CN106274556A - A kind of contact net bar changes shifting method - Google Patents

A kind of contact net bar changes shifting method Download PDF

Info

Publication number
CN106274556A
CN106274556A CN201610644902.8A CN201610644902A CN106274556A CN 106274556 A CN106274556 A CN 106274556A CN 201610644902 A CN201610644902 A CN 201610644902A CN 106274556 A CN106274556 A CN 106274556A
Authority
CN
China
Prior art keywords
contact net
bar
frame bridge
net bar
soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610644902.8A
Other languages
Chinese (zh)
Other versions
CN106274556B (en
Inventor
于奇建
陈巳龙
刘伟
李少鹏
黄亚洲
李强
梁波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Original Assignee
China Railway Sixth Group Co Ltd
Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Sixth Group Co Ltd, Tianjin Railway Construction Co Ltd of China Railway Sixth Group Co Ltd filed Critical China Railway Sixth Group Co Ltd
Priority to CN201610644902.8A priority Critical patent/CN106274556B/en
Publication of CN106274556A publication Critical patent/CN106274556A/en
Application granted granted Critical
Publication of CN106274556B publication Critical patent/CN106274556B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60MPOWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
    • B60M1/00Power supply lines for contact with collector on vehicle
    • B60M1/12Trolley lines; Accessories therefor
    • B60M1/28Manufacturing or repairing trolley lines
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2284Means for adjusting the orientation of the post or pole

Abstract

A kind of contact net bar changes shifting method, before it includes jacked frame bridge, by soft for the steel truss corner implanting Guan Liang across contact net bar bottom;The two piece steel truss corresponding in rail track both sides are soft connects a bracing wire across contact net masthead portion temporarily;The contact net high-voltage line that will be located on frame bridge moves in bracing wire, removes;4) recover the operation of rail track, carry out Framed underpass bridge by tradition jacking method;Soft for steel truss come of age from fender pile across contact net bar is removed beam and be hoisted on frame bridge, and its lower end is fitted together with anchor support base set;Finally soft across the upper end of contact net bar installation support bar at steel truss, and contact net high-voltage line is arranged on the first-class step of support bar.Effect of the present invention: good stability;Easy construction, it is possible to reduce and change the triviality of transposing net-fault bar, danger.Cost can be reduced by the impact of railway normal operation is minimized.Solve frame bridge large span cannot the problem of railroad crossing, advanced technology.

