CN106245833A - Concrete heat-insulating curtain wall lamination transition construction method - Google Patents

Concrete heat-insulating curtain wall lamination transition construction method Download PDF

Info

Publication number
CN106245833A
CN106245833A CN201610708882.6A CN201610708882A CN106245833A CN 106245833 A CN106245833 A CN 106245833A CN 201610708882 A CN201610708882 A CN 201610708882A CN 106245833 A CN106245833 A CN 106245833A
Authority
CN
China
Prior art keywords
curtain wall
concrete
cast
concrete heat
rearmounted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610708882.6A
Other languages
Chinese (zh)
Other versions
CN106245833B (en
Inventor
胡保刚
职晓云
耿丽
吕高乐
张存钦
马寅栋
吕如春
邱峙
苑毓坤
付红安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No1 Building Engineering Co Of Henan Province
Henan Huayi Green Building Materials Co Ltd
Original Assignee
No1 Building Engineering Co Of Henan Province
Henan Huayi Green Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No1 Building Engineering Co Of Henan Province, Henan Huayi Green Building Materials Co Ltd filed Critical No1 Building Engineering Co Of Henan Province
Priority to CN201610708882.6A priority Critical patent/CN106245833B/en
Publication of CN106245833A publication Critical patent/CN106245833A/en
Application granted granted Critical
Publication of CN106245833B publication Critical patent/CN106245833B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls

Abstract

The invention belongs to building field.A kind of concrete heat-insulating curtain wall lamination transition construction method, including cast-in-place concrete heat-preservation curtain wall construction technique and rearmounted concrete heat-insulating curtain wall construction technique;First it fix the warming plate of cast-in-place concrete heat-preservation curtain wall, and install agent structure mould, with rearmounted concrete heat-insulating curtain wall interface at cast-in-place concrete panel position load EPS sheet so that at the cast-in-place concrete panel at EPS sheet position wouldn't casting concrete, formed overlapping breach;Fill after wall poured, the warming plate of rearmounted concrete heat-insulating curtain wall and the warming plate of cast-in-place concrete curtain wall are made that gingival cyst of mucous gland in the newborn stubble is staggered connects stubble;The warming plate of rearmounted concrete heat-insulating curtain wall is hung reinforced mesh, the warming plate of rearmounted concrete heat-insulating curtain wall smears concrete.Construction crack at interface is dispersed in the one fixed width of interface intersection by the present invention, so that interface seam width is reduced in allowed band, it is ensured that the durability of concrete heat-insulating curtain wall.

Description

Concrete heat-insulating curtain wall lamination transition construction method
Technical field
The invention belongs to building field, be specifically related to a kind of concrete heat-insulating curtain wall lamination transition construction method.
Background technology
Concrete heat-insulating curtain wall is formed by concrete topping and heat preservation plate material, is not undertaken agent structure load and effect External wall external thermal insulation structure, it includes cast-in-place concrete heat-preservation curtain wall and rearmounted concrete heat-insulating curtain wall.Cast-in-place concrete Insulation curtain wall refers to that the concrete heat-insulating curtain wall with agent structure synchronous construction, rearmounted concrete heat-insulating curtain wall refer in body junction The concrete heat-insulating curtain wall that structure or building enclosure wall construction are constructed after completing again.As it is shown in figure 1, at the exterior wall of a building building On face, agent structure concrete uses cast-in-place concrete heat-preservation curtain wall, fill and use rearmounted concrete heat-insulating curtain wall, just on wall It is bound on the concrete heat-insulating curtain wall of twice construction, leave a construction joint.This construction joint can affect attractive in appearance, it is also possible to Cause percolating water, and then destroy concrete heat-insulating curtain wall.
Summary of the invention
It is an object of the invention to the problem and shortage for above-mentioned existence, it is provided that a kind of arrangement and method for construction is good, it is possible to effectively subtract The impact of few construction joint, improves the lamination transition construction method of the durability of concrete heat-insulating curtain wall.
For reaching above-mentioned purpose, adopted the technical scheme that:
A kind of concrete heat-insulating curtain wall lamination transition construction method, including cast-in-place concrete heat-preservation curtain wall construction technique and rearmounted mixed Solidifying soil insulation curtain wall construction technology;Described cast-in-place concrete heat-preservation curtain wall construction technique is: installs mould in agent structure and enters During row pouring construction, synchronize to carry out the construction of cast-in-place concrete heat-preservation curtain wall, first fix cast-in-place concrete heat-preservation curtain wall Warming plate, and install agent structure mould, with rearmounted concrete heat-insulating curtain wall interface at cast-in-place concrete panel part Position load EPS sheet so that at the cast-in-place concrete panel at EPS sheet position wouldn't casting concrete, formed overlapping breach.
Described rearmounted concrete heat-insulating curtain wall construction technique is: after agent structure concrete construction completes, builds by laying bricks or stones and fills out Fill wall, fill and be formed with construction joint, first by the warming plate of rearmounted concrete heat-insulating curtain wall between wall and agent structure concrete Make with the warming plate of cast-in-place concrete curtain wall that gingival cyst of mucous gland in the newborn stubble is staggered connects stubble, and the warming plate of rearmounted concrete heat-insulating curtain wall presses through and executes Work seam 50mm ~ 150mm, it is achieved to agent structure concrete and the covering of the junction construction joint filling walling;Secondly, rear Putting extension reinforced mesh on the warming plate of concrete heat-insulating curtain wall, reinforced mesh presses through construction joint 100mm ~ 300mm;Finally, rear Put and smear concrete on the warming plate of concrete heat-insulating curtain wall, form the rearmounted concrete slab of rearmounted concrete heat-insulating curtain wall, Complete the second time of agent structure concrete and the junction construction joint filling walling is covered.
During cast-in-place concrete heat-preservation curtain wall construction, the agent structure concrete corresponding with overlapping breach is embedded with Connector, the reinforced mesh that the warming plate of rearmounted concrete heat-insulating curtain wall hangs is connected with connector.
Use technique scheme, acquired provide the benefit that:
The whole construction process of the present invention uses twice construction, for the covering of construction joint and to existing in twice work progress The linking of pouring concrete insulation curtain wall and rearmounted concrete heat-insulating curtain wall is all optimized innovative design so that the construction of the two Can complement each other, and then the construction joint at interface is dispersed in the one fixed width of interface intersection, so that interface seam Width is reduced in allowed band, it is ensured that the durability of concrete heat-insulating curtain wall.
The present invention follows to disperse construction joint, ensure that the service life of concrete heat-insulating curtain wall is as mesh in work progress , the connection between each Rotating fields of Optimizing construction technique, reasonable disposition construction concrete heat-insulating curtain wall simultaneously, it is achieved structure one Body.
Accompanying drawing explanation
Fig. 1 is the connected structure signal of cast-in-place concrete heat-preservation curtain wall of the prior art and rearmounted concrete heat-insulating curtain wall Figure.
Fig. 2 is cast-in-place concrete heat-preservation curtain wall and the connected structure schematic diagram of rearmounted concrete heat-insulating curtain wall of the present invention.
Fig. 3 is cast-in-place concrete heat-preservation curtain wall mould constructing structure schematic diagram.
Fig. 4 is the structural representation of cast-in-place concrete heat-preservation curtain wall.
Fig. 5 be in Fig. 4 A to the attachment structure schematic diagram of warming plate.
Sequence number in figure: 1 be agent structure concrete, 2 be fill walling, 3 be the insulation of cast-in-place concrete heat-preservation curtain wall Plate, 4 for cast-in-place concrete panel, 5 be rearmounted concrete slab, 6 for construction joint, 7 for connector, 8 for overlapping breach, 9 be EPS Plate, 10 be the warming plate of rearmounted concrete heat-insulating curtain wall, 11 be reinforced mesh, 12 for agent structure mould.
Detailed description of the invention
Below in conjunction with accompanying drawing, the detailed description of the invention of the present invention is elaborated.
See Fig. 2-Fig. 5, one concrete heat-insulating curtain wall lamination transition construction method of the present invention, protect including cast-in-place concrete Temperature curtain wall construction technique and rearmounted concrete heat-insulating curtain wall construction technique;Described cast-in-place concrete heat-preservation curtain wall construction technique For: install during mould carries out pouring construction in agent structure, synchronize to carry out the construction of cast-in-place concrete heat-preservation curtain wall, first The warming plate of fixing cast-in-place concrete heat-preservation curtain wall, and install agent structure mould 12, handing over rearmounted concrete heat-insulating curtain wall Cast-in-place concrete panel 4 position of interface loads EPS sheet 9 so that wouldn't water at the cast-in-place concrete panel at EPS sheet 9 position Build concrete, form overlapping breach 8.
Described rearmounted concrete heat-insulating curtain wall construction technique is: after agent structure concrete 1 has been constructed, builds by laying bricks or stones and fills out Fill wall, fill and be formed with construction joint 6, first by rearmounted concrete heat-insulating curtain wall between walling 2 and agent structure concrete 1 Warming plate 10 and the warming plate 3 of cast-in-place concrete curtain wall make that gingival cyst of mucous gland in the newborn stubble is staggered meets stubble, and the guarantor of rearmounted concrete heat-insulating curtain wall Temperature plate 10 presses through construction joint 50mm ~ 150mm, it is achieved to agent structure concrete 1 and the junction construction joint 6 of filling walling 2 Covering;Secondly, hanging reinforced mesh 11 on the warming plate 10 of rearmounted concrete heat-insulating curtain wall, reinforced mesh 11 presses through construction joint 100mm ~ 300mm, and make in the reinforced mesh in cast-in-place concrete heat-preservation curtain wall panel and rearmounted concrete heat-insulating curtain wall Reinforced mesh overlap joint about the 200mm of state;Finally, the warming plate 10 of rearmounted concrete heat-insulating curtain wall smears concrete, shape Become the rearmounted concrete slab 5 of rearmounted concrete heat-insulating curtain wall, complete agent structure concrete 1 and the friendship of filling walling 2 The second time connecing place's construction joint 6 covers.
In order to ensure cast-in-place concrete heat-preservation curtain wall and the structural stability of rearmounted concrete heat-insulating curtain wall, at cast-in-place coagulation In soil insulation curtain wall work progress, the agent structure concrete 1 corresponding with overlapping breach 8 is embedded with connector 7, by rearmounted mixed Reinforced mesh in the reinforced mesh 11 hung on the warming plate of solidifying soil insulation curtain wall and the panel of cast-in-place concrete heat-preservation curtain wall It is connected with connector 7, and handing-over width is about 200mm.
The ultimate principle of the present invention, principal character and advantages of the present invention have more than been shown and described.The technology of the industry The personnel simply present invention it should be appreciated that the present invention is not restricted to the described embodiments, described in above-described embodiment and description Principle, the present invention also has various changes and modifications without departing from the spirit and scope of the present invention, these change and Improvement both falls within the range of claimed invention.The protection domain of application claims by appending claims and Equivalent defines.

Claims (2)

1. a concrete heat-insulating curtain wall lamination transition construction method, it is characterised in that: include that cast-in-place concrete heat-preservation curtain wall is executed Work technique and rearmounted concrete heat-insulating curtain wall construction technique;
Described cast-in-place concrete heat-preservation curtain wall construction technique is: install during mould carries out pouring construction in agent structure, Synchronize to carry out the construction of cast-in-place concrete heat-preservation curtain wall, first fix the warming plate of cast-in-place concrete heat-preservation curtain wall, and install master Body structure mold, with rearmounted concrete heat-insulating curtain wall interface at cast-in-place concrete panel position load EPS sheet so that At the cast-in-place concrete panel at EPS sheet position wouldn't casting concrete, formed overlapping breach;
Described rearmounted concrete heat-insulating curtain wall construction technique is: after agent structure concrete construction completes, build filling wall by laying bricks or stones, Fill and be formed with construction joint between walling and agent structure concrete, first by the warming plate of rearmounted concrete heat-insulating curtain wall with The warming plate of cast-in-place concrete curtain wall makes that gingival cyst of mucous gland in the newborn stubble is staggered connects stubble, and the warming plate of rearmounted concrete heat-insulating curtain wall presses through construction Seam 50mm ~ 150mm, it is achieved to agent structure concrete and the covering of the junction construction joint filling walling;Secondly, rearmounted Hanging reinforced mesh on the warming plate of concrete heat-insulating curtain wall, reinforced mesh presses through construction joint 100mm ~ 300mm so that cast-in-place coagulation Reinforced mesh in soil panel connects with the reinforced mesh on rearmounted concrete heat-insulating curtain wall;Finally, protect at rearmounted concrete Smear concrete on the warming plate of temperature curtain wall, form the rearmounted concrete slab of rearmounted concrete heat-insulating curtain wall, complete main body The second time of the junction construction joint of structural concrete and filling walling covers.
Concrete heat-insulating curtain wall lamination transition construction method the most according to claim 1, it is characterised in that: at cast-in-place coagulation In soil insulation curtain wall work progress, the agent structure concrete corresponding with overlapping breach is embedded with connector, rearmounted concrete Reinforced mesh in the reinforced mesh hung on the warming plate of insulation curtain wall and cast-in-place concrete panel connects with connector.
CN201610708882.6A 2016-08-24 2016-08-24 Concrete heat-insulating curtain wall lamination transition construction method Active CN106245833B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610708882.6A CN106245833B (en) 2016-08-24 2016-08-24 Concrete heat-insulating curtain wall lamination transition construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610708882.6A CN106245833B (en) 2016-08-24 2016-08-24 Concrete heat-insulating curtain wall lamination transition construction method

Publications (2)

Publication Number Publication Date
CN106245833A true CN106245833A (en) 2016-12-21
CN106245833B CN106245833B (en) 2017-07-11

Family

ID=57595174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610708882.6A Active CN106245833B (en) 2016-08-24 2016-08-24 Concrete heat-insulating curtain wall lamination transition construction method

Country Status (1)

Country Link
CN (1) CN106245833B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060163A (en) * 2017-05-26 2017-08-18 南昌大学 A kind of integrated regenerated aggregate concrete curtain wall of heat preserving heat insulating noise insulation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201195893Y (en) * 2008-04-03 2009-02-18 上海市第七建筑有限公司 Construction joint
CN102071746A (en) * 2011-01-20 2011-05-25 上海市城市建设设计研究院 T-shaped connecting node for superposed external wall and prefabricated internal wall of shear wall structure
WO2012072671A1 (en) * 2010-11-30 2012-06-07 Maurice O'brien A composite beam flooring system
CN203174780U (en) * 2013-04-11 2013-09-04 中建城市建设发展有限公司 Concrete construction joint reserving structure
CN103541443A (en) * 2013-10-31 2014-01-29 中国建筑第八工程局有限公司 Post-cast strip structure and construction method thereof
CN204552145U (en) * 2015-01-16 2015-08-12 广东建星建筑工程有限公司 The house that wall body structure is integrated with agent structure after-pouring

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201195893Y (en) * 2008-04-03 2009-02-18 上海市第七建筑有限公司 Construction joint
WO2012072671A1 (en) * 2010-11-30 2012-06-07 Maurice O'brien A composite beam flooring system
CN102071746A (en) * 2011-01-20 2011-05-25 上海市城市建设设计研究院 T-shaped connecting node for superposed external wall and prefabricated internal wall of shear wall structure
CN203174780U (en) * 2013-04-11 2013-09-04 中建城市建设发展有限公司 Concrete construction joint reserving structure
CN103541443A (en) * 2013-10-31 2014-01-29 中国建筑第八工程局有限公司 Post-cast strip structure and construction method thereof
CN204552145U (en) * 2015-01-16 2015-08-12 广东建星建筑工程有限公司 The house that wall body structure is integrated with agent structure after-pouring

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060163A (en) * 2017-05-26 2017-08-18 南昌大学 A kind of integrated regenerated aggregate concrete curtain wall of heat preserving heat insulating noise insulation

Also Published As

Publication number Publication date
CN106245833B (en) 2017-07-11

Similar Documents

Publication Publication Date Title
CN105507462B (en) Have both the combined wall and its construction method of load-bearing and heat insulation function
CN106499046A (en) Architectural Equipment pipeline integral structure and design and construction process based on inverted ladder type slot type combined wall board
CN104652668B (en) Armored integrated wall and construction method thereof
CN104153508B (en) The constructing structure and its construction method of floor
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN206956959U (en) Light composite heat insulation outer wall plate
CN106245833A (en) Concrete heat-insulating curtain wall lamination transition construction method
CN105178503B (en) A kind of prefabricated strap-on insulation wallboard
CN206245459U (en) Architectural Equipment pipeline integral structure based on inverted ladder type slot type combined wall board
CN205502366U (en) Evaporate and press whole wallboard of aerated concrete
CN105714943B (en) Exterior-wall heat insulation reinforcement composite plate, heat-preserving wall integral structure and construction method
CN204662772U (en) A kind of concrete panel of prefabricated band door opening brace summer
CN106320568B (en) The production method of close rib composite wall board
CN106522746A (en) Sill structure and construction method
CN205677083U (en) Assembled EPS block combiner plate connecting bridge
CN205369603U (en) Steel mesh frame integration board cast in situ concrete compound incubation system
CN105484201B (en) A kind of manufacture method of concrete works swaging die skeleton
CN209854976U (en) Assembled heat preservation brickwork wall
CN208184019U (en) A kind of prefabricated reinforced concrete composite thermo-insulating wall board being connect using wedge-shaped notch with insulating layer
CN210947244U (en) Assembled building external thermal insulation wall
CN206034698U (en) Construct two component of wall body for secondary structure and wall bodies
CN214195205U (en) Laminated wall component and laminated wall comprising same
CN204437501U (en) A kind of floor node waterproof structure
CN212534571U (en) Structure integration detaching-free template
CN104018614B (en) The preparation of precast concrete assembled plate and monolithic architecture constructive method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant