plate and institute Stating iron pipe affixed, the external diameter of described iron plate is more than the external diameter of described iron pipe, and the internal diameter of described iron plate is interior less than water level monitoring pipe Footpath, is provided with crushing shell 4, the tip shaped of described crushing shell in the lower loop week of described iron plate.
In the present invention, described water level monitoring pipe is tubing or permeable corrugated tube 5.Described tubing is wrapped with filter course. For filtering subsoil water, concrete structure is, described filter course is sponge 6 and geotextiles 7, and described sponge wrapping is described Outside water level monitoring pipe, described geotextiles is wrapped in outside described sponge.
In the present invention, permeable corrugated tube is also a modification of the present invention, makes traditional corrugated tube into permeable nonwoven Cloth.Owing to corrugated tube can shrink, thus, take up room the least, the lightest, during construction, drill steel is inserted into ripple The lower end of pipe, drives corrugated tube to move, and corrugated tube upper end is fixed, and such corrugated tube can slowly extend in well.
As in figure 2 it is shown, present invention also offers a kind of method for burying well casing,
Its embedment underground comprises the following steps:
Step one, first traditional quartering hammer is improved, have an annular chuck 9, drill steel in drill steel 8 end of quartering hammer Middle part have an exhalant canal 10 from top to down, then an intake tunnel 11, the bottom of intake tunnel are opened in the end of drill steel Mounting spray head 12, intake tunnel top connects a high-pressure water pipe 13, and high-pressure water pipe connects high-pressure pump;
Step 2, by step one improve drill steel be inserted in described well casing, on drill steel annular chuck be pressed on well casing On iron plate, starting quartering hammer, quartering hammer drives drill steel to shake downwards iron plate, and the crushing shell of iron plate bottom crushes ground;
Step 3, startup high-pressure pump, the water under high pressure that high-pressure pump pump produces enters into shower nozzle from intake tunnel, and shower nozzle sprays earthward Penetrating water under high pressure, broken up by soil, along with well casing moves down, the mud that water under high pressure produces is discharged to well from exhalant canal automatically.
In step 2, also include that utilizing the vibration of quartering hammer to first pass through drill steel breaks soil layer harder for ground, utilize The step of drill steel penetrated surface.
The invention has the beneficial effects as follows: relative to prior art, this device is applicable to the dewatering well that bore is bigger, once Pressure is pulled out and is got final product disposable Cheng Jing, and shrinkage cavity will not occur, and working procedure is few, simple to operate, quick, utilizes this kind of mode to have only to one Two staff are the most operable, and efficiently, expense is low, simple and convenient, are greatly shortened the down tube time, complete a underground and bury Pipe was not over one hour.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For Yuan, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (7)

1. a well casing, it is characterised in that: include water level monitoring pipe and ferrule, the lower loop week band of described water level monitoring pipe Have permeable hole, described ferrule to be made up of iron plate with holes and iron pipe, described iron pipe be enclosed within described water level monitoring pipe and with It is affixed, and described iron plate is affixed with described iron pipe, and the external diameter of described iron plate is more than the external diameter of described iron pipe, the internal diameter of described iron plate Less than the internal diameter of water level monitoring pipe, the lower loop week of described iron plate is provided with crushing shell, the tip shaped of described crushing shell.
Well casing the most according to claim 1, it is characterised in that: described water level monitoring pipe is tubing or permeable corrugated tube.
Well casing the most according to claim 2, it is characterised in that: described tubing is wrapped with filter course.
Well casing the most according to claim 3, it is characterised in that: described filter course is sponge and geotextiles, described sponge bag Being rolled in outside described water level monitoring pipe, described geotextiles is wrapped in outside described sponge.
Well casing the most according to claim 2, it is characterised in that: the surface of described permeable corrugated tube is by permeable non-woven fabrics structure Become.
6. one kind is used for burying the method for well casing described in claim 1 to 5 any one underground, it is characterised in that:
Its embedment underground comprises the following steps:
Step one, first traditional quartering hammer is improved, have an annular chuck in the drill steel end of quartering hammer, drill steel Middle part has an exhalant canal from top to down, then an intake tunnel is opened in the end of drill steel, and spray is installed in the bottom of intake tunnel Head, intake tunnel top connects a high-pressure water pipe, and high-pressure water pipe connects high-pressure pump;
Step 2, by step one improve drill steel be inserted in described well casing, on drill steel annular chuck be pressed on well casing On iron plate, starting quartering hammer, quartering hammer drives drill steel to shake downwards iron plate, and the crushing shell of iron plate bottom crushes ground;
Step 3, startup high-pressure pump, the water under high pressure that high-pressure pump pump produces enters into shower nozzle from intake tunnel, and shower nozzle sprays earthward Penetrating water under high pressure, broken up by soil, along with well casing moves down, the mud that water under high pressure produces is discharged to well from exhalant canal automatically.
Method for burying well casing underground the most according to claim 6, it is characterised in that: in step 2, also include utilizing The vibration of quartering hammer first passes through drill steel and is broken by soil layer harder for ground, utilizes the step of drill steel penetrated surface.
CN201610751152.4A 2016-08-28 2016-08-28 The method of well casing and its embedded well casing Active CN106284388B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610751152.4A CN106284388B (en) 2016-08-28 2016-08-28 The method of well casing and its embedded well casing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610751152.4A CN106284388B (en) 2016-08-28 2016-08-28 The method of well casing and its embedded well casing

Publications (2)

Publication Number Publication Date
CN106284388A true CN106284388A (en) 2017-01-04
CN106284388B CN106284388B (en) 2019-04-05

Family

ID=57677565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610751152.4A Active CN106284388B (en) 2016-08-28 2016-08-28 The method of well casing and its embedded well casing

Country Status (1)

Country Link
CN (1) CN106284388B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206481A (en) * 2019-04-24 2019-09-06 武汉一冶建筑安装工程有限责任公司 Dewatering well constructing device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002012637A1 (en) * 2000-08-02 2002-02-14 Nishimatsu Construction Co., Ltd. Underground water pumping device
CN100999900A (en) * 2006-01-09 2007-07-18 立基工程有限公司 Bottom impacting type steel pipe concrete pole and construction method thereof
CN103061667A (en) * 2012-03-08 2013-04-24 杨晓胤 Water hammer type well drill
CN203498848U (en) * 2013-09-03 2014-03-26 中铁建设集团有限公司 Light-weight well point downcast pipe hole forming device
CN105386480A (en) * 2015-12-11 2016-03-09 神翼航空器科技(天津)有限公司 Pore-forming device for breaking hammer type cast-in-place pile
CN105649096A (en) * 2015-12-29 2016-06-08 上海广联环境岩土工程股份有限公司 Standby and observation well for foundation pit dewatering
CN205329702U (en) * 2016-01-08 2016-06-22 孔祥瑞 Building engineering foundation ditch precipitation is with from towards formula step -down well
CN206173985U (en) * 2016-08-28 2017-05-17 神翼航空器科技(天津)有限公司 Well casing

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002012637A1 (en) * 2000-08-02 2002-02-14 Nishimatsu Construction Co., Ltd. Underground water pumping device
CN100999900A (en) * 2006-01-09 2007-07-18 立基工程有限公司 Bottom impacting type steel pipe concrete pole and construction method thereof
CN103061667A (en) * 2012-03-08 2013-04-24 杨晓胤 Water hammer type well drill
CN203498848U (en) * 2013-09-03 2014-03-26 中铁建设集团有限公司 Light-weight well point downcast pipe hole forming device
CN105386480A (en) * 2015-12-11 2016-03-09 神翼航空器科技(天津)有限公司 Pore-forming device for breaking hammer type cast-in-place pile
CN105649096A (en) * 2015-12-29 2016-06-08 上海广联环境岩土工程股份有限公司 Standby and observation well for foundation pit dewatering
CN205329702U (en) * 2016-01-08 2016-06-22 孔祥瑞 Building engineering foundation ditch precipitation is with from towards formula step -down well
CN206173985U (en) * 2016-08-28 2017-05-17 神翼航空器科技(天津)有限公司 Well casing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110206481A (en) * 2019-04-24 2019-09-06 武汉一冶建筑安装工程有限责任公司 Dewatering well constructing device

Also Published As

Publication number Publication date
CN106284388B (en) 2019-04-05

Similar Documents

Publication Publication Date Title
CN102926770B (en) Underground draining and grouting process in thin bedrock and thick loose sand layer rich water areas
CN108149699A (en) The dewatering well device and its construction method of a kind of recoverable quick well formation
CN106192981B (en) A kind of Dewatering dynamic compaction integrated device and its application method
WO2017198109A1 (en) Pitshaft coal uncovering method for coal mines whose coal seam lies in main aquifer
CN110939137A (en) Vibration drainage anchor rod supporting structure for sand soil layer and construction method thereof
CN1963044A (en) Construction method for withdrawal of waste pile
CN109577380B (en) Construction method for basement bottom plate water seepage under karst landform condition
CN206173985U (en) Well casing
CN104975611B (en) The heavy of the well-points dewatering pipe of liquid soil layer sets device and heavy equipment, method
CN106284388A (en) Well casing and the method burying well casing underground thereof
CN205502044U (en) Be applied to precipitation structure in grittiness water -bearing stratum under building
CN110130377A (en) Combined shaft and application are shared for the double plate water isolation types of foundation pit drainage-decompression inward turning
CN106436727A (en) Extreme geological tunnel portal construction method
CN110206481A (en) Dewatering well constructing device
CN205713982U (en) A kind of pile foundation construction drilling equipment being applicable to karst area
CN202787289U (en) Shut-in dewatering device for tube well
CN110318661A (en) Dewatering well construction method
CN206246133U (en) A kind of anti-rock burst support system in tunnel and tunnel structure
CN212104106U (en) A vibration drainage stock supporting construction for sand type soil layer
CN204326061U (en) A kind of pile tube be drawn out easily
JP2001226977A (en) Drainage amount increasing method for drainage boring
CN206015695U (en) Buried pipe
CN106759411A (en) Dry construction well point pipe's dmbeding method and special well point tube assembly
CN209261488U (en) A kind of anchor cable multistage subsection is discontinuous with pipe structure
CN106245661B (en) The method of buried pipe and its embedded buried pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220315

Address after: 300000 6-902, No.60, 1st Street, Binhai New Area Development Zone, Tianjin

Patentee after: TIANJIN JIANYAN ROCK AND SOIL ENGINEERING Co.,Ltd.

Address before: 300000 Tianjin Jinnan District Jinnan Economic Development Zone (West District) Hongkong block 3, block B 206-4.

Patentee before: TIANJIN DIVINE WING AIRCRAFT TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right