Description

A kind of contact net bar changes shifting method
Technical field
The invention belongs to railway bridges and culverts technical field of construction, particularly relate to a kind of undercrossing tunnel Framed underpass bridge region Contact net bar changes shifting method.
Background technology
Along with the development of urban construction, the situation of town road railroad crossing is on the increase, and planning width is continuous Strengthen.The mode currently mainly using undercrossing tunnel genuine carrys out railroad crossing, and undercrossing tunnel is genuine mainly by frame bridge be positioned at The composition of leading the way of frame bridge front and back end, wherein frame bridge many employings jacking method is arranged on below railway.Fig. 1 is a kind of existing skill The electric railway planar structure schematic diagram of art.Fig. 2 is the electric railway transverse sectional view of prior art.Such as Fig. 1, figure Shown in 2, the both sides bit interval of rail track 1 arranges multiple contact net bar 2, and support bar 3 is installed in the upper end of contact net bar 2, connects Net-fault high-voltage line 4 is arranged on support bar 3, for powering for electric train.According to the rules, what electric railway was used connects Critical distance between net-fault bar 2 is 65m, but when frame bridge span is located exactly at the frame treating jacking more than 60m or contact net bar 2 Time above bridge formation, in order to ensure railway normal operation, then need the contact net bar 2 that some is existing changes shifting or reinforces guarantor Protect.The most the most frequently used shifting way that changes has two kinds, and a kind of method is that the contact net bar 2 of xoncrete structure is changed pan position temporarily, After Framed underpass bridge has been constructed, steelframe bar is installed the most in situ;Another kind of method is to be tied by concrete when construction The contact net bar 2 of structure is replaced by steelframe bar, and makes it be integrally forming with railway reinforced system, after jacking construction completes, then Original position installs steelframe bar.The shortcoming of former construction method is cumbersome, first needs former contact net bar 2 is changed pan position, so After recover again, operating expenses is higher.The shortcoming of latter construction method is to be affected relatively greatly by Framed underpass bridge, in case of roadbed caves in Or " bundle head " or " new line " phenomenon occurs in frame bridge, then contact net bar changes greatly, and therefore danger is the biggest.
Summary of the invention
In order to solve the problems referred to above, it is an object of the invention to provide a kind of contact net bar and change shifting method.
In order to achieve the above object, the contact net bar that the present invention provides changes the following step that shifting method includes carrying out in order Rapid:
1), before jacked frame bridge, the railway bed of both sides, place to be placed, frame bridge front and back end is respectively provided with one group of L Shape armored concrete fender pile and be positioned at the armored concrete Guan Liang at this group fender pile top and protect as railway bed, is being arranged Fender pile is come of age during beam, at the pre-buried many screw rods in the hat back portion being positioned at corner and the bolt of certain side, and by steel truss Frame is soft to be connected with above-mentioned pre embedded bolt and bolt across the lower end of contact net bar, thus by soft for steel truss across contact net bar with Fender pile beam of coming of age is linked to be an entirety, to increase stability;
2) suspending the operation of rail track, the two piece steel truss corresponding in rail track both sides are soft across contact net masthead Portion connects a bracing wire temporarily;
3) will be located in the contact net high-voltage line above frame bridge to be placed to move to, in above-mentioned bracing wire, then utilize lifting track Contact net bar at this is removed and is transported by car;
4) recover the operation of rail track, and carry out the jacking of frame bridge by tradition jacking method;
5) after Framed underpass bridge completes, the operation of rail track is again paused for, then at the former contact net in frame bridge top Bar arranges place's perforating anchor support basis so that it is form an entirety with frame bridge, then by soft for above-mentioned steel truss across connecing Net-fault bar is come of age from fender pile and is removed beam, utilizes lifting railcar to be hoisted on frame bridge afterwards, and by its lower end with above-mentioned Anchor support base set is fitted together;
6) finally at the soft support bar of installing across the upper end of contact net bar of steel truss, and contact net high-voltage line is arranged on On strut, recover the operation of rail track, thus complete whole contact net bar and change shifting work progress.
Pre-buried 8 bolts in described hat back portion and nut, and be uniformly arranged.
The contact net bar that the present invention provides changes shifting method and has the advantages that
1, selecting existing fender pile beam of coming of age as the soft basis across contact net bar of steel truss, rigidity is preferable, forever faces In conjunction with, therefore good stability.
2, easy construction, it is possible to reduce and change the triviality of transposing net-fault bar, danger.
3, in Framed underpass bridge work progress, contact net remains able to properly functioning, therefore, it is possible to will be normal to railway The impact of operation is minimized, and reduces cost.
4, solve frame bridge large span cannot the problem of railroad crossing, advanced technology, therefore there is promotional value.
Accompanying drawing explanation
Fig. 1 is the electric railway planar structure schematic diagram of a kind of prior art.
Fig. 2 is the electric railway transverse sectional view of prior art.
The contact net bar that Fig. 3 provides for using the present invention changes Framed underpass bridge front job site plane during shifting method Figure.
The contact net bar that Fig. 4 provides for using the present invention changes Framed underpass bridge front job site transverse cutting during shifting method Face schematic diagram.
Fig. 5 is that the contact net bar using the present invention to provide changes during shifting method job site plane after Framed underpass bridge Figure.
Fig. 6 is that the contact net bar using the present invention to provide changes during shifting method job site transverse cutting after Framed underpass bridge Face schematic diagram.
Detailed description of the invention
The contact net bar provided the present invention with specific embodiment below in conjunction with the accompanying drawings changes shifting method and is described in detail.With The parts that prior art is identical use identical drawing reference numeral.
As shown in Fig. 3 Fig. 6, the contact net bar that the present invention provides changes the following step that shifting method includes carrying out in order:
1), before jacked frame bridge 5, the railway bed of both sides, place to be placed, frame bridge 5 front and back end is respectively provided with one group L-shaped armored concrete fender pile 6 and be positioned at this group fender pile 6 top armored concrete hat beam 7 as railway bed protect, Fender pile 6 is set and comes of age during beam 7, at the pre-buried many screw rods in hat beam 7 top being positioned at corner and the bolt of certain side, and It is connected soft for steel truss with above-mentioned pre embedded bolt and bolt across the lower end of contact net bar 8, thus by soft for steel truss across connecing Net-fault bar 8 and fender pile 6 beam 7 of coming of age is linked to be an entirety, to increase stability;
2) suspending the operation of rail track 1, the two piece steel truss corresponding in rail track 1 both sides are soft across contact net bar 8 tops connect a bracing wire 9 temporarily;
3) will be located in the contact net high-voltage line 4 above frame bridge 5 to be placed to move to, in above-mentioned bracing wire 9, then utilize lifting Contact net bar 2 at this is removed and is transported by railcar;
4) recover the operation of rail track 1, and carry out the jacking of frame bridge 5 by tradition jacking method;
5) after frame bridge 5 jacking completes, the operation of rail track 1 is again paused for, then in the former contact in frame bridge 5 top Net bar 2 arranges place's perforating anchor support basis so that it is form an entirety with frame bridge 5, then by soft for above-mentioned steel truss horizontal stroke Bridging net-fault bar 8 is come of age from fender pile 6 and is removed beam 7, utilizes lifting railcar to be hoisted on frame bridge 5 afterwards, and by under it End is fitted together with above-mentioned anchor support base set;
6) finally soft across the upper end of contact net bar 8 installation support bar 3 at steel truss, and contact net high-voltage line 4 is arranged On support bar 3, recover the operation of rail track 1, thus complete whole contact net bar and change shifting work progress.
Pre-buried 8 screw rods in described hat beam 7 top and bolt, and be uniformly arranged.

Claims (2)

1. a contact net bar changes shifting method, it is characterised in that: described contact net bar changes what shifting method included carrying out in order The following step:
1), before jacked frame bridge (5), the railway bed of both sides, place to be placed, frame bridge (5) front and back end is respectively provided with one group L-shaped armored concrete fender pile (6) and be positioned at the armored concrete Guan Liang (7) at this group fender pile (6) top as railway bed Protection, comes of age during beam (7), at pre-buried many of Guan Liang (7) top being positioned at corner of certain side arranging fender pile (6) Screw rod and bolt, and soft for the steel truss lower end across contact net bar (8) is connected with above-mentioned pre-embedded bolt and nut, thus will Steel truss is soft is linked to be an entirety, to increase stability across contact net bar (8) and fender pile (6) beam (7) of coming of age;
2) suspending the operation of rail track (1), the two piece steel truss corresponding in rail track (1) both sides are soft across contact net bar (8) top connects a bracing wire (9) temporarily;
3) the contact net high-voltage line (4) that will be located in frame bridge to be placed (5) top moves to, in above-mentioned bracing wire (9), then utilize Contact net bar (2) at this is removed and is transported by weight railcar;
4) recover the operation of rail track (1), and carry out the jacking of frame bridge (5) by tradition jacking method;
5) after frame bridge (5) jacking completes, again pause for the operation of rail track (1), then connect frame bridge (5) top is former Net-fault bar (2) arranges place's perforating anchor support basis so that it is form an entirety with frame bridge (5), then by above-mentioned steel truss Frame soft coming of age from fender pile (6) across contact net bar (8) is removed beam (7), utilizes lifting railcar to be hoisted to frame bridge afterwards (5) on, and its lower end is fitted together with above-mentioned anchor support base set;
6) finally soft across the upper end of contact net bar (8) installation support bar (3) at steel truss, and contact net high-voltage line (4) is set Put on support bar (3), recover the operation of rail track (1), thus complete whole contact net bar and change shifting work progress.
Contact net bar the most according to claim 1 changes shifting method, it is characterised in that: pre-buried 8 of described Guan Liang (7) top Bolt and nut, and be uniformly arranged.
CN201610644902.8A 2016-08-05 2016-08-05 A kind of contact net bar changes shifting method Active CN106274556B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610644902.8A CN106274556B (en) 2016-08-05 2016-08-05 A kind of contact net bar changes shifting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610644902.8A CN106274556B (en) 2016-08-05 2016-08-05 A kind of contact net bar changes shifting method

Publications (2)

Publication Number Publication Date
CN106274556A true CN106274556A (en) 2017-01-04
CN106274556B CN106274556B (en) 2018-07-20

Family

ID=57667215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610644902.8A Active CN106274556B (en) 2016-08-05 2016-08-05 A kind of contact net bar changes shifting method

Country Status (1)

Country Link
CN (1) CN106274556B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558375A (en) * 2017-09-12 2018-01-09 中铁六局集团有限公司 The construction method that contact net bar is torn down and reconstructed during a kind of Framed underpass bridge

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831873A (en) * 2010-05-25 2010-09-15 北京城建设计研究总院有限责任公司 Temporary bridge covered excavation method for constructing box culvert below traffic ground line of operating track
CN202247688U (en) * 2011-09-23 2012-05-30 中铁十一局集团有限公司 Aerodynamic force prevention protecting shed frame for overpassing of high-speed railways
CN102979041A (en) * 2012-12-26 2013-03-20 中铁七局集团郑州工程有限公司 Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN103362073A (en) * 2013-08-08 2013-10-23 中铁六局集团天津铁路建设有限公司 Method for pushing frame bridge
JP5405337B2 (en) * 2010-02-01 2014-02-05 株式会社フジタ Construction method of railway RC ramen structure viaduct
CN103643640A (en) * 2013-12-19 2014-03-19 中铁六局集团天津铁路建设有限公司 Jacking-first and line-reinforcement-second jacking construction method for frame bridge
CN203855866U (en) * 2014-06-03 2014-10-01 中铁二十局集团第四工程有限公司 Large-span frame bridge overhead roof with beams convenient to construct
CN105464008A (en) * 2016-01-12 2016-04-06 中铁第五勘察设计院集团有限公司 Large longitudinal beam system line reinforcement construction device and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5405337B2 (en) * 2010-02-01 2014-02-05 株式会社フジタ Construction method of railway RC ramen structure viaduct
CN101831873A (en) * 2010-05-25 2010-09-15 北京城建设计研究总院有限责任公司 Temporary bridge covered excavation method for constructing box culvert below traffic ground line of operating track
CN202247688U (en) * 2011-09-23 2012-05-30 中铁十一局集团有限公司 Aerodynamic force prevention protecting shed frame for overpassing of high-speed railways
CN102979041A (en) * 2012-12-26 2013-03-20 中铁七局集团郑州工程有限公司 Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN103362073A (en) * 2013-08-08 2013-10-23 中铁六局集团天津铁路建设有限公司 Method for pushing frame bridge
CN103643640A (en) * 2013-12-19 2014-03-19 中铁六局集团天津铁路建设有限公司 Jacking-first and line-reinforcement-second jacking construction method for frame bridge
CN203855866U (en) * 2014-06-03 2014-10-01 中铁二十局集团第四工程有限公司 Large-span frame bridge overhead roof with beams convenient to construct
CN105464008A (en) * 2016-01-12 2016-04-06 中铁第五勘察设计院集团有限公司 Large longitudinal beam system line reinforcement construction device and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558375A (en) * 2017-09-12 2018-01-09 中铁六局集团有限公司 The construction method that contact net bar is torn down and reconstructed during a kind of Framed underpass bridge

Also Published As

Publication number Publication date
CN106274556B (en) 2018-07-20

Similar Documents

Publication Publication Date Title
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN103362073B (en) A kind of Framed underpass bridge method
CN103938534B (en) Elevated rail hands over the integrated bridge structure in station and its application process
CN102758387B (en) Reinforcing construction method for H-shaped steel line
CN106192620B (en) A kind of railway ballastless track supporting layer and substructure change method
CN204940141U (en) The reinforcement system of existing line in Framed underpass bridge process
CN106049209A (en) Temporary steel rail supporting device for disassembling and replacing railway ballastless track supporting layers
KR101269868B1 (en) A method for bridge improving
CN105908629A (en) Descending movable framework for highway box girder at highway and railway combined construction section and application method of descending movable framework
CN107740352A (en) The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road
CN106274556A (en) A kind of contact net bar changes shifting method
CN205242238U (en) Be applied to self anchored suspension bridge's main girder structure
CN103882802A (en) Cross-railway road bridge protection structure
CN204174481U (en) Soft clay area modern tram abutment rebound structure
CN106192761A (en) A kind of method disassembling mobile formwork in bridge tunnel narrow short transition time section
CN105236265B (en) Reinforcing method and reinforcing structure for rail of portal crane
CN108385454A (en) A kind of railway plate-type ballastless track working drawing review operational method
CN107245960A (en) A kind of segmented construction system updated for urban viaduct and method
CN205188823U (en) Construction of light rail prestressing force bent cap and end -blocking work platform
CN107604823B (en) It is a kind of to cross the construction method for shipping beam by railway
CN202688805U (en) Framed bent unit with supporting stud outside template
CN102444293A (en) Cutting and slipping method for extension of existing large-span truss structure
CN203878479U (en) Bridge erection machine traversing support
CN203295955U (en) Composite bridge for railway
CN208280731U (en) Physical isolation apparatus between a kind of Business Line construction line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant